Loading...
HomeMy WebLinkAboutFOOTHILLS MALL REDEVELOPMENT, PHASE ONE - PDP/FDP - FDP130040 - SUBMITTAL DOCUMENTS - ROUND 1 - SITE PLAN (6)FOOTHILLS MALL REDEVELOPMENT LOCATED IN THE SOUTHWEST QUARTER OF SECTION 25, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO FINAL PLANS PLANNING AREA 1 OCTOBER 9, 2013 Do not scale prints. Use figured dimensions. 2010 JPRA Architects Issued for: Subject: Project: Sheet No. Job No. FORT COLLINS, CO FOOTHILLS MALL REDEVELOPMENT FIRST LEVEL 100' - 0" UPPER PARAPET 123' - 0" METAL CAP FLASHING CONCRETE FOUNDATION WALL RE: STRUCTURAL 2" PERIMETER RIGID FOUNDATION INSULATION. EXTEND MIN. 2' BELOW FINISH GRADE. 1/2" CONT SEALANT INTERIOR CONCRETE SLAB OVER 4" GRANULAR FILL DAMP PROOFING. ST-2 PRECAST BASE EIFS OVER WEATHER BARRIER OVER SHEATHING OVER INSULATED METAL STUDS OVER GYP. BD. EIFS CORNICE MECHANICALLY FASTENED TPO INSULATION OVER METAL DECK FIRST LEVEL 100' - 0" LOWER PARAPET 120' - 0" METAL CAP FLASHING CONCRETE FOUNDATION WALL RE: STRUCTURAL 2" PERIMETER RIGID FOUNDATION INSULATION. EXTEND MIN. 2' BELOW FINISH GRADE. 1/2" CONT SEALANT INTERIOR CONCRETE SLAB OVER 4" GRANULAR FILL DAMP PROOFING. ST-2 PRECAST BASE ST-1 STONE OVER WEATHER BARRIER OVER SHEATHING OVER INSULATED METAL STUDS OVER GYP. BD. EIFS CORNICE MECHANICALLY FASTENED TPO INSULATION OVER METAL DECK THROUGH WALL B-1 BRICK ST-2 PRECAST COPING A400 1 3/4" = 1'-0" WALL SECTION 2 3/4" = 1'-0" WALL SECTION 5 3/4" = 1'-0" SECTION 12048.01 WALL SECTIONS