HomeMy WebLinkAboutLDS TEMPLE (OF FORT COLLINS) - FDP - FDP130029 - PLANS - PHOTOMETRIC PLANKEYED NOTES:
GENERAL NOTES:
1. PEDESTAL MOUNTED OUTLET IN LANDSCAPING WITH WEATHER PROOF IN-USE COVER. COORDINATE LOCATION WITH LANDSCAPE
ARCHITECT AND OWNER PRIOR TO ROUGH-IN. REFER TO DETAIL 1/ES502.
2. PEDESTAL MOUNTED OUTLET IN LANDSCAPING WITH WEATHER PROOF IN-USE COVER FOR DEDICATION POWER. COORDINATE
LOCATION WITH LANDSCAPE AND CORNERSTONE PRIOR TO ROUGH-IN. OUTLET SHALL BE LOCATED AT LEAST 10 FEET BUT NO MORE
THAN 20 FEET FROM CORNERSTONE.
3. EXTEND A 1"C WITH (1) CAT 6E (YELLOW JACKET) CABLE(S ) PER CAMERA, TO NEAREST 'CCTV' EQUIPMENT. REFER TO SPECIFICATIONS
AND DETAIL SHEETS FOR ADDITIONAL INFORMATION.
4. CONTINUATION OF FORT COLLINS LIGHT AND POWER UNDERGROUND MEDIUM VOLTAGE UTILITY LINE BY UTILITY COMPANY.
5. PROVIDE A 2" EMPTY CONDUIT WITH PULL STRING FROM PULL BOX BACK TO DEDICATION EQUIPMENT BOX 'DE'. COORDINATE EXACT
LOCATIONS WITH LANDSCAPE ARCHITECT AND OWNER AND EXACT REQUIREMENTS WITH A/V SHEETS.
6. PROVIDE 1" CONDUIT, WITH 2#10 AND 1 #10 GND TO JUNCTION BOX PROVIDED BY FOUNTAIN CONTRACTOR. REFER TO FOUNTAIN PLANS
'WF' SERIES FOR QUANTITIES AND LOCATIONS. COORDINATE WITH FOUNTAIN EQUIPMENT INSTALLER TO DETERMINE EXACT SCOPE OF
WORK TO BE PROVIDED BY ELECTRICAL CONTRACTOR.
7. PROVIDE BONDING AND GROUNDING OF ALL METAL PARTS OF FOUNTAIN INCLUDING BUT NOT NECESSARILY LIMITED TO METAL HANDRAIL,
LIGHTS, GRATES, STRUCTURAL STEEL, METAL DRAINS, PIPING FITTINGS, ETC., PER NEC ARTICLE 680. PROVIDE NEC REQUIRED BONDING
GRID IF INSULATED REBAR IS USED FOR CONSTRUCTION.
8. PROVIDE MINIMUM 10FT RADIUS LONG SWEEP BENDS TO FACILITATE CONDUCTOR PULL.
9. ROUTE CONDUITS BELOW GRADE BELOW CRAWL SPACE OF TEMPLE. COORDINATE EXACT ROUTING WITH STRUCTURAL FOOTINGS,
WALLS AND OTHER SYSTEMS. PROVIDE CONDUIT SLEAVE SYSTEM AND SEAL WHERE INTERIOR WALLS/FLOORS ARE PENETRATED.
#
ELECTRICAL UTILITY CONTACT:
DOUG MARTINE
ELECTRIC PROJECT ENGINEERING SUPERVISOR
FORT COLLINS LIGHT AND POWER
(970) 224-6152
DMARTINE@FCGOV.COM
TELECOM UTILITY CONTACT:
ROBERT RULLI
CENTURY LINK
(970) 490-7503
ROBERT.RULLI@CENTURYLINK.COM
1. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL TRENCHING, BORING, INSTALLING CONDUIT CONDUCTORS AND EQUIPMENT
PADS UNLESS NOTED OTHERWISE. UTILITY DISTRIBUTION SYSTEM INCLUDING MEDIUM VOLTAGE CONDUCTORS, UTILITY
TRANSFORMERS, SWITCH VAULTS, AND FINAL MEDIUM VOLTAGE CONNECTIONS SHALL BE BY FORT COLLINS LIGHT AND POWER.
