HomeMy WebLinkAboutCARRIAGE HOUSE APARTMENTS - FDP - FDP130024 - REPORTS - DRAINAGE REPORTJuly 24, 2013
FINAL DRAINAGE REPORT
Carriage House Apartments
Fort Collins, Colorado
Prepared for:
Catamount Properties Ltd.
7302 Rozena Drive
Longmont, Colorado 80503
Prepared by:
200 South College Avenue, Suite 10
Fort Collins, Colorado 80524
Phone: 970.221.4158 Fax: 970.221.4159
www.northernengineering.com
Project Number: 620-002
3This Drainage Report is consciously provided as a PDF.
Please consider the environment before printing this document in its entirety.
When a hard copy is absolutely necessary, we recommend double-sided printing.
July 24, 2013
City of Fort Collins
Stormwater Utility
700 Wood Street
Fort Collins, Colorado 80521
RE: Final Drainage Report for
Carriage House Apartments
Dear Staff:
Northern Engineering is pleased to submit this Final Drainage Report for your review.
Comments from the Carriage House Apartments, FDP130024, Round Number 1 letter
dated July 2, 2013 have been addressed. Written responses thereto can be found in the
comprehensive response to comments letter on file with Current Planning.
This report has been prepared in accordance with the Fort Collins Stormwater Criteria
Manual (FCSCM), and serves to document the stormwater impacts associated with the
proposed Carriage House Apartments student housing project. We understand that review
by the City of Fort Collins is to assure general compliance with standardized criteria
contained in the FCSCM.
If you should have any questions as you review this report, please feel free to contact us.
Sincerely,
NORTHERN ENGINEERING SERVICES, INC.
Nicholas W. Haws, PE Andrew Reese
Project Manager Project Engineer
Carriage House Apartments
Final Drainage Report
TABLE OF CONTENTS
I. GENERAL LOCATION AND DESCRIPTION ......................................................... 1
II. DRAINAGE BASINS AND SUB-BASINS ............................................................. 4
III. DRAINAGE DESIGN CRITERIA ......................................................................... 5
IV. DRAINAGE FACILITY DESIGN .......................................................................... 7
V. CONCLUSIONS............................................................................................... 9
References ............................................................................................................. 10
APPENDICES:
APPENDIX A – Hydrologic Computations
APPENDIX B – Detention Facilities
APPENDIX C – Water Quality Design Computations
APPENDIX D – Erosion Control Report
MAP POCKET:
DR1 – Drainage Exhibit
Carriage House Apartments
Final Drainage Report 1
I. GENERAL LOCATION AND DESCRIPTION
A. Location
1. Vicinity Map
Figure 1 – Vicinity Map
2. The Carriage House Apartments project site is located in the Southeast quarter of
Section 15, Township 7 North, Range 69 West of the 6th Principal Meridian, City of
Fort Collins, County of Larimer, State of Colorado.
3. The project site (refer to Figure 1) is bordered to the north by Springfield Drive (60'
Right-of-Way); to the south by Bennett Road Bungalows, a detention pond and single-
family residential; to the east by South Shields Street (proposed 100' Right-of-Way);
and to the west by single-family residential.
Carriage House Apartments
Final Drainage Report 2
4. There are no major drainageways within or adjacent to the site.
B. Description of Property
1. Carriage House Apartments is comprised of ±1.45 acres.
2. The site is currently occupied by three single-family residences and associated
improvements.
Figure 2 – Aerial Photograph
3. The existing groundcover consists of grasses and numerous mature trees. The existing
on-site runoff generally drains west-to-east across flat grades (e.g., <2.00%) into
Springfield Drive and South Shields Street.
4. A soils report (Project No. 12-1-5-517 | Date: December 12, 2012) was completed
by Kumar and Associates, Inc. The report contains the results of a complete
geotechnical subsurface exploration as well as pertinent geotechnical
recommendations. According to the summary of findings presented in the
aforementioned report,
"The borings encountered 4 to 6 inches of topsoil overlying nil to 5 feet of man-
placed fill. The fill was composed of fine to coarse-grained sandy lean clay with
occasional small gravels. The natural soil underlying the fill material consisted of
fine-grained sandy lean clay with occasional zones of lean clay. In the deeper
foundation borings, fine to coarse-grained clayey sand was encountered below the
clayey soil and continued to the overburden soil/bedrock interface. The natural
overburden clay soils were slightly moist to moist, and generally very stiff to hard.
The natural clayey sands were slightly moist to wet below ground water, and
medium dense to dense."
Project Site
Carriage House Apartments
Final Drainage Report 3
The boring logs show that USCS soil group CL is predominant on-site. These soils are
inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clays and
lean clays.
5. There are no major drainageways within or adjacent to the project site.
6. The proposed Carriage House Apartments development will consist of a student
residential complex with five multi-unit buildings. Other proposed improvements
include: a new asphalt and permeable Modular Block Paver (MBP) parking area and
landscaping.
7. The proposed land use is residential, multi-family dwellings. This is a permitted use in
the Neighborhood Community - Buffer District (NCB).
C. Floodplain
1. The subject property is not located in a FEMA regulatory or City of Fort Collins
designated floodplain. In particular, the project site is not located within a FEMA
designated 100-year floodplain per Map Number 08069C0978G (Effective date: May
2, 2012).
