Loading...
HomeMy WebLinkAboutTHE LEARNING EXPERIENCE @ MIRAMONT OFFICE PARK - PDP130023 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSC0.0 AKD 1" = 20' n/a COVER AND NOTES SHEET I:\2012\12026 - The Learning Experience at Miramont Office Park\CADD\Sheet Sets\Utility Plans\C0.0-12026 Utility Plans Cover Sheet.dwg tab: 1 C0.0-12026 Utility Plans Cover Sheet - Layout1 Jul 15, 2013 - 4:24pm adoll SHEET DRAWN CHECKED APPROVED PROJECT NO. HORZ. SCALE VERT. SCALE DATE NO. NOTES THE LEARNING EXPERIENCE AT MIRAMONT OFFICE PARK MDC MDC 12026 07.12.2013 1 1ST SUBMITTAL UTILITY PLANS FOR THE LEARNING EXPERIENCE AT MIRAMONT OFFICE PARK LOT 3 WITHIN THE MIRAMONT OFFICE PARK PUD A PLANNED UNIT DEVELOPMENT IN THE CITY OF FORT COLLINS COUNTY OF LARIMER, STATE OF COLORADO JUNE 2013 PROJECT TEAM: REDLAND 8000 LINCOLN STREET, SUITE 206 LITTLETON, COLORADO 80122 720.283.6783 CONTACT: MARK CEVAAL, P.E. EMAIL: MCEVAAL@REDLAND.COM BRITINA DESIGN GROUP 7600 GRANDVIEW AVE., SUITE 210 ARVADA, COLORADO 80002 303.556.2887 CONTACT: CHRIS COOPER LIMA ARCHITECTS 4855 TECHNOLOGY WAY, SUITE 200 BOCA RATON, FLORIDA 33431 561.886.6400 CONTACT: OCTAVIO LIMA RUBENSTEIN REAL ESTATE C\O LEGEND RETAIL GROUP 5150 E. YALE CIRCLE, SUITE 400 DENVER, COLORADO 80222 720.529.2881 CONTACT: ADAM RUBENSTEIN INDEX OF DRAWINGS SHEET NO. DESCRIPTION C0.0 COVER AND NOTES SHEET C1.0 OVERALL UTILITY PLAN C2.0 GRADING & DRAINAGE PLAN C3.0 EROSION CONTROL PLAN C4.0 DETIALS BASIS OF BEARINGS THE NORTH LINE OF THE NORTHEAST QUARTER OF SECTION 1 TOWNSHIP 6 NORTH, RANGE 69 WEST OF THE I:\2012\12026 - The Learning Experience at Miramont Office Park\CADD\Sheet Sets\Utility Plans\C1.0-12026 Overall UTILITY Plan.dwg tab: 2 C1.0-12026 Overall UTILITY Plan - C3.0 UTILITY Jul 15, 2013 - 4:24pm adoll SHEET DRAWN CHECKED APPROVED PROJECT NO. HORZ. SCALE VERT. SCALE DATE NO. NOTES THE LEARNING EXPERIENCE AT MIRAMONT OFFICE PARK MDC MDC 12026 07.12.2013 1 1ST SUBMITTAL C1.0 AKD N/A N/A OVERALL UTLITY PLAN 0 SCALE: 1" = 10 20 40 20' APPROVED: CITY OF FORT COLLINS NOTE: ALL STORM SEWER IS PRIVATE 0 SCALE: 1" = 15 30 60 30' C2.0 1" = 20' n/a GRADING & DRAINAGE PLAN I:\2012\12026 - The Learning Experience at Miramont Office Park\CADD\Sheet Sets\Utility Plans\C2.0 12026 Grading and Drainage Plan.dwg tab: 3 C2.0 12026 Grading and Drainage Plan - Layout1 Jul 15, 2013 - 4:24pm adoll SHEET DRAWN CHECKED APPROVED PROJECT NO. HORZ. SCALE VERT. SCALE DATE NO. NOTES THE LEARNING EXPERIENCE AT MIRAMONT OFFICE PARK MDC MDC 12026 07.12.2013 1 1ST SUBMITTAL BASIS OF BEARINGS THE NORTH LINE OF THE NORTHEAST QUARTER OF SECTION 1 TOWNSHIP 6 NORTH, RANGE 69 WEST OF THE SIXTH PRINCIPAL MERIDIAN IS CONSIDERED TO BEAR 1257+ƒ ($67 BENCHMARK NGS CONTROL POINT Y402 BEING A STAINLESS STEEL ROD IN A RANGE BOX ON EAST SIDE OF HIGHWAY 287, “6287+25+$5021<52$' PUBLISHED ELEVATION 5018.96 (NAVD88) BASIN A= 3.65 AC APPROVED: CITY OF FORT COLLINS TYPICAL DETAIL LANDSCAPE WALL NOT TO SCALE VARIES FROM 0.40' TO 4.95' HIGH 11" SEGMENTED BLOCK RETAINING WALL 8" x 18" SPLIT FACE BLOCK COLOR: TAN SLOPE VARIES VARIES WITH WALL HEIGHT AND BATTER SLOPE VARIES NOTE: 1. FOR REVEGETATION DETAILS, SEE LANDSCAPE PLANS. 