HomeMy WebLinkAboutASPEN HEIGHTS STUDENT HOUSING - FDP - FDP130010 - SUBMITTAL DOCUMENTS - ROUND 3 - DRAINAGE REPORT (8)Aspen Heights Student Housing, Fort Collins, CO PAGE 1 OF 2
9/16/13
ASPEN HEIGHTS STUDENT HOUSING
Fort Collins, Colorado
STORM WATER MANAGEMENT PLAN
INSPECTION REPORT (Page 1 of 2)
Inspections/reports must be completed at least every fourteen (14) days and within 24 hours following
any rainfall or snowmelt event that causes erosion.
Inspection Type: Routine (every 14 calendar days) Pre-Storm Storm Post-Storm
Date: _______________________________ Week Ending: ___________________________
Weather/Storm Event Information:
Storm Start Time: ________________________ Storm Duration: ___________________________
Time Elapsed Since Last Storm: _____________ Approximate Amount of Rainfall (inches): ______
Based on the results of the inspection, necessary control modifications shall be implemented within seven (7)
calendar days. These reports shall be kept on file as part of the Storm Water Pollution Prevention Plan for at least
five (5) years from the date of completion and submission of the Final Stabilization Certification/Termination Checklist
and Notice of Termination. A copy of the SWMP shall be kept at the site at all times during construction.
Certification Statement:
“I certify under penalty of law that this document and all attachments were prepared under my direction or supervision
in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the
information submitted. Based on my inquiry of the person or persons who manage the system, or those persons
directly responsible for gathering information, the information submitted is, to the best of my knowledge and belief,
true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fine and imprisonment for knowing violations.”
Name of Inspector: _________________________________ Title of Inspector: ____________________________
Qualifications of Inspector:
Inspector’s Signature:
Construction phasing/sequencing is consistent with the SWMP and Erosion Control Plans: Yes No
Compliance Certification
I certify that, based on there being no incidents of non-compliance identified during the inspection, the site is
in compliance with the SWMP and the Construction General Permit.
Name of duly authorized representative (Printed):
Signature of duly authorized representative:
Date:
*Note: This Compliance Certification is only to be signed by a duly authorized representative (Project Manager) when
there are no “unsatisfactory” conditions and the construction phasing/sequencing is consistent with the SWMP,
rendering the site in full compliance with the SWMP and the Construction General Permit.
Aspen Heights Student Housing, Fort Collins, CO PAGE 2 OF 2
9/16/13
Form C-1 Continued
Inspection Areas
(Structural)
Satisfactory
Unsatisfactory
(provide location or
numeric identification
per plan sheet)
N/A Corrective Action Required Implementation Date
of Corrective Action
Construction Entrance/Exit
Perimeter Silt Fence
Inlet Protection
Outlet Protection
Temporary Drainage Swales
Temporary Sediment Basin
Material Laydown/
Staging Area
Underground Storm Sewer
Curb & Gutter System
Storm Water Detention Basin
Vehicle / Equipment Service
Area
Soil Stockpile Area
Material Storage Areas
Waste Storage Areas
Discharges of Sediments or
Other Pollutants from Site
Project Manager: ________________________________________