Figure 4 – FEMA Firmette (Map Number 08069C0978G)
Project Site
Carriage House Apartments
Final Drainage Report 4
II. DRAINAGE BASINS AND SUB-BASINS
A. Major Basin Description
1. Carriage House Apartments is located within the City of Fort Collins Old Town major
drainage basin. Specifically, the project site is situated in the southwest corner of this
major drainage basin. This basin is located in north-central Fort Collins and has a
drainage area of approximately 2,120 acres, including approximately 400 acres of the
Colorado State University campus. The Old Town major drainage basin generally
drains from west to east. It receives some runoff from the Canal Importation Basin
directly west of Old Town. Most of the runoff from the Old Town major drainage basin
drains into the Poudre River.
B. Sub-Basin Description
1. The outfall for the project site is an existing curb inlet located at the southwest corner
of South Shields Street and Springfield Drive.
2. The existing subject site can be defined by three (3) sub-basins (i.e., EX1 through
EX3). Refer to the Existing Conditions Drainage & Erosion Control Exhibit.
x Sub-basin EX1 delineates the proposed project site. Approximately twelve feet
of Right-Of-Way (ROW) will be dedicated along South Shields Street with this
project. This area is included in sub-basin EX1, which was used to
approximate the 2- and 100-year existing runoff.
x Sub-basins EX2 and EX3 delineate the existing Springfield Drive and South
Shields Street right-of-way areas contiguous with the project site, respectively.
The existing site runoff generally drains from west-to-east into Springfield Drive and
South Shields Street.
3. The project site does not receive notable runoff from contiguous off-site properties.
Carriage House Apartments
Final Drainage Report 5
III. DRAINAGE DESIGN CRITERIA
A. There are no optional provisions outside of the FCSCM proposed with Carriage House
Apartments.
B. The overall stormwater management strategy employed with Carriage House Apartments
utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving
waters. The following is a description of how the proposed development has incorporated
each step.
Step 1 – Employ Runoff Reduction Practices. The first consideration taken in trying to
reduce the stormwater impacts of this development is the site selection itself. By choosing
an already developed site with public storm sewer currently in place, the burden is
significantly less than developing a vacant parcel absent of any infrastructure.
Carriage House Apartments aims to reduce runoff peaks, volumes and pollutant loads from
frequently occurring storm events (i.e., water quality (i.e., 80th percentile) and 2-year
storm events) by implementing Low Impact Development (LID) strategies. Wherever
practical, runoff will be routed across landscaped areas or through grass-lined swales and
Modular Block Pavers (MBPs). This LID practice reduces the overall amount of impervious
area, while at the same time Minimizing Directly Connected Impervious Areas (MDCIA).
The combined LID/MDCIA techniques will be implemented, where practical, throughout
the development, thereby slowing runoff and increasing opportunities for infiltration.
Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with
Slow Release. The efforts taken in Step 1 will help to minimize excess runoff from
frequently occurring storm events; however, urban development of this intensity will still
have stormwater runoff leaving the site. The primary water quality treatment will occur in
the Modular Block Paver (MBP) section in sub-basin A.
Step 3 – Stabilize Drainageways. As stated in Section I.B.5, above, there are no major
drainageways in or near the subject site. While this step may not seem applicable to
Carriage House Apartments, the proposed project indirectly helps achieve stabilized
drainageways nonetheless. Once again, site selection has a positive effect on stream
stabilization. By redeveloping an existing project with existing stormwater infrastructure,
combined with LID and MDCIA strategies, the likelihood of bed and bank erosion is
reduced. Furthermore, this project will pay one-time stormwater development fees, as well
as ongoing monthly stormwater utility fees, both of which help achieve Citywide
drainageway stability.
Step 4 – Implement Site Specific and Other Source Control BMPs. This step typically
applies to industrial and commercial developments.
C. Development Criteria Reference and Constraints
1. The subject property is not part of any Overall Development Plan (ODP) drainage
study or similar “development/project” drainage master plan.
2. The site plan is constrained on two sides by public streets, as well as by existing and
fully developed sites along the remaining two sides. As previously mentioned, the
drainage outfall for sub-basin A is an existing curb inlet at the southwest corner of
Springfield Drive and South Shields Street. Total runoff, from the project site during
Carriage House Apartments
Final Drainage Report 6
the 2- and 100-year storm events, will decrease. During the 2-year storm event, runoff
decreased negligibly from ±0.91 cfs to ±0.90 cfs; and during the 100-year storm
event runoff decreased from ±4.01 cfs to ±2.01 cfs.
D. Hydrological Criteria
1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in
Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations
associated with the Carriage House Apartments development. Tabulated data
contained in Table RA-7 has been utilized for Rational Method runoff calculations.
2. The Rational Method has been employed to compute stormwater runoff utilizing
coefficients contained in Tables RO-11 and RO-12 of the FCSCM.
3. The Rational Formula-based Federal Aviation Administration (FAA) procedure has
utilized for detention storage calculations.
4. Two separate design storms have been utilized to address distinct drainage scenarios.
The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2-year
recurrence interval. The second event considered is the “Major Storm,” which has a
100-year recurrence interval.
E. Hydraulic Criteria
1. The drainage facilities proposed with the Carriage House Apartments project
are designed in accordance with criteria outlined in the FCSCM and/or the
Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage
Criteria Manual.
