HomeMy WebLinkAboutRIVER DISTRICT BLOCK ONE MIXED-USE (ENCOMPASS) - FDP - FDP130015 - PLANS - UTILITY PLANSJEFFERSON ST.
WILLOW ST.
LINDEN ST.
N. COLLEGE AVE.
E. LINCOLN AVE.
BUCKINGHAM ST.
E. VINE DR.
OLD TOWN BASIN
CACHE LA POUDRE BASIN
CACHE LA POUDRE BASIN
DRY CREEK BASIN
CONIFER ST.
MOUNTAIN AVE.
E. MULBERRY ST
N. COLLEGE AVE.
C000
COVER SHEET
N.A.
J. Prelog
NTS
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'� �����.
C��� ������ ��� ���.
R
JUNE, 2013
UTILITY PLANS FOR
No. Revisions:
By: Date:
REVIEWED BY:
R. Provencio
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
06/19/13
PROJECT:
685-002
Sheet
RIVER DISTRICT BLOCK ONE MIXED USE
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
No. Revisions:
By: Date:
REVIEWED BY:
R. Provencio
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
06/19/13
PROJECT:
685-002
Sheet
RIVER DISTRICT BLOCK ONE MIXED USE
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
of 47 Sheets
C001
CONSTRUCTION NOTES
GENERAL AND N.A.
J. Prelog
N/A
A. GENERAL NOTES
1. All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the
Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and
the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the
City of Fort Collins.
2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise.
3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins
Engineer. Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to
commencement of any work shown in these plans.
4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as
beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort
Collins Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by
law, the engineer hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all
liabilities, claims, and demands which may arise from any errors and omissions contained in these plans.
5. All storm sewer construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and
specifications current at the date of approval of the plans by the City of Fort Collins Engineer.
6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the
responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing
new construction. The Developer shall be responsible for unknown underground utilities.
7. The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning
excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to
be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading.
JEFFERSON ST.
WILLOW ST.
LINDEN ST.
N. COLLEGE AVE.
E. LINCOLN AVE.
BUCKINGHAM ST.
E. VINE DR.
OLD TOWN BASIN
CACHE LA POUDRE BASIN
CACHE LA POUDRE BASIN
DRY CREEK BASIN
CONIFER ST.
MOUNTAIN AVE.
E. MULBERRY ST
N. COLLEGE AVE.
N48�18'50"W 299.24'
N48�50'00"W (R)
DRAINAGE &
ACCESS
EASEMENT TO
BE DEDICATED
WITH THIS PLAT
DRAINAGE EASEMENT
TO BE DEDICATED
BY SEPARATE DOCUMENT
REC. NO. _______________
LINDEN STREET
(100' ROW)
(PER PLAT OF CITY OF FORT COLLINS)
CACHE LA POUDRE RIVER
WESTERLY CORNER OF BLOCK 1
SET 1" BRASS TAG & NAIL, LS 14823
POINT OF
BEGINNING
250.00'
BASIS OF BEARINGS
NORTHWESTERLY LINE
OF BLOCK 1
(N41�41'10"E)
LOT 1
BLOCK 1
44,885 sq. ft.
1.030 ac.
100-YR FLOODPLAIN
BOUNDARY
FEMA FLOODWAY
BOUNDARY
PORTION OF BLOCK 1
CITY OF FORT COLLINS
UNPLATTED
FND #4 REBAR w/
1" PLASTIC CAP
LS 14823
FND #4 REBAR w/
1" PLASTIC CAP
LS 14823
FND #4 REBAR w/
1" PLASTIC CAP
LS 14823
FND #4 REBAR w/
S
S
h2o
W
ELEC VAULT
ELEC
BOX
ELEC
BOX
ELEC
BOX
WV
WVWV
H Y
D
CONTROL IRR
V.P.
F
E
S
D D D
OWNER:
RANCH-WAY INC.
OWNER:
CITY OF FORT COLLINS
OWNER:
CITY OF FORT COLLINS
OWNER:
KEIFER
MARJORIE R.
OWNER:
KIEFER BLAIR A
FAMILY TRUST
OWNER:
KIEFER BLAIR A
FAMILY TRUST
LINDEN STREET
(100' ROW)
CACHE LA POUDRE RIVER
G
G
C
ELEC VAULT
CONTROL IRR
CONTROL CONTROL IRR
IRR
CONTROL IRR
CONTROL IRR
CONTROL IRR
CONTROL IRR
CONTROL IRR
CABLE VAULT
T
T
T
T
CTV
ELEC
BOX
D
S
WV
WVWV
H Y
D
F
E
S
OWNER:
RANCH-WAY INC.
OWNER:
CITY OF FORT COLLINS
OWNER:
CITY OF FORT COLLINS
OWNER:
KEIFER
MARJORIE R.
OWNER:
KIEFER BLAIR A
FAMILY TRUST
OWNER:
KIEFER BLAIR A
FAMILY TRUST
G
G
C
ELEC VAULT
CABLE VAULT
T
T
T
PROPOSED
BUILDING
(FIRST FLOOR)
PROPOSED
BUILDING
(FIRST FLOOR)
16.03'
102.02'
76.6'
76.52'
66.05'
6'
6.83'
8'
20'
15'
15'
17'
19'
20'
8' 9'
9'
8.5'
20.5'
20'
PROPOSED DRAINAGE
EASEMENT (BY
SEPARATE DOCUMENT)
22'
S
S
WV
WVWV
H Y
D
F
E
S
OWNER:
RANCH-WAY INC.
OWNER:
CITY OF FORT COLLINS
OWNER:
CITY OF FORT COLLINS
OWNER:
KEIFER
MARJORIE R.
