HomeMy WebLinkAboutLDS TEMPLE (OF FORT COLLINS) - FDP - FDP130029 - PLANS - ELEVATIONSMAIN FLOOR
100' - 0"
T.O. TOWER GABLE
187' - 1"
TOWER PARAPET 02
178' - 5"
T.O. LOWER TOWER WALL
139' - 6"
MORONI BASE
204' - 0"
T.O. CURB @ UPPER ROOF
130' - 8"
UPPER TOWER
146' - 1"
ARCHITECTURAL PRECAST
CONCRETE, TYP.
SLATE ROOF
METAL WINDOW SYSTEM
WITH ARTGLASS, TYP.
PAINTED
FIBERGLASS
STATUE
ROOF ACCESS PLATFORMS
128' - 8"
WINDOW GRATE MID
159' - 10"
WINDOW GRATE HIGH
167' - 10"
WINDOW GRATE LOW
150' - 10"
1. UTILITY METERS, CONDUIT, LADDERS, FLUES,
VENTS, AND OTHER EQUIPMENT ATTACHED TO
THE BUILDING, SHALL BE PAINTED TO MATCH
THE ADJACENT EXTERIOR BUILDING MATERIAL
COLOR. CONTRACTOR SHALL SUBMIT PAINT
COLOR FOR APPROVAL BY ARCHITECT.
2. INSTALL A RECESSED FIRE DEPARTMENT KNOX
BOX BY EACH OF THE THREE KEYED ENTRY
DOORS. FINISH SHALL MATCH ADJACENT
MATERIAL.
GENERAL NOTES -
BUILDING ELEVATION
000 A.1 1/8" = 1'-0"
A1 EXTERIOR EAST ELEVATION
http://www.archnexus.com
DATE:
DRAWN BY:
CHECKED BY:
NEXUS PROJECT #:
A R C H I T E C T U R A L
SHEET CONTENTS:
2505 East Parleys Way
Salt Lake City, UT 84109
T 801.924.5000 f 801.924.5001
Architectural NEXUS, Inc.
REVISIONS
1 2 3 4 5
D
C
B
MAIN FLOOR
100' - 0"
T.O. PARAPET 01
124' - 0"
T.O. TOWER GABLE
187' - 1"
T.O. PARAPET 02
130' - 8"
TOWER PARAPET 02
178' - 5"
T.O. LOWER TOWER WALL
139' - 6"
MORONI BASE
204' - 0"
UPPER TOWER
146' - 1"
ARCHITECTURAL PRECAST
CONCRETE, TYP.
SLATE ROOF
METAL WINDOW SYSTEM
WITH ARTGLASS, TYP.
PAINTED
FIBERGLASS
STATUE
ROOF ACCESS PLATFORMS
128' - 8"
WINDOW GRATE MID
159' - 10"
WINDOW GRATE HIGH
167' - 10"
WINDOW GRATE LOW
150' - 10"
FD KNOX BOX
1. UTILITY METERS, CONDUIT, LADDERS, FLUES,
VENTS, AND OTHER EQUIPMENT ATTACHED TO
THE BUILDING, SHALL BE PAINTED TO MATCH
THE ADJACENT EXTERIOR BUILDING MATERIAL
COLOR. CONTRACTOR SHALL SUBMIT PAINT
COLOR FOR APPROVAL BY ARCHITECT.
2. INSTALL A RECESSED FIRE DEPARTMENT KNOX
BOX BY EACH OF THE THREE KEYED ENTRY
DOORS. FINISH SHALL MATCH ADJACENT
MATERIAL.
GENERAL NOTES -
BUILDING ELEVATION
000 A.2 1/8" = 1'-0"
A1 EXTERIOR NORTH ELEVATION
http://www.archnexus.com
DATE:
DRAWN BY:
CHECKED BY:
NEXUS PROJECT #:
A R C H I T E C T U R A L
SHEET CONTENTS:
2505 East Parleys Way
Salt Lake City, UT 84109
T 801.924.5000 f 801.924.5001
Architectural NEXUS, Inc.