2. As stated in Section I.C.1, above, the subject property is not located in a
FEMA regulatory or a City of Fort Collins designated floodplain.
F. Floodplain Regulations Compliance
1. As previously mentioned, this project is not subject to any floodplain
regulations.
G. Modifications of Criteria
1. No modifications are requested at this time.
Carriage House Apartments
Final Drainage Report 7
IV. DRAINAGE FACILITY DESIGN
A. General Concept
1. The main objective of the Carriage House Apartments drainage design is to maintain
existing drainage patterns, while not adversely impacting adjacent properties.
2. No notable off-site runoff passes directly through the project site.
3. A list of tables and figures used within this report can be found in the Table of
Contents at the front of the document. The tables and figures are located within the
sections to which the content best applies.
4. The project site has been divided into three (3) drainage sub-basins, designated as
sub-basins A, B, and C. The drainage patterns anticipated for each basin are further
described below.
Sub-Basin A
Sub-basin A encompasses ±85 percent of the total site area. This sub-basin is
comprised of roof area, landscaping and the on-site parking area. This parking area
will be a mix of asphalt and Modular Block Pavers (MBPs). Detention will be provided
within in the MBPs (WSEL100-year=5030.17). This basin will release at an adjusted 2-
year rate of 0.57 cfs through an orifice plate. The orifice plate will be located on the
west wall of the most downstream area inlet.
Sub-Basin B
Sub-basin B is a relatively small basin (0.02 acre) that is comprised of asphalt (i.e.,
project site drive entrance) and landscaping. The excess developed runoff will drain
into Springfield Drive. The 100-year developed runoff (Q100=0.18 cfs), for sub-basin
B, was subtracted from the total 2-year existing release rate (Q100=2.01cfs).
Sub-Basin C
Sub-basin C encompasses the northeast corner of the project site. It is comprised of
roof area and landscaping. The excess developed runoff will drain into Springfield
Drive and South Shields Street. The 100-year developed runoff (Q100=1.27 cfs), for
sub-basin C, was subtracted from the total 2-year existing release rate
(Q100=2.01cfs).
A full-size copy of the Drainage Exhibit (sheet DR1) can be found in the Map Pocket
at the end of this report.
B. Specific Details
1. A hybrid approach was utilized to compute the maximum allowable release
rate associated with the FAA detention sizing calculations. The 100-year peak
runoff rate was calculated for the pre-development impervious areas. This
essentially “grandfathers” the existing impervious areas by allowing the
respective 100-year peak discharge to be added to the maximum allowable
release rate. The release rate for the remaining undeveloped land (pre-
development pervious areas) was established by calculating the 2-year peak
runoff rate for these areas. The total of these two discharges (i.e., 1.45cfs and
Carriage House Apartments
Final Drainage Report 8
0.56cfs) establishes the overall maximum allowable release rate, 2.01 cfs,
from the project site. The allowable release rate of 0.57 cfs utilized in the FAA
procedure detention storage computations (Refer to Appendix B for these
calculations) and was established by subtracting the undetained release of
1.44 cfs, from the overall maximum allowable release rate. This hybrid
approach ensures that all increased impervious areas, not just those greater
than 5,000 sq-ft, are over-detained down to the 2-year undeveloped (existing
or pre-development) rate for the 100-year developed condition.
2. The FAA method was used to size the on-site pond for quantity detention.
Calculations for this area, based on the characteristics of sub-basin A and
adjusted release rate, indicate a detention volume of 8114 cu. ft. This
includes 711 cu. ft. of Water Quality Capture Volume (WQCV). During water
quality events the water quality capture volume will release over 12-hours.
There is no-infiltration section because in-situ soils are USCS Type CL.
3. The storage volume available within the reservoir area (i.e., No. 57 and No. 2
open-graded aggregate) of the MBP section is ±8114 cu. ft. The MBP section
is designed with an increased No.2, open-graded aggregate, material depth in
order to provide storage for storm events in excess of the water quality (80th
percentile) storm event.
4. Several Nyloplast 12" Standard Grates are located along the north perimeter of
sub-basin A between the Springfield Drive right-of-way and the front of
Building 1 through Building 4. These area inlets are designed to intercept local
flows. To the maximum extent feasible, roof drains will direct flows south and
into the on-site detention pond. These areas will be mostly comprised of
landscaping and sidewalks. The inlet grates are connected to the outfall
system and located upstream from the orifice plate; therefore, some localized
ponding will occur at the two easternmost inlets during more severe storm
events. These two areas will pond because the grate elevations (i.e., 5029.31
and 5029.16) are lower than the proposed 100-year water surface elevation
(i.e., 5030.17).
5. The emergency spillway will be located on the southern side of the parking area. The
spillway will be built into the curb, and will be defined by a 3” notch in the curb that
will be 20’ long. The spillway has been sized to pass the entire 100-yr flow from
Basin A. In the event that an emergency overflow occurs, the drainage will flow to the
south, into the existing drainage facilities that were constructed with the Bennett
Bungalows. The drainage will pass through the pond to the existing outlet structure,
and then into the Bennet Road Right-of-Way. The weir crest elevation is set at
5030.84, which is approximately 8” above the 100-yr WSEL. The elevation is more
than 1’ below the lowest finished floor elevation.
