Loading...
HomeMy WebLinkAboutASPEN HEIGHTS STUDENT HOUSING - FDP - FDP130010 - PLANS - UTILITY PLANS (104)CONIFER STREET CONIFER STREET CONIFER STREET SPURGE CIRCLE YARROW CIRCLE BLONDEL OSIANDER STREET OSIANDER STREET OSIANDER STREET BLUE SPRUCE DRIVE REDWOOD STREET REDWOOD STREET CAJETAN STREET LUPINE DRIVE CONIFER STREET CAJETAN STREET LAKE CANAL STREET 66 1-800-922-1987 400' GRAPHIC SCALE 100' 0' 50' 100' 200' 1 INCH = 100 FEET No. Revision/Issue Date 1269 CLEVELAND AVE #4 deanne@TFGcolorado.com (970) 669-3737 PLANNERS / LANDSCAPE ARCHITECTS SHEET OF PROJECT: 155-101FC DATE: DRAWN BY: OCG SCALE: By: THIS DOCUMENT IS AN INSTRUMENT OF PROFESSIONAL SERVICE OF THE FREDERICKSON GROUP, LLC. THE FREDERICKSON GROUP SHALL, TO THE FULLEST EXTENT PERMITTED BY LAW, BE HELD HARMLESS AND RELEASED OF ANY DAMAGE,LIABILITY, OR COST ALLEGEDLY ARISING OUT OF UNAUTHORIZED MODIFICATION, CHANGE, OR REUSE OF THIS DOCUMENT BY OTHERS. 3715 Shallow Pond Drive Ft. Collins, CO 80528 Phone: (970) 226-0264 larrycowen@comcast.net 16 SEPT 2013 70 ASPEN HEIGHTS, FORT COLLINS LOVELAND,CO 80537 1"=100' LUPINE DRIVE BLUE SPRUCE DRIVE OSIANDER STREET BLUE SPRUCE DRIVE CONIFER STREET CONIFER STREET CONIFER STREET BLUE SPRUCE DRIVE BLUE SPRUCE DRIVE BLONDEL DRIVE OSIANDER STREET CAJETAN STREET CONIFER STREET (NEW VINE DRIVE) (NEW VINE DRIVE) (NEW VINE DRIVE) LUPINE DRIVE LUPINE DRIVE REDWOOD STREET YARROW CIRCLE SPURGE CIRCLE REDWOOD STREET REDWOOD STREET REDWOOD STREET ASPEN HEIGHTS FORT COLLINS CONSTRUCTION PHASING 1. THE GEOGRAPHICAL EXTENT OF EACH OF THE RESPECTIVE CONSTRUCTION PHASES IS SHOWN WITH BOUNDARIES ON THE PHASING PLAN. 2. 7+(6&23(2):25.7+$7:,//%(&203/(7(',1($&+³3+$6(´:,//,1&/8'( x ALL ROAD AND UTILITIES IMPROVEMENTS, INCLUDING SERVICE CONNECTIONS, THAT ARE /2&$7(':,7+,17+(%281'$5,(62)7+(³3+$6(´ x $//87,/,7<0$,167+$7$5(/2&$7('2876,'(7+(%281'$5,(62)7+(³3+$6(´%87 :+,&+$5(1(&(66$5<7268332577+(,1)5$6758&785(:,7+,17+(³3+$6(´ INCLUDING: a. DOWNSTREAM SANITARY SEWER OR STORM DRAIN MAINS. b. WATER MAINS TO COMPLETE A TRUNK LOOP. c. DRY UTILITIES NECESSARY TO COMPLETE A TRUNK LOOP. x 87,/,7<0$,16$1'6(59,&(6$662&,$7(':,7+)8785(³3+$6(6´%87:+,&+$5( /2&$7('%(1($7+52$'672%(&216758&7('$63$572)7+(&855(17³3+$6(´ x ALL TEMPORARY TERMINATION REQUIREMENTS, AS CALLED OUT ON THE PHASING PLAN, INCLUDING: a. TEMPORARY HYDRANTS AT THE ENDS OF MAINS THAT WILL BE EXTENDED INTO A 68%6(48(17³3+$6(´ b. CAPS, PLUGS OR BULKHEADS AT THE UPSTREAM ENDS OF SANITARY SEWER AND 67250'5$,13,3,1*7+$7:,//%((;7(1'(',172$68%6(48(17³3+$6(´ c. NOTE THAT TEMPORARY TERMINATION INFRASTRUCTURE TYPICALLY ONLY $33/,(6727+(,1,7,$/³3+$6(´,1)5$6758&785()2568%6(48(17³3+$6(6´:,// BE INFILL IN NATURE. x ALL TEMPORARY GRADING, SWALES, AND EROSION CONTROL TO SAFELY TRANSMIT SHEET FLOWS AND CONCENTRATED RUNOFF TO INTENDED DRAINAGE PATTERNS AND TO MINIMIZE SOIL EROSION. REFERENCE DRAINAGE AND EROSION CONTROL PLANS. ADDITIONAL GRADING AND EROSION CONTROL MEASURES SHALL BE INSTALLED AS NECESSARY AND PER THE PROJECT EROSION CONTROL REPORT/SWMP PERMIT THROUGHOUT CONSTRUCTION. FEMA/FIRM 100 YEAR FLOODWAY BOUNDARY FEMA/FIRM 100 YEAR FLOODPLAIN BOUNDARY REDWOOD STREET CONIFER STREET CONIFER STREET BLUE SPRUCE DRIVE CONIFER STREET SPURGE CIRCLE YARROW CIRCLE LUPINE DRIVE BLONDEL STREET NEW VINE DRIVE NEW VINE DRIVE OSIANDER STREET OSIANDER STREET OSIANDER STREET REDWOOD STREET REDWOOD STREET NEW VINE DRIVE MULLEN DRIVE BLUE SPRUCE DRIVE LUPINE DRIVE LUPINE DRIVE BLUE SPRUCE DRIVE CONIFER STREET KEYMAP NOT TO SCALE INSTALL TEMPORARY CAP AND STAKE AT END OF SEWER MAIN STUB. INSTALL TEMPORARY HYDRANTS AT ENDS OF WATER MAIN STUB. INSTALL TEMPORARY HYDRANTS AT ENDS OF WATER MAIN STUB. INSTALL TEMPORARY CAP AND STAKE AT END OF SEWER MAIN STUB. SOUTHEAST PHASE II NORTH EAST PHASE I NORTHWEST PHASE III SOUTHWEST PHASE IV OFFSITE PHASE INTERIM OUTFALL WILL BE COMPLETED TO LAKE CANAL DISCHARGE POINT WITH PHASE I PROPOSED INTERIM DETENTION BASIN STORM SEWER SECTION ON REDWOOD ST. TO INTERIM DETENTION BASIN TO BE INCLUDED IN NORTH EAST PHASE I CONSTRUCTION INSTALL BLUE SPRUCE DRIVE STREET IMPROVEMENTS FROM LUPINE DRIVE TO NEW VINE DRIVE AS SHOWN OVERALL PHASING PLAN