Loading...
HomeMy WebLinkAboutTERRA VIDA II APARTMENTS - PDP - PDP130028 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSZIEGLER ROAD E. HARMONY ROAD PRECISION DR. ����� ���� �� ���������� ROCK CREEK DR. LADY MOON DR. CINQUEFOIL LANE (MINOR COLLECTOR 76' ROW) 76' ROW 9' UTILITY ESMT. 9' UTILITY ESMT. 25' {}-50' {}-{} 25' -{} 8' PARKING 11' TRAVEL 6' BIKE LN. 11' TRAVEL 6' BIKE LN. 8' PARKING No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: Sept. 4, 2013 PROJECT: 514-002 335-009 Sheet MASTER T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 09/04/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� TERRA VIDA II APARTMENTS & OFFSITE ROADWAY IMPROVEMENTS SEPTEMBER 2013 PROJECT ZIEGLER ROAD E. HARMONY ROAD PRECISION DR. ����� ���� �� ����������� ROCK CREEK DR. LADY MOON DR. No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: Sept. 4, 2013 PROJECT: 514-002 Sheet Of 6 Sheets TERRA VIDA II APARTMENTS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 09/04/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� C000 COVER SHEET A. Reese N. Whitcomb N/A H���� D����� G���� S���� A���� 1501 W���� S����� S���� 1-C D�����, C������� 80202 (303) 446-2368 M�������� T���� V��� II LLP K�� K���� 1400 16�� S�����, 6�� F���� D�����, C������� 80202 (303) 419-0744 CTL / THOMPSON, INC S������ S�����, PE 351 L����� S�����, S���� 140 F��� C������, C������� 80524 (970) 206-9455 No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: Sept. 4, 2013 PROJECT: 514-002 Sheet Of 6 Sheets TERRA VIDA II APARTMENTS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 09/04/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R A. GENERAL NOTES 1. All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort Collins. 2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise. 3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer. Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of any work shown in these plans. 4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 5. All storm sewer construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and specifications current at the date of approval of the plans by the City of Fort Collins Engineer. 6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The Developer shall be responsible for unknown underground utilities. S WV WV WV H Y D D S WV WV D S WV S V.V.P. P. V.P.S V.P. V.P. X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X V.P.S V.P. W S E E E VAULT ELEC E E E E E E E E E E E E E VAULT S WV WV WV H Y D D S WV WV D S WV S V.V.P. P. V.P.S V.P. V.P. V.P.S V.P. W S E E E VAULT ELEC E E E E E E E E E E E E E VAULT ELEC E E E G G G G W W W W W W W W 12" W WV WV 12" W 12" W 12" W T T T T T WV WV WV W W W W W W W W W W W W W W D D G G G G T T T T T ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST � � GM GM GM CO HC HC VAN HC HC TF TF TF TF TF TF TF TF TF TF TF HC GARAGE G8 GARAGE G9 GARAGE G13 GARAGE G15 GARAGE G16 GARAGE G12 GARAGE G11 GARAGE G17 9' UTILITY EASEMENT 9' UTILITY EASEMENT LE FEVER DRIVE (76' ROW) PRECISION DRIVE (51' ROW) GARAGE G1 LADY MOON DRIVE D D G G G G T T T T T ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST � � GM GM GM HC HC VAN HC HC TF TF TF TF TF TF TF TF TF TF TF HC GARAGE G8 GARAGE G9 GARAGE G13 GARAGE G15 GARAGE G16 GARAGE G12 GARAGE G11 GARAGE G17 LE FEVER DRIVE (76' ROW) CINQUEFOIL LANE (82' ROW) PRECISION DRIVE (51' ROW) LADY MOON DRIVE (84' ROW) GARAGE G1 ZIEGLER ROAD E. HARMONY ROAD PRECISION DR. ����� ���� �� ����������� ROCK CREEK DR. LADY MOON DR. CINQUEFOIL LANE (MINOR COLLECTOR 76' ROW) 76' ROW 9' UTILITY ESMT. 9' UTILITY ESMT. 25' {}-50' {}-{} 25' -{} 8' PARKING 11' TRAVEL 6' BIKE LN. 11' TRAVEL 6' BIKE LN. 8' PARKING No. Revisions: By: Date: REVIEWED BY: R. Provencio DESIGNED BY: DRAWN BY: SCALE: DATE: Sept. 4, 2013 PROJECT: 335-009 Sheet Of 11 Sheets TERRA VIDA II APARTMENTS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 09/04/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� OFFSITE ROADWAY IMPROVEMENTS CTL / THOMPSON, INC S������ S�����, PE 351 L����� S�����, S���� 140 No. Revisions: By: Date: REVIEWED BY: R. Provencio DESIGNED BY: DRAWN BY: SCALE: DATE: Sept. 4, 2013 PROJECT: 335-009 Sheet Of 11 Sheets TERRA VIDA II APARTMENTS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 09/04/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� OFFSITE ROADWAY IMPROVEMENTS CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R A. GENERAL NOTES 1. All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort Collins. 2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise. 3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer. Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of any work shown in these plans. 4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 5. All storm sewer construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and specifications current at the date of approval of the plans by the City of Fort Collins Engineer. 6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The LE FEVER DRIVE CINQUEFOIL LANE PRECISION DRIVE S S WV WV WV WV WV S S S V.V.P. P. S S S C.O. S C.O. D D S D 12" W 12" W 12" W 12" SS 12" SS 12" SS E E E E/FO/CTV E/FO/CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV G G G G G G G G G G E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV EXISTING 51' R.O.W. EXISTING 76' R.O.W. LE FEVER DRIVE EXISTING 69' R.O.W. S X X X X S 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W W V WV 12" W 12" W T T T W V WV WV 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS 8" SS 8" SS 18" SS 8" SS 8" SS 8" SS 8" SS 6" SS 12" W 8" W 8" W 8" W 8" W 8" SS 8" SS 8" SS S S S S T T T T T T T T T T S S C.O. S C.O. D D G D D CINQUEFOIL LANE PRECISION DRIVE 50' { -} PROPOSED 76' R.O.W. 76' R.O.W. LE FEVER DRIVE Δ ∆ 51' R.O.W. TF TF HC EXISTING 51' R.O.W. EXISTING 82' R.O.W. LE FEVER DRIVE BANNER HEALTH MEDICAL CAMPUS EXISTING 69' R.O.W. 4895 4900 4905 4910 4915 4895 4900 4905 4910 4915 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 4895 4900 4905 4910 4915 4895 4900 4905 4910 4915 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 4895 4900 4905 4910 4915 4895 4900 4905 4910 4915 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 CINQUEFOIL LANE (MINOR COLLECTOR 76' ROW) 76' ROW CINQUEFOIL LANE PRECISION DRIVE 50' { -} 76' R.O.W. LE FEVER DRIVE Δ 51' R.O.W. TF TF HC 1 1 1 1 1 1 1 1 11' 8' 11' 6' 8' 2 2 6' PRECISION DRIVE PROPOSED 76' R.O.W. 76' R.O.W. LE FEVER DRIVE 51' R.O.W. EXISTING 51' R.O.W. EXISTING 82' R.O.W. LE FEVER DRIVE EXISTING 69' R.O.W. SEE UTILITY PLANS FOR TERRA VIDA II APARTMENTS FOR ON-SITE INFORMATION BLDG 4 BLDG 8 EXISTING 69' R.O.W. 51' R.O.W. CINQUEFOIL LANE (MINOR COLLECTOR 76' ROW) 76' ROW 9' UTILITY ESMT. 9' UTILITY ESMT. 25' {}50' -{}-{} 25' -{} 8' PARKING 11' TRAVEL 6' BIKE LN. Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 10+50 4896 4900 4904 4908 4896 4900 4904 4908 -40 -20 0 20 40 Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 11+00 4896 4900 4904 4908 4896 4900 4904 4908 -40 -20 0 20 40 Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 11+50 4896 4900 4904 4908 4896 4900 4904 4908 -40 -20 0 20 40 Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 12+00 4896 4900 4904 4908 4896 4900 4904 4908 -40 -20 0 20 40 Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 12+50 4896 4900 4904 4908 4896 4900 4904 4908 -40 -20 0 20 40 No. Revisions: By: Date: REVIEWED BY: R. Provencio DESIGNED BY: DRAWN BY: SCALE: DATE: Sept. 4, 2013 PROJECT: 335-009 Sheet Of 11 Sheets TERRA VIDA II APARTMENTS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 09/04/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� OFFSITE ROADWAY IMPROVEMENTS City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner C400 DETAILS J. Prelog J. Prelog N/A NOT TO SCALE 1 WATER MAIN BEDDING REQUIREMENTS 2 STANDARD CONCRETE THRUST BLOCKS 3 FIRE HYDRANT INSTALLATION WATER MAIN LOWERING 7 TYPICAL WATER SERVICE CROSS SECTION NOTE: WYE CONNECTION NOT ALLOWED ON VCP SERVICE WYE 8 IN. PVC SEWER PIPE PLAN VIEW 45 MAX. 4 IN. X 4 IN. MARKER POST AIR-TIGHT PLUG 45 ELBOW PVC SEWER PIPE GRANULAR MATERIAL CONFORMING TO CDDH #67 AIR-TIGHT PLUG WITH 4 IN. X 4 IN. MARKER POST GRANULAR MATERIAL CONFORMING TO CDDH #67 4" TYP TRENCH PVC SEWER PIPE SCALE: NTS TYPICAL SANITARY SEWER SERVICE CONNECTION SOUTH FORT COLLINS SANITATION DISTRICT Office (970) 226-3104 Fax (970) 226-0186 APPROVED: DATE: 12-15-2010 No. Revisions: By: Date: REVIEWED BY: R. Provencio DESIGNED BY: DRAWN BY: SCALE: DATE: Sept. 4, 2013 PROJECT: 335-009 Sheet Of 11 Sheets TERRA VIDA II APARTMENTS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 09/04/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� OFFSITE ROADWAY IMPROVEMENTS No. Revisions: By: Date: REVIEWED BY: R. Provencio DESIGNED BY: DRAWN BY: SCALE: DATE: Sept. 4, 2013 PROJECT: 335-009 Sheet Of 11 Sheets TERRA VIDA II APARTMENTS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 09/04/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� OFFSITE ROADWAY IMPROVEMENTS City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner C402 DETAILS J. Prelog J. Prelog N/A 1 CHANNELING DETAILS FOR MANHOLES BEND WITH CURVED DEFLECTOR STRAIGHT DEFLECTOR NOT TO SCALE 1 Max. Sign Panel 1. Attach the sign panels tightly to the post and use oversized washers to keep the sign from breaking loose from the post when hit by a vehicle. 