October 24, 2013
Bryan Mcfarland
Walton Foothills Holdings VI, LLC
5750 DTC Parkway, Suite 210
Greenwood Village, CO 80111
Comment Summary:
Department: Current Planning
Contact: Courtney Levingston, 970-416-2283, clevingston@fcgov.com
Topic: Building Elevations
10/21/2013: All sides of the Phase One (A301) should include materials and design characteristics
consistent with those on the front. The south elevation will need to include stone similar to the north,
east and west elevations and the large blank walls on the south elevation will need to be mitigated
(Section 3.5.3(E)(2)(a)(3).
Comment Number: 1 Comment Originated: 10/21/2013
10/22/2013: Could the stone base be more substantial? (Section 3.5.3(E)(6))
Comment Number: 2 Comment Originated: 10/22/2013
Topic: General
10/16/2013: Mineral Rights Notification form needs to be completed before the City can record Phase
One Final plans. This form was e-mailed to SEM architecture and Alberta on October 16th.
Comment Number: 2 Comment Originated: 10/16/2013
Topic: Landscape Plans
10/21/2013: The oaks along South College Ave are required to be spaced at 30 - 40 foot intervals.
The Phase One landscape plan (LA101) is showing 60 foot spacing.
Comment Number: 1 Comment Originated: 10/21/2013
10/21/2013: "Full tree stocking" is required in all landscape areas within 50 feet of a building,
especially in high visibility areas (such as along College Ave and the north elevation). The lanscape
plan is required to incorporate additional trees in front of the building.
Comment Number: 2 Comment Originated: 10/21/2013
Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of
the above referenced project. If you have questions about any comments, you may contact the individual
commenter or direct your questions through the Project Planner, Courtney Levingston, at 970-416-2283 or
clevingston@fcgov.com.
RE: Foothills Mall Redevelopment - Phase One, FDP130040, Round Number 1
Page 1 of 6
DRAFT
10/21/2013: Could the building be shifted two feet to the south to better accommodate three Kentucky
Coffee (or similar) trees in the parkway strip adjacent to the drive to the north?
The north elevation is highly visible and is required to be landscaped.
Comment Number: 3 Comment Originated: 10/21/2013
10/21/2013: Please add another tree 10' off the stormline in the parking lot landscape area south of the
drive.
Comment Number: 4 Comment Originated: 10/21/2013
Topic: Lighting Plan
10/15/2013: The decorative pedestrian street lighting proposed along College Avenue in front of the
Phase One building will need to be modified.
The City¿s recently adopted Midtown Plan calls for this type of lighting to follow the standard light
fixture currently used at the Harmony Road and College Avenue intersection in Fort Collins. The
Midtown Plan goes on to state that these lights will be used mid-block along College Avenue, and that
they should be evenly spaced.
This lighting can be found online at Architectural Area Lighting, http://www.aal.net/ The fixture should
be the bronze color and be the full cut-off, as shown in the photos.
It appears that the pedestrian lighting may be located in the right-of-way. We do not have a plat yet, so
we can't confirm. If the place-making decorative lighting will be located in the R.O.W, the City of Fort
Collins Engineering Department will require an encroachment permit or the lighting will need to be
relocated out of the right-of-way.
The excerpt from the Midtown Plan and photo examples were sent on October 15 to JK Design Group,
SEM Architecture and Alberta. This will need to be updated on the plans by the end of October.
Comment Number: 1 Comment Originated: 10/15/2013
Topic: Plat
10/22/2013: Phase One exhibit references the Block 16 of the larger plat (that I understand to be)
approved with Phase Two. This does not make sense. City Staff suggests a separate final plat for
Phase One to be approved the same time as the Phase One Final Plans, and then the larger plat can
be a replat of the phase one plat.
Comment Number: 1 Comment Originated: 10/22/2013
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com
Topic: General
Page 2 of 6
DRAFT
10/22/2013: Will the Larimer Canal be relocated prior to Phase One construction?
As per the submittal, the area of wetlands impacted by the relocation of the Larimer Canal No. 2 is
0.196 acres. However, as I understand it, the wetlands will not all be mitigated at the same time, e.g., a
portion will be impacted through the excavation permit and a portion will be impacted at the time of
Phase One as well as the time of the Major Amendment. Can an updated ECS be provided that
stipulates when the impacts will occur how these impacts will be mitigated for? Is there an Army Corps
of Engineers permit already, and if so, can that also be provided?
I have spoken with the Natural Areas Department and they are available to still conduct the off-site
mitigation, if that is still your request. Please let me know.
Comment Number: 1 Comment Originated: 10/22/2013
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
10/22/2013:
Provide a tree survey and mitigation plan for the project. Include a sheet showing all the existing trees
shown and numbered. This information is available on Sheet Number C405 of the Existing Tree Plan
Southwest. Include a table on that sheet listing all existing trees by number, species, size, condition
and with the mitigation number. This information is available in the Tree Survey November 2012.
Provide the required number of upsized mitigation trees on site and/or offsite. Upsized Trees should
be sized as follows:
Shade Trees 3.0 inch caliper
Ornamental Trees 2.5 inch caliper
Evergreen Trees 8 feet height
Comment Number: 1 Comment Originated: 10/22/2013
10/22/2013:
Evaluate if there are any trees that can be transplanted and provide for transplanting if reasonably
feasible.
Comment Number: 2 Comment Originated: 10/22/2013
10/22/2013:
Provide a statement explaining why existing significant trees cannot be retained or transplanted. The
statement should address the LUC requirement to retain existing trees to the extent reasonably
feasible.
