Please see the following summary of comment responses
If have any questions regarding the responses in red contact Stephanie Sigler with Ripley Design Inc.
For responses in blue please contact Stephanie Thomas at Northern Engineering
Comment Summary:
Department: Current Planning
Contact: Jason Holland, 970-224-6126, jholland@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/28/2013
It would be helpful to show the proposed construction access route east to the frontage road on
the plans. This route could be converted to a trail connection after construction. It may also be
helpful to show a street connection arrow to reserve the potential for this access on the ODP
plan.
Response: The construction route may have changed location due to floodway restrictions. Erosion control measures will be
applied for the entire length of Carriage Parkway.
Comment Number: 2 Comment Originated: 08/28/2013
Please label the pocket park as "small neighborhood park" Fix the descrepancy for the park
acreage, shown as both 1.3 acres and 1 acre.
Response: Drawing has been revised.
Comment Number: 3 Comment Originated: 08/28/2013
The arrow symbol which designates a local street connection, please add this symbol to the
legend, so that it's clear this is not pedestrian only.
Response: Drawing has been revised.
Comment Number: 4 Comment Originated: 08/28/2013
For the frontage road, please remove the words "by others" and add the word connection.
Response: Drawing has been revised.
Comment Number: 5 Comment Originated: 08/28/2013
Please make the line types and hierarchy more distinctive on the plan and vicinity map for the
Fox Grove ODP – Comment Responses
September 4, 2013
Page 2 of 6
elements shown and reduce the shading of the existing topo will also help.
Response: Drawing has been revised.
Comment Number: 6 Comment Originated: 08/28/2013
Per the ODP checklist, label approximate number, height, and types of residential uses
proposed in each phase; label the approximate density of adjacent existing developments.
Response: Drawing has been revised.
Comment Number: 7 Comment Originated: 08/28/2013
Change the Urban Growth Area label to "Growth Management Area" Make the City Limits and
GMA more readable on the Vicinity map. The vicinity map could be larger.
Response: Drawing has been revised.
Comment Number: 8 Comment Originated: 08/28/2013
Please break down the land use table by phase and match acreages on the plan.
Response: Drawing has been revised.
Comment Number: 9 Comment Originated: 08/28/2013
See redline for additional clarification to these comments.
Department: Engineering Development Review
Contact: Tyler Siegmund, 970-221-6501, tsiegmund@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/30/2013
08/30/2013: Please add the following note to the ODP:
All public streets will be designed to meet or exceed City Standards unless variances are
granted to allow a reduction in City Standards. Exact location of access points and certain
street alignments will be determined with the submittal and review of PDP.
Response: Drawing has been revised.
Comment Number: 2 Comment Originated: 08/30/2013
08/30/2013: Please add the following note to the ODP:
The proposal boundary connections conform to minimum street access requirements. Further
internal connections to major collector streets, minor collector streets, and connector streets
shall be reviewed in accordance with the Land Use Code Section 3.6.3 at the time of the
Project Development Plan.
Response: Drawing has been revised.
Comment Number: 3 Comment Originated: 08/30/2013
08/30/2013: The proposed construction access road off of the I-25 SE Frontage Road is a
Colorado Department of Transportation roadway. Plans will need to be submitted to CDOT for
review and approval of the construction access road.
Response: The construction route may have changed location due to floodway restrictions. Erosion control measures will be
applied for the entire length of Carriage Parkway.
Fox Grove ODP – Comment Responses
September 4, 2013
Page 3 of 6
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/26/2013
08/26/2013: No comments on the ODP.
Department: Light And Power
Contact: Doug Martine, 970-224-6152, dmartine@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/14/2013
08/14/2013: Power is located along the eastern side of the I-25 frontage road. The developer
will need to provide an off-site easement for a power line from the frontage road to the
development. Specifics of this easement will need to be coordinated with Light & Power
Engineering (970)221-6700.
NE Response: An off-site 6’ Dry Utility Easement will be shown on the Plat. This will be shown on the PDP.
Department: Park Planning
Contact: Craig Foreman, 970-221-6618, cforeman@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/12/2013
08/12/2013: No comments
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: Floodplain
Comment Number: 1 Comment Originated: 08/27/2013
08/27/2013:
1. On the ODP (Sheet 1 of 1), please label the floodplain boundaries as Boxelder 100-year
Floodplain and Boxelder 100-year Floodway, and make the lines more distinctive so they don’t
blend in with the contours, etc.
Response: Drawing has been revised.
2. Also on the ODP, please add the following notes:
a) Portions of this property are located in the FEMA-regulatory 100-year Boxelder Creek
Floodway and High-Risk Flood Fringe.
b) All development within the floodplain must comply with the floodplain regulations of Chapter
10 of City of Fort Collins Municipal Code.
c) Construction of residential structures is not allowed in the 100-year Floodway.
d) Residential structures are allowed in the 100-year High Risk Flood Fringe provided they
meet all elevation requirements of Chapter 10 of City Municipal Code.
e) Non-structural development (fences, detention ponds, hard surface paths, fill, driveways,
Fox Grove ODP – Comment Responses
September 4, 2013
Page 4 of 6
parking areas, vegetation etc.) is allowed within the 100-year Floodway, provided the
development will not cause a rise in the Base Flood Elevation or a change to the Floodway or
Flood Fringe boundaries. Non-structural development is not restricted in the flood fringe.