OWNER:
KIEFER BLAIR A
FAMILY TRUST
OWNER:
KIEFER BLAIR A
FAMILY TRUST
LINDEN STREET
(100' ROW)
CACHE LA POUDRE RIVER
G
G
C
ELEC VAULT
CONTROL IRR
CONTROL CONTROL IRR
IRR
CONTROL IRR
CONTROL IRR
CONTROL IRR
CONTROL IRR
CONTROL IRR
CABLE VAULT
T
T
T
PROPOSED
BUILDING
(FIRST FLOOR)
PROPOSED
BUILDING
(FIRST FLOOR)
RD
ELEC
BOX
E
S S
G
F
W
W
TCTV
T TV
C
CONTROL IRR
CONTROL IRR
CONTROL IRR
CONTROL IRR
E
G
W
FO
PROPOSED
BUILDING
AREA INLET B
STA 10+20.37
N: 132314.01
E: 196124.99
EXISTING INLET
STA 10+00.00
N: 132325.38
E: 196108.09
LINDEN ST.
EXISTING
RIGHT-OF-
WAY
5' MH A2
STA 10+15.73
N: 132388.91
E: 196330.85
OUTLET STRUCTURE A3
STA 10+32.16
N: 132372.94
E: 196334.68
(SEE DETAIL SHEET C701)
FES A1
STA 10+00.00
N: 132398.44
E: 196343.37
SSA5 - 4'' 90� BEND
CACHE LA POUDRE RIVER
{REFER TO APPROVED BANK STABILIZATION
DRAWINGS AND REPORT BY FLYWATER}
S
WV
WVWV
H Y
D
F
E
S
CONTROL IRR
CONTROL CONTROL IRR
IRR
T
T
RD
ELECBOX
S S
F
W
W
TCTV
F
E
S
OWNER:
RANCH-WAY INC.
OWNER:
CITY OF FORT COLLINS
OWNER:
CITY OF FORT COLLINS
OWNER:
KEIFER
MARJORIE R.
OWNER:
KIEFER BLAIR A
FAMILY TRUST
OWNER:
KIEFER BLAIR A
FAMILY TRUST
G
G
RD
RD
PROPOSED
BUILDING
PROPOSED
BUILDING
EXISTING 100'
LINDEN
STREET
RIGHT-OF-WAY
PROPOSED DRAINAGE
EASEMENT (BY SEP. DOC.)
EXISTING 36" STORM DRAIN
GRADE BREAK
GRADE BREAK
PROPOSED DRAINAGE
AND ACCESS EASEMENT
GRADE BREAK
EXISTING BRIDGE WALL
A
A
FFE=65.00
(FIRST FLOOR)
FFE=65.00
(FIRST FLOOR)
EXISTING R.O.W.
LINDEN STREET
(100' ROW)
No. Revisions:
By: Date:
REVIEWED BY:
R. Provencio
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
06/19/13
PROJECT:
685-002
Sheet
RD
RD
PROPOSED BUILDING
PROPOSED BUILDING
FFE=65.00
(FIRST FLOOR)
FFE=65.00
(FIRST FLOOR)
RD
RD
PROPOSED BUILDING
GRADE BREAK
GRADE BREAK
No. Revisions:
By: Date:
REVIEWED BY:
R. Provencio
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
06/19/13
PROJECT:
685-002
Sheet
RIVER DISTRICT BLOCK ONE MIXED USE
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
of 47 Sheets
C401
GRADING DETAILS
J. Prelog
J. Prelog
1"=10'
NORTH
( IN FEET )
1 inch = ft.
10 0 10 Feet
10
20 30
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
C
F E
S
G
C
ELEC VAULT
CONTROL CONTROL IRR
IRR
CONTROL IRR
CONTROL IRR
CONTROL IRR
CABLE VAULT CONTROL IRR CONTROL IRR CONTROL IRR
T
T
RD
RD
PROPOSED
PROPOSED BUILDING
BUILDING
Δ
Δ
EXISTING BRIDGE WALL
EXISTING R.O.W.
LINDEN ST.
F
E
S
T
T
RD
RD
Δ
PROPOSED
BUILDING
EXISTING BRIDGE WALL
EXISTING R.O.W.
LINDEN ST.
4950
4955
4960
4965
4970
4975
4980
4950
4955
4960
4965
4970
4975
4980
9+75 10+00 11+00 12+00 13+00 13+25
4950
4955
4960
4965
4970
4950
4955
4960
F
E
S
OWNER:
RANCH-WAY INC.
OWNER:
CITY OF FORT COLLINS
OWNER:
CITY OF FORT COLLINS
OWNER:
KEIFER
MARJORIE R.
OWNER:
KIEFER BLAIR A
FAMILY TRUST
OWNER:
KIEFER BLAIR A
FAMILY TRUST
LINDEN STREET
(100' ROW)
CACHE LA POUDRE RIVER
T
T
RD
RD
PROPOSED
BUILDING
PROPOSED
BUILDING
PROPOSED
BUILDING
PROPOSED
BUILDING
EXISTING 100'
LINDEN
STREET
RIGHT-OF-WAY
FFE=65.00
(FIRST FLOOR)
2
0.30
2
FFE=65.00
(FIRST FLOOR)
1
0.05
3
0.02
4
0.59
5
0.07
OS1
0.63
OS2
0.38
OS3
0.12
5
OS2
C700
CONSTRUCTION DETAILS
N.A.