2. Sign panels should be mounted a minimum of 7 feet above the pavement or ground. Cross section of post 3" - 6" ABOVE GRADE 2 1/4" Anchor 3. Signs larger than 36 inches in length or width require wind bracing and special post design. NOTES: 4. Anchor Stub and post are square steel tube (perforated). Anchor/Stub Post Size CRITERIA FOR SINGLE POST 36" x 36" 2.25" x 2.25" x 3'-0" 2" x 2" x 12'-0" 5. All "No Parking" signs shall be installed at 45� from Flow Line. * * 2" x 2" x 10' OR 12' 12 GAUGE TELESPAR POST (22F12A31) 7'-0" MIN. CLEARANCE 2' - 3' FROM F Street Curb REVISION NO: 1 DATE: 04/01/07 STREET STANDARDS CONSTRUCTION DRAWINGS SIGN POST URBAN AREA LARIMER COUNTY DRAWING 1401 See Figure 16-1 SW SAMPLE AVE 2400 R1-1 "STOP" SIGN 30" HIGH DENSITY/DIAMOND GRADE. SIGN MOUNTED TO POST WITH 1 EACH DRIVE RIVET WITH NYLON WASHER AGAINST SIGN FACE (ON TOP OF THE SIGN). THE BOTTOM OF THE SIGN SHALL BE MOUNTED WITH 1 EACH 5/16"x2-1/2" HEW BOLT WITH METAL AND FROM NYLON WASHERS (NYLON WASHER AGAINST SIGN FACE) AND SECURED WITH 1 EACH 5/16" HEX NUT ON THE BACK SIDE OF POST. L 2-1/4" x 2-1/4" x 3' ANCHOR/STUB 2 EACH 8" BLADES MOUNTED TO POST WITH 4 EACH DRIVE RIVETS WITH NYLON WASHERS * 12 Gauge 30" 8" 8" SIGN POST Double Lines Normal Width Line 4" White 4" Yellow 4" Space 4" White Preferential lane symbol (6' X 4') for designated bikeways. White pavement marking placed 65' (min) from the projected flowline and Projected Flowline (FL) NO CROSSPAN Continental bars (9' X 1.5'): NO CROSSPAN OR EXISTING CROSSPAN White Stop Bar (1.5' X Length) 30' Gaps 3:1 Ratio 10' Segments 4" White Broken Line STANDARD NO STOP BAR SPECIFIED STOP BAR SPECIFIED STOP BAR SPECIFIED EXISTING CROSSPAN Crosspan exits (no stop bar) -- shall No crosspan -- shall be positioned along projected flowline. match the edge of the pan. Crosspan exits (stop bar specified) -- shall be positioned along projected flowline overlapping 4' of crosspan. 1 2 3 CROSSWALK MARKINGS FL to stop bar 14.5' Projected 14.5' Stop Bar to FL 13' 9' 1.5' 6' Crosspan 4' 4' 4' NOTES: Continental crosswalk bars shall be placed centered on each lane line & in the center of each lane. (Lanes 5' wide or less shall not receive a bar centered in the lane.) Both outside Continental bars shall be centered on the curb & gutter when possible. If 6' crosspan exists, bars to match pan edge to 13' from projected FL. Exception: The downstream bike lane line shall terminate at the curb return. NOTE: All longitudinal (lane) striping shall terminate at the continental crosswalk bars when no stop bar exists. If a stop bar is specified, the striping shall terminate at the stop bar. REVISION NO: 1 DATE: 03/01/02 STREET STANDARDS STANDARD CONSTRUCTION DRAWINGS PAVEMENT MARKINGS URBAN AREA LARIMER COUNTY DRAWING 1403 65' (min) centered on bike lane. No. Revisions: By: Date: REVIEWED BY: R. Provencio DESIGNED BY: DRAWN BY: SCALE: DATE: Sept. 4, 2013 PROJECT: 335-009 Sheet Of 11 Sheets TERRA VIDA II APARTMENTS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 09/04/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� OFFSITE ROADWAY IMPROVEMENTS City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner C403 DETAILS J. Prelog J. Prelog N/A F Curb Flare Varies Curb 2'-0" Flare Ramp concrete ramps Panels embedded in the Apron Gutter or Curb and Gutter Flow line 1:20 Slope 1:12 MAX Slope Section A-A NTS Varies Varies Curb Curb Flare Ramp 2'-0" Varies Panels Panels 6" A A CL Pedestrian flow Aligned with Ramp Width: 4.5' 5.0' 6.0' 7.0' 8.0' Note: Truncated dome panels are available in 2'x2' squares and 2'x2.5' rectangles. Combine the widths to fit the ramp. Panels may be cut to no less than a 2'x1.5' size. Panel Width Combinations: 2'+2.5' 2.5'+2.5' 2'+2'+2' 2.5'+2'+2.5' 2'+2'+2'+2' Note: 1. Truncated dome warning panel: Install panels along with the concrete pour for the ramp. The panel material shall be "Cast In Tact Warning Panels" or an equivalent material that must be first approved by the City Engineer prior to installation. The panel color shall be red, no other color is approved. Specifications for the panel and installation instructions will be provided upon request. 2. This drawing shows vertical curb. For Drive Over Curb the warning detection location shall be placed in the same position 6" back from the Face of Curb or . Case 1-Directional Ramps Case 2-Non-Directional Ramps Varies Panels Ramp Panels Flare 2'-0" Curb Case 3-Mid-Block Ramps 6" Panels Panels Apron Gutter or Flare 6" Flare (Center line of ramp) CL -Center line of ramp BOC BOC BOC FOC L or FL FOC BOC FL -Back of Curb -Face of Curb -Flow line 2' REVISION NO: DATE: 04/01/07 DRAWING STREET STANDARDS DRAWINGS 1607 URBAN AREA LARIMER COUNTY TRUNCATED DOME WARNING FOR ACCESS RAMPS CONSTRUCTION FORT COLLINS ONLY NOT TO SCALE 6 TRUNCATED DOMES NOT TO SCALE 5 PEDESTRIAN RAMP DETAIL 1. NO JOINTS ARE ALLOWED IN THE FLOWLINE. SIX INCH WIDE CURB OR "DUMMY JOINT" MAY BE TOOLED NO CLOSER THAN 6 INCHES FROM FLOW LINE AS SHOWN. 2. MINIMUM CONCRETE THICKNESS IS 6 INCHES. 3. JOINT PATTERN TO BE ACCORDING TO 'INTERSECTION GUTTER DETAIL' OR AS DETERMINED BY THE LOCAL ENTITY. 4. WOOD FLOAT FINISH IS REQUIRED OVER THE SLOPED SURFACE OF RAMP AND FLARES. 5. A 6 INCH WIDE CURB MAY BE POURED AT THE BACK OF THE RAMP AS SHOWN IF REQUIRED. IF CURB IS USED IT SHALL MATCH THE CURB AND GUTTER STYLE OF ADJACENT CURB AND GUTTER. 6. MINIMUM RAMP WIDTH SHALL BE FOUR FEET, OR THE SAME AS THE WIDEST ADJACENT SIDEWALK, WHICHEVER IS GREATER, UP TO A MAXIMUM WIDTH OF 8 FEET. 7. THE RAMP LANDING MAY BE POURED MONOLITHIC WITH THE ADJACENT TRANSITIONS PROVIDED THAT AN APPROVED "SHAKE-ON" PIGMENT BE USED TO COLOR THE LANDING AREA. 8. T= THICKNESS (AS SPECIFIED ON PLANS OR LOCAL ENTITY ENGINEER). STANDARD GRAY CONCRETE RAMP WITH PARTIALLY COLORED CONCRETE SECTION A-A LIP OF GUTTER PLAN VIEW FLOWLINE CURB A A 0.5' TYP. N.T.S. 6" 1:12 SLOPE MAX. CURB 0.5' 4' MIN. N.T.S. FLARE OPTION CURB OPTION 6" CURB 0" CURB 1' R 2' NOTES: t=6" or as specified 1"/ft. Max 1"/ft. Max 1.5' TRANSITION 1.5' TRANSITION Flared Option 2' FL REVISION NO: 1 DATE: 04/01/07 DRAWING STREET STANDARDS DRAWINGS 1606 URBAN AREA LARIMER COUNTY PEDESTRIAN RAMP DETAIL (For New Const. & Alterations) CONSTRUCTION 1:25 slope (max.) Truncated Dome Warning Detection Truncated Dome Warning Detection NOT TO SCALE 4 SIDEWALK DETAIL ATTACHED SIDEWALK DETAIL Slope sidewalk to curb 1/4" per foot. NOTE: Construct sidewalk with joints at 10' intervals R 1/8" WEAKENED PLANE JOINT EXPANSION JOINT R1/4" and aligned with scoring on curb. INSTALL IN LOCATIONS SPECIFIED IN CHAPTER 22 1/2" 1/4" 1/4 SLAB THICKNESS 1/4" 1/2" Expansion Joint material DETACHED SIDEWALK DETAIL Variable Landscaping Slope sidewalk to curb 1/4" per foot. 2' min. Slope: Minumum 1 4"/ft Maximum 3"/ft CONSTRUCTION SIDEWALK DETAIL LARIMER COUNTY STREET URBAN STANDARDS AREA DRAWINGS 1602 DRAWING REVISION DATE: 04/NO: 01/07 2 NOT TO SCALE 3 STANDARD SIDEWALK Sidewalk Driveway LIP F.L. T.C. DRIVEWAY SIDEWALK SECTION A-A NOTE: 1. Sidewalk grade shall remain consistent across driveway 3. This detail applies to Residential & Commercial driveways. 6" 6" Residential Detached Sidewalk Attached Sidewalk 1/2" Expansion Joint Material 1/2" Expansion Joint Material � � 2. For driveway design requirements, see�����. ���. 706 & 707. DETACHED ATTACHED 3'-0" 6'-0" All Sidewalk Thickness Shall Be 6" minimum. Min. STANDARD SIDEWALK STREET STANDARDS LARIMER URBAN COUNTY AREA REVISION NO: 1 CONSTRUCTION DRAWINGS DATE: 04/01/07 1601 DRAWING SIDEWALK 8" Commercial NOT TO SCALE 7 TRENCH DETAIL 12" (Water & Sewer) If this section is less than 4' of existing asphalt/concrete, it must be removed and replaced. Edge of Pavement or Lip of Existing Gutter Compacted Lifts of Suitable Materials Pavement Thickness Varies Varies 1" (min.) (See Note 9 below for Storm.) 4" (min.) 6" (max.) Trench Width Varies 2' (min.) Bedding Material Undisturbed Soil Utility Conduit New Asphalt/Concrete Clean Road Base Existing Road Base 6" Full Depth Asphalt or X/Y Composite Section NOTES: 1. All trenches shall be backfilled in accordance with the above detail unless otherwise specified by the Local Entity Engineer. 2. Prior to placement of asphalt/concrete, pavement edge shall be saw cut to a clean, vertical, and straight edge. 3. Where the surrounding soils are non-expansive, a sand/cement slurry (1 sack mix) may be substituted for backfill material. 4. Trench width shall not be more than 16" nor less than 12" wider than the outside diameter of the pipe. 5. Use a #4 rebar at centers along the perimeter of concrete replacement sections. 6. Refer to Chapter 22, Materials & Construction Specifications for compaction and testing requirements. 7. In unimproved areas, all disturbed areas shall be regraded, seeded & mulched. 8. In concrete roadways, a minimum of one entire concrete panel must be replaced. 9. Bedding material depth when installing storm sewer shall be up to spring line, except in areas of unsuitable backfill; then, bedding material shall be placed to a level 12" above pipe. LARIMER COUNTY URBAN AREA STREET STANDARDS CONSTRUCTION DRAWINGS REVISION NO: 1 DRAWING 2201 DATE: 08/07/00 TRENCH DETAIL NOT TO SCALE 2 STANDARD PAVEMENT MARKINGS BEND WITH INLINE UPSTREAM MAIN & 90 LATERAL WITH DEFLECTOR WITH DEFLECTOR DIRECTLY OPPOSED LATERAL (HEAD LOSSES ARE STILL EXCESSIVE WITH THIS METHOD, BUT ARE SIGNIFICANTLY MORE THAN WHEN NO DEFLECTOR EXISTS) DETAIL FORT COLLINS CONSTRUCTION STORMWATER DETAILS FORT COLLINS, CO. UTILITIES CITY OF (970) 221-6700 APPROVED: DATE: DRAWN BY: NJB 11/9/00 D-5 CHANNELING DETAILS FOR MANHOLES o STANDARD CONCRETE NOTES 1. ALL CONCRETE WORK SHALL BE IN ACCORDANCE WITH THE LATEST VERSION OF ACI 318, ACI 304, AND ACI 315. ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI AT 28 DAYS WITH 4%-6% ENTRAINED AIR AND TYPE II CEMENT UNLESS NOTED OTHERWISE. REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60, DEFORMED UNLESS NOTED OTHERWISE. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185 WELDED STEEL WIRE FABRIC UNLESS NOTED OTHERWISE. SPLICES SHALL BE CLASS "B". ALL HOOKS SHALL BE STANDARD UNLESS NOTED OTHERWISE. THE FOLLOWING MINIMUM CONCRETE COVER SHALL BE PROVIDED FOR REINFORCING STEEL UNLESS SHOWN OTHERWISE ON DRAWINGS: CONCRETE CAST AGAINST EARTH = 3" CONCRETE EXPOSED TO EARTH OR WEATHER: #6 AND LARGER = 2" #5 AND SMALLER AND WWF = 1 1/2" CONCRETE NOT EXPOSED TO WEATHER NOR CAST AGAINST EARTH: SLAB AND WALL = 3/4" BEAMS AND COLUMNS = 1 1/2" A 3/4" CHAMFER SHALL BE PROVIDED AT ALL EXPOSED EDGES OF CONCRETE UNLESS NOTED OTHERWISE IN ACCORDANCE WITH ACI 301 SECTION 4.2.4. HOLES TO RECEIVE EXPANSION/WEDGE ANCHORS SHALL BE 1/8" LARGER IN DIAMETER THAT THE ANCHOR BOLT, DOWEL OR ROD AND SHALL CONFORM TO MANUFACTURER'S RECOMMENDATION FOR EMBEDDMENT DEPTH OR AS SHOWN ON THE DRAWINGS. LOCATE AND AVOID CUTTING EXISTING REBAR WHEN DRILLING HOLES IN ELEVATED CONCRETE SLABS. USE AND INSTALLATION OF CONCRETE EXPANSION/WEDGE ANCHORS SHALL BE PER ICBO AND MANUFACTURER'S WRITTEN RECOMMENDED PROCEDURES. 2. 3. 5. 6. 7. 4. DETAIL FORT COLLINS CONSTRUCTION STORMWATER DETAILS FORT COLLINS, CO. UTILITIES CITY OF (970) 221-6700 APPROVED: DATE: DRAWN BY: STANDARD CONCRETE NOTES 2/22/05 D-41 TDC NOT TO SCALE 3 STANDARD CONCRETE NOTES NOT TO SCALE 2 SINGLE COMBINATION INLET IF RISER IS REQUIRED THE BASE IS POURED WITH A "SHIP-LAP" JOINT. 