Loading...
HomeMy WebLinkAboutLDS TEMPLE (OF FORT COLLINS) - FDP - FDP130029 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSCommunity Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview October 22, 2013 Jeff Olhausen Landmark Engineering Ltd. 3721 West Eisenhower Blvd Loveland, CO 80537 Comment Summary: Department: Current Planning Contact: Courtney Levingston, 970-416-2283, clevingston@fcgov.com Topic: General 09/20/2013: Please note that we will need the photometric plan, lighting cut sheets and shadow study visual submitted as part of the planning set for mylar. A digital pre-mylar check set should include these items. Comment Number: 7 Comment Originated: 09/20/2013 Topic: Landscape Plans 10/09/2013: Please update Sheet LP115 to include a call out note stating, "refer to median detail on utility sheet C 61 for curb design" Comment Number: 1 Comment Originated: 10/09/2013 Department: Engineering Development Review Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com Topic: Construction Drawings 10/09/2013: The concrete scoring pattern should be changed from 15' x 12' panel sizes to 10' x 12', as we're finding that panel sizing larger than 120 sq. ft. has been prone to cracking. A note should be added to the detail indicating that the joint pattern detail may be modified in the field in consultation with City Engineering Inspection. Will the concrete panels be dowelled into the curb and gutter section, and if so, provide spacing. 08/08/2013: A concrete joint pattern design for Timberline Road is required. Information provided should be in a manner similar to CDOT's M-412 standard. Comment Number: 36 Comment Originated: 08/08/2013 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Courtney Levingston, at 970-416-2283 or clevingston@fcgov.com. RE: Fort Collins Colorado Temple, FDP130029, Round Number 2 Page 1 of 10 10/09/2013: The private storm lines crossing Majestic Drive right-of-way need to be labeled on the construction plan set. Installation of sleeving spanning the right-of-way also needs to indicated on the plans and that encroachment permits will be required from Engineering Inspection prior to the installation Comment Number: 37 Comment Originated: 10/09/2013 10/09/2013: The transition to remove the crown along Majestic Drive is set too far back from the Timberline Road intersection, with the concern that the cross slopes are below 2% for too long of an area for drainage. Please look to carry the crown 2% to the eastern edge of the median and then transition. Comment Number: 38 Comment Originated: 10/09/2013 10/09/2013: In general, the cross sections provided in the plan set are not labelling the spot elevations correctly. The cross section should also be indicating the slopes outside of the roadway section. Comment Number: 39 Comment Originated: 10/09/2013 10/09/2013: For roadway widening in areas without curb and gutter and not a bikelane, the City requires beyond the pavement section, a 4 foot asphalt shoulder followed by a 2 foot gravel shoulder. For the Timberline Road southbound right turn lane onto Trilby Road from approximately STA 94+80 south, the additional 4 foot asphalt shoulder and 2 foot gravel shoulder is required. Ensure cross sections on Timberline reflect the additional pavement/shoulder. Comment Number: 40 Comment Originated: 10/09/2013 10/09/2013: On sheets C16 and C18, please showing street patching along Trilby Road for the two FCLWD connections. Add the following street cut note to these sheets: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. Comment Number: 41 Comment Originated: 10/09/2013 10/09/2013: The use of LCUASS detail 705a included on Sheet C.61 is needed for the underdrain information. The barrier curb and splash guard design has since been replaced by a dual curb and gutter design as part of the City's recently updated streetscape standards. Please cross out the use of the barrier curb and splash guard in the 705a detail and include the dual curb detail shown on Page 31 in the following link: http://www.fcgov.com/advanceplanning/pdf/streetscape-doc.pdf Comment Number: 42 Comment Originated: 10/09/2013 Page 2 of 10 10/09/2013: Offsite easements appear to be needed from the following property owners: 1) Lot 25 of Paragon Estates for grading and drainage easement 2) Tract F of Paragon Estates for grading (unless there's an underlying easement already in place, with this plat being in Larimer County, the City does not have a copy) 3) Lot 3 Leistikow MRD drainage easement to the City, plus a grading easement that can be dedicated to the City, but okay to be private? 