REVISIONS
1 2 3 4 5
MAIN FLOOR
100' - 0"
T.O. TOWER GABLE
187' - 1"
T.O. PARAPET 02
130' - 8"
TOWER PARAPET 02
178' - 5"
T.O. LOWER TOWER WALL
139' - 6"
MORONI BASE
204' - 0"
UPPER TOWER
146' - 1"
ARCHITECTURAL PRECAST
CONCRETE, TYP.
SLATE ROOF
METAL WINDOW SYSTEM
WITH ARTGLASS, TYP.
PAINTED
FIBERGLASS
STATUE
ROOF ACCESS PLATFORMS
128' - 8"
WINDOW GRATE MID
159' - 10"
WINDOW GRATE HIGH
167' - 10"
WINDOW GRATE LOW
150' - 10"
1. UTILITY METERS, CONDUIT, LADDERS, FLUES,
VENTS, AND OTHER EQUIPMENT ATTACHED TO
THE BUILDING, SHALL BE PAINTED TO MATCH
THE ADJACENT EXTERIOR BUILDING MATERIAL
COLOR. CONTRACTOR SHALL SUBMIT PAINT
COLOR FOR APPROVAL BY ARCHITECT.
2. INSTALL A RECESSED FIRE DEPARTMENT KNOX
BOX BY EACH OF THE THREE KEYED ENTRY
DOORS. FINISH SHALL MATCH ADJACENT
MATERIAL.
GENERAL NOTES -
BUILDING ELEVATION
000 A.3 1/8" = 1'-0"
A1 EXTERIOR WEST ELEVATION
http://www.archnexus.com
DATE:
DRAWN BY:
CHECKED BY:
NEXUS PROJECT #:
A R C H I T E C T U R A L
SHEET CONTENTS:
2505 East Parleys Way
Salt Lake City, UT 84109
T 801.924.5000 f 801.924.5001
Architectural NEXUS, Inc.
REVISIONS
1 2 3 4 5
D
C
B
MAIN FLOOR
100' - 0"
T.O. TOWER GABLE
187' - 1"
TOWER PARAPET 02
178' - 5"
T.O. LOWER TOWER WALL
139' - 6"
MORONI BASE
204' - 0"
UPPER TOWER
146' - 1"
ARCHITECTURAL PRECAST
CONCRETE, TYP.
SLATE ROOF
METAL WINDOW SYSTEM
WITH ARTGLASS, TYP.
PAINTED
FIBERGLASS
STATUE
ROOF ACCESS PLATFORMS
128' - 8"
WINDOW GRATE MID
159' - 10"
WINDOW GRATE HIGH
167' - 10"
WINDOW GRATE LOW
150' - 10"
1. UTILITY METERS, CONDUIT, LADDERS, FLUES,
VENTS, AND OTHER EQUIPMENT ATTACHED TO
THE BUILDING, SHALL BE PAINTED TO MATCH
THE ADJACENT EXTERIOR BUILDING MATERIAL
COLOR. CONTRACTOR SHALL SUBMIT PAINT
COLOR FOR APPROVAL BY ARCHITECT.
2. INSTALL A RECESSED FIRE DEPARTMENT KNOX
BOX BY EACH OF THE THREE KEYED ENTRY
DOORS. FINISH SHALL MATCH ADJACENT
MATERIAL.
GENERAL NOTES -
BUILDING ELEVATION
000 A.4 1/8" = 1'-0"
A1 EXTERIOR SOUTH ELEVATION
http://www.archnexus.com
DATE:
DRAWN BY:
CHECKED BY:
NEXUS PROJECT #:
A R C H I T E C T U R A L
SHEET CONTENTS:
2505 East Parleys Way
Salt Lake City, UT 84109
T 801.924.5000 f 801.924.5001
Architectural NEXUS, Inc.