2'-0" 3'-0" GRATING (SEE DETAIL, THIS DRAWING) GRATING DETAIL 3. 2. WEIGHT: 560 LBS 1. NOTES: %ISOMETRIC VIEW PLAN VIEW N.T.S. 4'6" 6" 2' 6" N.T.S. 6" 5'-8" MAX 3'-0" MIN 4 TON P52 SL M.(NUMBER A. STEPS REQ'D @12" VARIES O.C. WITH HEIGHT) 5'-8" MAX 3'-0" MIN 6" N.T.S. SECTION B-B 3' 6" 3) STEEL REINFORCEMENT: 4) CEMENT: ASTM C-150 SPECIFICATIONS 1) 4 TON P-52 SL ANCHORS (8 REQ'D) A. AASHTO HS-20-44, W/ IMPACT C. EQUIVALENT FLUID PRESSURE = 45 PCF D. 80 PSF LATERAL LIVE LOAD SURCHARGE B. SOIL WEIGHT = 120 PSF 2) CONCRETE 28 DAY COMPRESSIVE STRENGTH SHALL BE DESIGN NOTES: 4500 PSI (MIN.) 1) DESIGN LOADINGS: LIFTING NOTES: FRAME & GRATING NOT SHOWN 4 TON P-52 SL ANCHORS FOR SETTING A. REBAR, ASTM A-615 GRADE 60, MIN. OF 2" CLR. B. MESH, ASTM A-497 GRADE 80 N.T.S. N.T.S. DESIGNED ACCORDING TO ASTM C857-87 AND ASTM C858-83 DESIGNED FOR AASHTO HS-20 LOADING EAST JORDON IRON WORKS CURB INLET 7030 (OR EQUAL) TYPE M2 GRATE AND T1 BACK COMBINATION. 3' GRATING (SEE DETAIL, THIS DRAWING) PIPE(S) SIZE, SHAPE AND LOCATION VARIES A A SECTION A-A B B A A DIRECTION SECTION LINE SECTION A-A (ARROWS IS VIEWED) POINT IN LEGEND PIPE(S) SIZE, SHAPE AND LOCATION VARIES OPEN AREA: 260 SQ. IN. 3'-7" CURB ADJUSTS 4" 2'-7" 6" 3 1/4" TO 9" ANCHORS DATE DRAWN: 3/3/05 D43.dwg DRAWN BY: T. COX SINGLE CURB INLET CAD FILE NAME: DETAIL D-43 STORMWATER CONSTRUCTION DETAILS P.O. BOX 580, FORT COLLINS, CO. 80522 CITY OF FORT COLLINS UTILITIES NOT TO SCALE 4 CURB AND GUTTER 6" 2"R. 2" 6" 6" 12" 1 1/2"R. 2'-6" 6" 4 1/2" 30" 9" R 0.5" 4.5" 18" 3.63" 21.75" R 0.13" 7" 2" 3.75" 12" ROLL-OVER VERTICAL (LOVELAND) Gutter edge may be tapered or battered. (Typical for all Curb & & Gutter Types) DATE: 03/01/02 CURB AND GUTTER URBAN AREA STREET STANDARDS LARIMER COUNTY CONSTRUCTION DRAWINGS REVISION NO: 1 701 DRAWING City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner C401 DETAILS J. Prelog J. Prelog N/A NOT TO SCALE 1 PVC WATER MAIN TRACER WIRE DETAIL NOT TO SCALE 2 VALVE ASSEMBLY BOX ������ ������ VALVE (TYPICAL) HYDRANT SECONDARY FIRE HYDRANT (TYPICAL) LOCATOR STATION PVC MAIN TRACER WIRE NOTES: 1. TRACER WIRE TO BE PLACED ALONG TOP CENTERLINE OF MAIN AND SECURED AS NECESSARY TO PREVENT MOVEMENT OF WIRE. TRACER WIRE SHALL BE SINGLE CONDUCTOR #12 STRANDED COPPER WITH TYPE THNN OR THWN FOR LOCATOR STATION DETAILS SEE DETAIL 25 2. 3. 4. 800' MAXIMUM DISTANCE BETWEEN LOCATOR STATIONS TRACER WIRES FOR PERPENDICULAR MAINS AT STREET INTERSECTIONS ARE NOT TO BE SPLICED TOGETHER. SEE NOTE 4 (TYPICAL) INSULATION DESIGNATED FOR DIRECT BURY. TRACER WIRE SHALL BE CONTINUOUS (WITHOUT SPLICES) WHENEVER POSSIBLE. WHEN SPLICES ARE REQUIRED, ALL SPLICES OF TRACER WIRE SHALL BE MADE USING BRASS SPLIT-BOLT CONNECTORS AND ROYSTON "MINI SPLICE-RIGHT" SPLICE KITS. REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 PVC WATER MAIN TRACER WIRE DETAIL 30 4/11/11 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 WATER MAIN SEAT VALVE RESILIENT CAST IRON VALVE BOX CAST IRON PER CITY OF FORT COLLINS AND AWWA SPECS. ALL VALVES TO BE 8 MIL POLY WRAPPED. T-BOLTS, NUTS AND RODS ALL VALVE BOXES TO BE OF CAST IRON CONSTRUCTION, TWO PIECE TO BE TAR COATED BEFORE WRAPPED. THREADED ADJUSTABLE DESIGN PER CITY OF FORT COLLINS SPECS. VALVE BOX W\CAST IRON LID MARKED "WATER" ALL VALVES TO BE RESILIENT SEAT, EPOXY COATED INSIDE AND OUT UNEXCAVATED A EARTH SECTION A-A ASPHALT A HAND BACKFILL AND IN TAMP 3" LAYERS OPERATING NUT BACKFILL IN 6" LAYERS AND TAMP 2" SQUARE OPEN RIGHT BACKFILL METHOD DEPENDING ON LOCATION NOT TO SCALE 4 STORMWATER BEDDING REQUIREMENTS 5 STANDARD MANHOLE CLASS B BEDDING LOWER LIMIT OF UNIFORM GRADED CLASS A BEDDING LOWER LIMIT OF LOWER LIMIT OF MATERIAL 12 IN. MIN. 12 IN. MIN. TRENCH WIDTHS SHALL BE AS SPECIFIED ON PLANS. REFER TO THE STORM SRAINAGE CONSTRUCTION STANDARDS, SECTION 6, "BEDDING MATERIALS" FOR GRADATIONS. SUBDRAIN DETAIL TRENCH WIDTH AS SPECIFIED TRENCH WIDTH AS SPECIFIED ROCK EXCAVATION TRENCH WIDTH AS SPECIFIED GRANULAR MATERIAL UNSTABLE SUBGRADE TRENCH WIDTH AS SPECIFIED ROCK 1 1/2 IN. COMPACTED GRANULAR OR TRENCH WALL SLOPE COMPACTED MATERIAL GRANULAR NOTES: 2. 1. 6 IN. MIN. 4 IN. MIN. 12 IN. MIN. 1/8 PIPE O.D. OR 4 IN. MIN. SLOTTED PIPE PERFORATED OR GRAVEL FILTER BACKFILL COMPACTED DENSELY TRENCH WIDTH AS SPECIFIED CLASS C BEDDING TRENCH WIDTH AS SPECIFIED 1/4 PIPE O.D. SLOPE MATERIAL COMPACTED TRENCH DENSELY WALL PIPE O.D. + 8 IN. 1/4 PIPE O.D. MATERIAL COMPACTED DENSELY SLOPE TRENCH WALL MATERIAL PIPE O.D. 12 IN. MIN. OR 6 IN. MIN. 1/8 PIPE O.D. 3000 CONCRETE P.S.I. TRENCH WALL LOWER LIMIT OF UNIFORMLY SELECTED GRADED SLOPE GRADED COMPACTED ROCK OR MATERIAL GRANULAR COMPACTED PIPE O.D. 12 IN. MIN. TRENCH WALL LOWER LIMIT OF SLOPE COMPACTED DENSELY FILTER 6 IN. MIN. PIPE O.D. 1/OR 8 4 PIPE IN. MIN. O.D. PIPE O.D. BROKEN LARGE (IF CONCRETE, REQUIRED) STONES, ETC. MATERIAL LOWER LIMIT OF TRENCH WALL SLOPE DETAIL FORT COLLINS CONSTRUCTION STORMWATER DETAILS FORT COLLINS, CO. UTILITIES CITY OF (970) 221-6700 APPROVED: DATE: DRAWN BY: STORMWATER BEDDING REQUIREMENTS 1/12/00 D-1 SKC DETAIL FORT COLLINS CONSTRUCTION STORMWATER DETAILS FORT COLLINS, CO. UTILITIES CITY OF (970) 221-6700 APPROVED: DATE: DRAWN BY: STANDARD MANHOLE 11/7/00 D-3 NBJ MANHOLE SHALL BE AS FOLLOWS: NOTE: MINIMUM INSIDE DIAMETER OF 27 IN. TO 42 IN. (INCL.) 24 IN. OR LESS VARIABLE ALTERNATE BASE 8 IN. MIN. 6 IN. 1 SLOPE IN./FT. RECAST MANHOLE BASE OVER 42 IN. PIPE SIZE 2 IN. MIN. POURED INVERT 8 IN. MIN. 1 FT. 1 IN./FT. SLOPE 2 IN. 18 IN. MAX 48 IN. MAX. DEPTH 30 IN. MIN. DEPTH 5 FT. MIN. DEPTH RUNGS 12" O.C. MANHOLE 8 IN. SEE NOTE 24 IN. 24 IN. RING AND COVER - 400 LB. OR APPROVED EQUAL DENVER HEAVY BY MACLEAR FINISHED GRADE 16 IN. MAX 28 IN. MAX 48 IN. 72 60 IN. IN. DIAMETER MIN. MANHOLE POURED CONCRETE INSIDE AND OUT GROUT BASE TO CONE BASE MANHOLE SECTIONS ASTM C-478 INSIDE AND OUT GROUT SHIPLAP JOINT ECCENTRIC CONE ASTM C-478 GROUTED INSIDE AND OUT ADJUSTMENT SHIM BRICK &/OR CONCRETE NOT TO SCALE 3 TYPICAL SANITARY SEWER SERVICE CONNECTION NOT TO SCALE 4 NOT TO SCALE 5 WATER MAIN LOWERING GRAVITY BLOCKS BOTTOM OF PIPE AND A MINIMUM OF 12 INCHES ABOVE TOP OF PIPE. GRANULAR BEDDING MATERIAL SHALL BE A MINIMUM OF 4 INCHES BELOW INITIAL 12 IN. LIFT MIN. PIPE O.D. 4 IN. MIN. GRANULAR MATERIAL BEDDING ZONE NOTE: * INITIAL LIFT SHALL NOT EXCEED 2 FEET IN DEPTH. TRENCH WALL LOWER LIMIT OF SLOPING TRENCH IN WIDTH SECTION AS 02221 SPECIFIED * REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 WATER MAIN BEDDING REQUIREMENTS (DIP & PVC) 1 4/8/11 PIPE SIZE BENDS TEE OR DEAD END 22 1/2 45 90 6" 8" 12" 1.0 1.5 3.0 1.5 2.5 4.5 2.5 4.5 9.0 4.5 8.0 16.5 3.5 5.5 12.0 MINIMUM BEARING SURFACE AREA (SQ. FT.) Bearing surface areas shown in chart are minimum. All fittings to be wrapped with polyethylene. Pipe installed under conditions different from those normally encountered shall require thrust blocks designed for those particular conditions. Thrust blocks on pipe larger than 16 inches diameter shall be designed for conditions existing at the installation site. Refer to Section 03300 for concrete requirements. 1. 2. 3. 4. 5. GENERAL NOTES: UNDISTURBED SOIL POLYETHYLENE BOND BREAKER UNDISTURBED SOIL BOND BREAKER POLYETHYLENE BEARING SURFACE POLYETHYLENE BOND BREAKER UNDISTURBED SOIL BEARING SURFACE SOIL UNDISTURBED BEARING SURFACE POLYETHYLENE BOND BREAKER BEDDING MATERIAL 2/3 DIA. TEE TYPICAL BEND TYPICAL CROSS-SECTION DEAD END BEARING SURFACES ARE A MINIMUM REQUIREMENT AND DO NOT RELIEVE DESIGN ENGINEER OF RESPONSIBILITY TO DESIGN EACH THRUST BLOCK. 16" 4.8 9.6 18.9 34.7 24.5 REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 STANDARD CONCRETE THRUST BLOCKS 2 4/8/11 FIRE HYDRANT PIPING, VALVES, ETC. SHALL BE WRAPPED IN WALLS OR FENCES ALLOWED WITHIN 4 FEET OF FIRE HYDRANT. NO LANDSCAPING (TREES, SCRUBS, BOULDERS, ETC.), RETAINING GATE VALVE RESILIENT SEAT POLYETHYLENE 8 MIL SHEET OF MUST REMAIN CLEAR OF 24 INCH MIN. CONCRETE BLOCK (REF. SECTION 02644) THRUST BLOCK 12 IN. POLYETHYLENE. JOINTS RESTRAINED (REF. SECTION 02644) HYDRANT GRAVEL 6 INCH DIA. PIPE OBSTRUCTIONS NOTES 18 IN. 0.1 FT.-0.2 FT. FLOW-FILL 12 IN. OR BACK OF CURB EDGE OF SIDEWALK HYDRANT DRAIN OPENINGS MINIMUM 30 INCHES 66 INCHES 54 INCHES MAXIMUM MINIMUM LOCATOR STATION (SEE DETAIL 25) WATROUS PACER 250 NUMBER A-423 OR MUELLER HYDRANT 22 IN. 18 IN. to THRUST BLOCK SWIVEL TEE SECTION 02641) MAIN ONLY) (PVC WATER TRACER WIRE (REFERENCE VALVE BOX REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 FIRE HYDRANT INSTALLATION 3 4/8/11 All residential water service shall be installed in the center of the lot All water and sanitary sewer service shall have a minimum of the curb stop and meter pit, and no trees within 10 feet of curb and meter pit. No landscaping (shrubs, boulders, etc.), retaining walls or fences allowed within 4 feet Use type K copper for the service from the corporation stop to a minimum of 5 feet up to and including the curb stop. The owner is responsible for service from the The City is responsible for maintaining the water main, corporation stop, and service piping Locate curb box and meter pit according to the approved utility drawings. Install 1 1/2 inch and 2 inch services with tapped tee and corporation stop at time of Use direct tap (as shown) for 3/4 inch and 1 inch services unless water main is PVC, unless otherwise approved by the Utility. horizontal separation of ten feet. past the meter pit. No couplings allowed between curb stop and meter setting. curb stop, including the outlet coupling to the building. construction or use a tapping saddle. in which case, use a tapping saddle. GENERAL NOTES 9. 8. 4. 6. 7. 5. WATER MAIN 3. 2. 1. IN FACE OF CURB CUT 4 INCH CROSS CORPORATION STOP FOR PAVEMENT CURB STOP CURB BOX 66 INCH MAX. 54 INCH MIN. CURB, GUTTER AND SIDEWALK DISTANCE VARIES 1 FT. PROPERTY OR EASEMENT LINE GRADE FINAL LANDSCAPED REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 TYPICAL WATER SERVICE 11 4/12/11 1 1/2 INCH OR GREATER CORPORATION STOP FOR 3/4 AND 1 INCH SERVICES SERVICES 1 INCH SERVICES RETAINER GLANDS INSTALL MEG-A-LUG SEE DETAIL 2 FOR THRUST BLOCK SIZING. AS APPLICABLE. SECTION 02615-2.6A OR SECTION 02622-2.2A ALL D.I.P. AND FITTINGS SHALL BE WRAPPED ALL FITTINGS AND JOINTS IN LOWERING AREA SEE DETAIL 4B FOR GRAVITY BLOCK SIZING. WITH POLYETHYLENE ENCASEMENT. TO BE RESTRAINED IN ACCORDANCE WITH GENERAL NOTES: 4. 