J. Prelog
NTS
No. Revisions:
By: Date:
REVIEWED BY:
R. Provencio
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
06/19/13
PROJECT:
685-002
Sheet
RIVER DISTRICT BLOCK ONE MIXED USE
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
of 47 Sheets
Date
Date
Date
Date
Date
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
City Engineer
Water & Wastewater Utility
Stormwater Utility
Parks & Recreation
Traffic Engineer
Environmental Planner
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
C701
CONSTRUCTION DETAILS
N.A.
J. Prelog
NTS
No. Revisions:
By: Date:
REVIEWED BY:
R. Provencio
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
06/19/13
PROJECT:
685-002
Sheet
RIVER DISTRICT BLOCK ONE MIXED USE
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
of 47 Sheets
Date
Date
Date
Date
Date
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
City Engineer
Water & Wastewater Utility
Stormwater Utility
Parks & Recreation
Traffic Engineer
Environmental Planner
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
PROPOSED
42"X72" HATCH
C702
CONSTRUCTION DETAILS
N.A.
J. Prelog
NTS
No. Revisions:
By: Date:
REVIEWED BY:
R. Provencio
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
06/19/13
PROJECT:
685-002
Sheet
RIVER DISTRICT BLOCK ONE MIXED USE
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
of 47 Sheets
Date
Date
Date
Date
Date
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
City Engineer
Water & Wastewater Utility
Stormwater Utility
Parks & Recreation
Traffic Engineer
Environmental Planner
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
C703
CONSTRUCTION DETAILS
N.A.
J. Prelog
NTS
No. Revisions:
By: Date:
REVIEWED BY:
R. Provencio
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
06/19/13
PROJECT:
685-002
Sheet
RIVER DISTRICT BLOCK ONE MIXED USE
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
of 47 Sheets
Date
Date
Date
Date
Date
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
City Engineer
Water & Wastewater Utility
Stormwater Utility
Parks & Recreation
Traffic Engineer
Environmental Planner
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
JEFFERSON ST.
WILLOW ST.
LINDEN ST.
N. COLLEGE AVE.
E. LINCOLN AVE.
BUCKINGHAM ST.
E. VINE DR.
OLD TOWN BASIN
CACHE LA POUDRE BASIN
CACHE LA POUDRE BASIN
DRY CREEK BASIN
MOUNTAIN AVE.
E. MULBERRY ST
N. COLLEGE AVE.
CACHE
LA
POUDRE
RIVER
1
COVER SHEET
M Shupe
M. Kinkade
N.A.
1 COVER SHEET
2 GENERAL NOTES
JUNE, 2013
VICINITY MAP
VICINITY MAP
{SCALE 1" = 1000'}
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'� �����.
C��� ������ ��� ���.
R
3 SITE PLAN
4 BANK STABILIZATION PLAN
5 PLANTING PLAN
PROJECT
SITE
PROJECT TEAM
DESIGNER
FlyWater, Inc.
PO Box 973
Fort Collins, CO 80522
(970) 217-3182
CONTACT INFORMATION
CONTRACTOR
SHEET INDEX
6-7
8
GRADING SECTIONS
DESIGN SECTIONS
Date:
Sheet:
Of:
Job No:
Drawn:
Checked:
Scale:
2
GENERAL NOTES
M. Shupe
M. Kinkade
N.A.
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'� �����.
C��� ������ ��� ���.
R
Date:
Sheet:
Of:
Job No:
Drawn:
Checked:
Scale:
Design:
June 19, 2013
237-500
B. Schenderlein
49
No. Revisions:
By: Date:
ENCOMPASS
TECHNOLOGIES
RIVER DISTRICT BLOCK ONE MIXED USE
FORT COLLINS, COLORADO
ENCOMPASS TECHNOLOGIES
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
BANK STABILIZATION
A. GENERAL NOTES
1. All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer
County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications,
or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort Collins.
2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise.
3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer.
Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of any
work shown in these plans.
4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as
beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins
Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer
hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and
demands which may arise from any errors and omissions contained in these plans.
5. All storm sewer construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and specifications
current at the date of approval of the plans by the City of Fort Collins Engineer.
6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of
the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The
Developer shall be responsible for unknown underground utilities.
7. The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning
excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located
by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the
responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans.
8. The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility
crossings required.
9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to
modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction.
S
S
WV
WVWV
H Y
D
F
E
S
G
G
C
ELEC VAULT
CONTROL IRR
CONTROL CONTROL IRR
IRR
CONTROL IRR
CONTROL IRR
CONTROL IRR
CONTROL IRR
CONTROL IRR
CABLE VAULT
T
T
T
T
RD
ELEC
BOX
E
ELEC VAULT
CTV
S
S
G
TV
T
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
LINDEN STREET
CACHE LA
POUDRE RIVER
CACHE LA
POUDRE RIVER
10+25
10+39
10+50
10+75
11+00
11+25
11+50
11+70
12+00
12+25
12+50
S
F
E
S
RD
ELEC
BOX
F
W
W
LINDEN STREET
(100' R.O.W.)
CACHE LA POUDRE
STAGING AND
STOCKPILE AREA
41
42
43
44
45
46
47
48
49
50
51
42
44 43
45
50
52
53
RIPRAP TIE-IN ZONE
(SEE DETAIL)
PROPOSED PATH
PROPOSED PATH
0+00
0+00
0+00
0+00
0+00
0+00
0+00
0+00
54 53
55
56
57
58
F
E
S
OWNER:
CITY OF FORT COLLINS
CACHE LA POUDRE RIVER
RD
ELEC
BOX
PROPOSED PATH
PROPOSED PATH TRM
( IN FEET )
1 inch = ft.
10 0 10 Feet
10
20 30
NORTH
K��� ����'������.
C��� ������ ��� ���.