REVISIONS
1 2 3 4 5
D
C
B
A
#
GROUNDS BUILDING FLOOR
100' - 0"
T.O. MASONRY WALL
112' - 0"
T.O. ENCLOSURE WALL
108' - 0"
STONE
EIFS
EARTH BERM
GROUNDS BUILDING FLOOR
100' - 0"
T.O. MASONRY WALL
112' - 0"
T.O. ENCLOSURE WALL
108' - 0"
STONE
EIFS
RECYCLING WASTE
GROUNDS BUILDING FLOOR
100' - 0"
T.O. MASONRY WALL
112' - 0"
T.O. ENCLOSURE WALL
108' - 0"
STONE
EIFS
EARTH BERM
GROUNDS BUILDING FLOOR
100' - 0"
T.O. MASONRY WALL
112' - 0"
T.O. ENCLOSURE WALL
108' - 0"
STONE
EIFS
GAS METER
STONE SCREEN WALL
MECHANICAL ENCLOSURE FLOOR
100' - 0"
MECHANICAL ENCLOSURE LOWER
FLOOR
94' - 0"
T.O. UTILITY WALL
108' - 0"
STONE
EARTH BERM
MECHANICAL ENCLOSURE FLOOR
100' - 0"
MECHANICAL ENCLOSURE LOWER
FLOOR
94' - 0"
T.O. UTILITY WALL
108' - 0"
STONE
EARTH BERM
MECHANICAL ENCLOSURE FLOOR
100' - 0"
MECHANICAL ENCLOSURE LOWER
FLOOR
94' - 0"
12
5
ARCHITECTURAL
GRADE SHINGLES
EIFS ACCENT BAND
EIFS
CAST STONE
MASONRY
12
5
12
5
22'-1"
12
5
000 A.6 1/8" = 1'-0"
D1 PRESIDENT'S RESIDENCE NORTH ELEVATION
000 A.6 1/8" = 1'-0"
D4 PRESIDENT'S RESIDENCE EAST ELEVATION
000 A.6 1/8" = 1'-0"
A1 PRESIDENT'S RESIDENCE SOUTH ELEVATION
000 A.6 1/8" = 1'-0"
A4 PRESIDENT'S RESIDENCE WEST ELEVATION
http://www.archnexus.com
DATE:
DRAWN BY:
CHECKED BY:
NEXUS PROJECT #:
A R C H I T E C T U R A L
SHEET CONTENTS:
2505 East Parleys Way
Salt Lake City, UT 84109
T 801.924.5000 f 801.924.5001
Architectural NEXUS, Inc.
REVISIONS
1 2 3 4 5
D
C
B
A
#
SALT LAKE CITY PLACERVILLE SACRAMENTO
Fort Collins Colorado Temple
September 11, 2013
8/30/2013 9:26:23 AM
BUILDING
ELEVATIONS
Author
The Church of Jesus Christ of Latter-day Saints
2180 Majestic Dr.
Fort Collins, Colorado 80528
11080
000
A.6
Checker
T.O. UTILITY WALL
108' - 0"
STONE
EARTH BERM
MECHANICAL ENCLOSURE FLOOR
100' - 0"
MECHANICAL ENCLOSURE LOWER
FLOOR
94' - 0"
T.O. UTILITY WALL
108' - 0"
STONE
EARTH BERM
GROUNDS BUILDING FLOOR
100' - 0"
T.O. MASONRY WALL
112' - 0"
T.O. ENCLOSURE WALL
108' - 0"
RECYCLING WASTE
SIGNAGE FOR "WASTE" &
"RECYCLING" (SEE SPECS).
BOLLARDS
EIFS
STONE
DOUBLE LEAF METAL
GATES (SEE C1/AS501)
GROUNDS BUILDING FLOOR
100' - 0"
T.O. MASONRY WALL
112' - 0"
T.O. ENCLOSURE WALL
108' - 0"
SECONDARY ROOF
DRAIN DOWNSPOUT
3' - 9"
FD KNOX BOX
HOSE REEL
EIFS
STONE
STONE SCREEN WALL
GAS METER
1. UTILITY METERS, CONDUIT, LADDERS, FLUES,
VENTS, AND OTHER EQUIPMENT ATTACHED TO
THE BUILDING, SHALL BE PAINTED TO MATCH
THE ADJACENT EXTERIOR BUILDING MATERIAL
COLOR. CONTRACTOR SHALL SUBMIT PAINT
COLOR FOR APPROVAL BY ARCHITECT.
