HomeMy WebLinkAboutASPEN HEIGHTS STUDENT HOUSING - FDP - FDP130010 - PLANS - UTILITY PLANS (251)LUPINE DRIVE
WALLFLOWER LANE
(PRIVATE DRIVE)
BLUE SPRUCE DRIVE
SANGRE DE CRISTO LANE
(PRIVATE DRIVE)
(PRIVATE DRIVE)
TEN-MILE RANGE LANE
LA GARITA LANE
(PRIVATE DRIVE)
ECHO MOUNTAIN LANE
(PRIVATE DRIVE)
COPPER MOUNTAIN LANE
(PRIVATE DRIVE)
(PRIVATE DRIVE)
STEAMBOAT LANE
(PRIVATE DRIVE)
SOL VISTA LANE
(PRIVATE DRIVE)
MARY JANE WAY
BLUE SPRUCE DRIVE
COPPER MOUNTAIN STREET
(PRIVATE DRIVE)
STEAMBOAT STREET
(PRIVATE DRIVE)
LUPINE DRIVE
FORGET-ME-NOT LANE
(PRIVATE DRIVE)
INTERIM
DETENTION BASIN
DISCHARGE PIPE
FEMA/FIRM
100 YEAR
FLOODPLAIN
BOUNDARY
INSTALL SITE
PORTIONS OF NECCO
STORM DRAINS FOR
FUTURE USE
FIREWEED LANE
(PRIVATE DRIVE)
(PRIVATE DRIVE)
TEN-MILE RANGE
LANE
MARY JANE WAY
(PRIVATE DRIVE)
NEW VINE DRIVE
PER OFFSITE PLANS
TRICKLE
PAN
OUTLET CONTROL
STRUCTURE OF
INTERIM
DETENTION
BASIN
YARROW
CIRCLE
LUPINE
DRIVE
SPURGE
CIRCLE
MAINTAIN / MODIFY
EXISTING OUTLET
PROTECTION AS
NECESSARY FOR NEW PIPE
CAJETAN STREET
LAKE CANAL
PER OFFSITE PLANS
OSIANDER STREET
REDWOOD STREET
5
EROSION CONTROL PLAN
1-800-922-1987
400'
GRAPHIC SCALE
100' 0' 50' 100' 200'
1 INCH = 100 FEET
LEGEND
1"=100'
No. Revision/Issue Date
1269 CLEVELAND AVE #4
deanne@TFGcolorado.com (970) 669-3737
PLANNERS / LANDSCAPE ARCHITECTS
SHEET
OF
PROJECT:
155-101FC
DATE: DRAWN BY:
OCG
SCALE:
By:
THIS DOCUMENT IS AN INSTRUMENT OF PROFESSIONAL SERVICE OF THE FREDERICKSON GROUP, LLC. THE FREDERICKSON GROUP SHALL, TO THE FULLEST EXTENT PERMITTED BY LAW, BE HELD HARMLESS AND RELEASED
OF ANY DAMAGE,LIABILITY, OR COST ALLEGEDLY ARISING OUT OF UNAUTHORIZED MODIFICATION, CHANGE, OR REUSE OF THIS DOCUMENT BY OTHERS.
3715 Shallow Pond Drive
Ft. Collins, CO 80528
Phone: (970) 226-0264
larrycowen@comcast.net
16 SEPT 2013
70
ASPEN HEIGHTS, FORT COLLINS
LOVELAND,CO 80537
(1.) THE EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO
ANY CONSTRUCTION ON THIS SITE.
(2.) THERE SHALL BE NO EARTH-DISTURBING ACTIVITY OUTSIDE THE LIMITS DESIGNATED ON THE ACCEPTED
PLANS.
(3.) ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND
DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION
CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE
AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL
REPORT.
(4.) AT ALL TIMES DURING CONSTRUCTION, THE DEVELOPER SHALL BE RESPONSIBLE FOR PREVENTING AND
CONTROLLING ON-SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO
MINIMIZE WIND BLOWN SEDIMENT. THE DEVELOPER SHALL ALSO BE RESPONSIBLE FOR INSTALLING AND
MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN.
(5.) PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL
OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR
IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME.
(6.) ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS,
STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG
LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL BMPS ARE
INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS-OF-WAY SHALL REMAIN EXPOSED BY
LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR
PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS
OTHERWISE APPROVED BY THE CITY/COUNTY.
(7.) IN ORDER TO MINIMIZE EROSION POTENTIAL, ALL TEMPORARY (STRUCTURAL) EROSION CONTROL
MEASURES SHALL:
(A.) BE INSPECTED AT A MINIMUM OF ONCE EVERY TWO (2) WEEKS AND AFTER EACH
SIGNIFICANT STORM EVENT AND REPAIRED OR RECONSTRUCTED AS NECESSARY IN ORDER TO
ENSURE THE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION.