Carriage House Apartments
Final Drainage Report 9
V. CONCLUSIONS
A. Compliance with Standards
1. The design elements comply without variation.
2. The drainage design proposed with Carriage House Apartments complies with the City
of Fort Collins Master Drainage Plan for the Old Town Basin.
3. There are no regulatory floodplains associated with the Carriage House Apartments
development.
4. The drainage plan and stormwater management measures proposed with the Carriage
House Apartments student housing project are compliant with all applicable State and
Federal regulations governing stormwater discharge.
B. Drainage Concept
1. The drainage design proposed with this project will effectively limit potential damage
associated with its stormwater runoff. Carriage House Apartments will detain for the
pervious area converted to impervious areas to release at the 2-year existing rate
during the 100-year storm.
2. The proposed Carriage House Apartments development will not impact the Master
Drainage Plan recommendations for the Old Town major drainage basin.
Carriage House Apartments
Final Drainage Report 10
References
1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities,
November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services.
2. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No.
174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code.
3. Geotechnical Engineering Study and Pavement Thickness Design Proposed Student
Apartment Development 1305 and 1319 South Shields Avenue Fort Collins, Colorado,
December 13, 2012, Kumar and Associates, Inc. (Project No. 12-1-517).
4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation
Service, United States Department of Agriculture.
5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control
District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008.
APPENDIX A
HYDROLOGIC COMPUTATIONS
Carriage House Apartments
Project: Carriage House Apartments
Project Site Area 62991 Calculations By:
EX1 62991 Date:
A 54170
B 1439
C 7382
Basin Area, sq. ft. Surface Description % Impervious Area, sq. ft. Notes
EX1 0 Asphalt 100% 0
EX1 2864 Concrete (e.g., walks & parking) 90% 2578
EX1 1773 Gravel 40% 709
EX1 4893 Roofs 90% 4404
Impervious Area 7691
% Impervious 12%
Total Impervious Area 7691
% Impervious 12%
Basin Area, sq. ft. Surface Description % Impervious Area, sq. ft. Notes
A 6941 Asphalt 100% 6941
A 9142 Pavers 22% 2011
A 5046 Concrete (e.g., walks & parking) 90% 4541
A 13725 Roofs 90% 12353
Impervious Area 25846
% Impervious 48%
B 492 Asphalt 100% 492
B 59 Concrete (e.g., walks & parking) 90% 53
SUMMARY OF EXISTING AND PROPOSED IMPERVIOUS AREA
A. Reese
July 24, 2013
EXISTING CONDITION
PROPOSED CONDITION
Areas, sq. ft.
B 59 Concrete (e.g., walks & parking) 90% 53
Impervious Area 545
% Impervious 38%
C 566 Concrete (e.g., walks & parking) 90% 509
C 3106 Roofs 90% 2795
Impervious Area 3305
% Impervious 45%
Impervious Area 26391
% Impervious 42%
Area, sq. ft. Area, acre
Total Impervious Area Increase 18701 0.429
SUMMARY
7/24/2013 12:38 PM D:\Projects\620-002\Drainage\Hydrology\620-002_Historic_Rational_Calcs.xlsx\Impervious Area
Carriage House Apartment Homes
CHARACTER OF SURFACE1:
Runoff
Coefficient
Percentage
Impervious Project: Carriage House Apartments
Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: A. Reese
Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 100% . Date:
Concrete …….......……………….….……….………………..….…………………………………………………….0.95 90% .
Gravel ……….…………………….….…………………………..……………………………………………………… 0.50 40%
Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90%
Pavers …………………………...………………..……………………………………………………………………… 0.40 22%
Lawns and Landscaping
Sandy Soil
Flat <2% ……………………………………………………………………………………………………………… 0.10 0%
Average 2% to 7% ………………………………………………………………………………………………….0.15 0% .
Steep >7% …………………………………………………………………………………………………………… 0.20 0%
Clayey Soil
Flat <2% ……………………………………………………………………………………………………………… 0.20 0%
Average 2% to 7% ………………………………………………………………………………………………….0.25 0% .
Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year Cf = 1.25
Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11
Basin ID
Basin Area
(ac)
Area of
Asphalt
(ac)
Area of
Concrete
(ac)
Area of
Gravel
(ac)
Area of
Roofs
(ac)
Area of
Pavers
(ac)
Soil Type and Average
Slope
Area of
Lawns and
Landscaping
(ac)
2-year
Composite
Runoff
Coefficient
10-year
Composite
Runoff
Coefficient
100-year
Composite
Runoff
Coefficient
Composite
% Imperv.
Carriage House Apartments
Overland Flow, Time of Concentration:
Project: Carriage House Apartments
Calculations By:
Date:
Gutter/Swale Flow, Time of Concentration:
Tt = L / 60V
Tc = T
i + Tt
(Equation RO-2)
Velocity (Gutter Flow), V = 20·S
½
Velocity (Swale Flow), V = 15·S
½
NOTE: C-value for overland flows over grassy surfaces; C = 0.25
Is Length
>500' ?
