Loading...
HomeMy WebLinkAboutLDS TEMPLE (OF FORT COLLINS) - FDP - FDP130029 - PLANS - ELEVATIONSMAIN FLOOR 100' - 0" T.O. TOWER GABLE 187' - 1" TOWER PARAPET 02 178' - 5" T.O. LOWER TOWER WALL 139' - 6" MORONI BASE 204' - 0" T.O. CURB @ UPPER ROOF 130' - 8" UPPER TOWER 146' - 1" ARCHITECTURAL PRECAST CONCRETE, TYP. SLATE ROOF METAL WINDOW SYSTEM WITH ARTGLASS, TYP. PAINTED FIBERGLASS STATUE ROOF ACCESS PLATFORMS 128' - 8" WINDOW GRATE MID 159' - 10" WINDOW GRATE HIGH 167' - 10" WINDOW GRATE LOW 150' - 10" 1. UTILITY METERS, CONDUIT, LADDERS, FLUES, VENTS, AND OTHER EQUIPMENT ATTACHED TO THE BUILDING, SHALL BE PAINTED TO MATCH THE ADJACENT EXTERIOR BUILDING MATERIAL COLOR. CONTRACTOR SHALL SUBMIT PAINT COLOR FOR APPROVAL BY ARCHITECT. 2. INSTALL A RECESSED FIRE DEPARTMENT KNOX BOX BY EACH OF THE THREE KEYED ENTRY DOORS. FINISH SHALL MATCH ADJACENT MATERIAL. GENERAL NOTES - BUILDING ELEVATION 000 A.1 1/8" = 1'-0" A1 EXTERIOR EAST ELEVATION http://www.archnexus.com DATE: DRAWN BY: CHECKED BY: NEXUS PROJECT #: A R C H I T E C T U R A L SHEET CONTENTS: 2505 East Parleys Way Salt Lake City, UT 84109 T 801.924.5000 f 801.924.5001 Architectural NEXUS, Inc. REVISIONS 1 2 3 4 5 D C B MAIN FLOOR 100' - 0" T.O. PARAPET 01 124' - 0" T.O. TOWER GABLE 187' - 1" T.O. PARAPET 02 130' - 8" TOWER PARAPET 02 178' - 5" T.O. LOWER TOWER WALL 139' - 6" MORONI BASE 204' - 0" UPPER TOWER 146' - 1" ARCHITECTURAL PRECAST CONCRETE, TYP. SLATE ROOF METAL WINDOW SYSTEM WITH ARTGLASS, TYP. PAINTED FIBERGLASS STATUE ROOF ACCESS PLATFORMS 128' - 8" WINDOW GRATE MID 159' - 10" WINDOW GRATE HIGH 167' - 10" WINDOW GRATE LOW 150' - 10" FD KNOX BOX 1. UTILITY METERS, CONDUIT, LADDERS, FLUES, VENTS, AND OTHER EQUIPMENT ATTACHED TO THE BUILDING, SHALL BE PAINTED TO MATCH THE ADJACENT EXTERIOR BUILDING MATERIAL COLOR. CONTRACTOR SHALL SUBMIT PAINT COLOR FOR APPROVAL BY ARCHITECT. 2. INSTALL A RECESSED FIRE DEPARTMENT KNOX BOX BY EACH OF THE THREE KEYED ENTRY DOORS. FINISH SHALL MATCH ADJACENT MATERIAL. GENERAL NOTES - BUILDING ELEVATION 000 A.2 1/8" = 1'-0" A1 EXTERIOR NORTH ELEVATION http://www.archnexus.com DATE: DRAWN BY: CHECKED BY: NEXUS PROJECT #: A R C H I T E C T U R A L SHEET CONTENTS: 2505 East Parleys Way Salt Lake City, UT 84109 T 801.924.5000 f 801.924.5001 Architectural NEXUS, Inc. REVISIONS 1 2 3 4 5 MAIN FLOOR 100' - 0" T.O. TOWER GABLE 187' - 1" T.O. PARAPET 02 130' - 8" TOWER PARAPET 02 178' - 5" T.O. LOWER TOWER WALL 139' - 6" MORONI BASE 204' - 0" UPPER TOWER 146' - 1" ARCHITECTURAL PRECAST CONCRETE, TYP. SLATE ROOF METAL WINDOW SYSTEM WITH ARTGLASS, TYP. PAINTED FIBERGLASS STATUE ROOF ACCESS PLATFORMS 128' - 8" WINDOW GRATE MID 159' - 10" WINDOW GRATE HIGH 167' - 10" WINDOW GRATE LOW 150' - 10" 1. UTILITY METERS, CONDUIT, LADDERS, FLUES, VENTS, AND OTHER EQUIPMENT ATTACHED TO THE BUILDING, SHALL BE PAINTED TO MATCH THE ADJACENT EXTERIOR BUILDING MATERIAL COLOR. CONTRACTOR SHALL SUBMIT PAINT COLOR FOR APPROVAL BY ARCHITECT. 