CONTRACTOR SHALL CONFIRM ALL REQUIREMENTS AND FEES WITH FORT COLLINS LIGHT AND POWER AND LOCAL
TELECOMMUNICATIONS UTILITY(S) PRIOR TO BID. COORDINATE ALL WORK WITH FORT COLLINS LIGHT AND POWER AND LOCAL
TELECOMMUNICATIONS UTILITY(S)AND OWNER PRIOR TO START. CONDUIT SHALL NOT BE ROUTED BELOW LANDSCAPING. CALL FOR
ALL UTILITY LOCATES PRIOR TO TRENCHING. . MAINTAIN AT LEAST 12” SEPARATION IN ALL DIRECTIONS BETWEEN OTHER UTILITIES.
NOTIFY FORT COLLINS LIGHT AND POWER REPRESENTATIVE AND LOCAL TELECOMMUNICATIONS UTILITY(S) FOR INSPECTION OF
TRENCH AND PVC INSTALLATION PRIOR TO BACKFILLING TRENCH. INCLUDE ALL UTILITY FEES AS A SEPARATE LINE ITEM IN BID.
10. EXTEND A 1"C FROM FUTURE CAMERA LOCATION TO NEAREST 'CCTV' EQUIPMENT. REFER TO SPECIFICATIONS AND DETAIL SHEETS
FOR ADDITIONAL INFORMATION.
AT
3"
AT
3"
AT
3"
AT
3"
AT
3"
PPF
8'
PPF
8'
PGD
8'
AT
3"
AT
3"
AT
3"
AT
3"
AT
3"
PPF
8'
PPF
8'
PGD
8'
PGD
8'
PPH
8'
PP
8' PPH
8'
PP
8'
PP
8' PPH
8'
PPH
8'
PPF
8'
PPF
8'
PPF
8'
PPF
PPH 8'
8'
PPH
8'
PPH
8'
PPH
8'
PPH
8'
PPH
8'
PPH
8'
PPH
8'
PPH
8'
PPH
8'
PPH
PPH 8'
8'
PPH
8' PPH
8'
PPH
8'
PPH
8'
PP
8'
PP
8'
PP
8'
AT
3"
AT
3"
AT
3"
AT
3"
AT
3"
AT
3"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MT
2.5"
MT
2.5"
JSW JSW JSW JSW JSW JSW JSW
PMT
8'
PMT
8'
PCC
PCC
PPF
PPF
PPF
PP
PPF
PPF
PPF
PPF
PPF
PPF
PP
PP
PPH PFV
PPH
PCC
PCC
PCC
PCC
PCC
PCCPCC
PCC
PCC
PCC
PCC
PCC
PCC
PCC PCC
PCC
PCC
PCC
PCC
PCC
PFVPFV
PP
PPH
PPH
PP
PP
PFV
TCG TCG TCG TCG
TCG
TCG
TCG
TCG
PCC
PCC
PCC
PCC
PCC
PCC
PCC
PCC
PCC
PCC
PP
PPH
TCG
PPH
PPF
PPH
JSW JSW JSW JSW JSW JSW JSW
MT
MT
QRC QRC QRC
PCC
PCC
PCC
PCC PCC
PCC
PCC
PCC
MS
MS
PMT
8'
PMT
8'
PPH
PPH
PPH
PPH
PP
MS MS MS MS
MS MS
MS MS
PPF
PFV
PPF
PPF
PPH
PPH PPF
PPH
PPF
MS MS MS MS
TCGTCG
PPF
PP
MT
MT
MT
TCG TCG TCG
TCG TCG TCG
TCG TCG TCG
TCG TCG TCG TCG
TCG TCG TCG TCG
TCG TCG TCG TCGTCGTCG
TCG
TCG
TCG
TCG
TCG TCG TCG TCG TCG TCG
TCGTCGTCG
TCG
TCG TCG
AF AF AF AF AF
AF AF
AF AF AF AF AF
AF
EASEMENT
EASEMENT
PRESIDENT'S
RESIDENCE
7
A
N F
N F
A
7
DN
DN
MECHANICAL