C*Cf
(2-yr
Cf=1.00)
C*Cf
(10-yr
Cf=1.00)
C*Cf
(100-yr
Cf=1.25)
Length,
L
(ft)
Slope,
S
(%)
Ti
2-yr
(min)
Ti
10-yr
(min)
Ti
100-yr
(min)
Length,
L
(ft)
Slope,
S
(%)
Velocity,
V
(ft/s)
Tt
(min)
Length,
L
(ft)
Slope,
S
(%)
Velocity,
V
Carriage House Apartments
Rational Method Equation: Project: Carriage House Apartments
Calculations By:
Date:
Rainfall Intensity:
n/a EX1Impervious 0.22 15.8 15.8 14.8 0.87 0.87 1.00 1.84 3.14 6.62 0.35 0.59 1.45
n/a EX1Pervious 1.23 15.8 15.8 14.8 0.25 0.25 0.31 1.84 3.14 6.62 0.56 0.96 2.54
EX1 EX1 1.45 15.83 15.83 14.82 0.34 0.34 0.43 1.84 3.14 6.62 0.91 1.56 4.10
EX2 EX2 0.34 5.00 5.00 5.00 0.82 0.82 1.00 2.85 4.87 9.95 0.80 1.36 3.39
EX3 EX3 0.17 5.00 5.00 5.00 0.80 0.80 1.00 2.85 4.87 9.95 0.39 0.66 1.69
Intensity,
i2
(in/hr)
Intensity,
i10
(in/hr)
Intensity,
i100
(in/hr)
Allowable release rate: 1.45
+ 0.56 = 2.01 cfs
Notes
EXISTING RUNOFF COMPUTATIONS
A. Reese
July 24, 2013
Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8
Design
Point
Basin(s)
Area, A
(acres)
2-yr
Tc
(min)
10-yr
Tc
(min)
100-yr
Tc
(min)
Flow,
Q2
(cfs)
Flow,
Q10
(cfs)
Flow,
Q100
(cfs)
C2 C10 C100
Q C f C i A
7/24/2013 12:38 PM D:\Projects\620-002\Drainage\Hydrology\620-002_Historic_Rational_Calcs.xlsx\Runoff
Carriage House Apartments
CHARACTER OF SURFACE1:
Runoff
Coefficient
Percentage
Impervious Project: Carriage House Apartments
Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: A. Reese
Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 100% . Date:
Concrete …….......……………….….……….………………..….…………………………………………………….0.95 90% .
Gravel ……….…………………….….…………………………..……………………………………………………… 0.50 40%
Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90%
Pavers …………………………...………………..……………………………………………………………………… 0.40 22%
Lawns and Landscaping
Sandy Soil
Flat <2% ……………………………………………………………………………………………………………… 0.10 0%
Average 2% to 7% ………………………………………………………………………………………………….0.15 0% .
Steep >7% …………………………………………………………………………………………………………… 0.20 0%
Clayey Soil
Flat <2% ……………………………………………………………………………………………………………… 0.20 0%
Average 2% to 7% ………………………………………………………………………………………………….0.25 0% .
Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year Cf = 1.25
Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11
Basin ID
Basin Area
(ac)
Area of
Asphalt
(ac)
Area of
Concrete
(ac)
Area of
Gravel
(ac)
Area of
Roofs
(ac)
Area of
Pavers
(ac)
Soil Type and Average
Slope
Area of
Lawns and
Landscaping
(ac)
2-year
Composite
Runoff
Coefficient
10-year
Composite Runoff
Coefficient
100-year
Composite Runoff
Coefficient
Composite
% Imperv.
A 1.25 0.16 0.12 0.00 0.32 0.21 Clayey | Average 2% to 7% 0.45 0.60 0.60 0.76 47%
B 0.02 0.01 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.01 0.66 0.66 0.82 58%
Carriage House Apartments
Overland Flow, Time of Concentration:
Project: Carriage House Apartments
Calculations By:
Date:
Gutter/Swale Flow, Time of Concentration:
Tt = L / 60V
Tc = T
i + Tt
(Equation RO-2)
Velocity (Gutter Flow), V = 20·S
½
Velocity (Swale Flow), V = 15·S
½
NOTE: C-value for overland flows over grassy surfaces; C = 0.25
Is Length
>500' ?