2. INSTALL A RECESSED FIRE DEPARTMENT KNOX BOX BY EACH OF THE THREE KEYED ENTRY DOORS. FINISH SHALL MATCH ADJACENT MATERIAL. GENERAL NOTES - BUILDING ELEVATION 000 A.3 1/8" = 1'-0" A1 EXTERIOR WEST ELEVATION http://www.archnexus.com DATE: DRAWN BY: CHECKED BY: NEXUS PROJECT #: A R C H I T E C T U R A L SHEET CONTENTS: 2505 East Parleys Way Salt Lake City, UT 84109 T 801.924.5000 f 801.924.5001 Architectural NEXUS, Inc. REVISIONS 1 2 3 4 5 D C B MAIN FLOOR 100' - 0" T.O. TOWER GABLE 187' - 1" TOWER PARAPET 02 178' - 5" T.O. LOWER TOWER WALL 139' - 6" MORONI BASE 204' - 0" UPPER TOWER 146' - 1" ARCHITECTURAL PRECAST CONCRETE, TYP. SLATE ROOF METAL WINDOW SYSTEM WITH ARTGLASS, TYP. PAINTED FIBERGLASS STATUE ROOF ACCESS PLATFORMS 128' - 8" WINDOW GRATE MID 159' - 10" WINDOW GRATE HIGH 167' - 10" WINDOW GRATE LOW 150' - 10" 1. UTILITY METERS, CONDUIT, LADDERS, FLUES, VENTS, AND OTHER EQUIPMENT ATTACHED TO THE BUILDING, SHALL BE PAINTED TO MATCH THE ADJACENT EXTERIOR BUILDING MATERIAL COLOR. CONTRACTOR SHALL SUBMIT PAINT COLOR FOR APPROVAL BY ARCHITECT. 2. INSTALL A RECESSED FIRE DEPARTMENT KNOX BOX BY EACH OF THE THREE KEYED ENTRY DOORS. FINISH SHALL MATCH ADJACENT MATERIAL. GENERAL NOTES - BUILDING ELEVATION 000 A.4 1/8" = 1'-0" A1 EXTERIOR SOUTH ELEVATION http://www.archnexus.com DATE: DRAWN BY: CHECKED BY: NEXUS PROJECT #: A R C H I T E C T U R A L SHEET CONTENTS: 2505 East Parleys Way Salt Lake City, UT 84109 T 801.924.5000 f 801.924.5001 Architectural NEXUS, Inc. REVISIONS 1 2 3 4 5 D C B A # GROUNDS BUILDING FLOOR 100' - 0" T.O. MASONRY WALL 112' - 0" T.O. ENCLOSURE WALL 108' - 0" STONE EIFS EARTH BERM GROUNDS BUILDING FLOOR 100' - 0" T.O. MASONRY WALL 112' - 0" T.O. ENCLOSURE WALL 108' - 0" STONE EIFS RECYCLING WASTE GROUNDS BUILDING FLOOR 100' - 0" T.O. MASONRY WALL 112' - 0" T.O. ENCLOSURE WALL 108' - 0" STONE EIFS EARTH BERM GROUNDS BUILDING FLOOR 100' - 0" T.O. MASONRY WALL 112' - 0" T.O. ENCLOSURE WALL 108' - 0" STONE EIFS GAS METER STONE SCREEN WALL MECHANICAL ENCLOSURE FLOOR 100' - 0" MECHANICAL ENCLOSURE LOWER FLOOR 94' - 0" T.O. UTILITY WALL 108' - 0" STONE EARTH BERM MECHANICAL ENCLOSURE FLOOR 100' - 0" MECHANICAL ENCLOSURE LOWER FLOOR 94' - 0" T.O. UTILITY WALL 108' - 0" STONE EARTH BERM MECHANICAL ENCLOSURE FLOOR 100' - 0" MECHANICAL ENCLOSURE LOWER FLOOR 94' - 0" 12 5 ARCHITECTURAL GRADE SHINGLES EIFS ACCENT BAND EIFS CAST STONE MASONRY 12 5 12 5 22'-1" 12 5 000 A.6 1/8" = 1'-0" D1 PRESIDENT'S RESIDENCE NORTH ELEVATION 000 A.6 1/8" = 1'-0" D4 PRESIDENT'S RESIDENCE EAST ELEVATION 000 A.6 1/8" = 1'-0" A1 PRESIDENT'S RESIDENCE SOUTH ELEVATION 000 A.6 1/8" = 1'-0" A4 PRESIDENT'S RESIDENCE WEST ELEVATION http://www.archnexus.com DATE: DRAWN BY: CHECKED BY: NEXUS PROJECT #: A R C H I T E C T U R A L SHEET CONTENTS: 2505 East Parleys Way Salt Lake City, UT 84109 T 801.924.5000 f 801.924.5001 Architectural NEXUS, Inc. REVISIONS 1 2 3 4 5 D C B A # SALT LAKE CITY PLACERVILLE SACRAMENTO Fort Collins Colorado Temple September 11, 2013 8/30/2013 9:26:23 AM BUILDING ELEVATIONS Author The Church of Jesus Christ of Latter-day Saints 2180 Majestic Dr. Fort Collins, Colorado 80528 11080 000 A.6 