Response: Drawing has been revised.
3. On the Master Drainage Plan, add “FEMA” to the labels for the floodway and flood fringe.
NE Response: “FEMA” was added to the floodway and flood fringe labels.
4. Also on the Master Drainage Plan, show and label the CSL’s and the BFE’s. The label for
the CSL should include the station, elevation, and datum; e.g. #144454 4906.74 ft. NAVD88.
The label for the BFE should include the elevation and datum; e.g. 4907 NAVD88.
NE Response: The BFE and CSL lines are now shown on the Master Drainage Plan.
Comment Number: 2 Comment Originated: 08/27/2013
08/27/2013:
5. Add the following notes to the Master Drainage Plan.
a) Portions of this property are located in the FEMA-regulatory 100-year Boxelder Creek
Floodway and High-Risk Flood Fringe, and must comply with the floodplain requirements of
Chapter 10 of City of Fort Collins Municipal Code.
b) Construction of new residential structures is not allowed in the floodway. Residential
structures are allowed in the flood fringe, provided that all duct work, heating, ventilation and air
conditioning systems, hot water heater, electrical and the lowest floor of the building, are a
minimum of 18-inches above the Base Flood Elevation (BFE). That minimum elevation is
known as the Regulatory Flood Protection Elevation (RFPE). RFPE = BFE + 18”.
c) The Flood Fringe is an AO Zone, meaning that the BFE’s have not been determined, so
the BFE for each structure will be 2.0 feet above the highest adjacent grade (HAG), and the
RFPE will be HAG + 3.5 feet; or this area will have to be modeled by a Professional Engineer
licensed in the State of Colorado to establish BFE’s.
d) Basements may not be constructed below the RFPE in the flood fringe. Crawl spaces (if
used rather than slab-on-grade) must be built in conformance with Section 10-40 of City of Fort
Collins Municipal Code (this will include venting, sump pumps, etc.).
e) Nonstructural development (fences, detention ponds, hard surface paths, fill, driveways,
parking areas, vegetation, etc.) is allowed within the 100-year Floodway as long as it can be
proven that the development will not cause a rise in the Base Flood Elevation (BFE) or a
change to the floodway or flood fringe boundaries. Nonstructural development is not restricted
within the flood fringe.
f) Any and all construction activities in the floodway or flood fringe must be preceded by an
approved floodplain use permit. If the construction is in the floodway a no-rise certification must
be approved prior to construction.
NE Response: Notes have been added.
6. In the Drainage Report, describe the site as being in the FEMA-regulatory 100-year Boxelder
Floodplain, describe the floodway, identify the FEMA FIRM panel number and the date it was
mapped, include a copy of the FIRM panel and show the location of the development, discuss
the location of all structures relative to the floodplain and describe how the development will
meet the requirements of Chapter 10 of City of Fort Collins Municipal Code (In this instance it
sounds as if the portion of the development in the flood fringe will be delayed until upstream
Fox Grove ODP – Comment Responses
September 4, 2013
Page 5 of 6
improvements decrease---or eliminate---the size of the flood fringe. That discussion should be
included in this report, but it doesn’t preclude the need for inclusion of all the items asked for in
this note.)
NE Response: The drainage report now contains further explanation of the FEMA floodplain, and a FIRM panel is included with
this report.
7. I understand that the developer has asked for approval of an access road across the
floodway from the I-25 frontage road to the site. In order for the road to be approved, the
developer will have to obtain an approved floodplain use permit and no-rise certification, as a
minimum. If construction of the road will cause a change to the Base Flood Elevation (BFE) or
the floodplain or flood fringe boundaries, a Conditional Letter of Map Revision (CLOMR) will
have to be approved by FEMA prior to beginning any work on the roadway, and a Letter of
Map Revision (LOMR) approved by FEMA upon completing the work. If there is an existing
culvert which needs to be modified where the existing road crosses over Boxelder Creek, that
will also have to be included in the CLOMR/LOMR process.
NE Response: Acknowledged.
Topic: General
Comment Number: 3 Comment Originated: 08/27/2013
08/27/2013: The ODP is required to have quantity detention. At this time, the City can not
guarantee if modeling that showed this development not increasing any flows downstream
would reduce the detention requirement.
NE Response: Acknowledged. Further modeling will be done if this direction is pursued.
Comment Number: 4 Comment Originated: 08/27/2013
08/27/2013: Off-site drainage easements would be required for any flow path between the site
and Boxelder Creek.
NE Response: An off-site Drainage Easement will be shown on the Plat.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 08/26/2013
08/26/2013: No comments.
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 08/27/2013
08/27/2013: The City agrees with the statement in the TIS that some form of access control to
Sun Chase needs to be determined as the project moves forward.
Response: Drawing has been revised to show emergency access gate
Fox Grove ODP – Comment Responses
September 4, 2013
Page 6 of 6
Topic: Traffic Impact Study
Comment Number: 1 Comment Originated: 08/27/2013
08/27/2013: The number of housing units in the TIS differs from what was stated in the May 2013
neighborhood meeting. The number used in the TIS creates more trips than what was
expressed at the May 2013 neighborhood meeting. The City assumes the July 2013 TIS is
based upon the most current plan for this site and accepts the TIS. The City also assumes the