4) Westchase HOA, drainage easement (unless considered resolved by City Stormwater and City Attorney's Office) 5) Susan Levine for grading and drainage 6) Potentially Chuck Burchett for grading? (right-of-way isn't clearly delineated on the plans) 7) Wayne Leistikow for grading and drainage We'll need legal descriptions for the easements for review. Because some of these easements are located in areas that are under Larimer County's jurisdiction, I've inquired with Traci at Larimer County Engineering on whether they have any interest or concerns on the easement language. I may have additional comments upon their input. Each easement dedicated to the City requires a $250 Transportation Development Review Fee as well as recording fees assess by Larimer County. Comment Number: 43 Comment Originated: 10/09/2013 10/09/2013: Please continue illustrating the left flowline/edge of pavement further south past Rock Castle Lane to illustrate the extent of new pavement and indicate the existing edge of pavement grade being tied into (since this is under Larimer County jurisdiction however, I will defer to Larimer County if they don't feel this additional information is needed). Comment Number: 44 Comment Originated: 10/09/2013 10/09/2013: Sawcut line for Majestic on the west side should be perpendicular to the lane of travel (will defer to the County however.) Comment Number: 45 Comment Originated: 10/09/2013 10/09/2013: Please label and dimension the installation of new sidewalk along the curb return along Majestic Drive at the northwest corner of Timberline Road. Comment Number: 46 Comment Originated: 10/09/2013 Topic: Easements 10/09/2013: Please remove the "Natural Habitat Buffer Zone" label on the plat. 08/07/2013: Is the Natural Habitat Buffer Zone, Drainage, Landscape, Irrigation and Access Easement needing to be dedicated to the City? I'm not sure where "Access" is needed and "Irrigation" as well? A "Natural Habitat Buffer Zone" if dedicated to the City, may need clarification language from our standard easement dedication form, explaining what this easement is. Comment Number: 34 Comment Originated: 08/07/2013 Topic: General Page 3 of 10 10/09/2013: On the construction plans, Sheet C6, please indicate the removal of existing vertical curb and replacement with driveover curb for the emergency access. Include the driveover curb detail in the details sheet. 08/07/2013: There's been further discussion and coordination with PFA on the design of emergency access off of public streets on projects as a whole. Pending verification from PFA, Engineering would prefer to see that instead of a driveway cut for the emergency access onto Trilby, that the vertical curb and gutter is replaced with driveover curb for the emergency access and the bollards are placed behind the right-of-way. We've looked to implement this design on other projects for the aesthetic value of the streetscape not having bollards and the driveway cut. In addition the bollard placement in right-of-way is of concern. Comment Number: 1 Comment Originated: 08/07/2013 Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com Topic: General 08/06/2013: The comments related to the raptor's nest are continued and will be included in the Development Agreement. 01/22/2013: The raptor nest to the west of Timberline cannot be removed until final plans have been approved and recorded. If the timing of this removal conflicts with the seasonal restrictions on nesting and rearing, then a temporary LOD will be established around the nest. 11/27/2012: As per the ECS, the recommendations found on page 7 regarding the raptor nest to the west of Timberline shall be a condition of this project's approval. In addition, the Siberian elms on site shall be surveyed prior to construction for any raptor nests. If a raptors nest is found during the pre construction surveys, then a temporary Limits of Development shall be applied in accordance with Section 3.4.1(N)(5) of the Land Use Code. Comment Number: 2 Comment Originated: 08/06/2013 10/08/2013: I have provided the draft Development Agreement language to Marc. 08/06/2013: A landscaping bond for the Natural Habitat Buffer Zones will be required at the time of C.O. for 67% of the construction value - this language will be included in the development agreement. Comment Number: 3 Comment Originated: 08/06/2013 Topic: Reports - Soils, Subdrain 10/08/2013: As indicated in my prior email, I am meeting with several City staff members to assess whether our success criteria is appropriate. We'll get back with David Johnson after this site visit (scheduled for 10/15). 