Loading...
HomeMy WebLinkAboutLAKEVIEW - PDP - PDP130026 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTPRELIMINARY DRAINAGE AND EROSION CONTROL REPORT LAKEVIEW SUBDIVISION Fort Collins, Colorado August 21, 2012 Prepared for: Century Communities, LLC 8390 E. Crescent Parkway, Suite 650 Greenwood Village, CO 80111 Prepared by: 200 South College Avenue, Suite 100 Fort Collins, Colorado 80524 Phone: 970.221.4158 Fax: 970.221.4159 www.northernengineering.com Project Number: 665-002  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. ADDRESS: 200 S. College Ave. Suite 10 Fort Collins, CO 80524 PHONE: 970.221.4158 FAX: 970.221.4159 WEBSITE: www.northernengineering.com August 21, 2012 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Preliminary Drainage and Erosion Control Report for Lakeview Subdivision Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage and Erosion Control Report for your review. This report accompanies the 08.21.13 Project Development Plan submittal for the proposed Lakeview Subdivision Single-family development. Comments from the Conceptual Review Letter dated 02.14.13 have been addressed. Written responses thereto can be found in the comprehensive response to comments letter on file with Current Planning. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed Lakeview Subdivision project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Ryan O. Banning, PE Project Engineer Lakeview Subdivision Preliminary Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION .................................................................... 1 A. Location ..................................................................................................................... 1 B. Description of Property ................................................................................................ 2 C. Floodplain .................................................................................................................. 4 II. DRAINAGE BASINS AND SUB-BASINS ........................................................................ 4 A. Major Basin Description ............................................................................................... 4 B. Sub-Basin Description ................................................................................................. 4 III. DRAINAGE DESIGN CRITERIA .................................................................................... 5 A. Regulations ................................................................................................................ 5 B. Four Step Process ....................................................................................................... 5 C. Development Criteria Reference and Constraints ............................................................. 6 D. Hydrological Criteria .................................................................................................... 7 E. Hydraulic Criteria ........................................................................................................ 7 F. Floodplain Regulations Compliance ............................................................................... 8 G. Modifications of Criteria ............................................................................................... 8 IV. DRAINAGE FACILITY DESIGN ..................................................................................... 8 A. General Concept ......................................................................................................... 8 B. Specific Details ......................................................................................................... 10 V. CONCLUSIONS ........................................................................................................ 11 A. Compliance with Standards ........................................................................................ 11 B. Drainage Concept ...................................................................................................... 12 References ......................................................................................................................... 13 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations B.1 – Storm Sewers (reserved for future use) B.2 – Street Flow (reserved for future use) B.3 – Inlets (reserved for future use) B.4 – Detention Facilities APPENDIX C – Water Quality Design Computations (reserved for future use) APPENDIX D – Operations and Maintenance Guidelines for Bioretention Planters (reserved for future use) APPENDIX E – Erosion Control Report Lakeview Subdivision Preliminary Drainage Report LIST OF TABLES AND FIGURES: Figure 1 – Aerial Photograph .................................................................................................. 2 Figure 2– Proposed Site Plan .................................................................................................. 3 Figure 3 – Existing Floodplains ............................................................................................... 4 Table 1 – Detention Storage Summary ................................................................................... 