0 SCALE: 1" = 10 20 40 20' C3.0 AKD 1" = 20' n/a EROSION CONTROL PLAN I:\2012\12026 - The Learning Experience at Miramont Office Park\CADD\Sheet Sets\Utility Plans\C3.0-12026 Erosion Control Plan.dwg tab: 4 C3.0-12026 Erosion Control Plan - EC1 EROSION CONTROL PLAN Jul 15, 2013 - 4:25pm adoll SHEET DRAWN CHECKED APPROVED PROJECT NO. HORZ. SCALE VERT. SCALE DATE NO. NOTES THE LEARNING EXPERIENCE AT MIRAMONT OFFICE PARK MDC MDC 12026 07.12.2013 1 1ST SUBMITTAL DISTURBED AREA= 0.84 AC APPROVED: CITY OF FORT COLLINS I:\2012\12026 - The Learning Experience at Miramont Office Park\CADD\Sheet Sets\Utility Plans\C4.0-12026 Pond Details.dwg tab: 5 C4.0-12026 DETAILS Jul 15, 2013 - 4:25pm adoll SHEET DRAWN CHECKED APPROVED PROJECT NO. HORZ. SCALE VERT. SCALE DATE NO. NOTES THE LEARNING EXPERIENCE AT MIRAMONT OFFICE PARK MDC MDC 12026 07.12.2013 1 1ST SUBMITTAL C4.0 AKD AS SHOWN n/a DETAILS 100 YR WSEL: 5002.59 FREEBOARD: 5003.59 12" RCP WATER QUALITY ORIFICE PLATE C8X18.75 AMERICAN STANDARD STRUCTURAL STEEL CHANNEL. TRASH RACK ATTACHED BY WELDING NO. 93 JOHNSON VEE WIRE STAINLESS STEEL WELL SCREEN WING-WALL TRASH RACK TO BE A STAINLESS STEEL WELL SCREEN WITH 60% OPEN AREA. 12" WIDE x 56.6" HIGH ORIFICE PLATE 6" CLASS 0.25 D CONCRETE WQCV WSEL: 4999.00 OUTLET STRUCTURE SECTION A-A N.T.S. BOTTOM OF CONCRETE EL: 4997.37 INV. OUT=4997.34 CLOSE MESH TYPE 'C' INLET GRATE POND - OUTLET STRUCTURE PLAN VIEW 1"=4' 10 YR WSEL: 5000.60 TRASH RACK ATTACHED BY INTERMITTANT WELDING ALL AROUND 6" Min. 12" STEEL PERFORATED FLOW CONTROL PLATE Flow SECTION B-B - PLAN VIEW N.T.S. STAINLESS STEEL BOLTS OR INTERMITTANT WELDS, TRASH RACK DETAIL N.T.S. WATER QUALITY ORIFICE PLATE DETAIL N.T.S. 4" O.C. BOLT 12" O.C. MAX. BOTTOM OF BASE EL: 4997.37 2" NEOPRENE GASKET AROUND CONCRETE OPENING TO CREATE A WATER-TIGHT SEAL BETWEEN THE ORIFICE PLATE AND CONCRETE WALL WQCV WSEL: 4999.00 12" ‘25,),&( 5 HOLES 9/16" DIA. NOTE: TRASH RACK TO BE A STAINLESS STEEL WELL SCREEN WITH 60% OPEN AREA. 12" WIDE x 56.6" HIGH 1.63' STRUCTURAL STEEL CHANNEL FORMED INTO CONCRETE. C8X18.75 AMERICAN STANDARD STRUCTURAL STEEL CHANNEL FORMED INTO CONCRETE BOTTOM AND SIDES OF OPENING W/TRASH RACK ATTACHED BY INTERMITTANT WELDS. WELL-SCREEN FRAME ATTACHED TO CHANNEL BY INTERMITTANT WELDS TOP EL: 4997.68 FL: 4997.48 SIXTH PRINCIPAL MERIDIAN IS CONSIDERED TO BEAR 1257+ƒ ($67 BENCHMARK NGS CONTROL POINT Y402 BEING A STAINLESS STEEL ROD IN A RANGE BOX ON EAST SIDE OF HIGHWAY 287, “6287+25+$5021<52$' PUBLISHED ELEVATION 5018.96 (NAVD88) EROSION CONTROL GENERAL NOTES: 1) THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2) ALL REQUIRED BMPS SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OF REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3) PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4) ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5) THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6) ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7) NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8) CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. GENERAL LOCATION MAP 1"=2000' LOCATED WITHIN MCCLELLANDS DRAINAGE BASIN SITE HARMONY RD BOARDWALK DRIVE COLLEGE AVE. OAK RIDGE DR McCLELLAND'S BASIN BOUNDARY I HEREBY AFFIRM THAT THESE FINAL CONSTRUCTION PLANS WERE PREPARED UNDER MY DIRECT SUPERVISION, IN ACCORDANCE WITH ALL APPLICABLE CITY OF FORT COLLINS AND STATE OF COLORADO STANDARDS AND STATUTES, RESPECTIVELY; AND THAT I AM FULLY RESPONSIBLE FOR THE ACCURACY OF ALL DESIGN, REVISIONS, AND RECORD CONDITIONS THAT I HAVE NOTED ON THESE PLANS. MARK D. CEVAAL, P.E. COLORADO LICENSE NO. 33123 THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL ENTITY FOR CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE LOCAL ENTITY ENGINEER, OR THE LOCAL ENTITY FOR ACCURACY AND CORRECTNESS OF THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT QUANTITIES OF ITEMS ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE LOCAL ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION PHASE. APPROVED: CITY OF FORT COLLINS REDLAND GENERAL NOTES 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFEGUARDING THE PROJECT BENCHMARK AND OTHER SURVEY MONUMENTS AND SHALL HAVE A REGISTERED LAND SURVEYOR TIE OUT AND RESET ANY PROPERTY CORNERS OR SECTION CORNERS PLANNED TO BE DISTURBED BY CONSTRUCTION OF THIS PROJECT. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR ANY INADVERTENTLY DISTURBED OR DAMAGED MONUMENTS AND SHALL HAVE THEM REESTABLISHED AND REPLACED BY A REGISTERED LAND SURVEYOR. 2. THE CONTRACTOR SHALL COMPLY, AND PERFORM WORK IN ACCORDANCE, WITH THE REQUIREMENTS OF THE GEOTECHNICAL (SOILS) REPORT PREPARED FOR THIS PROJECT. 3. THE CONTRACTOR SHALL MAINTAIN AT LEAST ONE (1) SET OF ³5('/,1('´ PRINTS OF THE CONSTRUCTION PLANS. THE ³5('/,1('´ PRINTS SHALL BE KEPT CURRENT TO ACCURATELY REPRESENT THE DIMENSIONS AND LOCATIONS OF ALL WORK PERFORMED BY THE CONTRACTOR. THE CONTRACTOR MUST PRESENT THE ³5('/,1('´ PRINTS TO THE ENGINEER (REDLAND) TIMELY UPON COMPLETION OF EACH PHASE OF THE WORK. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROMPTLY NOTIFYING THE ENGINEER OF ANY PROBLEMS OR POTENTIAL PROBLEMS IN CONFORMING TO THE DESIGN LINE AND GRADE FOR ANY ELEMENT OF THE CONSTRUCTION. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROMPTLY NOTIFYING THE ENGINEER OF SITE CONDITIONS THAT DIFFER FROM THOSE SHOWN ON THE APPROVED PLANS. 5. IN THE EVENT THE CONTRACTOR ALLOWS, AUTHORIZES, APPROVES OR CONSTRUCTS ITEMS THAT DIFFER FROM THE APPROVED PLANS, SPECIFICATIONS OR OTHER CONTRACT DOCUMENTS, WITHOUT WRITTEN APPROVAL BY THE ENGINEER, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY LIABILITY ARISING FROM SUCH CHANGES. 6. THE CONTRACTOR SHALL PERFORM ALL WORK ACCORDING TO ALL CITY, COUNTY, STATE AND FEDERAL SAFETY AND HEALTH REGULATIONS. IN PARTICULAR, THE TRENCHING AND OPEN EXCAVATION OPERATIONS SHALL COMPLY WITH ALL CURRENT O.S.H.A. REGULATORY REQUIREMENTS. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT, AND ANY OTHER NEEDED ACTION TO PROTECT THE LIFE, HEALTH AND SAFETY OF THE PUBLIC AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK COVERED BY THE CONTRACTOR. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE JOB SITE CONDITIONS THROUGHOUT THE DURATION OF CONSTRUCTION, INCLUDING SAFETY OF ALL PERSONS AND PROTECTION OF PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED ONLY TO WORKING HOURS. THE CONTRACTOR SHALL DEFEND INDEMNIFY AND HOLD THE OWNER, THE ENGINEER AND THE GOVERNING JURISDICTION HARMLESS FOR ANY AND ALL LIABILITY, IN CONNECTION WITH THE PERFORMANCE OF WORK, EXCEPT FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER, THE ENGINEER OR THE GOVERNING JURISDICTION. 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING SAFE, PASSABLE ACCESS TO PRIVATE PROPERTIES ADJACENT TO THE WORK THROUGHOUT THE PERIOD OF CONSTRUCTION. 10. THE TYPE, SIZE, LOCATION, AND NUMBER OF UNDERGROUND UTILITIES ARE APPROXIMATE WHERE SHOWN ON THE PLANS AND WERE TAKEN FROM RECORDS OF THE CONTROLLING AGENCIES AND/OR FROM MARKINGS IN THE FIELD BY AN AGENCY AND/OR UTILITY LOCATING CONTRACTOR. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THEIR COMPLETENESS OR ACCURACY. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF THE WORK AND PARTICIPATE IN THE RESOLUTION OF ANY CONFLICTS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 11. THE CONTRACTOR SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO FOR THE LOCATION OF UNDERGROUND GAS, ELECTRIC AND COMMUNICATION UTILITIES AT LEAST 48 HOURS PRIOR TO CONSTRUCTION (CALL 811 OR 1-800-922-1987). THE CONTRACTOR SHALL ALSO NOTIFY OTHER APPLICABLE UTILITY COMPANIES TO OBTAIN FIELD LOCATES OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 12. THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES TO COORDINATE SCHEDULES PRIOR TO THE COMMENCEMENT OF CONSTRUCTION AND SHALL BE RESPONSIBLE FOR COORDINATION OF ALL NECESSARY UTILITY RELOCATIONS WITH THE APPROPRIATE UTILITY COMPANY. 13. TEMPORARY EROSION CONTROL MEASURES SHALL BE PROVIDED BY THE CONTRACTOR DURING CONSTRUCTION AS IDENTIFIED IN THE EROSION CONTROL AND/OR STORMWATER MANAGEMENT PLANS. MAINTENANCE OF ONSITE DRAINAGE AND EROSION CONTROL FACILITIES DURING CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE REMOVAL OF TEMPORARY EROSION CONTROL MEASURES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. HOWEVER, REMOVALS SHALL NOT OCCUR UNTIL THE GOVERNING JURISDICTION HAS GIVEN APPROVAL TO REMOVE ANY OF THE MEASURES. 14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING NEARBY PUBLIC OR PRIVATE STREETS OF MUD AND DEBRIS, DUE TO CONSTRUCTION ACTIVITIES, ON A DAILY BASIS OR AS DIRECTED BY GOVERNING JURISDICTION PERSONNEL. 15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR AND/OR REPLACEMENT OF ANY DAMAGED EXISTING IMPROVEMENTS INCLUDING, BUT NOT LIMITED TO, PAVEMENT, CURB AND GUTTER, SIDEWALK, LANDSCAPING, IRRIGATION, SIGNAGE, STRIPING, AND UTILITIES. 