3. 2. 1. 49"-66" >66" 25"-48" 4"-24" D UTILITY BEING CROSSED THRUST BLOCK (TYP.) GRAVITY ANCHOR (TYP.) SEE DETAIL 4B SEE DETAIL 2 L (ft) (Typ) 18 IN. MIN. D L (ft) STREET GRADE 7' 10' 5' 3' L(ft) WATER MAIN PROPOSED (TYP.) REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 WATER MAIN LOWERING 4A 4/11/11 WATER MAIN SIZE (INCHES) BENDS 45 22 1/2 6 8 10 TRENCH BOTTOM REINFORCING BAR (SEE TABLE) 16 14 12 4 CONCRETE GRAVITY 3 (FT. ) BLOCK VOLUME (FT. 3 ) (FT. 3 ) 15.9 35.3 62.4 8.6 19.1 33.8 4.4 9.7 17.2 95.4 136.4 184.7 51.6 73.8 100.0 26.3 37.6 51.0 240.9 130.4 66.5 LESS THAN 60CF 90CF 200CF 133CF 400CF 600CF NO. OF BARS & SIZE 2 2 2 2 2 3 1/2 IN. 5/8 IN. 3/4 IN. BAR SIZES FOR 150 P.S.I. RESTRAIN ALL FITTINGS AND JOINTS. VOLUMES SHOWN IN TABLE ARE BASED ON 150 P.S.I. INTERNAL STATIC PRESSURE. VALUES FOR ANY PRESSURE MAY BE OBTAINED BY MULTIPLYING TABULATED VALUES BY A CORRECTION FACTOR "F". "F" = (REQUIRED FOR VERTICAL BEND GRAVITY ANCHORS FOR 150 P.S.I. PRESSURE). NOTE: ACTUAL PRESSURE 150 GRAVITY ANCHOR DETAIL REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 WATER MAIN LOWERING GRAVITY BLOCKS 4B 4/11/11 1 2 3 4 T (ft) WATERLINE LOWERING ELEVATIONS CROSSING 1 2 3 4 5 D T EXISTING 36" STORM X X X X X X X X 5 NOT TO SCALE 6 STEEL CASING PVC INSTALLATION - SPACER SHALL BE PLACED ON THE SPIGOT END OF EACH SEGMENT. STANDARD INSTALLATION - SPACER SHALL NOT BE PLACED MORE THAN 2 FT. FROM END OF CASING. WITH CASING SPACERS CARRIER PIPE SUPPORTED CASING SPACERS CARRIER PIPE BELL OF PIPE CASING DIAMETER AND THICKNESS TO BE NOTED ON ENGINEERING PLANS. (REF. SECTION 02224) CASING SPACERS SHALL BE STAINLESS STEEL W/POLYMER RUNNER. 4. 3. 2. NOTES 1. 6 FT. SPACING FOR PVC ON LESS THAN 48 IN. DIA. 10 FT. SPACING CASING SEAL SIDE VIEW END VIEW STEEL CASING 1 IN. MAX. REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 STEEL CASING 7 4/8/11 STEEL CASING (MIN. {}" THICK) Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 13+00 4896 4900 4904 4908 4896 4900 4904 4908 -40 -20 0 20 40 Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 13+50 4896 4900 4904 4908 4896 4900 4904 4908 -40 -20 0 20 40 Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 14+00 4896 4900 4904 4908 4896 4900 4904 4908 -40 -20 0 20 40 Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 14+50 4896 4900 4904 4908 4896 4900 4904 4908 -40 -20 0 20 40 Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 15+00 4896 4900 4904 4908 4896 4900 4904 4908 -40 -20 0 20 40 Horizontal Scale 1" = 20' Vertical Scale 1" = 2' 15+50 4896 4900 4904 4908 4896 4900 4904 4908 -40 -20 0 20 40 EXISTING R.O.W. PROPOSED R.O.W. PROPOSED R.O.W. EXISTING R.O.W. EXISTING R.O.W. PROPOSED R.O.W. PROPOSED R.O.W. EXISTING R.O.W. EXISTING R.O.W. PROPOSED R.O.W. PROPOSED R.O.W. EXISTING R.O.W. EXISTING R.O.W. PROPOSED R.O.W. PROPOSED R.O.W. EXISTING R.O.W. EXISTING R.O.W. PROPOSED R.O.W. PROPOSED R.O.W. EXISTING R.O.W. EXISTING R.O.W. PROPOSED R.O.W. PROPOSED R.O.W. EXISTING R.O.W. EXISTING R.O.W. PROPOSED R.O.W. PROPOSED R.O.W. EXISTING R.O.W. EXISTING R.O.W. PROPOSED R.O.W. PROPOSED R.O.W. EXISTING R.O.W. EXISTING R.O.W. PROPOSED R.O.W. PROPOSED R.O.W. EXISTING R.O.W. EXISTING R.O.W. PROPOSED R.O.W. PROPOSED R.O.W. EXISTING R.O.W. EXISTING R.O.W. PROPOSED R.O.W. PROPOSED R.O.W. EXISTING R.O.W. EXISTING PROPOSED EXISTING PROPOSED EXISTING PROPOSED EXISTING PROPOSED EXISTING PROPOSED EXISTING PROPOSED EXISTING PROPOSED EXISTING PROPOSED EXISTING PROPOSED EXISTING PROPOSED EXISTING PROPOSED No. Revisions: By: Date: REVIEWED BY: R. Provencio DESIGNED BY: DRAWN BY: SCALE: DATE: Sept. 4, 2013 PROJECT: 335-009 Sheet Of 11 Sheets TERRA VIDA II APARTMENTS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 09/04/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� OFFSITE ROADWAY IMPROVEMENTS CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO K��� ����'� �����. C��� ������ ��� ���. R C302 CROSS SECTIONS CINQUEFOIL LANE J. Prelog J. Prelog 1"=20' C��� E������� D��� D��� D��� D��� D��� S��������� U������ P���� & R��������� T������ E������� D��� APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: W���� & W��������� U������ C��� �� F��� C������, C������� UTILITY PLAN APPROVAL 11' TRAVEL 6' BIKE LN. 8' PARKING No. Revisions: By: Date: REVIEWED BY: R. Provencio DESIGNED BY: DRAWN BY: SCALE: DATE: Sept. 4, 2013 PROJECT: 335-009 Sheet Of 11 Sheets TERRA VIDA II APARTMENTS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 09/04/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� OFFSITE ROADWAY IMPROVEMENTS NORTH ( IN FEET ) 1 inch = ft. 30 0 30 Feet 30 60 90 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO K��� ����'� �����. C��� ������ ��� ���. R LEGEND: SIGNAGE NOTES: PROPOSED SIGN PROPOSED STORM INLET PROPOSED CONCRETE PROPOSED 2.5' VERTICAL CURB & GUTTER SECTION PROPOSED SWALE EXISTING CURB & GUTTER EXISTING TREES EXISTING CONCRETE PROPOSED PAVEMENT SECTION EXISTING RIGHT-OF-WAY PROPOSED RIGHT-OF-WAY SAWCUT LINE C301 STRIPING PLAN CINQUEFOIL LANE J. Prelog J. Prelog 1"=30' 6" SOLID WHITE LINE (2) 4" SOLID LINES; 4" APART DOUBLE YELLOW LINE 1 2 3 PREFORMED PLASTIC PAVEMENT MARKING BICYCLIST AND ARROW A.ALL SIGNAGE AND MARKING IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF THESE PLANS, AS WELL AS THE TRAFFIC SIGNING AND MARKING CONSTRUCTION NOTES LISTED HERE. B.ALL SYMBOLS, INCLUDING ARROWS, ONLYS, CROSSWALKS, STOP BARS, ETC. SHALL BE PRE-FORMED THERMO-PLASTIC. C.ALL SIGNAGE SHALL BE PER CITY OF FORT COLLINS STANDARDS AND THESE PLANS OR AS OTHERWISE SPECIFIED IN MUTCD. (REF. LCUASS SECTION 22.6.2) D.ALL LANE LINES FOR ASPHALT PAVEMENT SHALL RECEIVE TWO COATS OF LATEX PAINT WITH GLASS BEADS. E.ALL LANE LINES FOR CONCRETE PAVEMENT SHALL BE EPOXY PAINT. F.PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMEMT AND PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE CITY OF FORT COLLINS ENGINEER PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS. G.PRE-FORMED THERMO-PLASTIC APPLICATIONS SHALL BE AS SPECIFIED IN THESE PLANS AND/OR THESE STANDARDS. H.EPOXY APPLICATIONS SHALL BE APPLIED AS SPECIFIED IN CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. I.ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR MARKINGS. J.ALL SIGN POSTS SHALL UTILIZE BREAK-AWAY ASSEMBLIES AND FASTENERS PER THE STANDARDS. K.A FIELD INSPECTION OF LOCATION AND INSTALLATION OF ALL SIGNS SHALL BE PERFORMED BY THE CITY OF FORT COLLINS ENGINEER. ALL DISCREPANCIES IDENTIFIED DURING THE FIELD INSPECTION MUST BE CORRECTED BEFORE THE 2-YEAR WARRANTY PERIOD WILL BEGIN. L.THE DEVELOPER INSTALLING SIGNS SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL UNDERGROUND UTILITIES. M.SPECIAL CARE SHALL BE TAKEN IN SIGN LOCATION TO ENSURE AN UNOBSTRUCTED VIEW OF EACH SIGN. N.SIGNAGE AND STRIPING HAS BEEN DETERMINED BY INFORMATION AVAILABLE AT THE TIME OF REVIEW. PRIOR TO INITIATION OF THE WARRANTY PERIOD. THE CITY OF FORT COLLINS RESERVES THE RIGHT TO REQUIRE ADDITIONAL SIGNAGE AND/OR STRIPING IF THE CITY OF FORT COLLINS DETERMINES THAT AN UNFORESEEN CONDITION WARRANTS SUCH SIGNAGE ACCORDING TO THE MUTCD OR THE CDOT M AND S STANDARDS. ALL SIGNAGE AND STRIPING SHALL FALL UNDER THE REQUIREMENTS OF THE 2-YEAR WARRANTY PERIOD FOR NEW CONSTRUCTION (EXCEPT FAIR WEAR ON TRAFFIC MARKINGS). O.SLEEVES FOR SIGN POSTS SHALL BE REQUIRED FOR USE IN STRIPING LEGEND: {PAVEMENT STRIPING} C��� E������� D��� D��� D��� D��� D��� S��������� U������ P���� & R��������� T������ E������� D��� APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: W���� & W��������� U������ C��� �� F��� C������, C������� UTILITY PLAN APPROVAL 9' UTILITY ESMT. 9' UTILITY ESMT. 25' {}50' -{}-{} 25' -{} 8' PARKING 11' TRAVEL 6' BIKE LN. 11' TRAVEL 6' BIKE LN. 8' PARKING LE FEVER DRIVE PRECISION DRIVE LE FEVER DRIVE (SIDEWALK IMPROVEMENT) PRECISION DRIVE (SIDEWALK IMPROVEMENT) No. Revisions: By: Date: REVIEWED BY: R. Provencio DESIGNED BY: DRAWN BY: SCALE: DATE: Sept. 4, 2013 PROJECT: 335-009 Sheet Of 11 Sheets TERRA VIDA II APARTMENTS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 09/04/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� OFFSITE ROADWAY IMPROVEMENTS LEFT FLOWLINE CINQUEFOIL LANE SCALE : 1" = 50' (H) 1" = 5' (V) CINQUEFOIL LANE CENTERLINE CINQUEFOIL LANE SCALE : 1" = 50' (H) 1" = 5' (V) RIGHT FLOWLINE CINQUEFOIL LANE SCALE : 1" = 50' (H) 1" = 5' (V) NORTH ( IN FEET ) 1 inch = ft. 50 0 50 Feet 50 100 150 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO K��� ����'� �����. C��� ������ ��� ���. R LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. {3.ALL PROPOSED PAVEMENT SECTIONS WITHIN THE PUBLIC RIGHT-OF-WAY SHALL BE SUBMITTED TO AND APPROVED BY THE CITY OF FORT COLLINS PRIOR TO CONSTRUCTION. SEE GENERAL NOTES FOR ADDITIONAL INFORMATION.} 4.MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO {}" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 5.EXPANSION JOINTS SHALL BE PROVIDED IN ALL SIDEWALKS AT MAXIMUM SPACING OF 50 FEET. 6.CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTION OF PRIVATE DRIVES SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE. 7.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. PROPOSED SIGN PROPOSED STORM INLET PROPOSED CONCRETE PROPOSED 2.5' VERTICAL CURB & GUTTER SECTION PROPOSED SWALE EXISTING CURB & GUTTER EXISTING TREES EXISTING CONCRETE PROPOSED HEAVY DUTY PAVEMENT SECTION EXISTING RIGHT-OF-WAY PROPOSED RIGHT-OF-WAY SAWCUT LINE C300 PLAN AND PROFILE CINQUEFOIL LANE J. Prelog J. Prelog 1"=50' C��� E������� D��� D��� D��� D��� D��� S��������� U������ P���� & R��������� T������ E������� D��� APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: W���� & W��������� U������ C��� �� F��� C������, C������� UTILITY PLAN APPROVAL LE FEVER DRIVE ENTRANCE PRECISION DRIVE ENTRANCE SCALE 1"=20' SCALE 1"=20' 77.71 (77.90) PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION PROPOSED GRADE 1.8% G G G G G G G G E E GAS 8" SS 8" SS 8" SS 8" SS TF TF HC F S S F W W FDC FDC 12" W 12" W 12" W 12" SS 12" SS E E E E/FO/CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV G G G G G E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV STMH-1 INLET 1B INLET 1A STMH-2 EXISTING 51' R.O.W. EXISTING 76' R.O.W. EXISTING 82' R.O.W. EXISTING 51' R.O.W. EXISTING 51' R.O.W. PROPOSED 76' R.O.W. EXISTING 69' R.O.W. PROPOSED 3.5' R.O.W. BY SEPARATE DOCUMENT PROPOSED 3.5' R.O.W. BY SEPARATE DOCUMENT 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 8" W 9' UTILITY EASEMENT CINQUEFOIL LANE LE FEVER DRIVE LE FEVER DRIVE CINQUEFOIL LANE PRECISION DRIVE PRECISION DRIVE BANNER HEALTH MEDICAL CAMPUS SEE UTILITY PLANS FOR TERRA VIDA II APARTMENTS FOR ON-SITE INFORMATION BLDG 4 BLDG 8 8" W 8" W 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS S 8" W No. Revisions: By: Date: REVIEWED BY: R. Provencio DESIGNED BY: DRAWN BY: SCALE: DATE: Sept. 4, 2013 PROJECT: 335-009 Sheet Of 11 Sheets TERRA VIDA II APARTMENTS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 09/04/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� OFFSITE ROADWAY IMPROVEMENTS C200 UTILITY PLAN J. Prelog J. Prelog 1"=30' CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL NORTH ( IN FEET ) 1 inch = ft. 30 0 30 Feet 30 60 90 NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL WATER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. 