HomeMy WebLinkAboutASPEN HEIGHTS STUDENT HOUSING - FDP - FDP130010 - SUBMITTAL DOCUMENTS - ROUND 3 - DRAINAGE REPORT (8)Aspen Heights Student Housing, Fort Collins, CO PAGE 1 OF 2 9/16/13 ASPEN HEIGHTS STUDENT HOUSING Fort Collins, Colorado STORM WATER MANAGEMENT PLAN INSPECTION REPORT (Page 1 of 2) Inspections/reports must be completed at least every fourteen (14) days and within 24 hours following any rainfall or snowmelt event that causes erosion. Inspection Type: Routine (every 14 calendar days) Pre-Storm Storm Post-Storm Date: _______________________________ Week Ending: ___________________________ Weather/Storm Event Information: Storm Start Time: ________________________ Storm Duration: ___________________________ Time Elapsed Since Last Storm: _____________ Approximate Amount of Rainfall (inches): ______ Based on the results of the inspection, necessary control modifications shall be implemented within seven (7) calendar days. These reports shall be kept on file as part of the Storm Water Pollution Prevention Plan for at least five (5) years from the date of completion and submission of the Final Stabilization Certification/Termination Checklist and Notice of Termination. A copy of the SWMP shall be kept at the site at all times during construction. Certification Statement: “I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.” Name of Inspector: _________________________________ Title of Inspector: ____________________________ Qualifications of Inspector: Inspector’s Signature: Construction phasing/sequencing is consistent with the SWMP and Erosion Control Plans: Yes No Compliance Certification I certify that, based on there being no incidents of non-compliance identified during the inspection, the site is in compliance with the SWMP and the Construction General Permit. Name of duly authorized representative (Printed): Signature of duly authorized representative: Date: *Note: This Compliance Certification is only to be signed by a duly authorized representative (Project Manager) when there are no “unsatisfactory” conditions and the construction phasing/sequencing is consistent with the SWMP, rendering the site in full compliance with the SWMP and the Construction General Permit. Aspen Heights Student Housing, Fort Collins, CO PAGE 2 OF 2 9/16/13 Form C-1 Continued Inspection Areas (Structural) Satisfactory Unsatisfactory (provide location or numeric identification per plan sheet) N/A Corrective Action Required Implementation Date of Corrective Action Construction Entrance/Exit Perimeter Silt Fence Inlet Protection Outlet Protection Temporary Drainage Swales Temporary Sediment Basin Material Laydown/ Staging Area Underground Storm Sewer Curb & Gutter System Storm Water Detention Basin Vehicle / Equipment Service Area Soil Stockpile Area Material Storage Areas Waste Storage Areas Discharges of Sediments or Other Pollutants from Site Project Manager: ________________________________________