R
20
5020
PROPOSED CONTOUR
EXISTING CONTOUR
LEGEND:
GRAPHIC SCALE:
NOTES:
1. ALL ZONES TO BE PLANTED WITH PERSCRIBED COMPOSITION OF
CUTTINGS TO PREVENT FORMATION OF MONOCULTURE.
2. CUTTINGS SHOULD BE PLACED HAVING 10 STEMS PER LIN. FT.
3. LIVE CUT BRANCHES TYPICALLY HARVESTED FROM NATURAL STANDS
WITHIN 40 MILES OF THE PROJECT SITE. NATIVE PLANTS SUCH AS
WILLOW SPECIES WORK WELL. LONG STEM PLANTS OBTAINED FROM A
NURSERY MAY BE USED AS WELL.
4. LIVE CUT BRANCHES SHALL BE 0.5 TO 3 INCHES IN DIAMETER, WITH A
MINUMUM LENGTH OF 6 FEET. BRANCHES SHOULD BE BUNDLED AT
THE HARVESTING SITE WITH THE TIPS ORIENTED IN THE SAME
DIRECTION AND KEPT MOIST.
5. LIVE CUTTINGS TO BE LAYERED BETWEEN VRSS BURRTIO WRAPS AS
ILLUSTRATED IN DETAILS AND REALTIVE TO SPECIFIC ZONE
COVERAGE.
6. GRASS SEED MIX SHALL BE COMPRISED OF EQUAL PARTS OF THE
FOLLOWING SPECIES:
INIDIAN SALTGRASS (D��������� �������)
SWITCHGRASS (P������ ��������)
WESTERN WHEATGRASS (P�������� �������)
7. VRSS BURRITO WRAP LAYERS SHOULD BE FILLED WITH CLEAN NATIVE
SOIL. EACH SOIL LIFT SHOULD BE BROADCAST SEEDED WITH SEED MIX
BEFORE WRAPPING COIR MAT BACK INTO SLOPE.
5
PLANTING PLAN
M. Shupe
M. Kinkade
1" = 10'
Date:
Sheet:
Of:
Job No:
Drawn:
Checked:
10+39.33
PROPOSED
GRADE
EXISTING
GROUND
EXISTING AND
PROPOSED
TOP OF BANK
10+50
PROPOSED
GRADE
EXISTING
GROUND
PROPOSED TOP OF BANK
EXISTING TOP OF BANK
4950.31
4950.3
10+75
PROPOSED
GRADE
EXISTING
GROUND
PROPOSED TOP OF BANK
EXISTING TOP OF BANK
4951.50
4951.5
10+25
PROPOSED
GRADE
EXISTING
GROUND
EXISTING TOP OF BANK
11+00
PROPOSED
GRADE
EXISTING
GROUND
PROPOSED TOP OF BANK
EXISTING TOP OF BANK
4950.54
4950.5
K��� ����'������.
C��� ������ ��� ���.
R
6
GRADING SECTIONS
M. Shupe
M. Kinkade
N/A
Date:
Sheet:
Of:
Job No:
Drawn:
Checked:
Scale:
Design:
June 19, 2013
237-500
B. Schenderlein
11+25
PROPOSED
GRADE
EXISTING
GROUND
EXISTING TOP OF BANK
PROPOSED TOP OF BANK
4952.69
4952.7
11+50
PROPOSED
GRADE
EXISTING
GROUND
PROPOSED TOP OF BANK
EXISTING TOP OF BANK
4952.47
4952.5
11+70.07
PROPOSED
GRADE
EXISTING
GROUND
EXISTING AND PROPOSED TOP OF BANK
4952.57
4952.6
K��� ����'� �����.
C��� ������ ��� ���.
R
7
GRADING SECTIONS
M. Shupe
M. Kinkade
N/A
Date:
Sheet:
Of:
Job No:
Drawn:
Checked:
Scale:
Design:
June 19, 2013
237-500
B. Schenderlein
49
No. Revisions:
By: Date:
ENCOMPASS
TECHNOLOGIES
RIVER DISTRICT BLOCK ONE MIXED USE
FORT COLLINS, COLORADO
ENCOMPASS TECHNOLOGIES
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
BANK STABILIZATION
22
STA 10+75
ORDINARY LOW WATER LEVEL
REDI ROCK
REDI ROCK
WILLOWS
VRSS BURRITO
@18" LIFTS
TOE PROTECTION
D 50 = 2.5'
3
1
2
GEOTEXTILE
NATIVE
MATERIAL
SOIL
SOIL
SOIL RIPRAP
D 50 = 18"
SOIL RIPRAP
D 50 = 18"
1
1.5
1
SOIL
2
1
EDGE OF TERRACE
PROPOSED 100 -YR FLOODPLAIN WSEL
2-YR WSEL
ELEV. = 4946.48
PROPOSED
GRADE
-20 -10 0 10 20 30
4950
4940
4950
4940
GEOTEXTILE
GEOTEXTILE
4960 4960
BEDDING
BEDDING
STA 11+00
ORDINARY LOW WATER LEVEL
REDI ROCK
REDI ROCK
WILLOWS
VRSS BURRITO
@18" LIFTS
TOE PROTECTION
D 50 = 2.5'
3
1
2
GEOTEXTILE
NATIVE
MATERIAL
SOIL
SOIL
8.00'
STRAP
1:1
1:1
A
A
41
45
50
ZONE
1
1
1
1
PLANTING ZONE
SOIL RIPRAP
SOIL RIPRAP
NOTE:
STORMWATER OUTLET PLANS TO BE SUBMITTED
SEPARATELY.
