Loading...
HomeMy WebLinkAboutASPEN HEIGHTS STUDENT HOUSING - FDP - FDP130010 - PLANS - UTILITY PLANS (252)B SECTION A-A SCALE: 1:10 OUTLET CONTROL STRUCTURE OF INTERIM DETENTION BASIN INTERIM DETENTION BASIN DISCHARGE PIPE FEMA/FIRM 100 YEAR FLOODWAY BOUNDARY FEMA/FIRM 100 YEAR FLOODPLAIN BOUNDARY VINE/REDWOOD - SEE SEPARATE OFFSITE PLANS INSTALL SITE PORTIONS OF NECCO STORM DRAINS FOR FUTURE USE TRICKLE PAN FIREWEED LANE (PRIVATE DRIVE) LUPINE DRIVE WALLFLOWER LANE (PRIVATE DRIVE) (PRIVATE DRIVE) FORGET-ME-NOT LANE LA GARITA LANE (PRIVATE DRIVE) ECHO MOUNTAIN LANE (PRIVATE DRIVE) (PRIVATE DRIVE) STEAMBOAT LANE (PRIVATE DRIVE) SOL VISTA LANE 2 3 4 7 8 16 12B 13 19 10 15 18 17 5 9 22 12A LUPINE DRIVE ECHO MOUNTAIN LANE LA GARITA LANE (PRIVATE DRIVE) (PRIVATE DRIVE) (PRIVATE DRIVE) FIREWEED LANE (PRIVATE DRIVE) STEAMBOAT LANE SOL VISTA LANE (PRIVATE DRIVE) REDWOOD STREET WALLFLOWER LANE (PRIVATE DRIVE) CONIFER STREET CONIFER STREET (PRIVATE DRIVE) MARY JANE WAY COPPER MOUNTAIN STREET (PRIVATE DRIVE) STEAMBOAT STREET (PRIVATE DRIVE) MARY JANE WAY (PRIVATE DRIVE) COPPER MOUNTAIN LANE (PRIVATE DRIVE) TEN-MILE RANGE LANE (PRIVATE DRIVE) SANGRE DE CRISTO LANE (PRIVATE DRIVE) BLUE SPRUCE DRIVE BLUE SPRUCE DRIVE TEN-MILE RANGE LANE (PRIVATE DRIVE) 24 23 25 26 160' EMERGENCY OVERFLOW WEIR 27 NEW VINE DRIVE FEMA/FIRM 100 YEAR FLOODPLAIN BOUNDARY 25 26 27 OSIANDER ST REDWOOD STREET LAKE CANAL CAJETAN ST FEMA/FIRM 100 YEAR FLOODWAY BOUNDARY 6 OVERALL DRAINAGE PLAN 1-800-922-1987 400' GRAPHIC SCALE 100' 0' 50' 100' 200' 1 INCH = 100 FEET LEGEND 8 NOTE: SEE SHEETS 7-11 FOR FLOW ARROWS. NOTE: SEE LANDSCAPE PLANS FOR REVEGATATION INFORMATION. NOTES: 1. A FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR ALL IMPROVEMENTS (CURB, GUTTER, ROADWAY, UTILITIES, LANDSCAPING, ETC.) LOCATED IN THE FLOODPLAIN. 2. STORAGE OF MATERIALS OR EQUIPMENT IS NOT ALLOWED IN THE FLOODWAY, WHETHER TEMPORARY (DURING CONSTRUCTION) OR PERMANENT. 3. A CONDITIONAL LETTER OF MAP REVISION (CLOMR) MUST BE APPROVED BY FEMA PRIOR TO DOING ANY WORK (CURB, GUTTER, ROADWAY, UTILITIES, EXCAVATION, LANDSCAPING, ETC.) WITHIN THE FLOODWAY. 4. UPON COMPLETION OF WORK WITHIN THE FLOODWAY, A LETTER OF MAP REVISION (LOMR) MUST BE APPROVED BY FEMA. 5. FEMA/FIRM FLOODPLAIN AND FLOODWAY ELEVATIONS ARE ON NAVD88 DATUM. ALL OTHER ELEVATIONS ARE ON NGVD29 + 3.00'. A FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR CONSTRUCTION WITHIN THE FLOODPLAIN. 1"=100' No. Revision/Issue Date 1269 CLEVELAND AVE #4 deanne@TFGcolorado.com (970) 669-3737 PLANNERS / LANDSCAPE ARCHITECTS SHEET OF PROJECT: 155-101FC DATE: DRAWN BY: OCG SCALE: By: THIS DOCUMENT IS AN INSTRUMENT OF PROFESSIONAL SERVICE OF THE FREDERICKSON GROUP, LLC. THE FREDERICKSON GROUP SHALL, TO THE FULLEST EXTENT PERMITTED BY LAW, BE HELD HARMLESS AND RELEASED OF ANY DAMAGE,LIABILITY, OR COST ALLEGEDLY ARISING OUT OF UNAUTHORIZED MODIFICATION, CHANGE, OR REUSE OF THIS DOCUMENT BY OTHERS. 3715 Shallow Pond Drive Ft. Collins, CO 80528 Phone: (970) 226-0264 larrycowen@comcast.net 16 SEPT 2013 70 ASPEN HEIGHTS, FORT COLLINS LOVELAND,CO 80537 SEE UPPER LEFT SIDE FOR CONTINUATION SEE BOTTOM RIGHT SIDE FOR CONTINUATION