11 MAP POCKET: C500 - Drainage Exhibit Lakeview Subdivision Preliminary Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map 2. The Lakeview Subdivision project site is located in the northwest quarter of Section 30, Township 6 North, Range 68 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. The project site is located on the south side of Drake Road, east of Christ Center Community Church (Church), and is bordered by single family residences on the south and east. The existing right-of-way (ROW) along Drake Road adjacent to the property is 90-feet. 4. The project site has an existing regional detention pond within the property located on the southern property boundary. Said pond provides detention for the existing Church property and will be upgraded with the proposed development to meet current City criteria and standards for the existing Church property and proposed development. A City of Fort Collins detention facility is located south of the subject property, and for reference, Williams Lake is located northwest of the subject property. Per the ALTA Land Title Survey prepared for the subject property by Northern Engineering (Northern) and dated July 26, 2011, no existing drainage easements are within the property. No public storm sewer is located immediately adjacent to the property. 5. Single family subdivisions are adjacent to the subject property including Silverwood Lakeview Subdivision Preliminary Drainage Report 2 2nd Subdivision and Eldorado Springs 2nd Subdivision, which are both located east of the project site, and Eastborough Subdivision, which is located south of the project site. As previously noted, Drake Road borders the north property boundary, and the entire remainder of the site to the west is bounded by Christ Center Community Church property. B. Description of Property 1. The Lakeview Subdivision property is approximately 11.23 net acres. Figure 1 – Aerial Photograph 2. The subject property currently consists of athletic facilities including several soccer fields, a baseball diamond, and a single small maintenance building. As such, the ground cover generally consists of sod and some native seeding with numerous trees and shrubs located mainly at the perimeter of the property. Due to the current use, slopes are rather gentle throughout (i.e., 2±%). General topography slopes from north to the south towards the detention area at the south end of the property. 3. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey, the site consists of Stoneham loam and Nunn clay loam, which fall into Hydrologic Soil Groups B and C respectively. More site-specific exploration found varying materials including sandy clay with occasional sand layers and sandy gravel. See the Geotechnical Engineering Report by CTL Thompson (CTL Thompson Project No. FC05622-115) for additional information. Lakeview Subdivision Preliminary Drainage Report 3 4. The proposed Lakeview Subdivision development project will develop the majority of the existing site, removing the existing athletic facilities and small maintenance building and sub-divide for 42 single-family residential lots. Existing landscaping north of the project will be maintained and common landscaping tracts will be provided. Figure 2– Proposed Site Plan 5. There are no irrigation ditches or related facilities in the project’s vicinity. 6. The proposed land use is residential, single-family dwellings. This is a permitted use Lakeview Subdivision Preliminary Drainage Report 4 in the current Low Density Residential (R-L) Zoning. C. Floodplain 1. The subject property is not located in either a FEMA regulatory or City of Fort Collins designated floodplain. The nearest City designated floodplain is more than one-half mile from the subject property. 2. FEMA places the subject property within the Zone X Flood Hazard Area, which constitutes an area determined to be outside the 0.2% annual chance floodplain. Figure 3 – Existing Floodplains II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. The Lakeview Subdivision project is located within the City of Fort Collins’ Foothills Drainage Basin, which is within central Fort Collins and is to a large degree dominated by residential development. 2. A portion of the subdivided property is located within the City of Fort Collins’ Spring Creek Drainage Basin. The project is not modifying this portion of the property. B. Sub-Basin Description 1. The subject property historically drains overland towards the south and into the Lakeview Subdivision Preliminary Drainage Report 5 existing detention facility located at the southern boundary of the property. The detention area outlets into a City of Fort Collins detention facility immediately south of the subject property. The Lakeview Subdivision development aims to preserve the existing drainage patterns as much as possible, and will maintain the same outfall location. A more detailed description of the project’s drainage patterns follows in Section IV.A.4., below. 2. The existing Church property to the west of the subject site drains via overland flows and channelized gutter flows to the existing drainage facility on the property. These off-site drainage flows and patterns will be maintained and accounted for with the proposed development. The project site does not drain across any off-site private land. III. DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with the Lakeview Subdivision project. B. Four Step Process The overall stormwater management strategy employed with the Lakeview Subdivision project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use as athletic facilities by implementing multiple Low Impact Development (LID) strategies including: Conserving existing amenities in the site including the existing vegetated areas and large trees around the perimeter of the site, particularly the north edge of the site adjacent to East Drake Road. Utilize minimum allowable grades across lots to reduce the rate of runoff from the properties and promote infiltration. Minimize the use of storm sewer as a conveyance to increase travel times and promote evaporation. