Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
UPTOWN PLAZA - PDP - PDP130025 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONS
FIRST FLOOR 40' - 3 19/32" SECOND FLOOR 53' - 3 19/32" ROOF 64' - 3 19/32" 9 4 3 4 2 6 5 3 5 12 10 6 3 4 1 8 3 1 1 9 2 11 2 31'-7" 28'-1 1/2" 32'-1 1/2" 39'-9" 2 1 12 33'-1 1/2" 2 7 28'-1 1/2" 32'-0 1/2" FIRST FLOOR 40' - 3 19/32" SECOND FLOOR 53' - 3 19/32" ROOF 64' - 3 19/32" 12 1 9 7 3 2 3 9 12 1 2 6 3 4 2 1 2 4 6 7 2 31'-4 1/2" 32'-5" 28'-1 1/2" 32'-1 1/2" 39'-9" 29'-10 1/2" 32'-0 1/2" 28'-1 1/2" CALCULATED MAX HEIGHT 32' - 8 1/2" 1 2 3 4 5 6 7 8 9 10 11 12 STUCCO #1 - AUTUMN WHEAT STUCCO #2 - ADOBE BROWN MANUF STONE - MOUNTAIN BLEND, SHADOW ROCK 6" x 12" STONE SOLDIER COURSE CORRUGATED METAL SIDING - GALVANIZED METAL ROOFING W/ EXPOSED FASTENERS COMPOSITION ROOFING - TAMKO HERITAGE - RUSTIC CEDAR FAUX CONCRETE PLINTH - NAT. CONCRETE COLOR METAL FASCIA - TERRA COTTA COLOR CMU - PAINTED CHANNEL BLUE BUILDING SIGNAGE (UNDER SEPARATE PERMIT) BRONZE ANODIZED ALUM. FRAMES inc 2150 W. 29th AVE #110 Hillhouse Architects Inc. DENVER, CO 80211 Architects - Planners - CMa Checked By: Drawn By: Orig. Issue Date: Job No: Issued: 1453 1453 JH ARH Revisions: 08/16/2013 UPTOWN PLAZA PROJECT DEVELOPMENT PLAN (PDP) 1501 W. ELIZABETH ST. D.K. INVESTMENTS, INC - DEVELOPER MR. SAPAN KAPOOR, PRES. CONSULTANT INFORMATION 08.08.13 EXTERIOR ELEVATIONS PDP-A3 PDP-A3 1/8" = 1'-0" 1 NORTH ELEVATION PDP-A3 1/8" = 1'-0" 2 SOUTH ELEVATION 1" = 1'-0" EXTERIOR MATERIALS 01 08.08. 2013 FOR PRICING 4 3