October 24, 2013
Bryan Mcfarland
Alberta Development Partners
5750 DTC PARKWAY, SUITE 210
Greenwood Village, CO 80111
Comment Summary:
Department: Current Planning
Contact: Courtney Levingston, 970-416-2283, clevingston@fcgov.com
Topic: General
10/22/2013: Would it be easier/beneficial to break Block 14A and Block 15 into Phase 3 and then
have the multi-family be phase 4?
Comment Number: 1 Comment Originated: 10/22/2013
10/22/2013: Should "civic/recreational" use be added to Phase 2 to account for the Foothills Activity
Center?
Comment Number: 2 Comment Originated: 10/22/2013
10/22/2013: The residential calls out 800 units on A101, should this be changed to 446 units?
Comment Number: 3 Comment Originated: 10/22/2013
Topic: Site Plan
10/16/2013: Please add a note on Sheet A100 of the ODP stating, " The purpose of the Foothills Mall
Redevelopment Overall Development Plan is to establish general planning and development control
parameters for project phasing with multiple submittals while allowing sufficient flexibility to permit
detailed planning in subsequent submittals. Approval of an Overall Development Plan does not
establish any vested right to develop property in accordance with this plan."
Comment Number: 1 Comment Originated: 10/16/2013
10/17/2013: On Sheet A100, please change the title of the box from "Current Approved Uses (PDP
Approved 5/7/13)" to simply "Land Use"
Comment Number: 2 Comment Originated: 10/17/2013
Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of
the above referenced project. If you have questions about any comments, you may contact the individual
commenter or direct your questions through the Project Planner, Courtney Levingston, at 970-416-2283 or
clevingston@fcgov.com.
RE: Foothills Mall Redevelopment Overall Development Plan, ODP130004, Round Number 1
Page 1 of 4
DRAFT
10/17/2013: On sheet A100 and A101, please make sure it is clear that this is called the Foothills Mall
Redevelopment Overall Development Plan
Comment Number: 3 Comment Originated: 10/17/2013
10/17/2013: The vicinity map road labels on sheet A100 is incorrect, Stanford Rd (not College Ave)
bounds the site to the east.
Comment Number: 4 Comment Originated: 10/17/2013
10/17/2013: On sheet A101, please call out under Overall Project Summary if the total parcel size is
gross or net. Under "land use summary" there is a collum titled "zoning". Please change "zoning" to
"use".
Comment Number: 5 Comment Originated: 10/17/2013
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com
Topic: General
10/22/2013: According to Section 2.3.2(H)(3)(5) of the Land Use Code, "the overall development plan
shall show the general location and approximate size of all natural areas, habitats and features within its
boundaries and shall indicate the applicant's proposed rough estimate of the natural area buffer zones
as required pursuant to Section 3.4.1(E)." The plans will need to include approximate buffer zones for
the Larimer Canal No. 2, which is 50'.
Comment Number: 1 Comment Originated: 10/22/2013
10/22/2013: Please include a note on the ODP that indicates something similar to the following, “This
Overall Development Plan shows the general location and approximate size of all natural areas,
habitats, and features within its boundaries and the proposed rough estimate of the natural area buffer
zone as required by Land Use Code Section 3.4.1(E). Detailed mapping of a site’s natural areas,
habitats, and features will be provided at the time of individual PDP submittals. General buffer zones
shown on this ODP may be reduced or enlarged by the decision maker during the PDP process.”
Comment Number: 2 Comment Originated: 10/22/2013
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
10/21/2013: Were the marked bearings on sheet A100, supposed to be spelled out like the rest of the
legal description? See redlines.
Comment Number: 1 Comment Originated: 10/21/2013
10/21/2013: Please mask all text on sheet A101. See redlines.
Comment Number: 2 Comment Originated: 10/21/2013
10/21/2013: Please move the East Monroe Drive label to the west as shown. East Monroe Drive ends
at the easterly right of way of J.F.K. Parkway. See redlines.
Comment Number: 3 Comment Originated: 10/21/2013
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com
Topic: Traffic Impact Study
Page 2 of 4
DRAFT
10/22/2013: The October 2013 TIS did not recognise the phases proposed in the ODP. Since a TIS
was waived for Phase 1 and the submitted revised TIS lacks any phasing discussion or timing of
improvements based upon the proposed phasing, the City has no choice than to expect all traffic
related roadway improvements to be constructed with whichever of phase 2 or 3 that begins
construction first.
Comment Number: 1 Comment Originated: 10/22/2013
10/23/2013: The Shopping Center square footage used in the October 2013 TIS trip generation table
does not match the square footage stated in the ODP application. Please revise the TIS to match.
Since both values are less than previously analyzed in earlier TIS reviews it is not expected to cause
additional traffic related improvements.
Comment Number: 2 Comment Originated: 10/23/2013
10/23/2013: In several locations in the TIS a reference is made to the College and FtHills Parkway
intersection being unsignalized (pg 15, 23), even though it is signalized. Please review and correct or
clarify.
Comment Number: 3 Comment Originated: 10/23/2013
10/23/2013: Page 26; each short term operational discussion uses the word "would" in a manner that
seems to imply a result if something else happened, but nothing else is provided. Please review and
revise or clarify.
Comment Number: 4 Comment Originated: 10/23/2013
10/23/2013: Page 28; Same comment for the Long Term operational discussion as stated in Comment
#4.
Comment Number: 5 Comment Originated: 10/23/2013
10/23/2013: Page 30; the Recommended Laneage discussion regarding the Stanford and Horsetooth
west bound right turn lane states it meets the volume threshold for a right turn lane. Review of the Site
Generated westbound right turning volumes compared with the Existing westbound through Approach
volumes (not including existing WbL or WbR approach volumes) warrants the westbound right turn
lane. As such the City feels the Mall's traffic impact alone warrants the right turn lane and therefore the
Mall Redevelopment project with the responsibility to construct the turn lane.
Comment Number: 6 Comment Originated: 10/23/2013
Department: Transportation Planning
Contact: Amy Lewin, 970-416-2040, alewin@fcgov.com
Topic: Site Plan
10/17/2013: Please call out/identify the west bound right turn lane on Horsetooth Road at Stanford
Road improvement on the Overall Development Plan.
This is required to be on the Overall Development Plan per LUC 2.3.2.(H)(3) of the Fort Collins Land
Use Code.
Comment Number: 1 Comment Originated: 10/17/2013
10/23/2013: Please ensure there is a strong connection for pedestrians and cyclists between the
underpass of College and the main building of the mall. The route should be as direct as possible and
well signed.
Comment Number: 2 Comment Originated: 10/23/2013
Page 3 of 4
DRAFT
10/23/2013: Please add missing sidewalks to the south side of Foothills and north side of Monroe to
ensure pedestrian connectivity.
Comment Number: 4 Comment Originated: 10/23/2013
Department: Water-Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
Topic: General
10/22/2013: No comments.
Comment Number: 1 Comment Originated: 10/22/2013
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
10/21/2013: Does specific dates need to be included on the phasing schedule of the ODP?
Comment Number: 1 Comment Originated: 10/21/2013