3.ALL SEWER CONSTRUCTION SHALL BE PER SOUTH FORT COLLINS SANITATION DISTRICT (SFCSD) STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 4.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 6.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 7.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 8.ALL SEWER CLEANOUTS LOCATED IN PAVED AREAS SHALL BE TRAFFIC RATED. 9.CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND POTHOLING OF SUBSURFACE UTILITIES. ENGINEER AND CITY SHALL BE NOTIFIED OF ANY POTENTIAL CONFLICTS. 10.SEE UTILITY PLANS FOR TERRA VIDA II APARMENTS BY NORTHERN ENGINEERING FOR CONTINUATION OF IMPROVEMENTS. { } Mr. Terry W. Farrill, P.E., District Engineer Mr. Michael D. DiTullio, Manager Fort Collins - Loveland Water District South Fort Collins Sanitation District Date Date All changes, addendum, additions, deletions and modifications to these drawings must be approved in writing, by the Fort Collins - Loveland Water District and the South Fort Collins Sanitation District. LEGEND: E EXISTING STORM SEWER EXISTING ELECTRIC EXISTING TREES EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT VAULT ELEC H Y D EXISTING TELEPHONE T EXISTING GAS G PROPOSED CURB & GUTTER PROPOSED STORM SEWER PROPOSED STORM INLET PROPOSED UNDERGROUND ELECTRIC E PROPOSED FIBER OPTIC FO PROPOSED GAS LINE G PROPOSED EASEMENT PROPOSED DOMESTIC SERVICE PROPOSED WATER MAIN 8" W PROPOSED WATER APPURTENANCES SAWCUT LINE EXISTING FIBER OPTICS FO EXISTING RIGHT-OF-WAY PROPOSED RIGHT-OF-WAY EXISTING ELECTRIC VAULT T PRECISION DRIVE ENTRANCE SCALE 1"=20' EXISTING 51' R.O.W. CINQUEFOIL LANE EXISTING 82' R.O.W. EXISTING 20' UTILITY EASEMENT No. Revisions: By: Date: REVIEWED BY: R. Provencio DESIGNED BY: DRAWN BY: SCALE: DATE: Sept. 4, 2013 PROJECT: 335-009 Sheet Of 11 Sheets TERRA VIDA II APARTMENTS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 09/04/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� OFFSITE ROADWAY IMPROVEMENTS CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL C100 & DEMOLITION PLAN EXISTING CONDITIONS J. Prelog J. Prelog 1"=30' NORTH ( IN FEET ) 1 inch = ft. 30 0 30 Feet 30 60 90 LEGEND: FIELD SURVEY BY: SUBSURFACE EXPLORATION BY: E FO EXISTING STORM SEWER EXISTING FIBER OPTIC EXISTING ELECTRIC EXISTING TELEPHONE PEDESTAL EXISTING TREES NOTES: EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 5015 5013 VAULT ELEC H Y D 1.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2.CURB, GUTTER AND SIDEWALK SHALL BE REMOVED TO THE NEAREST JOINT. 3.THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA INCLUDING, BUT NOT LIMITED TO, SIDEWALKS, PRIVATE FENCES, ABOVE GROUND OR UNDERGROUND UTILITIES, STRUCTURES, AND UNDERGROUND FOUNDATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT. 4.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 5.CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ITEMS IMPACTING ADJACENT PROPERTIES WITH THE PROPERTY OWNERS {PRIOR} TO BEGINNING ANY CONSTRUCTION ACTIVITIES. SAWCUT LINE EXISTING GAS G REMOVE EXISTING ASPHALT PAVEMENT EXISTING RIGHT-OF-WAY EXISTING TELEPHONE T CTL THOMPSON, INC. Geotechnical Investigation Presidio Apartments Project #: FC06257-115 Date: August 21, 2013 Northern Engineering Services, Inc. Project No. 335-009 Date: July 26, 2013 Developer shall be responsible for unknown underground utilities. 7. The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans. 8. The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required. 9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction. 10. The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the utility companies. 11. No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to commencement of any work. 12. The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be constructed prior to installation of the water lines and dry utilities. 13. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. 14. A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is discharged into a storm sewer, channel, irrigation ditch or any waters of the United States. 15. The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan. 16. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 18. The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. 19. All recommendations of the (Preliminary Drainage Letter Report for Terra Vida II Apartments dated September 4, 2013)by Northern Engineering shall be followed and implemented. 20. Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping. 21. The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the the City of Fort Collins street inspector. 22. No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit is obtained, if applicable. 23. The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work in the Engineer absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an improper installation. 24. The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final report. 25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets. 26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the excavation necessary for building connections. 27. Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for roads within these districts. 28. All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval. 29. Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree removal requiring a permit. 30. The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 31. The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The the City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be responsible for providing any and all traffic control devices as may be required by thE construction activities. 32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed. 33. The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the Development. 34. There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site construction activities on Sundays or holidays, unless there is prior written approval by Larimer County. 35. The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise. 36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for clarification, and annotate the dimension on the as-built record drawings. 37. The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any permits and extension agreements needed for the job. 38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the Developer shall contact the Designer and the City of Fort Collins Engineer immediately. 39. The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins Engineer. 40. The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of bearings. The information shall be as follows: City of Fort Collins Benchmark7-01 North side of Harmony Road on an Irrigation structure approx 100 FT. West of the West Curb Line of the East Entrance to H.P. ELEV= 4911.33 City of Fort Collins Benchmark7-07 0.5 Miles South of Harmony Rd. and Strauss Cabin Rd., On the West side of Strauss Cabin Rd., On the Northwest wingwall of the bridge over an irrigation canal on a Larimer County cap. ELEV= 4975.97 41. All stationing is based on centerline of roadways unless otherwise noted. 42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 43. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer and/or the City of Fort Collins Inspector at the time the cuts are made. 44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 45. Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections. 46. After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum period of two years from the date of acceptance. 47. The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following private streets: N.A. 48. Approved Variances are listed as follows: N.A. CONSTRUCTION NOTES A. Grading and Erosion Control Notes 1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site. 2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans. 3. All required perimeter silt and construction fencing shall be installed priorto any land disturbing activity (stockpiling, stripping, grading, etc). All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion control facilities shown herein. 5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area(s) required for immediate construction operations, and for the shortest practical period of time. 6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County. 7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall: a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order to ensure the continued performance of their intended function. b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector. c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector. 8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and debris from all drainage infrastructure and other public facilities. 9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of way, and make sure streets and walkways are cleaned at the end of each working day. 10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any waters of the United States. 11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched. 12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the City/County or Homeowners Association (HOA). 13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations. 14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 15. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever measures are determined necessary, as directed by the City. 16. For additional information see separate Stormwater Management Plan / Erosion Control Report for Terra Vida II Apartments. B. Street Improvement Notes\ 1. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here. 2. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins. 4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the City of Fort Collins Engineer. 5. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 7. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the Right-of-Way Work Permit traffic control plan. 8. The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt. Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly. 9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector. C. Traffic Signing and Pavement Marking Construction Notes 1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here. 2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic. 3. All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD. 4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads. 5. All lane lines for concrete pavement should be epoxy paint. 6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols. 7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards. 8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction. 9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings. 10. All sign posts shall utilize break-away assemblies and fasteners per the Standards. 11. A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin. 12. The Developer installing signs shall be responsible for locating and protecting all underground utilities. 13. Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings). 15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. D. Storm Drainage Notes 1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2. All recommendations of the (Preliminary Drainage Letter Report for Terra Vida II Apartments dated September 4, 2013)by Northern Engineering shall be followed and implemented. 3. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. E. Utility Notes 1. All waterline construction shall conform to the Fort Collins Utility standards and specifications current to date of construction. All sanitary sewer construction shall conform to the South Fort Collins Sanitation District standards and specifications current to date of construction. 2. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the water utility. 3. Water mains shall be poly-wrapped D.I.P, or PVC with tracer wire. 4. HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and ASTM. The HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections. Tracer wire shall be installed with the HDPE service, and shall extend up the curb stop. The curb stop shall be covered with a metal box and tracer wire test lid per City Water Detail 25. City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner C001 CONSTRUCTION NOTES GENERAL & J. Prelog J. Prelog N/A F��� C������, C������� 80524 (970) 206-9455 M��� D�����, PE D����� A��������� 2272 G��� H���� D���� L�������, C������� 80538 (970) 669-2061 TRAFFIC & TRANSPORTATION ENGINEERING SEPTEMBER 2013 PROJECT LOCATION VICINITY MAP NORTH 1"=1500' CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner I hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort Collins and State of Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design. revisions, and record conditions that I have noted on these plans. These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. DISCLAIMER STATEMENT: CERTIFICATION STATEMENT: Northern Engineering Services, Inc. Project No. 335-009 Date: July 26, 2013 ORIGINAL FIELD SURVEY BY: CONTACT INFORMATION PROJECT TEAM: N������� E���������� S�������, I��. 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 (970) 221-4158 N������� E���������� S�������, I��. 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 (970) 221-4158 CONTACT INFORMATION PROJECT TEAM: I���� E����������, I��. L�� K����� 140 P����� D���� F��� C������, C������� 80525 (970) 226-6819 SHEET INDEX C000 C001 C100 C400-C403 C200 C300 E N G I N E E R I N G � � � � � � �� E N G I N E E R I N G � � � � � � �� CTL THOMPSON, INC. Geotechnical Investigation Presidio Apartments Project #: FC06257-115 Date: August 21, 2013 SUBSURFACE EXPLORATION BY: COVER SHEET GENERAL & CONSTRUCTION NOTES EXISTING CONDITIONS & DEMOLITION PLAN UTILITY PLAN CINQUEFOIL LANE ROADWAY PLAN AND PROFILE DETAILS LOCATED IN THE NORTHEAST QUARTER OF SECTION 4, TOWNSHIP 6 NORTH, RANGE 68 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO TERRA VIDA II APARTMENTS OFFSITE ROADWAY IMPROVEMENTS UTILITY PLANS FOR OWNER/DEVELOPER/APPLICANT SITE ENGINEER SURVEYOR TRAFFIC ENGINEER GEOTECH Mr. Terry W. Farrill, P.E., District Engineer Mr. Michael D. DiTullio, Manager Fort Collins - Loveland Water District South Fort Collins Sanitation District Date Date All changes, addendum, additions, deletions and modifications to these drawings must be approved in writing, by the Fort Collins - Loveland Water District and the South Fort Collins Sanitation District. BENCHMARK: City of Fort Collins 7-01 - north side of Harmony Road on an irrigation structure approx. 100 ft. west of the west curb line of the east entrance to HP, elevation 4911.33 City of Fort Collins 7-07 - 0.5 Miles south of Harmony Road. and Strauss Cabin Road, on the west side of Strauss Cabin Road, on the northwest wingwall of the bridge over an irrigation canal on a Larimer County cap. Elevation 4875.97 Basis of Bearings Basis of Bearings is the North line of the Northeast Quarter of said Section 4 as bearing South 89�29'07" East (assumed bearing). PROJECT BENCHMARKS: GAS----------------- Xcel Energy---------------------------------Stephanie Rich (970) 225-7828 ELECTRIC-------- City of Fort Collins Light & Power-----Doug Martine (970) 224-6152 CABLE------------- Comcast------------------------------------- Don Kapperman (970) 567-0245 TELECOM.--------CenturyLink Local Network------------- Robert Rulli (970) 490-7503 WATER------------ City of Fort Collins Utilities--------------Roger Buffington (970) 221-6854 WASTEWATER--South Fort Collins Sanitation District-Terry Farrill (970) 226-3104 STORMWATER- City of Fort Collins Utilities--------------Glen Schlueter (970) 221-6700 FIBER OPTICS- Level III---------------------------------------Rick Miller (720) 888-7568 UTILITY CONTACT LIST: * UTILITY COMPANY * This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of Colorado (UNCC) at 811 for additional information. PHONE NUMBER ** The underground utility locates provided by SiteWise, LLC are based upon the best available information at the time of locating. Contractor acknowledges that it is common for underground facility owner maps to have errors and omissions of data shown. Consequently, it is the Contractor's sole responsibility to field verify the location of all utilities prior to construction, and notify the Engineer of any discrepancies found. C302 CINQUEFOIL LANE CROSS SECTIONS C301 CINQUEFOIL LANE ROADWAY STRIPING C000 COVER SHEET J. Prelog J.Prelog N/A BLDG 1 BLDG 2 BLDG 3 BLDG 4 BLDG 8 BLDG 7 BLDG 10 (4 LIVE/WORK UNITS) BLDG 9 BLDG 5 BLDG 6 GARAGE G14 GARAGE G10 3 5.67 ac 1 3.88 ac 2 0.60 ac 1 3 2 4.5' SIDEWALK 5' SIDEWALK 5' SIDEWALK 6' SIDEWALK No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: Sept. 4, 2013 PROJECT: 514-002 Sheet Of 6 Sheets TERRA VIDA II APARTMENTS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 09/04/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� C400 DRAINAGE EXHIBIT A. Cvar N. Whitcomb 1"=40' CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL NORTH ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 LEGEND: 4953 PROPOSED CONTOUR 93 PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED PROPERTY BOUNDARY CURB & GUTTER PROPOSED INLET 1 DESIGN POINT FLOW ARROW DRAINAGE BASIN LABEL DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 1 1 PROJECT BENCHMARK BENCHMARK #1: City of Fort Collins Benchmark 7-01 Elevation = 4911.33 BENCHMARK #2: City of Fort Collins Benchmark 7-07 Elevation = 4975.97 NOTES: 1.REFER TO THE "PRELIMINARY DRAINAGE REPORT FOR TERRA VIDA II APARTMENTS" BY NORTHERN ENGINEERING, DATED {SEPTEMBER 4, 2013} FOR ADDITIONAL INFORMATION.{ } BASIN DESIGNATION BASIN AREA (AC) FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION PROPOSED UNDERDRAIN UD 1 X.XXX (84' ROW) CINQUEFOIL LANE (82' ROW) BLDG 1 FFE=8.53 BLDG 2 FFE=8.13 BLDG 3 FFE=6.67 BLDG 4 FFE=6.35 BLDG 5 FFE=8.00 BLDG 6 FFE=6.55 BLDG 7 FFE=5.25 BLDG 8 FFE=5.21 CLUBHOUSE & COMMUNITY CENTER FFE=6.71 POOL DECK FFE=6.61 BLDG 9 FFE=6.76 BLDG 10 FFE=4.86 GARAGE G2 FFE=7.52 FFE= 7.71 FFE= 8.24 GARAGE G3 FFE=7.52 FFE=6.52 GARAGE G4 FFE=7.66 GARAGE G5 FFE=5.68 GARAGE G6 FFE=5.68 FFE=5.88 FFE=5.38 FFE=5.38 FFE=4.88 GARAGE G7 FFE=6.35 FFE=4.45 FFE=4.95 GARAGE G14 FFE=4.95 FFE=4.96 FFE=4.96 FFE=4.46 FFE=4.46 GARAGE G20 FFE=3.98 GARAGE G19 FFE=3.33 GARAGE G18 FFE=4.84 FFE=5.62 FFE=5.12 FFE= 5.87 FFE= 5.37 FFE= 5.37 FFE= 4.87 FFE=6.37 FFE=5.87 FFE=5.87 FFE=5.37 FFE=7.25 FFE=6.75 FFE=6.75 FFE=6.25 FFE=6.25 FFE=5.75 FFE=6.75 FFE=6.25 GARAGE G10 EXISTING 9' UTILITY EASEMENT EXISTING 20' UTILITY EASEMENT 9' UTILITY EASEMENT 4.5' SIDEWALK 5' SIDEWALK 5' SIDEWALK EXISTING 6' SIDEWALK No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: Sept. 4, 2013 PROJECT: 514-002 Sheet Of 6 Sheets TERRA VIDA II APARTMENTS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 09/04/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL NORTH ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPERTY BOUNDARY PROPOSED SPOT ELEVATION 33.43 PROPOSED SLOPES NOTES: 2.0% PEDESTRIAN ACCESS RAMPS EXISTING SPOT ELEVATION (47.45) C300 GRADING PLAN A. Reese N. Whitcomb 1"=40' PROPOSED 18" VERTICAL CURB & GUTTER W ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST 8" SS SS SS 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS SS SS SS SS SS SS 18" SS 18" SS 8" SS SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS ST W W W W W W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W � � 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W GM GM GM CO HC HC VAN HC HC TF TF TF TF TF TF TF TF TF TF TF HC S F F F F F F S S S S S S S S S F F F W W W W W W W W W W W S F FDC FDC FDC FDC FDC FDC FDC FDC FDC FDC 8" W 8" W 12" W 12" SS 8" W E E G G G G G G CTV CTV G G G G G G G G G G