Checker T.O. UTILITY WALL 108' - 0" STONE EARTH BERM MECHANICAL ENCLOSURE FLOOR 100' - 0" MECHANICAL ENCLOSURE LOWER FLOOR 94' - 0" T.O. UTILITY WALL 108' - 0" STONE EARTH BERM GROUNDS BUILDING FLOOR 100' - 0" T.O. MASONRY WALL 112' - 0" T.O. ENCLOSURE WALL 108' - 0" RECYCLING WASTE SIGNAGE FOR "WASTE" & "RECYCLING" (SEE SPECS). BOLLARDS EIFS STONE DOUBLE LEAF METAL GATES (SEE C1/AS501) GROUNDS BUILDING FLOOR 100' - 0" T.O. MASONRY WALL 112' - 0" T.O. ENCLOSURE WALL 108' - 0" SECONDARY ROOF DRAIN DOWNSPOUT 3' - 9" FD KNOX BOX HOSE REEL EIFS STONE STONE SCREEN WALL GAS METER 1. UTILITY METERS, CONDUIT, LADDERS, FLUES, VENTS, AND OTHER EQUIPMENT ATTACHED TO THE BUILDING, SHALL BE PAINTED TO MATCH THE ADJACENT EXTERIOR BUILDING MATERIAL COLOR. CONTRACTOR SHALL SUBMIT PAINT COLOR FOR APPROVAL BY ARCHITECT. GENERAL NOTES - BUILDING ELEVATION 000 A.5 1/8" = 1'-0" D4 GROUNDS BUILDING EAST EXTERIOR ELEVATION 000 A.5 1/8" = 1'-0" D1 GROUNDS BUILDING NORTH EXTERIOR ELEVATION 000 A.5 1/8" = 1'-0" C1 GROUNDS BUILDING SOUTH EXTERIOR ELEVATION 000 A.5 1/8" = 1'-0" C4 GROUNDS BUILDING WEST EXTERIOR ELEVATION 000 A.5 1/8" = 1'-0" B4 MECHANICAL ENCLOSURE EAST EXTERIOR ELEVATION 000 A.5 1/8" = 1'-0" B1 MECHANICAL ENCLOSURE NORTH EXTERIOR ELEVATION 000 A.5 1/8" = 1'-0" A1 MECHANICAL ENCLOSURE SOUTH EXTERIOR ELEVATION 000 A.5 1/8" = 1'-0" A4 MECHANICAL ENCLOSURE WEST EXTERIOR ELEVATION http://www.archnexus.com DATE: DRAWN BY: CHECKED BY: NEXUS PROJECT #: A R C H I T E C T U R A L SHEET CONTENTS: 2505 East Parleys Way Salt Lake City, UT 84109 T 801.924.5000 f 801.924.5001 Architectural NEXUS, Inc. REVISIONS 1 2 3 4 5 D C B A # SALT LAKE CITY PLACERVILLE SACRAMENTO Fort Collins Colorado Temple September 11, 2013 8/30/2013 9:26:18 AM BUILDING ELEVATIONS Author The Church of Jesus Christ of Latter-day Saints 2180 Majestic Dr. Fort Collins, Colorado 80528 11080 000 A.5 Checker 000 A.5 1/8" = 1'-0" E1 GROUNDS BUILDING NORTH ELEVATION (INSIDE SCREEN WALL) 000 A.5 1/8" = 1'-0" E2 GROUNDS BUILDING EAST ELEVATION (INSIDE SCREEN WALL) SALT LAKE CITY PLACERVILLE SACRAMENTO Fort Collins Colorado Temple September 11, 2013 9/9/2013 2:16:05 PM BUILDING ELEVATIONS Author The Church of Jesus Christ of Latter-day Saints 2180 Majestic Dr. Fort Collins, Colorado 80528 11080 000 A.4 Checker A # SALT LAKE CITY PLACERVILLE SACRAMENTO Fort Collins Colorado Temple September 11, 2013 9/9/2013 2:15:45 PM BUILDING ELEVATIONS Author The Church of Jesus Christ of Latter-day Saints 2180 Majestic Dr. Fort Collins, Colorado 80528 11080 000 A.3 Checker D C B A # SALT LAKE CITY PLACERVILLE SACRAMENTO Fort Collins Colorado Temple September 11, 2013 9/9/2013 2:15:23 PM BUILDING ELEVATIONS Author The Church of Jesus Christ of Latter-day Saints 2180 Majestic Dr. Fort Collins, Colorado 80528 11080 000 A.2 Checker A # SALT LAKE CITY PLACERVILLE SACRAMENTO Fort Collins Colorado Temple September 11, 2013 9/9/2013 2:15:08 PM BUILDING ELEVATIONS Author The Church of Jesus Christ of Latter-day Saints 2180 Majestic Dr. Fort Collins, Colorado 80528 11080 000 A.1 Checker