C*Cf
(2-yr
Cf=1.00)
C*Cf
(10-yr
Cf=1.00)
C*Cf
(100-yr
Cf=1.25)
Length,
L
(ft)
Slope,
S
(%)
Ti
2-yr
(min)
Ti
10-yr
(min)
Ti
100-yr
(min)
Length,
L
(ft)
Slope,
S
(%)
Velocity,
V
(ft/s)
Tt
(min)
Length,
L
(ft)
Slope,
S
(%)
Velocity,
V
Carriage House Apartments
Rational Method Equation: Project: Carriage House Apartments
Calculations By:
Date:
Rainfall Intensity:
A A 1.25 5.00 5.00 5.00 0.60 0.60 0.76 2.85 4.87 9.95 2.16 3.69 9.43 Q100 = 0.57 cfs
B B 0.02 5.00 5.00 5.00 0.66 0.66 0.82 2.85 4.87 9.95 0.04 0.07 0.18 Undetained release
C C 0.17 5.00 5.00 5.00 0.59 0.59 0.74 2.85 4.87 9.95 0.29 0.50 1.27 Undetained release
OS1 OS1 0.34 5.00 5.00 5.00 0.87 0.87 1.00 2.85 4.87 9.95 0.85 1.45 3.39
OS2 OS2 0.17 5.00 5.00 5.00 0.82 0.82 1.00 2.85 4.87 9.95 0.40 0.68 1.69
Flow,
Q100
(cfs)
C2 C10 C100
Intensity,
i2
(in/hr)
Intensity,
i10
(in/hr)
Intensity,
i100
(in/hr)
Notes
RUNOFF COMPUTATIONS
A. Reese
July 24, 2013
Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8
Design
Point
Basin(s)
Area, A
(acres)
2-yr
Tc
(min)
10-yr
Tc
(min)
100-yr
Tc
(min)
Flow,
Q2
(cfs)
Flow,
Q10
(cfs)
Q C f C i A
7/24/2013 12:37 PM D:\Projects\620-002\Drainage\Hydrology\620-002_Proposed_Rational_Calcs.xlsx\Runoff
APPENDIX B
DETENTION FACILITIES
Carriage House Apartment Homes
620-002
Fort Collins, Colorado
Detention Pond Calculation | FAA Method
Project Number:
Project Location: Fort Collins, Colorado
A. Reese Date: July 24, 2013
Pond No.: Pond A
Project Location:
Calculations By:
Pond No.: Pond A
A
Input Variables Results
Design Point A
100-yr
0.74 WQCV 711 ft
3
Design Point
Design Storm Required Detention Volume
Developed "C" = 0.74 WQCV 711 ft
3
Area (A)= 1.25 acres Quantity Detention 8114 ft
3
Max Release Rate = 0.57 cfs Total Volume 8114 ft
3
Developed "C" =
Max Release Rate = 0.57 cfs Total Volume 8114 ft
Total Volume 0.186 ac-ft
Time Time
Ft.Collins
100-yr
Intensity
Q100
Inflow
(Runoff)
Volume
Outflow
(Release) Volume
Storage
Detention
Intensity Volume Volume
(Release) Volume
Volume
(mins) (secs) (in/hr) (cfs) (ft
3
) (ft
3
) (ft
3
)
5 300 9.95 9.1 2742 171 2571
10 600 7.72 7.1 4256 342 3914
15 900 6.52 6.0 5391 513 4878
20 1200 5.60 5.1 6174 684 5490
25 1500 4.98 4.6 6863 855 6008
30 1800 4.52 4.2 7475 1026 6449
35 2100 4.08 3.7 7872 1197 6675
40 2400 3.74 3.4 8247 1368 6879
45 2700 3.46 3.2 8583 1539 7044
50 3000 3.23 3.0 8903 1710 7193
Carriage House Apartments
620-002
Stage - Storage Calculation
Project Number: 620-002
Fort Collins, Colorado
A. Reese Date: July 24, 2013
Project Number:
Project Location:
Calculations By: A. Reese Date: July 24, 2013
Pond No.: Pond A
Calculations By:
Required Volume Water Surface Elevation (WSE)
A
WQCV Void Ratio 40%
Design Point
Design Storm
Required Volume Water Surface Elevation (WSE)
WQCV Void Ratio 40%
722 ft3
Required Material
Volume 20301.00
Design Storm
Require Volume= 722 ft Volume 20301.00
Design Storm 100-yr
Required Volume= 8114 ft3 WSEL 5030.17 ft.
Require Volume=
Required Volume= 8114 ft3 WSEL 5030.17 ft.
Contour
Contour Incremental Incremental Area Cumulative Volume Incremental Volume
Contour Cummulative
Elevation (Y-
values)
Contour
Area
Incremental
Depth
Incremental Area
Avg. End
Cumulative Volume
Avg. End
Incremental Volume
Conic
Cummulative
Volume Conic (X-
values) values)
ft2 ft. ft3 ft3 ft3 ft3
5,027.80 1,856.25 n/a n/a 0 N/A 0
5,028.00 6,192.23 0.20 804.85 805 763 763
5,028.20 8,756.80 0.20 1494.90 2300 1488 2250
5,028.40 9,033.52 0.20 1779.03 4079 1779 4029
5,028.60 9,041.24 0.20 1807.48 5886 1807 5837
5,028.80 9,048.95 0.20 1809.02 7695 1809 7646
5,029.00 9,056.68 0.20 1810.56 9506 1811 9456
5,029.20 9,064.40 0.20 1812.11 11318 1812 11268
5,029.40 9,072.12 0.20 1813.65 13132 1814 13082
5,029.60 9,079.85 0.20 1815.20 14947 1815 14897
5,029.80 9,087.58 0.20 1816.74 16764 1817 16714
5,030.00 9,095.31 0.20 1818.29 18582 1818 18532
5,030.20 9,103.04 0.20 1819.83 20402 1820 20352
5,030.40 9,110.75 0.20 1821.38 22223 1821 22173
ORIFICE RATING CURVE
Area Inlet 2
100-yr Orifice
PROJECT: Carriage House
DATE: July 24, 2013
BY: A. Reese
ORIFICE RATING
Orifice Dia (in) 3.50
Orifice Area (sf) 0.0668