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, urban development of this intensity will still generate stormwater runoff that will require additional water quality measures to be implemented. All stormwater runoff from the site will ultimately be routed to the south where it is intercepted and treated in the main water quality and detention pond prior to leaving the site. A 40-hour release will be implemented for the WQCV to allow sedimentation and runoff treatment. Step 3 – Stabilize Drainageways Lakeview Subdivision Preliminary Drainage Report 6 As stated in Section I.C, above, there are no major drainageways in or near the subject property. While this step may not seem applicable to The Lakeview Subdivision development, the proposed project indirectly helps achieve stabilized drainageways nonetheless. Currently, the existing site includes an undersized detention pond located where the proposed water quality and detention pond is being proposed. By providing additional detention volume, downstream drainageways are further protected during flood events. By providing water quality where none previously existed, sediment with erosion potential is removed from the downstream drainageway systems. Furthermore, this project will pay one-time stormwater development fees, as well as ongoing monthly stormwater utility fees, both of which help achieve City-wide drainageway stability. Step 4 – Implement Site Specific and Other Source Control BMPs. Within the pond and the storm system, several BMPs will be utilized as site specific permanent BMPS including: A Snout devise on inflow pipes to reduce oil loads from the existing parking area. A sediment forebay at the inlet to the pond to allow sediment to settle from the incoming stormwater runoff before being delivered to the main pond facility A micro pool will be included in the outlet structure design. C. Development Criteria Reference and Constraints 1. The subject property is part of the First Christian Planned Unit Development (PUD) dated 8/26/80, which provided the drainage study for the subject property. Within said study, drainage patterns and impervious areas (C-values) have been master planned for the ultimate developed condition of the subject property. It was with the First Christian PUD that the existing regional detention pond for the property was designed and installed. Note that from a recent topographic survey of the pond, it appears that the existing pond was not built per the original plans, and is currently undersized as the actual spill elevation of the pond is approximately 2.2-feet below the designed elevation. This study will conform, to the extent possible, to the concepts within the original drainage study performed with the First Christian PUD, including: Drainage patterns and detention pond location. Drainage basin designations. Detention pond release rate in order to limit the impact to downstream facilities. This study will also be updating several items within the original study including: Hydrology calculations utilizing the current City of Fort Collins Rainfall Intensity Data. Detention storage volume calculations based upon current City of Fort Collins criteria. The addition of water quality treatment for the entire First Christian PUD property. 2. There are no known drainage studies for any adjacent properties that will have any effect on the Lakeview Subdivision project. 3. The subject property is essentially an "in-fill" development project as the property is surrounded by currently developed properties. As such, several constraints have been identified during the course of this analysis that will impact the proposed drainage Lakeview Subdivision Preliminary Drainage Report 7 system including: Existing elevations along the east and south property lines adjacent to existing residential properties will be maintained. Existing elevations and vegetation on the north side of the subject property will be preserved. Except where prohibited, grades along the existing private drive on the west side of the subject property will be maintained. As previously mentioned, overall drainage patterns of the existing site will be maintained. Elevations of existing downstream facilities that the subject property will release to will be maintained. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the Lakeview Subdivision development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. The Rational Formula-based Federal Aviation Administration (FAA) procedure has been utilized for detention storage calculations. 4. Three separate design storms have been utilized to address distinct drainage scenarios. A fourth design storm has also been computed for comparison purposes. The first design storm considered is the 80th percentile rain event, which has been employed to design the project’s water quality features. The second event analyzed is the “Minor,” or “Initial” Storm, which has a 2-year recurrence interval. The third event considered is the “Major Storm,” which has a 100-year recurrence interval. The fourth storm computed, for comparison purposes only, is the 10-year event. 5. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, the subject property historically drains to a separate detention facility located south of the property, which is owned and maintained by the City of Fort Collins. In order to maintain the current capacity of the downstream City of Fort Collins detention facility and associated storm sewers, the release rate from the proposed detention pond on the subject property will not increase from the rate originally designed with the First Christian PUD. 2. All drainage facilities proposed with the Lakeview Subdivision project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual. 3. As stated in Section I.C.1, above, the subject property is not located in either a FEMA regulatory or a City of Fort Collins designated floodplain. 