WILLOWS
VEGETATED REINFORCED SOIL
SLOPE VRSS BURRITO @18" LIFTS
TOE PROTECTION
D 50 = 2.5'
SEE DETAIL
3
1
2
1
GEOTEXTILE
NATIVE
MATERIAL
NATIVE
MATERIAL
SOIL
SOIL
SOIL
1
ORDINARY LOW WATER LEVEL 1.5
EDGE OF BUILDING
2-YR WSEL
ELEV. = 4946.48
PROPOSED GRADE
NOTE: TOP WALL TO BE 2 BLOCKS ONLY. OMIT BOTTOM BLOCK AS NOTED IN WALL PLANS
5' NOMINAL
5' NOMINAL
KEY INTO
BEDROCK
1/2 x D 50 = 1.25'
NOMINAL
EXTEND FABRIC TO
BACK OF TOP BLOCK
22 5/8" NOMINAL5"
12"
TOE IN FABRIC AT TOP OF SLOPE
REINFORCED BACKFILL
(SEE WALL PLAN)
ANCHOR TURF MAT
TO LIFT HOOK ON
PRECAST BLOCK
2"
2"
1' TYP. TUCK DEPTH MIN.
MSE WALL
3' MINIMUM EMBEDMENT
1' NOMINAL SOIL SEE MIX (SEE NOTES)
COIR WRAP
BURRITO.
COIR WRAP 1000
OR EQUIVALENT
1' TYP.
OVERLAP
48" - 12" 60" - OF 24" CUTTING OF CUTTING TO BE TO BEDDED BE EXPOSED, DEPENDING DEPENDING ON SPECIES ON SPECIES NATIVE
MATERIAL
SOIL RIPRAP
LINDEN STREET BRIDGE ABUTMENT
3'
5'
K��� ����'������.
C��� ������ ��� ���.
R
9
DETAILS & SPECIFICATIONS
BANK STABILIZATION
C. Engen
M. Kinkade
N/A
Date:
Sheet:
Of:
Job No:
Drawn:
Checked:
Scale:
Design:
June 19, 2013
237-500
B. Schenderlein
49
No. Revisions:
By: Date:
ENCOMPASS
TECHNOLOGIES
RIVER DISTRICT BLOCK ONE MIXED USE
FORT COLLINS, COLORADO
ENCOMPASS TECHNOLOGIES
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
BANK STABILIZATION
NOTES:
2 RIPRAP TIE-IN ZONE - SECTION A-A
9 NOT TO SCALE
1 RIPRAP TIE-IN ZONE - PLAN VIEW
9 NOT TO SCALE
5 SLOPE STABILIZATION DETAIL
9 NOT TO SCALE
6 TURF MAT DETAIL
9 NOT TO SCALE
7 TOE PROTECTION DETAIL
9 NOT TO SCALE
8 DRAINAGE OUTLET DETAIL
9 NOT TO SCALE
9 VEGETATED REINFORCED SOIL SLOPE (VRSS) DETAIL
9 NOT TO SCALE
����� ������������� ������
1. MSE WALL DESIGN PROVIDED BY EARTH ENGINEERING CONSULTANTS.
2. MSE WALL TO REDI-ROCK LEDGESTONE FACIA.
3. SEE MSE WALL DESIGN FOR LEVELING PAD, DRAINAGE ROCK, AND REINFORCED BACKFILL
SPECIFICATIONS.
���� ������
1. SOIL RIPRAP SHALL CONTAIN 35% CLEAN NATIVE SOIL BY VOLUME.
2. COIR WRAP BURRITOS SHALL BE INCLINED 20-40 DEGREES NORMAL TO HORIZONTAL
3. COIR WRAPS SHALL BE SHINGLED SUCH THAT UPSTREAM STRIPS ARE OVERLAPPED ABOVE
DOWNSTREAM STRIPS TO PREVENT STREAM FLOW FROM ERODING MATERIAL.
4. SEE PLANTING PLAN FOR CUTTING AND SEEDING DIRECTIONS ON SHEET 5.
Soil riprap - Mix Type H riprap with 35% soil (by volume), leaving 6" to 12" of angular riprap
exposed. Vibration compact or equivalent to ensure angular riprap interlocks in place around
soil.
Riprap color shall conform to City Stormwater Criteria Manual which states that non-native
riprap will not be used in the City.