Orifice invert (ft) 5026.52
Orifice Coefficient 0.65
Outlet
Stage release
(FT) (CFS)
5026.52 0.00
5026.62 0.00
5026.72 0.08
5026.82 0.14
5026.92 0.18
5027.02 0.21
5027.12 0.23
5027.22 0.26
5027.32 0.28
5027.42 0.30
5027.52 0.32
5027.62 0.34
5027.72 0.36
5027.82 0.37
5027.92 0.39
5028.02 0.41
5028.12 0.42
5028.22 0.43
5028.32 0.45
5028.42 0.46
5028.52 0.47
5028.62 0.49
5028.72 0.50
5028.82 0.51
5028.92 0.52
5029.02 0.53
5029.12 0.55
5029.22 0.56
5029.32 0.57
APPENDIX C
WATER QUALITY DESIGN COMPUTATIONS
Project Title Date:
Project Number Calcs By:
Client
Pond Designation
0.8
WQCV = Watershed inches of Runoff (inches) 47.00%
a = Runoff Volume Reduction (constant)
i = Total imperviousness Ratio (i = Iwq/100) 0.159 in
Carriage House July 24, 2013
620-002 A. Reese
Catamount Properties
Parking Lot
Drain Time
a =
i =
WQCV =
0.159
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
WQCV (watershed inches)
Water Quality Capture Volume
6 hr
12 hr
24 hr
WQCV a 0.91 i 3 1 . 19 i 2 0 . 78 i
WQCV a 0.91 i 3 1 . 19 i 2 0 . 78 i
12 hr
A = 1.03 ac
V = 0.0163 ac-ft
V = Water Quality Design Volume (ac-ft)
WQCV = Water Quality Capture Volume (inches)
A = Watershed Area (acres)
1.2 = 20% Additional Volume (Sediment Accumulation)
Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event
0
0.05
0.1
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
WQCV (watershed inches)
Total Imperviousness Ratio (i = Iwq
/100)
40 hr
* * 1 . 2
APPENDIX D
EROSION CONTROL REPORT
Preliminary Erosion Control Report
EROSION CONTROL REPORT
A comprehensive Erosion and Sediment Control Plan (along with associated details) will be
included with the final construction drawings. It should be noted, however, that any such Erosion
and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or
phasing of the BMPs depicted, and additional or different BMPs from those included may be
necessary during construction, or as required by the authorities having jurisdiction.
It shall be the responsibility of the Contractor to ensure erosion control measures are properly
maintained and followed. The Erosion and Sediment Control Plan is intended to be a living
document, constantly adapting to site conditions and needs. The Contractor shall update the
location of BMPs as they are installed, removed or modified in conjunction with construction
activities. It is imperative to appropriately reflect the current site conditions at all times.
The Erosion and Sediment Control Plan shall address both temporary measures to be implemented
during construction, as well as permanent erosion control protection. Best Management Practices
from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but
are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent
roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads,
spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and
job site restrooms shall also be provided by the Contractor.
Grading and Erosion Control Notes can be found on Sheet CS2 of the Utility Plans. The Utility
Plans also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion
Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be
aware of, and adhere to, the applicable requirements outlined in any existing Development
Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of
the Development Construction Permit. Also, the Site Contractor for this project will be required to
secure a Stormwater Construction General Permit from the Colorado Department of Public Health
and Environment (CDPHE), Water Quality Control Division – Stormwater Program, before
commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall
develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE
requirements and guidelines. The SWMP will further describe and document the ongoing
activities, inspections, and maintenance of construction BMPs.
MAP POCKET
DR1 –DRAINAGE EXHIBIT
12
V WQCV A
¸
¹
·
¨
©
§
5,031.00
5,030.50
5,031.00
5,030.50
5,030.00
Contour Elevation
5,029.50
Contour Elevation
5,029.00
Contour Elevation
5,028.50
Contour Elevation
5,028.00
5,028.50
5,028.00
5,027.50
0 5000 10000 15000 20000 25000
Cummulative Volume, cu. ft.