08/06/2013: Thank you for the timely submittal of the mitigation and monitoring plan. I have the following comments: 1. The success criteria outlind on page 5 of the document are a good start, but we typically require 80-90% vegetation cover by the third season. Please revise or provide a justification. In the past, we've required 50% cover at the end of the first year, 75% at the end of the second year and 85-90% at the end of the third year. 2. On Section 5.2, please include that the City will be invited to attend at least one site visit per year with the consultant. 3. On Section 5.5, please include a timing for delivery of the report, e.g., on or around December 1 of each calendar year. Also include in the report any suggestions for addressing concerns/needs on the site. Comment Number: 4 Comment Originated: 08/06/2013 Page 4 of 10 Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com Topic: Landscape Plans 08/07/2013: Tree Sizes: Review the installed size of conifer trees to be sure the intent of the applicant is to provide specimen trees larger than code requirement. There is not a restriction in providing larger trees but availability and other issues should be considered. Some conifer trees are listed at 10-16 feet height. Upsizing beyond what is in the code is not a City Requirement. For mitigation trees these are the minimum size requirements. 2.5 inch ornamental 3 inch shade trees 8 foot heath conifer trees Standard minimum size requirement 2.0 inch shade tree 1.5 inch ornamental tree 6 foot heath conifer tree Spring Snow Crab, Thunderchild Crab and Chanticleer Pear are listed as 3 and 4 inch caliper in the plant list. Comment Number: 1 Comment Originated: 08/07/2013 08/07/2013: Tree Mitigation Count and sizes: Trees listed on LP605 in the list of the quantities of trees upsized for mitigation do not coincide with those on the plant list. For one example there are 25 Spring Snow Crabs 2.5 inch caliper listed on LP605 but on the plant list there 42 Spring Snow Crab listed as 3 inch. Also on the landscape sheets where it shows the symbols of actual trees to plant the caliper is placed by the mitigation trees. Cross check all three of these so that the sizes and numbers coincide. 1. List on LP605 2. Plant List 3. Direct labeling of mitigation trees on the sheets with caliper or height listed by the symbol. Larger than mitigation size can be listed at the discretion of the applicant if that is the design intent of the project but is not a code requirement. If additional upsizing is the intent of the applicant then the upsized list on LP695 could say (Installed Size or Greater). Comment Number: 2 Comment Originated: 08/07/2013 Page 5 of 10 08/07/2013: On LP605 Under Tree Preservation Guidelines /Protect Trunk and Branches change note number 9 to say in effect the following. All damage to existing trees to remain shall be reported immediately to the Architect and City Forester. Fines for damage shall range from $500 to $1,000 per incident or as assessed by a private qualified landscape appraiser. Comment Number: 3 Comment Originated: 08/07/2013 08/07/2013: Clarify the calculation for the 90.5 tree mitigation credit listed on LP605 by adding this statement. (The tree mitigation credit for transplanting trees includes a maximum of 2 or the actual mitigation value whichever is less). Please add this statement at the appropriate location on LP605. Comment Number: 4 Comment Originated: 08/07/2013 Department: Light And Power Contact: Courtney Levingston, 970-416-2283, clevingston@fcgov.com Topic: General 08/06/2013: After plans are recorded, please send the final autoCAD to Terry Cox at TCOX@fcgov.com Comment Number: 2 Comment Originated: 08/06/2013 Department: PFA Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org Topic: General 08/07/2013: KNOX BOX LOCATIONS The Knox Box detailed for