3 TRM/VRSS DETAIL
9 NOT TO SCALE
DOWNSTREAM STORMWATER OUTLET
4 TRM/VRSS DETAIL
9 NOT TO SCALE
UPSTREAM STORMWATER OUTLET
24
BEDDING
BEDDING
SOIL RIPRAP
D 50 = 18"
SOIL RIPRAP
D 50 = 18"
1
1.5
2-YR WSEL
ELEV. = 4946.48
EDGE OF TERRACE
PROPOSED 100-YR FLOODPLAIN WSEL
PROPOSED
GRADE
4950
4940
4950
4940
-20 -10 0 10 20
GEOTEXTILE
GEOTEXTILE
1
4960 4960
STA 11+50
REDI ROCK
REDI ROCK
WILLOWS
VRSS BURRITO
@18" LIFTS
TOE PROTECTION
D 50 = 2.5'
3
1
2
1
GEOTEXTILE
NATIVE
MATERIAL
NATIVE
MATERIAL
SOIL
SOIL
SOIL
BEDDING
BEDDING
SOIL RIPRAP
D 50 = 18"
SOIL RIPRAP
D 50 = 18"
1
1.5
ORDINARY LOW WATER LEVEL
2-YR WSEL
ELEV. = 4946.48
PROPOSED
GRADE
4950
4940
4950
4940
4960 4960
-20 -10 0 10 20
PROPOSED 100-YR FLOOPLAIN WSEL
GEOTEXTILE
GEOTEXTILE
STA 11+25
ORDINARY LOW WATER LEVEL
REDI ROCK
REDI ROCK
WILLOWS
VRSS BURRITO
@18" LIFTS
TOE PROTECTION
D 50 = 2.5'
3
1
2
GEOTEXTILE
NATIVE
MATERIAL
NATIVE
MATERIAL
SOIL
SOIL
SOIL
BEDDING
BEDDING
SOIL RIPRAP
D 50 = 18"
SOIL
RIPRAP
D 50 = 18"
1
1.5
1
EDGE OF TERRACE
PROPOSED 100-YR FLOOPLAIN WSEL
2-YR WSEL
ELEV. = 4946.48
PROPOSED
GRADE
4950
4940
4950
4940
4960 4960
-20 -10 0 10 20
GEOTEXTILE
GEOTEXTILE
STA 10+25
ORDINARY LOW WATER LEVEL
TOE PROTECTION
D 50 = 2.5'
GEOTEXTILE
NATIVE
MATERIAL
SOIL RIPRAP
D 50 = 18"
SOIL RIPRAP
D 50 = 18"
PROPOSED
100 -YR
FLOODPLAIN
WSEL
2-YR WSEL
ELEV.=4946.48
NATIVE
MATERIAL
EXISTING
GROUND
4950
4940
4950
4940
-20 -10 0 10 20
GEOTEXTILE
EXISTING
GROUND
STA 10+39
ORDINARY LOW WATER LEVEL
WILLOWS
VRSS BURRITO
@18" LIFTS
TOE PROTECTION
D 50 = 2.5'
GEOTEXTILE
NATIVE
MATERIAL
1
2
2
1
PROPOSED 100 -YR FLOODPLAIN WSEL
2-YR WSEL
ELEV. = 4946.48
NATIVE
MATERIAL
EXISTING
GROUND
4950
4940
4950
4940
-20 -10 0 10 20
GEOTEXTILE
STA 11+70
WILLOWS
VRSS BURRITO
@18" LIFTS
TOE PROTECTION
D 50 = 2.5'
GEOTEXTILE
SOIL
SOIL RIPRAP
D 50 = 18"
1
ORDINARY LOW WATER LEVEL 1.5
2-YR WSEL
ELEV. = 4946.48
EXISTING GROUND
PROPOSED GRADE
4950
4940
4950
4940
-20 -10 0 10 20
PROPOSED 100-YR FLOOPLAIN WSEL
NATIVE MATERIAL FILL
NATIVE MATERIAL FILL
GEOTEXTILE
GEOTEXTILE
STA 10+50
ORDINARY LOW WATER LEVEL
WILLOWS
VRSS BURRITO
@18" LIFTS
TOE PROTECTION
D 50 = 2.5'
GEOTEXTILE
NATIVE
2 MATERIAL
1
PROPOSED 100 -YR FLOODPLAIN WSEL
2-YR WSEL
ELEV. = 4946.48
EXISTING GROUND
PROPOSED GRADE
4950
4940
4950
4940
-20 -10 0 10 20
GEOTEXTILE
1
1.8
( IN FEET )
1 inch = ft.
5 0 5 Feet
5
10 15
K��� ����'������.
C��� ������ ��� ���.
R
GRAPHIC SCALE:
NOTES:
1.SEE BANK STABILIZATION DETAILS AND SPECIFICATIONS FOR MORE DETAILED SECTION INFORMATION.
8
DESIGN SECTIONS
M. Shupe
M. Kinkade
N/A
Date:
Sheet:
Of:
Job No:
Drawn:
Checked:
Scale:
Design:
June 19, 2013
237-500
B. Schenderlein
49
No. Revisions:
By: Date:
ENCOMPASS
TECHNOLOGIES
RIVER DISTRICT BLOCK ONE MIXED USE
FORT COLLINS, COLORADO
ENCOMPASS TECHNOLOGIES
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
BANK STABILIZATION
23
49
No. Revisions:
By: Date:
ENCOMPASS
TECHNOLOGIES
RIVER DISTRICT BLOCK ONE MIXED USE
FORT COLLINS, COLORADO
ENCOMPASS TECHNOLOGIES
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
BANK STABILIZATION
21
Scale:
Design:
June 19, 2013
237-500
B. Schenderlein
49
No. Revisions:
By: Date:
ENCOMPASS
TECHNOLOGIES
RIVER DISTRICT BLOCK ONE MIXED USE
FORT COLLINS, COLORADO
ENCOMPASS TECHNOLOGIES
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
BANK STABILIZATION
BANK STABILIZATION DISTURBANCE LIMITS
20
59
60 FT (%%P)
(SEE NOTE 12)
100 FT (%%P)
(SEE NOTE 13)
( IN FEET )
1 inch = ft.
10 0 10 Feet
10
20 30
NORTH
K��� ����'������.
C��� ������ ��� ���.
R
20
5020
PROPOSED CONTOUR
EXISTING CONTOUR
LEGEND:
GRAPHIC SCALE:
4
BANK STABILIZATION PLAN
M. Shupe
M. Kinkade
1" = 10'
Date:
Sheet:
Of:
Job No:
Drawn:
Checked:
Scale:
Design:
June 19, 2013
237-500
B. Schenderlein
49
No. Revisions:
By: Date:
ENCOMPASS
TECHNOLOGIES
RIVER DISTRICT BLOCK ONE MIXED USE
FORT COLLINS, COLORADO
ENCOMPASS TECHNOLOGIES
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
BANK STABILIZATION
BOULDER TOE PROTECTION
PROPOSED 100-YR FLOODPLAIN BOUNDARY
LIMIT OF PROPOSED RIPRAP STABILIZATION
BANK STABILIZATION DISTURBANCE LIMITS
NOTES:
Staging and stockpile areas to be defined by Contractor.