16. ALL CONSTRUCTION ACTIVITIES MUST COMPLY WITH THE COLORADO DISCHARGE PERMITTING SYSTEM'S PERMITTING PROCESS FOR ³67250:$7(5 DISCHARGES ASSOCIATED WITH CONSTRUCTION $&7,9,7<´ FOR INFORMATION, CONTACT THE COLORADO DEPARTMENT OF PUBLIC HEALTH & ENVIRONMENT, WATER QUALITY CONTROL DIVISION, WQCD-PE-B2, 4300 CHERRY DRIVE SOUTH, DENVER, COLORADO, 80246-1530, ATTENTION: PERMITS AND ENFORCEMENT SECTION. PHONE (303) 692-3590. 17. IF DEWATERING IS TO BE USED TO INSTALL UTILITIES OR CONSTRUCT IMPROVEMENTS, A STATE CONSTRUCTION DEWATERING DISCHARGE PERMIT IS REQUIRED IF DISCHARGE IS INTO A STORM SEWER, CHANNEL, IRRIGATION DITCH, OR ANY WATERS OF THE UNITED STATES. 18. THE CONTRACTOR SHALL HAVE IN HIS POSSESSION AT ALL TIMES THE APPROPRIATE EDITION OF THE GOVERNING JURISDICTION DESIGN AND CONSTRUCTION STANDARDS, ONE SET OF APPROVED CONSTRUCTION PLANS, THE STORMWATER MANAGEMENT PLAN, AND ALL REQUIRED PERMITS. 19. ALL STREET, SANITARY SEWER, STORM SEWER AND WATERLINE CONSTRUCTION SHALL CONFORM TO THE STANDARDS AND SPECIFICATIONS OF THE APPLICABLE GOVERNING LOCAL AGENCY CURRENT AT THE DATE OF CONSTRUCTION PLAN APPROVAL. FOR ELEMENTS OF WORK NOT COVERED BY LOCAL AGENCY STANDARDS AND SPECIFICATIONS, ALL CONSTRUCTION SHALL CONFORM TO THE APPROPRIATE EDITION OF THE STANDARDS AND SPECIFICATIONS OF THE COLORADO DEPARTMENT OF TRANSPORTATION, THE URBAN DRAINAGE AND FLOOD CONTROL DISTRICT, AND INDUSTRY STANDARDS AS APPLICABLE. REQUIREMENTS OF THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT, THE ENVIRONMENTAL PROTECTION AGENCY AND THE U.S. ARMY CORPS OF ENGINEERS, SHALL ALSO BE FOLLOWED AS THEY RELATE TO THE WORK. 20. THE CONTRACTOR SHALL PROVIDE AND IMPLEMENT A ³75$)),& CONTROL 3/$1´ RELATED TO ALL CONSTRUCTION ACTIVITIES FOR THIS PROJECT THAT AFFECT PUBLIC RIGHT-OF-WAY. ALL TRAFFIC CONTROL DEVICES, STRIPING, AND SIGNING SHALL BE IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). 21. CENTERLINE, RIGHTS-OF-WAY (R.O.W.), PROPERTY LINE, AND EASEMENT DIMENSIONS ARE FOR REFERENCE ONLY. REFER TO THE FINAL SUBDIVISION PLAT FOR PROJECT HORIZONTAL CONTROL. 22. ALL ELEVATIONS IN PLAN VIEW ARE ALONG FLOWLINE UNLESS OTHERWISE NOTED. WHERE SHOWN, 'TC' REPRESENTS TOP-OF-CURB ELEVATION ALONG CURB AND GUTTER OR BACK-OF-WALK ELEVATION ALONG COMBINATION CURB, GUTTER AND WALK. 23. STORM AND SANITARY SEWER MAIN LENGTHS ARE FROM CENTER OF STRUCTURE/MANHOLE TO CENTER OF STRUCTURE/MANHOLE. SANITARY SEWER AND STORM SEWER MANHOLES ARE 4-FOOT DIAMETER UNLESS OTHERWISE NOTED 24. STORM SEWER SHALL BE REINFORCED CONCRETE PIPE CLASS III, CONFORMING TO ASTM C-76. JOINTS FOR STORM SEWER SHALL BE RUBBER GASKETS MEETING THE MATERIAL AND JOINT CONFIGURATION REQUIRMENTS OF ASTM C443. ALL PVC STORM DRAINS SHALL BE THICK WALLED PIPE CONFORMING TO ASTM D-3034, SDR-35, WITH PUSH TYPE JOINTS IN CONFORMANCE TO ASTM D-3212. 25. ALL PVC SANITARY SEWER SHALL BE THICK WALLED PIPE CONFORMING TO ASTM D-3034, SDR-35, WITH PUSH TYPE JOINTS IN CONFORMANCE TO ASTM