install on the north gate may be omitted. Instead, due to the size and interior complexity of the temple, we are requesting a Knox Box be installed at each of the five exit doors. Comment Number: 1 Comment Originated: 08/07/2013 08/07/2013: BOLLARDS BLOCKING EAE The removable bollards detailed on the site plan at the location of the north, side emergency access drive aisle are to be omitted from the plan. A roll over curb is acceptable at this location in place of the bollards. "Fire Lane - No Parking" signage is also required at this location. Comment Number: 2 Comment Originated: 08/07/2013 Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com Topic: General 10/08/2013: Off-site drainage easements are required for the storm sewers along Timberline Rd. Comment Number: 6 Comment Originated: 10/08/2013 10/08/2013: Please label storm sewers as public or private on the plan and profiles. Comment Number: 7 Comment Originated: 10/08/2013 Page 6 of 10 10/08/2013: Please include the of-site drainage easement information form the Westchase development within the drainage report. Comment Number: 8 Comment Originated: 10/08/2013 Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Construction Drawings 10/09/2013: The index does not match the sheet numbers for the Westchase PUD reference plans. See redlines. 08/05/2013: There are problems with the sheet index on sheet C.1. See redlines. Comment Number: 4 Comment Originated: 08/05/2013 10/09/2013: Please change the legal to match what we have marked up. See redlines. 08/05/2013: The legal description on sheet C.1 should read "Lot 1, Fort Collins LDS Temple & Lot 3, Amended Plat of Leistikow M.R.D. S-21-92, situate in Section...". The metes & bounds portion of the description is not necessary. Comment Number: 5 Comment Originated: 08/05/2013 10/09/2013: There is still an issue with sheet C.2. Please correct the benchmark number. See redlines. 08/05/2013: The benchmarks on sheet C.1A should match the ones shown on sheet C.1. See redlines. Comment Number: 6 Comment Originated: 08/05/2013 10/09/2013: Sheet S1 still has some text that needs to be masked. See redlines. 08/05/2013: There is text that needs to be masked on several sheets. See redlines. Comment Number: 8 Comment Originated: 08/05/2013 10/09/2013: Please correct the spelling of "Left" on sheet C.53. See redlines. 08/06/2013: Please correct the spelling of "Left" on sheet C.52. See redlines. Comment Number: 11 Comment Originated: 08/06/2013 10/09/2013: Please change the title to "Fort Collins Colorado Temple". All other plan sets have this title on them. Comment Number: 23 Comment Originated: 10/09/2013 Topic: Lighting Plan 10/09/2013: Please mask all text on sheets E.1 & E.2. There are also line over text issues on sheet E.3. See redlines. 08/07/2013: No plans were routed to us for this review. Comment Number: 17 Comment Originated: 08/07/2013 Topic: Plat 10/09/2013: REPEAT COMMENT: Please contact John Von Nieda @ 221-6565 to discuss. 08/07/2013: The downstream owners of the irrigation easement in Easement Vacations note #2 must acknowledge the vacation, as they are the ones holding the right to the easement. Comment Number: 19 Comment Originated: 08/07/2013 Page 7 of 10 10/09/2013: REPEAT COMMENT: Please provide the reception numbers marked on sheet 2. See redlines. 08/07/2013: Please provide the reception numbers marked on sheet 2. These must be added prior to mylars. See redlines. Comment Number: 20 Comment Originated: 08/07/2013 Department: Traffic Operation Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com Topic: Construction Drawings 08/06/2013: Sht's C43/44: Please remove the Stop Bar at Timberline and Majestic. We only use them at signalized intersections that have decorative crosswalks and at mid-block x'ings of trails or sidewalks. Comment Number: 14 Comment Originated: 08/06/2013 10/21/2013: Sht C55: Please revise Item D in the S&S Legend to have the Continental crosswalk bars 12' in length. Comment Number: 18 Comment Originated: 10/21/2013 10/21/2013: Sht C55: County requested the southbound two way left turn lane (TWLTL) approaching Rock Castle be stripped as an exclusive left turn bay near Rock Castle. As such please modify the TWLTL per the sketch emailed to you the evening of 10-21. Make it 300' in total length with 200' of open "taper" and 100' of storage. I've emailed