Grading, erosion and sediment control (GESC) plans to be
determined by Contractor.
Proposed 100-Year Floodplain boundary based on pending
CLOMR for this project and subject to approval by FEMA
and the City of Fort Collins.
Stormwater Outlet Plans and associated Flooplain use
permits to be submitted separately.
MSE Wall Design provided by Earth Engineering
Consultants.
Waste concrete pour material to be broken or cut at
downstream end of Bank Stabilization Disturbance Area as
cleanly as practicable.
At edge of cut concrete VRSS to be stabilized with one layer
of buried riprap (D 50 = 18")
Detailed stormwater outlet plans/tie-in details to be
submitted separately.
Developer acknowledges risk associated with bank
protections not extending along the entire length of the
development. areas of landscaping, parking, trails, etc. may
be subject to erosion.
Project grades shall be built to the elevations shown on the
construction plans and in the project CLOMR. Any deviation
from design grades that cause a rise in 100-year water
surface elevations different than those shown in the CLOMR
shall be corrected by the developer.
CLOMR and LOMR are required to be submitted and
approved by FEMA.
This segment of Proposed Bank Stabilization Improvements
will be funded by the City of Fort Collins upon City Council
approval.
This segment of Proposed Bank Stabilization Improvements
1.
2.
3.
4.
5.
6.
7.
LINDEN STREET R.O.W.
8.
9.
10.
11.
12.
PROPOSED 0.5-FOOT FLOODWAY BOUNDARY
PROPOSED 500-YR FLOODPLAIN BOUNDARY
13.
PROPOSED TOP OF BANK
EXISTING TOP OF BANK
19
STAGING AND
STOCKPILING
AREA
( IN FEET )
1 inch = ft.
30 0 30 Feet
30
60 90
NORTH
K��� ����'������.
C��� ������ ��� ���.
R
5020 EXISTING MAJOR CONTOUR
LEGEND:
GRAPHIC SCALE:
NOTES:
Staging and stockpile areas to be defined by Contractor.
Coordinate removal and/or salvaging of trees with approved landscape
drawings.
Waste concrete pour material to be removed within bank stabilization area.
3
SITE PLAN
M. Shupe
M. Kinkade
1" = 10'
Date:
Sheet:
Of:
Job No:
Drawn:
Checked:
Scale:
Design:
June 19, 2013
237-500
B. Schenderlein
49
No. Revisions:
By: Date:
ENCOMPASS
TECHNOLOGIES
RIVER DISTRICT BLOCK ONE MIXED USE
FORT COLLINS, COLORADO
ENCOMPASS TECHNOLOGIES
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
BANK STABILIZATION
IMAGE: Ken Rushing Photographic Services, May & August 2005
EXISTING MINOR CONTOUR
PROPOSED LIMITS OF RIPRAP STABILIZATION
BANK STABILIZATION DISTURBANCE LIMITS
1.
2.
3.
18
10. The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is accomplished
in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any
disruption of any utility service as well as the utility companies.
11. No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider.
Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction
meeting may be required prior to commencement of any work.
12. The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary
sewer should be constructed prior to installation of the water lines and dry utilities.
13. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water
Utility.
14. A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is discharged
into a storm sewer, channel, irrigation ditch or any waters of the United States.
15. The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health,
Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan.
16. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite
drainage facilities shall be the responsibility of the property owner(s).
17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to
and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to
the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility
Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development
Agreement.
18. The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage,
whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the City
of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development.
19. All recommendations of the Final Drainage and Erosion Control Report for Block One Mixed Use Bank Stabilization dated December 7, 2012 by
Northern Engineering Services, Inc., shall be followed and implemented.
20. Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be
maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping.
21. The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be
removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the the
City of Fort Collins street inspector.
22. No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit is
obtained, if applicable.
23. The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The
Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort Collins
- 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the City of
Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work in the
Engineer's absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an improper
installation.
24. The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is
complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the
results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may
use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be
prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement of
base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final report.
25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all
intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to the City
of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with
the City of Fort Collins before installation of base course or asphalt will be allowed on the streets.
26. Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for roads
within these districts.
27. Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree removal
requiring a permit.
28. The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security.
Refer to OSHA Publication 2226, Excavating and Trenching.
29. The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The the City of
Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be
responsible for providing any and all traffic control devices as may be required by the construction activities.
30. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic
Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic sign
then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed.
31. There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site construction
activities on Sundays or holidays, unless there is prior written approval by Larimer County.
32. The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these
drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise.
33. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for
clarification, and annotate the dimension on the as-built record drawings.
34. The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications,
and a copy of any permits and extension agreements needed for the job.
35. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the
Developer shall contact the Designer and the City of Fort Collins Engineer immediately.
36. The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the
Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins Engineer.
37. The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the
basis of bearings. The information shall be as follows:
City of Fort Collins benchmark 4-00
Located in the sidewalk at the southwest end of the Poudre River bridge on Linden Street.
Elevation= 4960.55
City of Fort Collins benchmark 5-00
Located on the top of curb at the signal pole base at the northwest corner of Linden Street and Jefferson Street.
Elevation= 4974.87
38. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping,
structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the
Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of
the first Certificate of Occupancy.
39. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction,
or to the grades and condition as required by these plans.
40. The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures
and pipes, for the following private streets: N.A.
41. Approved Variances are listed as follows:
None.
CONSTRUCTION NOTES
A. Grading and Erosion Control Notes
1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site.