4. The Lakeview Subdivision project does not propose to modify any natural drainageways. Lakeview Subdivision Preliminary Drainage Report 8 F. Floodplain Regulations Compliance 1. As previously mentioned, this project is not subject to any floodplain regulations. However, extra care has been taken to ensure that neither existing nor proposed structures will suffer damage during the 100-year storm as a result of the Lakeview Subdivision development. G. Modifications of Criteria 1. The proposed Lakeview Subdivision development is not requesting any modifications to criteria at this time. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of the Lakeview Subdivision drainage design are to maintain existing drainage patterns, ensure no adverse impacts to any adjacent properties, and to maintain the drainage concepts as outlined in the First Christian PUD design documents. 2. The existing site does not have any off-site runoff that flows directly through the project site. However, with the development of the site, the stormwater runoff from the existing Church site west of the subject property will continue to flow through the subject property to the proposed regional detention and water quality pond to be located on the south end of the subject property. All detention and water quality calculations within this Drainage Report account for runoff from the entirety of the site as delineated within the First Christian PUD documents. 3. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 4. The First Christian PUD documents divided the site into two (2) major drainage basins, designated as Basins A and B. The subject property is located within Basin B. Said documents further subdivided Basin B in to three (3) sub-basins, designated as Basins B1, B2, and B3. This project has further divided Basin B3 into three (3) additional basins in order to better calculate hydraulic capacities of streets and better approximate overall times of concentration. The drainage patterns anticipated for each sub-basin within Basin B are further described below. Basin B1 Basin B1 consists of a portion of the existing Church property located south of the existing Church building and west of the street-like private drive from Drake Road that bisects the property. This basin is comprised of roof top area, drive lanes, and a large area of landscaping. The basin drains towards the east and south where it is conveyed to the proposed water quality and detention pond via street gutters through basin B3-1. Basin B2 Basin B2 consists of a portion of the existing Church property south of the existing Church building and west of the street-like private drive from Drake Road that bisects the property. The vast majority of this basin is comprised of existing parking lot and drive lane. The basin drains towards south and east to a point directly west of the proposed detention pond where the runoff will be intercepted and delivered to the Lakeview Subdivision Preliminary Drainage Report 9 pond through inlets and storm sewer. Major storm runoff will overtop the curb and gutter adjacent the pond and will be conveyed into the pond. Basin B3-1 Basin B3-1 consists of 2.85-acres of single family along the west side of the existing Church athletic facilities east of the private drive. Basin B3-1 is one of the basins where the proposed development will occur. In the proposed condition, the basin will consist of residential streets, single family residential lots and landscaped open area. The entirety of the basin will be directed to the south via gutter flows and storm sewer to the proposed detention and water quality pond. Basin B3-2 Basin B3-2 consists of 6.18-acres of single family along the north and east sides of the existing Church athletic facilities east of the private drive, along with a small portion of the existing Church building and parking area to the west. Basin B3-2 is the second basins where the proposed development will occur. In the proposed condition, the basin will consist of residential streets, single family residential lots and landscaped open area. The entirety of the basin will be directed to the south via gutter flows and storm sewer to the proposed detention and water quality pond. Basin B3-3 Basin B3-3 consists of 1.96-acres of open area and detention pond along the south side of the existing Church athletic facilities east of the private drive. Basin B3-3 is the second basins where the proposed development will occur. In the proposed condition, the basin will consist of the back of residential lots and a large detention pond area. The basin will be the collection point runoff from all other basins and will discharge into the existing detention pond on City property. In addition to the above basins included within the First Christian PUD documents, there are two (2) off-site basins that currently exist on the subject property. These basins are further described below. Basin OS1 Basin OS1 consists of a small area at the north edge of the subject property that drains directly to East Drake Road via overland and gutter flows. The vast majority of this basin is comprised of landscaped area; however a small portion of parking area and drive lane is also included. The proposed development reroutes a portion of the impervious parking area to the east for water quality treatment and extended release. However, the majority of the off-site runoff from this basin will continue to drain to East Drake Road. Basin OS2 Basin OS2 consists of a small area at the south edge of the subject property that drains towards the south into the existing City of Fort Collins detention facility. The vast majority of this basin is comprised of landscaped area. Due to existing physical constraints, the proposed development will continue to allow this basin to drain off- site. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. Lakeview Subdivision Preliminary Drainage Report 10 B. Specific Details 1. The main drainage problem associated with this project site is the deficiency of the existing detention pond located at the south side of the subject property. Specifically, as determined from a recent topographic survey of the pond, it appears that the existing pond was not built per the original plans and is currently undersized, as the actual spill elevation of the pond is approximately 2.2-feet below the designed elevation. In order to accommodate the required detention and water quality volumes, the proposed top of pond elevation must be raised. Due to the proximity of existing residential properties adjacent to the detention area, special attention has been given to this issue in order to minimize any aesthetic impacts the new pond elevations may have. The development team has attempted to accomplish this by: Providing retaining walls rather than large berms to adjust the top of pond elevations, reduce the aerial extent of the pond and to provide and aesthetic quality to the pond. Maintain existing mature trees on the east edge of the existing pond. Provide additional landscaping around the detention pond to "soften" the appearance of the pond and associated walls. Provide flat areas at the bottom of the pond for open play area. 2. As previously stated, detention will be provided at the southern portion of the subject property with an outlet connecting to the existing City of Fort Collins detention facility. An FAA method computation has been performed for the entirety of Basin B to determine the detention storage volume to be provided within the pond. Water quality is also being provided for the proposed development, as well as for the existing drainage basins as described in Section IV.A.4 of this report. To achieve this objective, water quality is being accomplished through a multi-tiered, comprehensive approach by providing the following BMPs: Water quality Snouts upstream of each discharge location into the proposed pond. Sediment forebays at the inlets to the pond to allow sediment to settle from the incoming stormwater runoff before being delivered to the main pond facility. Micro pool components will be utilized within the outlet structure of from the pond for final treatment. The proposed water quality approach through the treatment BMPs, as noted above, is comprehensive in nature. Further documentation of treatment volumes and removal rates of each BMP will be documented with the Final Drainage Report prepared during the City FDP process. Final design details, construction documentation, and Standard Operating Procedures (SOP) Manual shall be provided to the City of Fort Collins for review prior to Final Development Plan approval. A final copy of the approved SOP manual shall be provided to City and is intended to be maintained on-site by the entity responsible for the facility maintenance. Annual reports must also be prepared and submitted to the City discussing the results of the maintenance program (i.e. inspection dates, inspection frequency, volume loss due to sedimentation, corrective actions taken, etc.). Lakeview Subdivision Preliminary Drainage Report 11 3. Table 1, below, summarizes the detention storage and water quality information for the main drainage facility. Table 1 – Detention Storage Summary Required Provided B 4.34 4.35 3.7(a) 4967.55 4967.70 4968.70 1.15 b. See Section IV.B.2 for information regarding water quality treatment within the pond. a. Peak Discharge rate as provided by the First Christian PUD drainage documents. 100-year Water Surface Elevation (ft) 100-year Detention Basin ID Storage Volume (cu-ft) 100-year Peak Discharge Pond Spillway Elevation Top of Pond Elevation Freeboard Provided (ft) 4. Proper maintenance of the drainage facilities designed with the Lakeview Subdivision development is a critical component of their ongoing performance and effectiveness. The stormwater detention and water quality pond, as well as the BMP facilities contained therein, may be accessed by maintenance staff via drive-over curb and gutter and the 8’ access ramp/pan provided to the bottom of the pond from the north side. Operations and maintenance of the bioretention areas and sand filters shall follow the recommendations for bioretention (rain garden) facilities, as outlined in the UDFCD manual. Appendix E will contain with future FCP submittals applicable excerpts to serve as guidance for the professional maintenance staff and subcontractors responsible for maintenance of these facilities at the Lakeview Subdivision development. Maintenance of the stormwater water quality Snouts provided shall follow the recommendations provided by the manufacturer. Appendix E will contain, with future FDP submittals, applicable excerpts to serve as guidance for the professional maintenance staff and subcontractors responsible for maintenance of these facilities at the Lakeview Subdivision development. 5. The drainage features associated with the Lakeview Subdivision project are all private facilities, located on private property. However, the new detention and water quality facility and associated storm sewers serve publically accessed roads and multiple lots. All storm facilities will be provided in a within drainage easements or tracts dedicated as such. 6. As previously mentioned, the outfall for the entire Lakeview Subdivision project is the existing COFC detention facility located south of the subject property. This facility discharges flows near the southeast corner into an existing 21-inch storm sewer. Stormwater conveyed by this City drainage system ultimately reaches Nelson Reservoir east of the site. There are no additional facilities or upgrades needed off- site in order to accommodate the developed runoff from the Lakeview Subdivision development. V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with the Lakeview Subdivision project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with the Lakeview Subdivision project complies with Lakeview Subdivision Preliminary Drainage Report 12 the City of Fort Collins’ Master Drainage Plan for the Foothills Drainage Basin. 