ENCLOSURE
750 KVA
UTILITY
TRANSFORMER
(7'X7')
PULL SECTION METER MAIN TEMPLE
FEEDER
DISTRIBUTION
EMERGENCY
GENERATOR
100KW
NATURAL
GAS
(4'X12')
(6' TALL)
(OPEN TO ABOVE)
MAIN
SWITCH
BOARD
'MSB-U'
(14'X3.5')
96" TALL
'ELUA''EHUA' 'ATS-1' 'ATS-'SHUA''SLUA'2'
'HUA1'
75 KVA
'T-UA' 'LUA1'
'SECURITY'
'NAC'
Elevation (-6'-0")
J
AP15s
AP15s AP15s
AP15s
AP15s
AP15s
AP15s
AP15s
AP15s
AB AB
AB
AB
AB
AB
AB
AB
AP15s
AP13
AP13
AP13
AP13 AP13
AP23 AP23
AP23 AP23
AP13
AP13 AP23
AP23
AP23
AP23
AP23 AP23
AP23
AP23
AP13 AP23
AP15
AP15
AP15
AP15
AP13
AP13 AP13
AP13
AP15 AP15
AP15 AP15
AP15 AP15
ASL
ASL ASL
ASL ASL ASL
ASL
ASL
ASL
ASL
ASL
ASL ASL
ASL ASL ASL
ASL
ASL
ASL
ASL
ASL ASL
ASL ASL 1
3
3
3
3
3
3
3
3
3
3
3
3
AGN AGN
AP15s
AP15s
AP15s AP15s AP15s AP15s
4
4
4 4
4
1
ES501
2
ES501
4
ES501
1
ES501
2
ES501
4
ES501
1
ES501
2
ES501
4
ES501
1
ES501
2
ES501
4
ES501
1
ES501
2
ES501
4
ES501
1
ES501
2
ES501
4
ES501
1
ES501
2
ES501
4
ES501
1
ES501
2
ES501
4
ES501
1
ES501
2
ES501
4
ES501
1
ES501
2
ES501
4
ES501
1
ES501
2
ES501
4
ES501
1
ES501
2
ES501
4
ES501
1
ES501
2
ES501
4
ES501
1
ES501
2
ES501
4
ES501
HPB- 18
(LCPD-20)
HPB- 18
(LCPD-17)
AP13
AP13
AP13 AP13 AP13
4
4
4
4 4 4 4
4
4
4
4
4
4
4
4
2 4
4 4
AB
4
4
AB
ASL ASL
ASL ASL
ASL
ASL
3
3 ES501
ES501
0' 20' 40' 80' 160'
ASL
ASL
AP13
HPB- 13
(LCPD-18)
HPB- 13
(LCPD-19)
AB AB AB
AB
AB
AB
4
4
4
4 4
4
4
AB
AB
AB
6
ES501
6
ES501
6
ES501
6
ES501
PB
PB PB
HPB- 16
(LCPD-10)
HPB- 16
(LCPD-9)
HPB- 20
(LCPD-12) HPB- 20
HPB- 17 (LCPD-11)
(LCPD-14)
HPB- 14
(LCPD-13)
HPB- 11
(LCPD-15)
HPB- 11
(LCPD-16)
LPD1- 9
(LCPD-21) LPD1- 9
(LCPD-22)
4
2
2
5
ES501 5
ES501
5
ES501
5
ES501
PB
PB
PB
PB
5
ES501
5
ES501
5
ES501
3
3
1
EL402
1
EL401
HPB- 5
(LCPD-26)
#8 WIRE #8 WIRE
#8 WIRE
ALF3 ALF3
ALF3 ALF3
ALF3
ALF3
ALF3
ALF3
ALS2 ALS2
ALS2 ALS2
HPA- 2
(LCPA-34)
http://www.archnexus.com
DATE:
DRAWN BY:
CHECKED BY:
NEXUS PROJECT #:
A R C H I T E C T U R A L
SHEET CONTENTS:
2505 East Parleys Way
Salt Lake City, UT 84109
T 801.924.5000 f 801.924.5001
Architectural NEXUS, Inc.