G G G G G G G G G G G G E E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV E/CTV 8" W CTV CTV CTV CTV 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 8" W BLDG 1 (MIRRORED) BLDG 2 BLDG 3 BLDG 4 BLDG 8 BLDG 7 BLDG 10 BLDG 9 (MIRRORED) BLDG 5 BLDG 6 GARAGE G1 GARAGE G2 GARAGE G3 GARAGE G5 GARAGE G6 GARAGE G8 GARAGE G9 GARAGE G10 GARAGE G14 GARAGE G13 GARAGE G15 GARAGE G16 GARAGE G12 GARAGE G11 GARAGE G7 GARAGE G17 GARAGE G18 GARAGE G4 GARAGE G19 GARAGE G20 CLUB HOUSE & COMMUNITY CENTER INLET B5 INLET B4 STMH B2 INLET B3 INLET B1 EX STMH B INLET C1 TEE C INLET A8 STMH A7 STMH A6 INLET A5 INLET A4 STMH A2 STMH A3 INLET A1 INLET A SSMH A2-4 SSMH A4-1 SSMH A2-3 SSMH A5 SSMH A2-2 SSMH A2-1 SSMH A4 SSMH A3 SSMH A1 SSMH A2 SSMH A EX SSMH 9' UTILITY EASEMENT 9' UTILITY EASEMENT 9' UTILITY EASEMENT 9' UTILITY EASEMENT LE FEVER DRIVE (76' ROW) CINQUEFOIL LANE (82' ROW) PRECISION DRIVE (51' ROW) LADY MOON DRIVE (84' ROW) 8" PVC 8" PVC 8" PVC 8" PVC 8" PVC 8" PVC 8" PVC 8" PVC 8" PVC 8" PVC 8" PVC 8" PVC 30" RCP 24" RCP 24" RCP 18" RCP 18" RCP 18" RCP 24" RCP 24" RCP 24" RCP 24" RCP 15" RCP 18" RCP 15" RCP 15" RCP 4.5' SIDEWALK 5' SIDEWALK 5' SIDEWALK EXISTING 6' SIDEWALK EXISTING 20' UTILITY EASEMENT No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: Sept. 4, 2013 PROJECT: 514-002 Sheet Of 6 Sheets TERRA VIDA II APARTMENTS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 09/04/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� C200 UTILITY PLAN A. Reese N. Whitcomb 1"=40' CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL NORTH ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 PROPOSED RIGHT OF WAY EXISTING WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL WATER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. 3.ALL SEWER CONSTRUCTION SHALL BE PER SOUTH FORT COLLINS SANITATION DISTRICT (SFCSD) STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 4.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 6.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 7.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 8.FIRE LINES SHALL BE STUBBED INSIDE THE RISER ROOM AND CAPPED 1' ABOVE THE FINISHED FLOOR ELEVATION. 9.CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND POTHOLING OF SUBSURFACE UTILITIES. ENGINEER AND CITY SHALL BE NOTIFIED OF ANY POTENTIAL CONFLICTS. 10.SEE UTILITY PLANS FOR TERRA VIDE II APARTMENTS OFFSITE ROADWAY IMPROVEMENTS BY NORTHERN ENGINEERING FOR ALL IMPROVEMENTS ASSOCIATED WITH THE CINQUEFOIL LANE CORRIDOR, LE FEVER SIDEWALKS & PRECISION DRIVE IMPROVEMENTS TO BE CONSTRUCTED BY OVERALL PRESIDIO DEVELOPER (IMAGO). 11.SEE UTILITY PLANS FOR BANNER HEALTH MEDICAL CAMPUS BY NORTHERN ENGINEERING FOR ALL IMPROVEMENTS ASSOCIATED WITH THE LE FEVER DRIVE CORRIDOR. ALL LE FEVER ROADWAY IMPROVEMENT TO BE CONSTRUCTED BY OTHERS. { W G T E EXISTING STORM SEWER ST PROPOSED ELECTRIC EXISTING TELEPHONE EXISTING GAS PROPOSED ELECTRIC TRANSFORMER S PROPOSED PROPOSED SEWER FIRE SERVICE SERVICE F W EXISTING SANITARY SEWER SS PROPOSED DOWNSPOUTS PROPOSED FIRE DEPT. CONN. PROPOSED CURB & GUTTER PROPOSED CURB STOP & METER PIT FDC PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT H Y D PROPOSED LOTLINE EASEMENT LINE PROPERTY BOUNDARY Mr. Terry W. Farrill, P.E., District Engineer Mr. Michael D. DiTullio, Manager Fort Collins - Loveland Water District South Fort Collins Sanitation District Date Date All changes, addendum, additions, deletions and modifications to these drawings must be approved in writing, by the Fort Collins - Loveland Water District and the South Fort Collins Sanitation District. TF ELEC E E E G G G G W W W W W W W W 12" W WV WV 12" W 12" W 12" W T T T T T WV WV WV W W W W W W W W W W W W W W W ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST 8" SS SS SS 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS SS SS SS SS SS SS 18" SS 18" SS 8" SS SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS ST W W W W W W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W � � 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W GM GM GM CO S WV WV WV H Y D D S WV WV D S WV S V.V.P. P. V.P.S V.P. V.P. X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X V.P.S V.P. W S E E E VAULT ELEC E E E E E E E E E E E E E VAULT ELEC E E E G G G G W W W W W W W W 12" W WV WV 12" W 12" W 12" W T T T T T WV WV WV W W W W W W W W W W W W W W W ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST 8" SS SS SS 12" SS 12" SS 12" SS 12" SS 12" SS 12" SS SS SS SS SS SS SS 18" SS 18" SS 8" SS SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS ST W W W W W W 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W � � 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W GM GM GM CO LE FEVER DRIVE (76' ROW) (PER BANNER HEALTH MEDICAL CAMPUS UTILITY PLANS) CINQUEFOIL LANE (82' ROW) PRECISION DRIVE (51' ROW) LADY MOON DRIVE (84' ROW) No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: Sept. 4, 2013 PROJECT: 514-002 Sheet Of 6 Sheets TERRA VIDA II APARTMENTS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 09/04/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL C100 EXISTING CONDITIONS A. Reese N. Whitcomb 1"=40' NORTH ( IN FEET ) 1 inch = ft. 40 0 40 Feet 40 80 120 EXISTING ELECTRIC E LEGEND: G T EXISTING STORM SEWER ST EXISTING TELEPHONE EXISTING GAS EXISTING IRRIGATION BOX EXISTING GAS METER EXISTING TELEPHONE PEDESTAL EXISTING TREES TO BE REMOVED NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3.CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. THE CITY OF FORT COLLINS STREET DEPARTMENT OPERATES A CRUSHING OPERATION THAT WILL ACCEPT CONCRETE MATERIAL AT NO COST FOR CRUSHING AND RE-USE AS RECYCLED AGGREGATE. THIS OPERATION IS LOCATED AT 1380 HOFFMAN MILL ROAD AND CAN BE REACHED AT (970) 482-1249. 4.ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5.CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. 6.REFER TO TERRA VIDA II APARTMENTS OFFSITE ROADWAY IMPROVEMENTS UTILITY PLANS FOR DEMOLITION AND REMOVALS WITHIN THE PUBLIC RIGHT-OF-WAY. 7.REFER TO LANDSCAPE PLANS FOR TREE REMOVAL & MITIGATION. EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FENCE X EXISTING WATER METER EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT PROPERTY BOUNDARY EXISTING RIGHT-OF-WAY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 5015 5013 EXISTING MONITORING WELL MW VAULT ELEC H Y D CONTROL IRR H2O G EXISTING LOT LINE EXISTING TREES TO BE REMOVED Northern Engineering Services, Inc. Project No. 514-001 Date: February 19, 2008 ORIGINAL FIELD SURVEY BY: Northern Engineering Services, Inc. Project No. 514-001 Date: December, 2012 Northern Engineering Services, Inc. Project No. 514-001 Date: July, 2013 ADDITIONAL FIELD SURVEY BY: 7. The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans. 8. The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required. 9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction. 10. The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the utility companies. 11. No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to commencement of any work. 12. The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be constructed prior to installation of the water lines and dry utilities. 13. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. 14. A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is discharged into a storm sewer, channel, irrigation ditch or any waters of the United States. 15. The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan. 16. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 18. The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. 19. All recommendations of the Preliminary Drainage Letter Report for Terra Vida II Apartments dated September 4, 2013by Northern Engineering shall be followed and implemented. 20. Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping. 21. The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the the City of Fort Collins street inspector. 22. No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit is obtained, if applicable. 23. The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work in the Engineer absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an improper installation. 24. The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final report. 25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets. 26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the excavation necessary for building connections. 27. Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for roads within these districts. 28. All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval. 29. Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree removal requiring a permit. 30. The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 31. The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The the City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be responsible for providing any and all traffic control devices as may be required by thE construction activities. 32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed. 33. The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the Development. 34. There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site construction activities on Sundays or holidays, unless there is prior written approval by Larimer County. 35. The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise. 36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for clarification, and annotate the dimension on the as-built record drawings. 37. The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any permits and extension agreements needed for the job. 38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the Developer shall contact the Designer and the City of Fort Collins Engineer immediately. 39. The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins Engineer. 40. The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of bearings. The information shall be as follows: City of Fort Collins Benchmark7-01 North side of Harmony Road on an Irrigation structure approx 100 FT. West of the West Curb Line of the East Entrance to H.P. ELEV= 4911.33 City of Fort Collins Benchmark7-07 0.5 Miles South of Harmony Rd. and Strauss Cabin Rd., On the West side of Strauss Cabin Rd., On the Northwest wingwall of the bridge over an irrigation canal on a larimer County cap. ELEV= 4975.97 41. All stationing is based on centerline of roadways unless otherwise noted. 