(B.) REMAIN IN PLACE UNTIL SUCH TIME AS ALL THE SURROUNDING
DISTURBED AREAS ARE SUFFICIENTLY STABILIZED AS DETERMINED BY THE EROSION CONTROL INSPECTOR.
(C.) BE REMOVED AFTER THE SITE HAS BEEN SUFFICIENTLY STABILIZED AS DETERMINED BY THE
EROSION CONTROL INSPECTOR.
(8.) WHEN TEMPORARY EROSION CONTROL MEASURES ARE REMOVED, THE DEVELOPER SHALL BE
RESPONSIBLE FOR THE CLEAN UP AND REMOVAL OF ALL SEDIMENT AND DEBRIS FROM ALL DRAINAGE
INFRASTRUCTURE AND OTHER PUBLIC FACILITIES.
(9.) THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY
DEPOSITED ON EXISTING STREETS, SIDEWALKS, OR OTHER PUBLIC RIGHTS OF WAY, AND MAKE SURE
STREETS AND WALKWAYS ARE CLEANED AT THE END OF EACH WORKING DAY.
(10.)ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED
AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY WATERS
OF THE UNITED STATES.
(11.)NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE
PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT
FENCING. ANY SOIL STOCKPILE REMAINING AFTER THIRTY (30) DAYS SHALL BE SEEDED AND MULCHED.
(12.)THE STORMWATER VOLUME CAPACITY OF DETENTION PONDS WILL BE RESTORED AND STORM SEWER
LINES WILL BE CLEANED UPON COMPLETION OF THE PROJECT AND BEFORE TURNING THE MAINTENANCE
OVER TO THE CITY/COUNTY OR HOMEOWNERS ASSOCIATION (HOA).
(13.) CITY ORDINANCE AND COLORADO DISCHARGE PERMIT SYSTEM (CDPS) REQUIREMENTS MAKE IT
UNLAWFUL TO DISCHARGE OR ALLOW THE DISCHARGE OF ANY POLLUTANT OR CONTAMINATED WATER
FROM CONSTRUCTION SITES. POLLUTANTS INCLUDE, BUT ARE NOT LIMITED TO DISCARDED BUILDING
MATERIALS, CONCRETE TRUCK WASHOUT, CHEMICALS, OIL AND GAS PRODUCTS, LITTER, AND SANITARY
WASTE. THE DEVELOPER SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE
THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND
ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS.
(14.) A DESIGNATED AREA SHALL BE PROVIDED ON SITE FOR CONCRETE TRUCK CHUTE WASHOUT. THE AREA
SHALL BE CONSTRUCTED SO AS TO CONTAIN WASHOUT MATERIAL AND LOCATED AT LEAST FIFTY (50)
FEET AWAY FROM ANY WATERWAY DURING CONSTRUCTION. UPON COMPLETION OF CONSTRUCTION
ACTIVITIES THE CONCRETE WASHOUT MATERIAL WILL BE REMOVED AND PROPERLY DISPOSED OF PRIOR
TO THE AREA BEING RESTORED.
(15.) TO ENSURE THAT SEDIMENT DOES NOT MOVE OFF OF INDIVIDUAL LOTS ONE OR MORE OF THE
FOLLOWING SEDIMENT/EROSION CONTROL BMPS SHALL BE INSTALLED AND MAINTAINED UNTIL THE LOTS
ARE SUFFICIENTLY STABILIZED, AS DETERMINED BY THE EROSION CONTROL INSPECTOR.
(A.) ALONG LOT PERIMETER.
(B.) OTHER LOCATIONS, IF NEEDED.
(16.) CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS
SHOWN ON THESE PLANS. THE DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED
NECESSARY, AS DIRECTED BY THE CITY/COUNTY.
MATCHLINE -- (SEE RIGHT SIDE)
MATCHLINE -- (SEE LEFT SIDE)
NOTE: REFER TO DRAINAGE PLAN
FOR FLOODPLAIN INFORMATION
Mobilization Fdn. Excav'n Site Grading Vertical Const. Flatwork Inst. Landscaping
Demobilization
Best Management Practices (BMP's)
Structural "Installation"
Silt Fence
Vehicle Tracking Pad
Inlet Protection (Any existing inlets
downstream of site)
Sediment Trap / Filter (in Detention Basin)
Contour Furrows (Ripping / Disking)
Flow Barriers / Wattle Dikes
Riprap Armoring
*All BMP's are to be removed once
construction is complete
Vegetative
Temporary Seeding / Planting
Any time the site will sit
dormant longer than 30 days.
Mulching / Sealant
Any time the site will sit
dormant longer than 30 days.
Sod Installation
Permanent Seeding / Planting
Rolled Products (Netting / Blankets / Mats)
Any time the site will sit
dormant longer than 30 days.