REVISIONS
1 234 5
D
C
B
A
#
SALT LAKE CITY LOGAN PLACERVILLE SACRAMENTO
8/27/2013 9:20:39 AM
SITE LIGHTING
PLAN
Author
The Church of Jesus Christ of Latter-day Saints
Fort Collins Colorado
Fort Collins Colorado Temple
11080
09-11-13
E.2
Checker
1 1" = 40'-0"
SITE LIGHTING PLAN
GENERAL NOTES:
1.
2.
3.
4.
5.
ALL POLE BASES SHALL BE A MINIMUM OF 3'-0" FROM THE TOP BACK OF CURB TO THE CENTER OF
POLE BASE, IN PARKING AREAS.
CONFIRM EXACT LOCATION OF ALL SITE AND FACADE LIGHTS WITH ARCHITECT AND ELECTRICAL
ENGINEER PRIOR TO ROUGH-IN. LIGHTING FIXTURES ON THE GROUND SHALL BE LOCATED BETWEEN
LANDSCAPE ELEMENTS.
BURIED CIRCUITS ARE DRAWN IN DARK DASHED LINES. COORDINATE ROUTING OF CONDUITS FOR
ALL NEW BRANCH CIRCUITS WITH LANDSCAPING. DO NOT ROUTE CONDUITS THROUGH ROOTS OF
TREES, SHRUBS, OR PLANTS. MARK LOCATION OF ALL UNDERGROUND CONDUITS AND CIRCUITING ON
RECORD DRAWINGS.
ALL SITE LIGHTING SHALL BE 3/4" CONDUIT MINIMUM PVC WITH 2#10, 1#10 GND MINIMUM.
ALL LIGHTING CIRCUITS ARE CONTROLLED VIA LIGHTING RELAYS. REFER TO SHEETS EL504 AND
EL505 FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
KEYED NOTES:
1.
2.
3.
4.
#
WATER FEATURE LIGHTING BY FOUNTAIN CONTRACTORS IN ACCORDANCE WITH NEC 680. SEE SPEC
SECTION 225200.
SURVEILLANCE CAMERA MOUNTED TO LIGHT POLE. REFER TO DETAIL 1, SHEET EY502 FOR MORE
INFORMATION.
STREET LIGHT PROVIDED BY FORT COLLINS LIGHT AND POWER
CONCRETE APRON DETAIL TO EXTEND OFF WALKWAYS FOR LIGHT FIXTURES THAT ARE ADJACENT
TO WALKWAYS. SEE DETAIL 2/ES501.
2 1/8" = 1'-0"
TOWER LIGHTING
PGD
8'
PPH
8'
PP
8' PPH
8'
PP
8'
PP
8' PPH
8'
PPH
8'
PPF
8'
PPF
8'
PPF
8'
PPF
PPH 8'
8'
PPH
8'
PPH
8'
PPH
8'
PPH
8'
PPH
8'
PPH
8'
PPH
8'
PPH
8'
PPH
8'
PPH
PPH 8'
8'
PPH
8' PPH
8'
PPH
8'
PPH
8'
PP
8'
PP
8'
PP
8'
AT
3"
AT
3"
AT
3"
AT
3"
AT
3"
AT
3"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
PCC
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MS
2.5"
MT
2.5"
MT
2.5"
JSW JSW JSW JSW JSW JSW JSW
PMT
8'
PMT
8'
PCC
PCC
PPF
PPF
PPF
PP
PPF
PPF
PPF
PPF
PPF
PPF
PP
PP
PPH PFV
PPH
PCC
PCC
PCC
PCC
PCC
PCCPCC
PCC
PCC
PCC
PCC
PCC
PCC
PCC PCC
PCC
PCC
PCC
PCC
PCC
PFVPFV
PP
PPH
PPH
PP
PP
TCG TCG TCG TCG
TCG
TCG
TCG
TCG
PCC
PCC
PCC
PCC
PCC
PCC
PCC
PCC
PCC
PCC
PP
PPH
TCG
PPH
PPF
PPH
JSW JSW JSW JSW JSW JSW JSW
MT
MT
QRC QRC QRC
PCC