GENERAL NOTES -
BUILDING ELEVATION
000 A.5 1/8" = 1'-0"
D4 GROUNDS BUILDING EAST EXTERIOR ELEVATION
000 A.5 1/8" = 1'-0"
D1 GROUNDS BUILDING NORTH EXTERIOR ELEVATION
000 A.5 1/8" = 1'-0"
C1 GROUNDS BUILDING SOUTH EXTERIOR ELEVATION
000 A.5 1/8" = 1'-0"
C4 GROUNDS BUILDING WEST EXTERIOR ELEVATION
000 A.5 1/8" = 1'-0"
B4 MECHANICAL ENCLOSURE EAST EXTERIOR ELEVATION
000 A.5 1/8" = 1'-0"
B1 MECHANICAL ENCLOSURE NORTH EXTERIOR ELEVATION
000 A.5 1/8" = 1'-0"
A1 MECHANICAL ENCLOSURE SOUTH EXTERIOR ELEVATION
000 A.5 1/8" = 1'-0"
A4 MECHANICAL ENCLOSURE WEST EXTERIOR ELEVATION
http://www.archnexus.com
DATE:
DRAWN BY:
CHECKED BY:
NEXUS PROJECT #:
A R C H I T E C T U R A L
SHEET CONTENTS:
2505 East Parleys Way
Salt Lake City, UT 84109
T 801.924.5000 f 801.924.5001
Architectural NEXUS, Inc.
REVISIONS
1 2 3 4 5
D
C
B
A
#
SALT LAKE CITY PLACERVILLE SACRAMENTO
Fort Collins Colorado Temple
September 11, 2013
8/30/2013 9:26:18 AM
BUILDING
ELEVATIONS
Author
The Church of Jesus Christ of Latter-day Saints
2180 Majestic Dr.
Fort Collins, Colorado 80528
11080
000
A.5
Checker
000 A.5 1/8" = 1'-0"
E1 GROUNDS BUILDING NORTH ELEVATION (INSIDE SCREEN WALL) 000 A.5 1/8" = 1'-0"
E2 GROUNDS BUILDING EAST ELEVATION (INSIDE SCREEN WALL)
SALT LAKE CITY PLACERVILLE SACRAMENTO
Fort Collins Colorado Temple
September 11, 2013
9/9/2013 2:16:05 PM
BUILDING
ELEVATIONS
Author
The Church of Jesus Christ of Latter-day Saints
2180 Majestic Dr.
Fort Collins, Colorado 80528
11080
000
A.4
Checker
A
#
SALT LAKE CITY PLACERVILLE SACRAMENTO
Fort Collins Colorado Temple
September 11, 2013
9/9/2013 2:15:45 PM
BUILDING
ELEVATIONS
Author
The Church of Jesus Christ of Latter-day Saints
2180 Majestic Dr.
Fort Collins, Colorado 80528
11080
000
A.3
Checker
D
C
B
A
#
SALT LAKE CITY PLACERVILLE SACRAMENTO
Fort Collins Colorado Temple
September 11, 2013
9/9/2013 2:15:23 PM
BUILDING
ELEVATIONS
Author
The Church of Jesus Christ of Latter-day Saints
2180 Majestic Dr.
Fort Collins, Colorado 80528
11080
000
A.2
Checker
A
#
SALT LAKE CITY PLACERVILLE SACRAMENTO
Fort Collins Colorado Temple
September 11, 2013
9/9/2013 2:15:08 PM
BUILDING
ELEVATIONS
Author
The Church of Jesus Christ of Latter-day Saints
2180 Majestic Dr.
Fort Collins, Colorado 80528
11080
000
A.1
Checker