a sketch of the desired left turn. Since the County asked for this we should match the northbound left turn lane at Timberline and Majestic (sht C48). Please do the same change there with the same dimensions for the northbound approach. Comment Number: 19 Comment Originated: 10/21/2013 10/21/2013: Sht C48: Please break the Trilby roadway striping (double yellow and white striping) where Majestic intersects Trilby. Comment Number: 20 Comment Originated: 10/21/2013 10/21/2013: Sht C46: Since this is the only sheet showing east of the median on Majestic please stripe a double yellow tapering gore area on the east side of the median to guide westbound motorists around the median. Start the gore area striping a little west of the South Temple Access drive. Comment Number: 21 Comment Originated: 10/21/2013 10/21/2013: Upon reviewing the turning template provided to Marc Virata Traffic has the following input. The southbound right turn onto Trilby should be modeled from a WB50 beginning their turn from the right turn lane, swinging out into the adjacent lanes then completing their right turn. It provides a more accurate turning characteristic than a truck assumed to be fully aligned in the southbound thru lane. The pavement should be widened in the corner to provide for imperfect turning by truck drivers allowing the rear truck tires to stay on the pavement. The signal pole should be a minimum of 4 feet away from the trucks average rear turning path to provide pole, pole mounted signal head and pole foundation clearance. Comment Number: 22 Comment Originated: 10/21/2013 Department: Water Conservation Contact: Eric Olson, 970-221-6704, eolson@fcgov.com Topic: Landscape Plans Page 8 of 10 08/06/2013: Irrigation plans must be submitted at time of final plan/building permit submittal. Please see LUC 3.2.2(J)(3) for details on how to ensure you comply with the irrigation plan requirements. Comment Number: 1 Comment Originated: 08/06/2013 08/06/2013: Please make sure the following notes are included on the irrigation plans: "A master shut-off valve shall be installed downstream of the backflow device to shut off water to the system when not operating. Irrigation controllers shall be "smart" controllers, using climate-based or soil moisture-based technology, selected from the Irrigation Association's current Smart Water Application Technologies (SWAT) tested products list or other similarly tested product list. Controllers shall be installed and programmed according to manufacturer's specifications. A rain sensor shall be installed on each irrigation controller and installed according to the manufacturer's specifications." Comment Number: 2 Comment Originated: 08/06/2013 Department: Water-Wastewater Engineering Contact: Terry Farrill, , Topic: General 08/05/2013: The District requires a minimum 30 foot wide easement, on the District's standard easement form, for the sanitary sewer lines that are not located within public ROW. The sanitary sewer line is to be centered in the easement. The District requires a minimum 20 foot wide easement, on the District's standard easement form, for water facilities that are not located within public ROW. Comment Number: 4 Comment Originated: 08/05/2013 08/05/2013: The water lines crossing the storm sewer need to be shown in the profile. Comment Number: 8 Comment Originated: 08/05/2013 08/05/2013: The District does not allow trees, tree canopies or landscaping within the District's easement. Comment Number: 10 Comment Originated: 08/05/2013 10/09/2013: Please coordinate with Terry Farrill 970-226-3104 to make sure all issues are addressed. 08/05/2013: The District will require another round of formal final plan review due to the nature and number of the above comments. Please do not hesitate to contact me at 970-226-3104 ext. 104 if you require additional information or for questions. Comment Number: 13 Comment Originated: 08/05/2013 Department: Zoning Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com Topic: General 07/16/2013: The lighting plan and Visual and shadow analysis are part of the Final Plan. The applicant can submit these electronically before going to MYLAR There appears to be down directional lighting on the outside of the steeple, where these fixtures in the lighting plan? Comment Number: 2 Comment Originated: 07/16/2013 Page 9 of 10 Page 10 of 10