PCC
PCC
PCC PCC
PCC
PCC
PCC
MS
MS MS
MS
PMT
8'
PMT
8'
PPH
PPH
PPH
PPH
PP
MS MS MS MS
MS MS
MS MS
PPF
PFV
PPF
PPF
PPH
PPH PPF
PPH
PPF
MS MS MS MS
TCGTCG
PPF
PP
MT
MT
MT
TCG TCG TCG
TCG TCG TCG
TCG TCG TCG
TCG TCG TCG TCG
TCG TCG TCG TCG
TCG TCG TCG TCGTCGTCG
TCG
TCG
TCG
TCG
TCG TCG TCG TCG TCG TCG
TCGTCGTCG
TCG
TCG TCG
TRILBY ROAD
TIMBERLINE ROAD
AF AF AF AF AF
AF AF
AF
AF AF AF AF AF
AF
AF
EASEMENT
EASEMENT
PRESIDENT'S
RESIDENCE
7
A
N F
N F
A
7
DN
DN
MECHANICAL
ENCLOSURE
750 KVA
UTILITY
TRANSFORMER
(7'X7')
PULL SECTION METER MAIN TEMPLE
FEEDER
DISTRIBUTION
EMERGENCY
GENERATOR
100KW
NATURAL
GAS
(4'X12')
(6' TALL)
(OPEN TO ABOVE)
MAIN
SWITCH
BOARD
'MSB-U'
(14'X3.5')
96" TALL
'ELUA''EHUA' 'ATS-1' 'ATS-'SHUA''SLUA'2'
'HUA1'
75 KVA
'T-UA' 'LUA1'
'SECURITY'
'NAC'
Elevation (-6'-0")
DS
ST
J
J
J
POSSIBLE NEW UNDERGROUND VAULT (6' X 3') AND TIE INTO
FORT COLLINS LIGHT AND POWER EXISTING UNDERGROUND
POWER DISTRIBUTION SYSTEM (BY UTILITY COMPANY).
EXACT LOCATION TO BE VERIFIED WITH LIGHT AND POWER
CENTURY LINK COMMUNICATION UTILITY
PROVIDER CONNECTION VAULT PEDESTAL
(EXACT LOCATION TO BE VERIFIED)
(3) 4"C WITH PULL STRING FOR
TEMPLE INCOMING
FIBER & COPPER
UTILITY COMMUNICATION
LINES
NEW FORT COLLINS LIGHT
AND POWER UNDERGROUND
MEDIUM VOLTAGE UTILITY LINE
(BY UTILITY COMPANY)
PROPOSED LOCATION FOR NEW
FORT COLLINS LIGHT AND POWER
UNDERGROUND SWITCH VAULT (6'X3')
(BY UTILITY COMPANY)
TELECOMMUNICATIONS
ROOM 'DATA/COM'
ON BASEMENT LEVEL
TEMPLE MAIN SERVICE
SWITCHBOARD 'MSB-T'
AND ELECTRICAL DISTRIBUTION IN
PENTHOUSE
MAINTENANCE BUILDING
POWER FEEDER
(1) 2.5", (2) 2"C, (1) 1.5"C
1
EP402
TEMPLE NORMAL, STAND-BY AND EMERGENCY
POWER FEEDERS SEE TRENCH DETAILS AND
ONE-LINE DIAGRAM FOR CONDUIT AND WIRE SIZE.
(4) 3"C, (4) 2"C
MECHANICAL ENCLOSURE
MAINTENANCE AREA
PRESIDENT'S RESIDENCE
NOT IN CONTRACT.
TO BE FED FROM SEPARATE,
SINGLE PHASE UTILITY
TRANSFORMER AND METER
TEMPLE
TRILBY ROAD
TIMBERLINE ROAD
WP
WP
WP
WP
WP
1
1
1
1 2
PTZ
3
PTZ
3
10
FORT COLLINS LIGHT AND POWER
UNDERGROUND MEDIUM VOLTAGE UTILITY LINE
PRIMARY FEED TO TRANSFORMER
(BY UTILITY COMPANY)
SITE MAIN ELECTRICAL
SERVICE AND METER
UTILITY TRANSFORMER
ACCESS GATE MOTOR
TIE WITH FIRE ALARM TO
OPEN ON ALARM
4
4
PTZ
3
MAINTENANCE BUILDING
COMMUNICATIONS
LINES (2) 4" AND (2) 2"C.