“Extent reasonably feasible shall mean that, under the circumstances, reasonable efforts have been
undertaken to comply with the regulation, that the cost of compliance clearly outweigh the potential
benefits to the public or would unreasonably burden the proposed project, and reasonable steps have
been undertaken to minimize any potential harm or adverse impacts resulting from noncompliance
with the regulation”.
Comment Number: 3 Comment Originated: 10/22/2013
Page 3 of 6
DRAFT
10/22/2013:
Evaluate adding an additional street tree for the 150 foot wide frontage. Three street trees are shown.
The standard is to provide street trees at 30-40 foot spacing. LUC 3.2.1 D 2 a
Comment Number: 4 Comment Originated: 10/22/2013
10/22/2013:
Provide trees between the sidewalk and building on the College Avenue side of the project to provide
for the full tree stocking standard. LUC 3.2.1 D c
Comment Number: 5 Comment Originated: 10/22/2013
10/22/2013:
Evaluate adding two suitable trees in the two landscape areas on the southeast side of the building.
Comment Number: 6 Comment Originated: 10/22/2013
10/22/2013:
Add in the plant list by the name for Bur Oak that trees should be Bullet Gall Resistant.
Evaluate adding compact narrow shrubs in the landscape area along the north side of the building.
Comment Number: 7 Comment Originated: 10/22/2013
10/22/2013:
Under comments in the plant list use balled and burlapped or equivalent in place of container.
Comment Number: 8 Comment Originated: 10/22/2013
Department: Park Planning
Contact: Craig Foreman, 970-221-6618, cforeman@fcgov.com
Topic: General
10/14/2013: No comments
Comment Number: 1 Comment Originated: 10/14/2013
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
10/23/2013: Please provide a temporary grading and erosion control plan for the construction of the
Sears building.
Comment Number: 1 Comment Originated: 10/23/2013
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
10/21/2013: There are line over text issues on sheet A301. See redlines.
Comment Number: 1 Comment Originated: 10/21/2013
Page 4 of 6
DRAFT
Topic: Construction Drawings
10/21/2013: Are there plans for this phase?
Comment Number: 2 Comment Originated: 10/21/2013
Topic: General
10/21/2013: If the Planning Area 1 plans need to be filed before the Foothills Mall Redevelopment
Subdivision Plat is recorded, an alternative might be filing a Minor Amendment. By changing the legal
description to reflect the existing Subdivision Plats already recorded, the Planning Area 1 plans could
be filed as a Minor Amendment to the existing plans on file.
Comment Number: 3 Comment Originated: 10/21/2013
Topic: Landscape Plans
10/21/2013: No comments.
Comment Number: 4 Comment Originated: 10/21/2013
Topic: Lighting Plan
10/21/2013: There are line over text issues on sheet LD-16.1. See redlines.
Comment Number: 5 Comment Originated: 10/21/2013
10/21/2013: There are text over text issues on sheet LD-16.2. See redlines.
Comment Number: 6 Comment Originated: 10/21/2013
10/21/2013: Some of the text in the details on sheet LD-16.5 & LD16.6 is hard to read. See redlines.
Please clean these up.
Comment Number: 7 Comment Originated: 10/21/2013
Topic: Site Plan
10/21/2013: Please remove "Proposed" from the legal decription on sheet A100. *Please Note*: If
these plans are dependant on the Foothills Mall Redevelopment Subdivision Plat, they can't be filed
until the Subdivision Plat is recorded.
Comment Number: 8 Comment Originated: 10/21/2013
10/21/2013: There are line over text issues on sheet A101. See redlines.
Comment Number: 9 Comment Originated: 10/21/2013
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com
Topic: Site Plan
10/23/2013: A101: Is the new right turn lane for the existing College right-in/right-out adjacent to the site
being built with this Phase?
Comment Number: 2 Comment Originated: 10/23/2013
Topic: Traffic Impact Study
10/22/2013: The TIS requirement for this phase has been waived. Most of the improvements related to
the Mall Redevelopment are significant improvements and greater in scale than a 10K sf retail use
would drive. Existing roadway and intersection capacity exists to acceptably accommodate Phase 1 of
the Mall Redevelopment.
Comment Number: 1 Comment Originated: 10/22/2013
Department: Transportation Planning
Page 5 of 6
DRAFT
Contact: Amy Lewin, 970-416-2040, alewin@fcgov.com
Topic: General
10/23/2013: Please note that construction of the missing sidewalk on the east side of College is
required to meet pedestrian LOS conditions for Phase 1.
Comment Number: 1 Comment Originated: 10/24/2013
Department: Water-Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
Topic: General
10/22/2013: Was there a Phase 1 utility plan?
Comment Number: 1 Comment Originated: 10/22/2013
Department: Zoning
Contact: Peter Barnes, 970-416-2355, pbarnes@fcgov.com
Topic: Building Elevations
10/21/2013: Show the dimensions of the trash enclosure on the elevation sheet.
Comment Number: 6 Comment Originated: 10/21/2013
Topic: Landscape Plans
10/21/2013: Landscape note #2 indicates that maintenance of trees within the development and in
ROW is responsibility of "metro district". Please clarify who the metro district is.
Comment Number: 4 Comment Originated: 10/21/2013
10/21/2013: Indicate the percentage of interior parking lot landscaping.
Comment Number: 5 Comment Originated: 10/21/2013
Topic: Site Plan
10/21/2013: Show the length/depth of the angled parking stalls.
Comment Number: 1 Comment Originated: 10/21/2013
10/21/2013: Label the lot line(s).
Comment Number: 2 Comment Originated: 10/21/2013
10/21/2013: Show dimensions of the building and setbacks to lot lines.
Comment Number: 3 Comment Originated: 10/21/2013
Page 6 of 6
DRAFT