3. There are no regulatory floodplains associated with the Lakeview Subdivision development. 4. The drainage plan and stormwater management measures proposed with the Lakeview Subdivision development are compliant with all applicable State and Federal regulations governing stormwater discharge. B. Drainage Concept 1. The drainage design proposed with this project will effectively limit any potential damage associated with its stormwater runoff by providing a regional detention pond that will serve the proposed Lakeview Subdivision development and existing Christ Center Community Church facilities. The proposed on-site stormwater facilities will also offer substantial water quality treatment, in addition to peak volume attenuation, through a comprehensive water quality treatment approach that includes multiple stormwater BMPs. 2. The proposed Lakeview Subdivision development will not have any impact on the Master Drainage Plan recommendations for the Foothills Drainage Basin. Lakeview Subdivision Preliminary Drainage Report 13 References 1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 2. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 3. Geotechnical Investigation, Regency Multi-Family Residential, 2700 South Lemay Avenue, Fort Collins, Colorado, August 24, 2011, CTL Thompson, Inc.(CTL Thompson Project No. FC05622-115). 4. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 5. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 6. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. APPENDIX A HYDROLOGIC COMPUTATIONS Lakeview Subdivision CHARACTER OF SURFACE 1 : Runoff Coefficient Percentage Impervious Project: Lakeview Subdivision Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: R. Banning Asphalt ……....……………...……….....…...……………….……………… 0.95 100% Date: Concrete …….......……………….….……….………………..….………… 0.95 90% Gravel ……….…………………….….…………………………..………… 0.50 40% Roofs …….…….………………..……………….…………………………… 0.95 90% General Single Family …………………………...………………..………… 0.60 50% Total Increase in Imperviousness Area Lawns and Landscaping 4.48 Acres Sandy Soil Flat <2% …………………………………………………………………… 0.10 0% Average 2% to 7% ………………………………………………………… 0.15 0% Steep >7% ………………………………………………………………… 0.20 0% Clayey Soil Flat <2% …………………………………………………………………… 0.20 0% Average 2% to 7% ………………………………………………………… 0.25 0% Steep >7% ………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year C f = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Basin ID Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Gravel (ac) Area of Roofs (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. B1 2.838 0.671 0.288 0.034 0.367 1.478 0.53 0.53 0.66 45% B2 4.704 3.799 0.023 0.000 0.000 0.882 0.80 0.80 1.00 81% B3-1 2.85 0.65 0.33 0.02 0.73 1.115 0.63 0.63 0.79 57% Lakeview Subdivision Overland Flow, Time of Concentration: Lakeview Subdivision Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) B1 B1 No 0.53 0.53 0.66 210 1.90% 12.5 12.5 9.6 566 1.10% 2.10 4.5 17.0 17.0 14.1 B2 B2 No 0.80 0.80 1.00 205 1.20% 7.6 7.6 2.5 540 1.30% 2.28 3.9 11.5 11.5 6.5 B3 B3-1 No 0.63 0.63 0.79 165 3.60% 7.3 7.3 4.8 640 1.40% 2.37 4.5 11.8 11.8 9.3 B3 B3-2 No 0.58 0.58 0.73 65 3.10% 5.4 5.4 3.9 1150 1.00% 2.00 9.6 14.9 14.9 13.4 B3-3 B3-3 No 0.28 0.28 0.34 50 2.00% 8.7 8.7 7.9 400 0.50% 1.41 4.7 13.4 13.4 12.7 Lakeview Subdivision Rational Method Equation: Project: Lakeview Subdivision Calculations By: Date: Rainfall Intensity: B1 B1 2.84 17.0 17.0 14.1 0.53 0.53 0.66 1.75 2.99 6.71 2.62 4.48 12.57 B2 B2 4.70 11.5 11.5 6.5 0.80 0.80 1.00 2.09 3.57 9.31 7.87 13.42 43.80 B3 B3-1 2.85 11.8 11.8 9.3 0.63 0.63 0.79 2.09 3.57 8.03 3.77 6.44 18.12 B3 B3-2 6.18 14.9 14.9 13.4 0.58 0.58 0.73 1.90 3.24 6.92 6.81 11.64 31.08 B3-3 B3-3 1.96 13.4 13.4 12.7 0.28 0.28 0.34 1.98 3.39 7.04 1.07 1.83 4.75 B3-1 B1&B3-1 5.69 18.3 18.3 15.2 0.58 0.58 0.73 1.70 2.90 6.52 5.62 9.58 26.93 B3-1 B1,B3-1 & B3-2 11.87 18.3 18.3 15.2 0.58 0.58 0.73 1.70 2.90 6.52 11.72 20.00 56.21 OS1 OS1 0.52 9.3 9.3 9.0 0.22 0.22 0.28 2.30 3.93 8.21 0.27 0.46 1.20 OS2 OS2 0.19 7.1 7.1 7.0 0.15 0.15 0.19 2.52 4.31 8.80 0.07 0.13 0.32 B Overall B Overall 18.54 18.7 18.7 15.4 0.60 0.60 0.76 1.68 2.86 6.52 18.76 32.03 91.28 Intensity, i2 (in/hr) Intensity, i10 (in/hr) Intensity, i100 (in/hr) Notes RUNOFF COMPUTATIONS R. Banning August 20, 2013 Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 Design Point Basin(s) Area, A (acres) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Flow, Q2 (cfs) Flow, Q10 (cfs) Flow, Q100 (cfs) C2 C 10 C100 Q  C f  C i  A 8/20/2013 8:45 AM D:\Projects\665-002\Drainage\Hydrology\665-002_Proposed_Rational_Calcs_Single-Family ROB.xlsx\Runoff APPENDIX B HYDRAULIC COMPUTATIONS B.1 – Storm Sewers (reserved for future use) B.2 – Street Flow B.3 – Inlets (reserved for future use) B.4 – Detention Facilities APPENDIX B.1 STORM SEWERS (reserved for future use) APPENDIX B.2 STREET FLOW (limit calculations only at this time) Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 11.