7/24/20131:26 PM D:\Projects\620-002\Drainage\Detention\620-002__Detention Pond.xlsm\Stage_Storage_MBP
55 3300 3.03 2.8 9187 1881 7306
60 3600 2.86 2.6 9459 2052 7407
65 3900 2.72 2.5 9746 2223 7523
70 4200 2.59 2.4 9994 2394 7600
75 4500 2.48 2.3 10253 2565 7688
80 4800 2.38 2.2 10496 2736 7760
85 5100 2.29 2.1 10730 2907 7823
90 5400 2.21 2.0 10964 3078 7886
95 5700 2.13 2.0 11155 3249 7906
100 6000 2.06 1.9 11356 3420 7936
105 6300 2.00 1.8 11576 3591 7985
110 6600 1.94 1.8 11764 3762 8002
115 6900 1.89 1.7 11981 3933 8048
120 7200 1.84 1.7 12172 4104 8068
125 7500 1.79 1.6 12334 4275 8059
130 7800 1.75 1.6 12541 4446 8095
135 8100 1.71 1.6 12726 4617 8109
140 8400 1.67 1.5 12888 4788 8100
145 8700 1.63 1.5 13029 4959 8070
150 9000 1.60 1.5 13230 5130 8100
155 9300 1.57 1.4 13415 5301 8114
160 9600 1.54 1.4 13583 5472 8111
165 9900 1.51 1.4 13734 5643 8091
170 10200 1.48 1.4 13869 5814 8055
175 10500 1.45 1.3 13988 5985 8003
180 10800 1.42 1.3 14090 6156 7934
185 11100 1.40 1.3 14277 6327 7950
190 11400 1.38 1.3 14454 6498 7956
195 11700 1.36 1.2 14619 6669 7950
200 12000 1.34 1.2 14774 6840 7934
205 12300 1.32 1.2 14917 7011 7906
210 12600 1.30 1.2 15049 7182 7867
215 12900 1.28 1.2 15170 7353 7817
220 13200 1.26 1.2 15281 7524 7757
225 13500 1.24 1.1 15380 7695 7685
230 13800 1.22 1.1 15468 7866 7602
235 14100 1.21 1.1 15675 8037 7638
240 14400 1.20 1.1 15876 8208 7668
7/24/2013 1:26 PM D:\Projects\620-002\Drainage\Detention\620-002__Detention Pond.xlsm\FAA_CoFC idf_A
(ft/s)
Tt
(min)
2-yr
Tc
(min)
10-yr
Tc
(min)
100-yr
Tc
(min)
A A No 0.25 0.25 0.31 0 0.00% N/A N/A N/A 0 0.00% N/A N/A 0 0.00% N/A N/A 5.00 5.00 5.00
B B No 0.25 0.25 0.31 0 0.00% N/A N/A N/A 0 0.00% N/A N/A 0 0.00% N/A N/A 5.00 5.00 5.00
C C No 0.25 0.25 0.31 0 0.00% N/A N/A N/A 0 0.00% N/A N/A 0 0.00% N/A N/A 5.00 5.00 5.00
OS1 OS1 No 0.95 0.95 1.00 20 3.10% 0.9 0.9 0.6 429 0.90% 1.90 3.8 0 0.00% N/A N/A 5.00 5.00 5.00
OS2 OS2 No 0.95 0.95 1.00 34 1.90% 1.3 1.3 0.9 144 1.00% 2.00 1.2 0 0.00% N/A N/A 5.00 5.00 5.00
* Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins.
TIME OF CONCENTRATION COMPUTATIONS
Gutter Flow Swale Flow
Design
Point
Basin
Overland Flow
A. Reese
July 24, 2013
Time of Concentration
(Equation RO-4)
3
1
1 . 87 1 . 1 *
S
Ti C Cf L
7/24/2013 12:37 PM D:\Projects\620-002\Drainage\Hydrology\620-002_Proposed_Rational_Calcs.xlsx\Tc
C 0.17 0.00 0.01 0.00 0.07 0.00 Clayey | Average 2% to 7% 0.09 0.59 0.59 0.74 44%
OS1 0.34 0.21 0.09 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.04 0.87 0.87 1.00 86%
OS2 0.17 0.09 0.05 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.03 0.82 0.82 1.00 79%
1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis
COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS
July 24, 2013
Composite Runoff Coefficient with Adjustment
7/24/2013 12:37 PM D:\Projects\620-002\Drainage\Hydrology\620-002_Proposed_Rational_Calcs.xlsx\Composite Runoff Coefficient
(ft/s)
Tt
(min)
2-yr
Tc
(min)
10-yr
Tc
(min)
100-yr
Tc
(min)
EX1 EX1 No 0.25 0.25 0.31 142 2.60% 13.8 13.8 12.8 282 1.30% 2.28 2.1 0 0.00% N/A N/A 15.83 15.83 14.82
EX2 EX2 No 0.95 0.95 1.00 20 3.10% 0.9 0.9 0.6 429 0.90% 1.90 3.8 0 0.00% N/A N/A 5.00 5.00 5.00
EX3 EX3 No 0.95 0.95 1.00 34 2.80% 1.2 1.2 0.8 144 0.80% 1.79 1.3 0 0.00% N/A N/A 5.00 5.00 5.00
* Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins.
EXISTING TIME OF CONCENTRATION COMPUTATIONS
Gutter Flow Swale Flow
Design
Point
Basin
Overland Flow
A. Reese
July 24, 2013
Time of Concentration
(Equation RO-4)
3
1
1 . 87 1 . 1 *
S
Ti C Cf L
7/24/2013 12:38 PM D:\Projects\620-002\Drainage\Hydrology\620-002_Historic_Rational_Calcs.xlsx\Tc
EX1Impervious 0.22 0.00 0.07 0.04 0.11 0.000 Clayey | Average 2% to 7% 0.00 0.87 0.87 1.00 81%
EX1Pervious 1.23 0.00 0.00 0.00 0.00 0.000 Clayey | Average 2% to 7% 1.23 0.25 0.25 0.31 0%
EX1 1.45 0.00 0.07 0.04 0.11 0.000 Clayey | Average 2% to 7% 1.23 0.34 0.34 0.43 12%
EX2 0.34 0.22 0.06 0.00 0.00 0.000 Clayey | Average 2% to 7% 0.06 0.82 0.82 1.00 80%
EX3 0.17 0.09 0.04 0.00 0.00 0.000 Clayey | Average 2% to 7% 0.04 0.80 0.80 1.00 76%
1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis
EXISTING COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS
July 24, 2013
Composite Runoff Coefficient with Adjustment
7/24/2013 12:38 PM D:\Projects\620-002\Drainage\Hydrology\620-002_Historic_Rational_Calcs.xlsx\Composite Runoff Coefficient