C5
FUTURE
C3
C2 C1
POWER PULL BOX
COORDINATE EXACT
LOCATION WITH
LANDSCAPING
COMMUNICATIONS PULL BOX
COORDINATE EXACT
LOCATION WITH
LANDSCAPING
4
NEW FORT COLLINS LIGHT
AND POWER UNDERGROUND
MEDIUM VOLTAGE UTILITY LINE
(BY UTILITY COMPANY)
NEW FORT COLLINS LIGHT
AND POWER UNDERGROUND
MEDIUM VOLTAGE UTILITY LINE
(BY UTILITY COMPANY)
FORT COLLINS LIGHT AND POWER
UNDERGROUND MEDIUM VOLTAGE UTILITY LINE
SECONDARY FEED TO PRESIDENT'S HOUSE
(BY UTILITY COMPANY)
PRESIDENT'S RESIDENCE ELECTRICAL
SERVICE AND METER
POSSIBLE NEW UNDERGROUND VAULT (6' X 3') AND TIE INTO
FORT COLLINS LIGHT AND POWER EXISTING UNDERGROUND
POWER DISTRIBUTION SYSTEM (BY UTILITY COMPANY).
EXACT LOCATION TO BE VERIFIED WITH LIGHT AND POWER
NEW CENTURY LINK
UNDERGOUND UTILITY LINK
(BY UTILITY COMPANY)
PTZ
3
C4
DEDICATION SUPPORT
PULL BOX
FIXED
3
C6
WP
WP
1
1
CORNERSTONE A/V
PULL BOX
MECHANICAL BUILDING
COMMUNICATIONS
LINES (2) 4" AND (2) 2"C.
POWER FEEDERS TO TEMPLE
AND MAINTENANCE BUILDING
(4) 3"C, (4) 2"C, (1) 2.5"C, (1) 1.5"C
5
WP
1
WP
1
5
MECHANICAL ENCLOSURE AND MAINTENANCE AREA
COMMUNICATION AND SECURITY SYSTEM FEEDERS.
SEE TRENCH DETAILS AND RISER DIAGRAMS
FOR ADDITIONAL INFORMATION.
(3) 4"C AND (3) 2"C.
WP
1
3/4" CONDUIT
FOR CONTROLS AND WIRING PER
MANUFACTURER
RECOMMENDATIONS
3/4" CONDUIT
FOR CONTROLS AND
WIRING PER
MANUFACTURER
RECOMMENDATIONS
LPD1-34
LPD1-26
LPD1-28
LPD1-30
SLPA-33 SLPA-35
LPD1-32
1
EY402
1
EY401
6
6
LPB1-21 6
LPB1-19
LPB1-7
PRESIDENTS RESIDENCE
COMMUNICATIONS LINES (1) 4"C
AND (1) 2"C
4
ES503
3
ES503
1
ES503
8
3
ES502
1
ES503
7
5
ES503
(TYP)
PTZ
WP
1
8
(TYP)
MECHANICAL/PLUMBING
UNDERGROUND PIPING
8
(TYP)
8
(TYP)
http://www.archnexus.com
DATE:
DRAWN BY:
CHECKED BY:
NEXUS PROJECT #:
A R C H I T E C T U R A L
SHEET CONTENTS:
2505 East Parleys Way
Salt Lake City, UT 84109
T 801.924.5000 f 801.924.5001
Architectural NEXUS, Inc.
REVISIONS
1 234 5
D
C
B
A
#
SALT LAKE CITY LOGAN PLACERVILLE SACRAMENTO
8/27/2013 9:20:08 AM
ELECTRICAL SITE
PLAN
Author
The Church of Jesus Christ of Latter-day Saints
Fort Collins Colorado
Fort Collins Colorado Temple
11080
09-11-13
E.1
Checker
1 1" = 40'-0"
SITE POWER PLAN
1 07-25-13 Addendum #4