42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 43. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer and/or the City of Fort Collins Inspector at the time the cuts are made. 44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 45. Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections. 46. After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum period of two years from the date of acceptance. 47. The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following private streets: N.A. 48. Approved Variances are listed as follows: CONSTRUCTION NOTES A. Grading and Erosion Control Notes 1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site. 2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans. 3. All required perimeter silt and construction fencing shall be installed priorto any land disturbing activity (stockpiling, stripping, grading, etc). All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion control facilities shown herein. 5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area(s) required for immediate construction operations, and for the shortest practical period of time. 6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County. 7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall: a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order to ensure the continued performance of their intended function. b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector. c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector. 8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and debris from all drainage infrastructure and other public facilities. 9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of way, and make sure streets and walkways are cleaned at the end of each working day. 10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any waters of the United States. 11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched. 12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the City/County or Homeowners Association (HOA). 13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations. 14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 15. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever measures are determined necessary, as directed by the City. 16. For additional information see separate Stormwater Management Plan / Erosion Control Report for Terra Vida II Apartments. �� Street Improvement Notes 17. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here. 18. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 19. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins. 20. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the City of Fort Collins Engineer. 21. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 22. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 23. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the Right-of-Way Work Permit traffic control plan. 24. The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt. Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly. 25. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector. C. Traffic Signing and Pavement Marking Construction Notes 1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here. 2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic. 3. All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD. 4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads. 5. All lane lines for concrete pavement should be epoxy paint. 6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols. 7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards. 8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction. 9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings. 10. All sign posts shall utilize break-away assemblies and fasteners per the Standards. 11. A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin. 12. The Developer installing signs shall be responsible for locating and protecting all underground utilities. 13. Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings). 15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. D. Storm Drainage Notes 1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2. All recommendations of the Preliminary Drainage Letter Report for Terra Vida II Apartments dated September 4, 2013by Northern Engineering shall be followed and implemented. 3. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. E. Utility Notes 1. All waterline construction shall conform to the City of Fort Collins Standards and specifications current to date of construction. 2. All sanitary sewer construction shall conform to the South Fort Collins Sanitation District Standards and Specification current at the date of construction. 3. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the water utility. 4. Water mains shall be poly-wrapped D.I.P, or PVC with tracer wire. 5. HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and ASTM. The HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections. Tracer wire shall be installed with the HDPE service, and shall extend up the curb stop. The curb stop shall be covered with a metal box and tracer wire test lid per City Water Detail 25. City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner C001 CONSTRUCTION NOTES GENERAL & A. Reese N. Whitcomb N/A M��� D�����, PE D����� A��������� 2272 G��� H���� D���� L�������, C������� 80538 (970) 669-2061 TRAFFIC & TRANSPORTATION ENGINEERING 2555 WALNUT STREET DENVER, COLORADO 80205 303.832.4474 F��: 303.832.4476 ���.�������.��� SEPTEMBER 2013 PROJECT LOCATION VICINITY MAP NORTH 1"=1500' CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner I hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort Collins and State of Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design. revisions, and record conditions that I have noted on these plans. These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. DISCLAIMER STATEMENT: CERTIFICATION STATEMENT: BENCHMARK #1: City of Fort Collins Benchmark 7-01 Elevation= 4911.33 BENCHMARK #2: City of Fort Collins Benchmark 7-07 Elevation= 4975.97 Basis of Bearings West line of the Northeast Quarter of said Section 4 as bearing North 01�32'05" West. Northern Engineering Services, Inc. Project No. 514-001 Date: February 19, 2008 ORIGINAL FIELD SURVEY BY: PROJECT BENCHMARKS: CONTACT INFORMATION PROJECT TEAM: N��� H���, PE, LEED AP N������� E���������� S�������, I��. 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 (970) 221-4158 G��� G��������, PLS N������� E���������� S�������, I��. 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 (970) 221-4158 LANDSCAPE ARCHITECT CONTACT INFORMATION PROJECT TEAM: I���� E����������, I��. L�� K����� 140 P����� D���� F��� C������, C������� 80525 (970) 226-6819 SHEET INDEX C000 C001 C100 C200 E N G I N E E R I N G � � � � � � �� E N G I N E E R I N G � � � � � � �� UTILITY CONTACT LIST: * UTILITY COMPANY PHONE NUMBER ARCHITECT K������ P��� C������� 2555 W����� S����� D�����, C������� 80205 (303) 832-4474 C300 C400 CTL / THOMPSON, INC. Preliminary Geotechnical Investigation Terra Vida II Apartments Fort Collins, Colorado CTL Project #: FC06257-115 Date: August 21, 2013 SUBSURFACE EXPLORATION BY: COVER SHEET GENERAL & CONSTRUCTION NOTES EXISTING CONDITIONS UTILITY PLAN GRADING PLAN DRAINAGE EXHIBIT LOCATED IN THE NORTHEAST QUARTER OF SECTION 4, TOWNSHIP 6 NORTH, RANGE 68 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO TERRA VIDA II APARTMENTS UTILITY PLANS FOR OWNER DEVELOPER/APPLICANT SITE ENGINEER SURVEYOR TRAFFIC ENGINEER GEOTECH Mr. Terry W. Farrill, P.E., District Engineer Mr. Michael D. DiTullio, Manager Fort Collins - Loveland Water District South Fort Collins Sanitation District Date Date All changes, addendum, additions, deletions and modifications to these drawings must be approved in writing, by the Fort Collins - Loveland Water District and the South Fort Collins Sanitation District. Northern Engineering Services, Inc. Project No. 514-001 Date: December, 2012 Northern Engineering Services, Inc. Project No. 514-001 Date: July, 2013 ADDITIONAL FIELD SURVEY BY: GAS----------------- Xcel Energy---------------------------------Stephanie Rich (970) 225-7828 ELECTRIC-------- City of Fort Collins Light & Power-----Doug Martine (970) 224-6152 CABLE------------- Comcast------------------------------------- Don Kapperman (970) 567-0245 TELECOM.--------CenturyLink Local Network------------- Robert Rulli (970) 490-7503 WATER------------ City of Fort Collins Utilities--------------Roger Buffington (970) 221-6854 WASTEWATER--South Fort Collins Sanitation District-Terry Farrill (970) 226-3104 STORMWATER- City of Fort Collins Utilities--------------Glen Schlueter (970) 221-6700 * This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of Colorado (UNCC) at 811 for additional information. LOCATION VICINITY MAP NORTH 1"=1500' CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner SHEET INDEX COVER SHEET GENERAL & CONSTRUCTION NOTES EXISTING CONDITIONS UTILITY PLAN GRADING PLAN DRAINAGE EXHIBIT LOCATED IN THE NORTHEAST QUARTER OF SECTION 4, TOWNSHIP 6 NORTH, RANGE 68 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO TERRA VIDA II APARTMENTS & OFFSITE ROADWAY IMPROVEMENTS UTILITY PLANS FOR Mr. Terry W. Farrill, P.E., District Engineer Mr. Michael D. DiTullio, Manager Fort Collins - Loveland Water District South Fort Collins Sanitation District Date Date All changes, addendum, additions, deletions and modifications to these drawings must be approved in writing, by the Fort Collins - Loveland Water District and the South Fort Collins Sanitation District. COVER MASTER COVER SHEET A. Reese N. Whitcomb N/A C000 C001 C100 C200 C300 C400 I���� E����������, I��. L�� K����� 140 P����� D���� F��� C������, C������� 80525 (970) 226-6819 SHEET INDEX C000 C001 C100 C400-C403 C200 C300 COVER SHEET GENERAL & CONSTRUCTION NOTES EXISTING CONDITIONS & DEMOLITION PLAN UTILITY PLAN CINQUEFOIL LANE ROADWAY PLAN AND PROFILE DETAILS OWNER/DEVELOPER/APPLICANT C302 CINQUEFOIL LANE CROSS SECTIONS C301 CINQUEFOIL LANE ROADWAY STRIPING OFFSITE ROADWAY IMPROVEMENTS TERRA VIDA II APARTMENTS M��������, T���� V��� II LLP K�� K���� 1400 16�� S�����, 6�� F���� D�����, C������� 80202 (303) 419-0744 DEVELOPER/APPLICANT