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb nBACK = 0.015 Height of Curb at Gutter Flow Line HCURB = 4.38 inches Distance from Curb Face to Street Crown TCROWN = 15.0 ft Gutter Width W = 1.17 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.098 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.025 ft/ft Manning's Roughness for Street Section nSTREET = 0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 15.0 15.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 4.4 12.0 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = 10.0 146.7 cfs Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) Lakeview Subdivision Maximum Grade 2.5% Street Capacity (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' Street Cap Max Grade.xlsm, Q-Allow 8/20/2013, 8:55 AM Project: Inlet ID: Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb TBACK = 11.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) SBACK = 0.020 ft/ft Manning's Roughness Behind Curb nBACK = 0.015 Height of Curb at Gutter Flow Line HCURB = 4.38 inches Distance from Curb Face to Street Crown TCROWN = 15.0 ft Gutter Width W = 1.17 ft Street Transverse Slope SX = 0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft) SW = 0.098 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO = 0.005 ft/ft Manning's Roughness for Street Section nSTREET = 0.015 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX = 15.0 15.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX = 4.4 12.0 inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow = 4.4 94.5 cfs Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) Lakeview Subdivision Min Grade 0.5% Street Capacity (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' Street Cap Min Grade.xlsm, Q-Allow 8/20/2013, 8:55 AM Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, Aug 12 2013 Basin B Street Discharge Triangular Side Slopes (z:1) = 12.00, 12.00 Total Depth (ft) = 1.50 Invert Elev (ft) = 67.62 Slope (%) = 0.50 N-Value = 0.015 Calculations Compute by: Known Q Known Q (cfs) = 11.30 Highlighted Depth (ft) = 0.57 Q (cfs) = 11.30 Area (sqft) = 3.90 Velocity (ft/s) = 2.90 Wetted Perim (ft) = 13.73 Crit Depth, Yc (ft) = 0.57 Top Width (ft) = 13.68 EGL (ft) = 0.70 0 5 10 15 20 25 30 35 40 45 50 Elev (ft) Section Depth (ft) 67.00 -0.62 67.50 -0.12 68.00 0.38 68.50 0.88 69.00 1.38 69.50 1.88 70.00 2.38 Reach (ft) APPENDIX B.3 INLETS (reserved for future use) APPENDIX B.4 DETENTION FACILITIES Lakeview Subdivision Detention Pond Calculation | FAA Method Project Number: 665-665 002 Fort Collins Colorado Project Number: Project Location Location: Fort Collins, Colorado Calculations By: R. Banning Date: 8/20/2013 Pond No Basin B Calculations By: Pond No.: Basin B Input Variables Results Design Point B3-3 100 yr g Design Storm 100-yr Required Detention Volume 3 Design Storm Required Detention Volume 078 WQCV 16772 ft Developed "C" = 0.78 WQCV 16772 ft 3 3 Developed C Area (A)= 19.25 acres Quantity Detention 172279 ft () y 3 Max Release Rate 370 cfs Total Volume 189051 ft 3 Max Release Rate = 3.70 cfs Total Volume 189051 ft Total Volume 4.34 3 ac-ft Ft.Collins Inflow Of Storage Ti Ti Ft.Collins 100 Q Inflow (R ff) Outflow Storage Time Time 100-yr Q100 (Runoff) Dt ti (Release) Volume Detention Intensity Volume (Release) Volume Intensity Volume Volume (mins) (secs) (in/hr) (cfs) (ft 3 ) (ft 3 ) (ft 3 (mins) (secs) (in/hr) (cfs) (ft ) (ft ) (ft ) 5 300 9.95 149.4 44820 1110 43710 10 600 772 7.72 115 115.9 69549 2220 67329 15 900 652 6.52 97 97.9 88108 3330 84778 20 1200 560 5.60 84 84.1 100901 4440 96461 25 1500 498 4.98 74 74.8 112162 5550 106612 30 1800 452 4.52 67 67.9 122162 6660 115502 35 2100 4.08 61.3 128649 7770 120879 40 2400 374 3.74 56 56.2 134775 8880 125895 45 2700 3.46 52.0 140270 9990 130280 50 3000 323 3.23 48 48.5 145495 11100 134395 Lakeview Subdivision St Stage - Storage St Calculation C l l ti 665 002 gg Project Number: 665-002 F t C lli C l d Project Number: Pjt Project Location: L ti Fort Collins, Colorado Calculations By: R. Banning Date: 8/20/2013 Pond No : N/A Calculations By: Pond No.: N/A Required Volume Water Surface Elevation (WSE) Design Point B3 3 q B3-3 100 Design Point Di Design Storm S 100-yr Require Volume= 434 4.34 acft 4967 4967.55 ft ft. Require Volume= Design Storm WQCV Ri Required d V Volume= l 16772 ft3 4962 4962.53 ft ft. Contour Contour Elevation (Y- Contour Area Depth Column Not Used Incremental Volume Total Volume Total Volume values) Area p values) ft3 ft ft ft. ft3 ft ft3 ft ft3 ft acre-acre feet 4 4,960 960.75 0 000 0.00 0 0 0 0 4 4,961 961.00 1253 025 0.25 104 104 000 0.00 4 4,962 962.00 13074 100 1.00 6119 6223 014 0.14 4,963.00 27577 1.00 19860 26083 0.60 4 4,964 964.00 33565 100 1.00 30491 56574 130 1.30 4 4,965 965.00 34455 100 1.00 33975 90549 208 2.08 4,, 966.00 36675 1.00 35524 126073 2.89 4 4,967 967.00 41176 100 1.00 38865 164938 379 3.79 4 4,968 968.00 47189 100 1.00 44104 209042 480 4.80 4 4,969 969.00 4,968.00 4,96 967.00 n 4 966 00 ion 4,966.00 El ev vat 4 965 00 ur 4,965.00 Co ont tou 4,, 964.00 4 4,963 963.00 4 4,962 962.00 -50000 0 50000 100000 150000 200000 250000 Cummulative Volume Volume, cu cu. ft ft. APPENDIX C WATER QUALITY DESIGN COMPUTATIONS (reserved for future use) APPENDIX D OPERATIONS AND MAINTENANCE GUIDELINES FOR BIORETENTION PLANTERS (reserved for future use) APPENDIX E EROSION CONTROL REPORT Lakeview Subdivision Preliminary Erosion Control Report EROSION CONTROL REPORT A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet C001 of the Utility Plans. The Final Plans will contain a full-size Erosion Control sheet as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in the Development Agreement for the Lakeview Subdivision development. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, prior to any earth disturbance activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. Lakeview Subdivision Preliminary Erosion Control Report MAP POCKET C500 – DRAINAGE EXHIBIT ELEC WV WV H Y D H Y D CABLE VAULT CONTROL IRR T C C CT C T C S S T T T T F E S B2 4.70 �� EXISTING CHURCH BUILDING B1 2.84 �� B3-2 6.18 �� B3-1 2.85 �� OS1 0.52 �� B3-3 1.96 �� LOT 21 LOT 23 LOT 22 LOT 20 LOT 19 LOT 18 LOT 17 LOT 16 LOT 15 LOT 14 LOT 13 LOT 12 LOT 11 LOT 10 LOT 9 LOT 8 LOT 7 LOT 2 LOT 1 LOT 24 LOT 25 LOT 26 LOT 27 LOT 28 LOT 29 LOT 30 LOT 31 LOT 32 LOT 33 LOT 34 LOT 35 LOT 36 LOT 37 LOT 38 LOT 39 LOT 40 LOT 41 TRACT C TRACT B TRACT A LOT 42 B2 OS1 EXTENDED DETENTION BASIN/ DETENTION POND 100-YR VOLUME: 4.34 AC-FT 100-YR WSEL: 4967.55 40-HOUR WQ RELEASE OS2 0.19 �� LOT 133 OWNER: ROSCHKE FAMILY TRUST LOT 132 OWNER: KLINEDINST, NICHOLAS J/TARA C EASTBOROUGH LOT 131 OWNER: JORISSEN, DAVID W WILBUR, WENDY P TRACT A OWNER: CITY OF FORT COLLINS LOT 111 OWNER: HOLMES, RICHARD L/ SHARON M LOT 110 OWNER: VANDER WILT, DOUGLAS W/ LOIS K LOT 109 OWNER: DU CHATEAU, PAUL C/SARA J LOT 108 OWNER: GRIDER, DAN A, THE WILD ROSE REVOCABLE TRUST LOT 106 OWNER: LEWIS, ANDREW/ S JUANETTE ELDORADO SPRINGS SECOND FILING LOT 105 OWNER: BACKES, KARI K LOT 104 OWNER: RICHARDSON, DONALD L/ MARILYN J LOT 6 OWNER: MT. VERNON INVESTMENT GROUP LLC LOT 7 OWNER: RAVENSCHLAG, RALPH W/ CHERYL E SILVERWOOD VILLAGE SECOND FILING LOT 8 OWNER: KENNING, MARK R/ DIANE L LOT 9 OWNER: BEANER, ROGER W/ JOANN E LOT 10 OWNER: PELKEY, SCOTT HOWE, CHARLES B3 B1 B3-3 OS2 OS1 LOT 112 OWNER: CALE, GARY S. SILVERWOOD VILLAGE FIRST FILING ELDORADO SPRINGS SECOND FILING LOT 5 LOT 6 LOT 4 LOT 3 100' SPILLWAY CHRIST CENTER COMMUNITY CHURCH N�. R��������: B�: D���: REVIEWED BY: R. B������ DESIGNED BY: DRAWN BY: SCALE: DATE: AUGUST 2013 PROJECT: 665-002 S���� O�10S����� LAKEVIEW SUBDIVISION T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 08/21/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� C600 DRAINAGE EXHIBIT A. B���� A. B���� 1"=50' NORTH ( IN FEET ) 1 ���� = ��. 50 0 50 F��� 50 100 150 LEGEND: 4953 PROPOSED CONTOUR 93 PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER NOTES: PROPOSED INLET A DESIGN POINT FLOW ARROW DRAINAGE BASIN LABEL BASIN DESIGNATION BASIN AREA (AC) DRAINAGE BASIN BOUNDARY FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION 1.REFER TO THE "PRELIMINARY DRAINAGE REPORT FOR REGENCY LAKEVIEW' BY NORTHERN ENGINEERING, DATED AUGUST 21, 2013 FOR ADDITIONAL INFORMATION. B2 1.45 �� D��� D��� D��� D��� D��� D��� APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: C��� E������� W���� & W��������� U������ S��������� U������ P���� & R��������� T������ E������� E������������ P������ C��� �� F��� C������, C������� UTILITY PLAN APPROVAL CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO K��� ����'������. C��� ������ ��� ���. R BASIN B POND SUMMARY VOLUME REQ'D (��-��) VOLUME PROVIDED (��-��) POND INVERT 100-YEAR WATER SURFACE POND SPILL ELEV. BASIN B 4.34 4.35 4960.75 4967.55 4967.70 DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (�����) C2 C100 2-�� T� (���) 100-�� T� (���) Q10 (���) Q100 (���) B1 B1 2.84 0.53 0.66 17.0 14.1 2.62 12.57 B2 B2 4.70 0.80 1.00 11.5 6.5 7.87 43.80 B3 B3-1 2.85 0.63 0.79 11.8 9.3 3.77 18.12 B3 B3-2 6.18 0.58 0.73 14.9 13.4 6.81 31.08 B3-3 B3-3 1.96 0.28 0.34 13.4 12.7 1.07 4.75 OS1 OS1 0.52 0.22 0.28 9.3 9.0 0.27 1.2 OS2 OS2 0.19 0.15 0.19 7.1 7.0 18.76 91.28 8/20/20138:52 AM D:\Projects\665-002\Drainage\Detention\ 665-002__Detention Pond_Single-Family ROB.xlsm\Stage_Storage_North Wall ROB 55 3300 3.03 45.5 150135 12210 137925 60 3600 286 2.86 42 42.9 154594 13320 141274 65 3900 2.72 40.8 159279 14430 144849 70 4200 259 2.59 38 38.9 163333 15540 147793 75 4500 2.48 37.2 167567 16650 150917 80 4800 238 2.38 35 35.7 171531 17760 153771 85 5100 2.29 34.4 175360 18870 156490 90 5400 221 2.21 33 33.2 179189 19980 159209 95 5700 2.13 32.0 182297 21090 161207 100 6000 206 2.06 30 30.9 185585 22200 163385 105 6300 2.00 30.0 189189 23310 165879 110 6600 194 1.94 29 29.1 192252 24420 167832 115 6900 1.89 28.4 195811 25530 170281 120 7200 184 1.84 27 27.6 198919 26640 172279 8/20/2013 8:48 AM D:\Projects\665-002\Drainage\Detention\ 665-002__Detention Pond_Single-Family ROB.xlsm\FAA_with church B3-1 B1&B3-1 No 0.58 0.58 0.73 205 2.00% 11.0 11.0 7.9 950 1.20% 2.19 7.2 18.3 18.3 15.2 B3-1 B1,B3-1 & B3-2 No 0.58 0.58 0.73 205 2.00% 11.0 11.0 7.9 950 1.20% 2.19 7.2 18.3 18.3 15.2 OS1 OS1 No 022 022 028 45 11 10% 49 49 46 368 0 50% 141 43 93 93 90 TIME OF CONCENTRATION COMPUTATIONS Gutter Flow 1 Design Point Basin Overland Flow R. Banning August 20, 2013 Time of Concentration (Equation RO-4)  3 1 1 . 87 1 . 1 * S Ti C Cf L   OS1 OS1 No 0.22 0.22 0.28 45 11.10% 4.9 4.9 4.6 368 0.50% 1.41 4.3 9.3 9.3 9.0 OS2 OS2 No 0.15 0.15 0.19 20 23.50% 2.8 2.8 2.7 368 0.50% 1.41 4.3 7.1 7.1 7.0 B Overall B Overall No 0.60 0.60 0.76 210 1.90% 10.8 10.8 7.5 1150 1.50% 2.45 7.8 18.7 18.7 15.4 * Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins. 8/20/2013 8:44 AM D:\Projects\665-002\Drainage\Hydrology\665-002_Proposed_Rational_Calcs_Single-Family ROB.xlsx\Tc B3-2 6.18 0.90 0.72 0.06 1.68 2.813 0.58 0.58 0.73 50% B3-3 1.96 0.00 0.03 0.01 0.27 1.650 0.28 0.28 0.34 14% B1&B3-1 5.69 1.32 0.62 0.06 1.09 2.592 0.58 0.58 0.73 51% B1,B3-1 & B3-2 11.87 2.23 1.34 0.12 2.77 5.406 0.58 0.58 0.73 50% OS1 0.52 0.05 0.00 0.00 0.00 0.473 0.22 0.22 0.28 9% OS2 0.19 0.00 0.00 0.00 0.00 0.195 0.15 0.15 0.19 0% B Overall 18.54 6.03 1.39 0.13 3.05 7.938 0.60 0.60 0.76 54% EXISTING TOTAL 19.25 4.70 0.34 0.19 0.62 13.396 0.39 0.39 0.49 29% TOTAL AREA 19.25 6.08 1.39 0.13 3.05 8.605 0.59 0.59 0.74 53% 1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS August 20, 2013 Composite Runoff Coefficient with Adjustment 8/20/2013 8:44 AM D:\Projects\665-002\Drainage\Hydrology\665-002_Proposed_Rational_Calcs_Single-Family ROB.xlsx\Composite Runoff Coefficient