2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans.
3. All required perimeter silt and construction fencing shall be installed priorto any land disturbing activity (stockpiling, stripping, grading, etc). All other
required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project
schedule, construction plans, and erosion control report.
4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property
sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion control
facilities shown herein.
5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the
area(s) required for immediate construction operations, and for the shortest practical period of time.
6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by
ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project
street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion
control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County.
7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall:
a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order
to ensure the continued performance of their intended function.
b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector.
c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector.
8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and debris
from all drainage infrastructure and other public facilities.
9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of
way, and make sure streets and walkways are cleaned at the end of each working day.
10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause
their release into any waters of the United States.
11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering,
and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched.
12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before
turning the maintenance over to the City/County or Homeowners Association (HOA).
13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or
contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals,
oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper
containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations.
14. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever
measures are determined necessary, as directed by the City.
B. Riprap Rundown Notes
1. Existing riprap for Linden Street bridge protection is D50 = 18". It is assumed that the existing bridge riprap was designed to withstand the 100-yr event
and that the new larger riprap will therefore withstand the 100-yr event.
2. Existing riprap to be re-used where possible. additional riprap to be added to reach design depth.
3. Contractor shall ensure that the new riprap matches the existing riprap in color and blends seemlessly.
C. Flooplain Notes
1. There shall be no storage of equipment or materials in the Poudre River 100-Year Floodplain or Floodway.
2. There shall be no storage or floatable materials in the Poudre River Floodplain or Floodway. This includes overnight parking. Any items in the
Poudre River Floodplain that can float (bike racks, tables, benches, etc) shall be anchored to prevent floatation.
17
Design:
June 19, 2013
237-500
B. Schenderlein
49
No. Revisions:
By: Date:
ENCOMPASS
TECHNOLOGIES
RIVER DISTRICT BLOCK ONE MIXED USE
FORT COLLINS, COLORADO
ENCOMPASS TECHNOLOGIES
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
BANK STABILIZATION
BHA Design, Inc.
1603 Oakridge Drive, Suite 100
Fort Collins, CO 80525
(970) 223-7577
PLANNER/
LANDSCAPE ARCHITECT
Encompass Technologies
324 Jefferson Street
Fort Collins, CO 80524
(970) 449-8000
DEVELOPER/APPLICANT
RIVER DISTRICT BLOCK ONE MIXED USE
BANK STABILIZATION
BEING A PORTION OF BLOCK 1, CITY OF FORT COLLINS AND A PORTION OF THE NORTHWEST QUARTER
OF SECTION 12, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS,
COUNTY OF LARIMER, STATE OF COLORADO
9 BANK STABILIZATION DETAILS & SPECIFICATIONS
I hereby affirm that these final
construction plans were prepared
under my direct supervision, in
accordance with all applicable City
of Fort Collins and State of
Colorado standards and statutes,
respectively; and that I am fully
responsible for the accuracy of all
design. revisions, and record
conditions that I have noted on
these plans.
These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility
by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness
of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities
required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort
Collins for additional quantities of items shown that may be required during the construction phase.
DISCLAIMER STATEMENT:
CERTIFICATION STATEMENT:
BENCHMARK #1:
City of Fort Collins Benchmark 4-00
Located in the sidewalk at the southwest end of the Poudre River bridge on Linden Street .
Elevation= 4960.55
BENCHMARK #2:
City of Fort Collins Benchmark 5-00
Located on the top of curb at the signal pole base at the northwest corner of Linden Street
and Jefferson Street.
Elevation= 4974.87
Basis of Bearings
Basis of Bearings is the Northwest line of Block 1, City of Fort Collins bearing North
41�41'10" East from a set 1" brass tag & nail at the Westerly corner of Block 1 to a found #4
rebar with 1" plastic cap LS 14823 at the Northerly corner of property (assumed bearing).
Northern Engineering Services, Inc
NE Project No. 685-001
Date: October, 2011
ORIGINAL FIELD SURVEY BY:
Earth Engineering Consultants, Inc.
"SUBSURFACE EXPLORATION REPORT
418 LINDEN STREET
FORT COLLINS, COLORADO"
EEC Project No. 1112066
Date: October 25, 2011
SUBSURFACE EXPLORATION BY:
PROJECT BENCHMARKS:
Earth Engineering Consultants, Inc.
4396 Greenfield Drive
Windsor, Colorado 80550
(970) 545-3908
Northern Engineering Services, Inc.
200 South College Avenue, Suite 010
Fort Collins, Colorado 80524
(970) 221-4158
Northern Engineering Services, Inc.
200 South College Avenue, Suite 010
Fort Collins, Colorado 80524
(970) 221-4158
E N G I N E E R I N G
� � � � � � ��
E N G I N E E R I N G
� � � � � � ��
GEOTECHNICAL ENGINEER
SITE ENGINEER
SURVEYOR
Date
Date
Date
Date
Date
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
City Engineer
Water & Wastewater Utility
Stormwater Utility
Parks & Recreation
Traffic Engineer
Environmental Planner
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
16
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
36"
CITY OF FORT COLLINS MOTORCYCLE STENCIL
PREFORMED THERMOPLASTIC
24"
1:12 max.
X=2' min. Driveway Width Varies
2'-0"
6"
Attached
Sidewalk
Lip
FL
Back of curb
Right of Way line
Detached
Attached
Right of Way Line
Detached
Sidewalk
1:24 (max.)
NOTE:
1. Concrete driveway must be
provided to the property line.
Refer to C������ 25for minimum removal dimensions.
X
Y
W
X
Y
W = Width
1:12 (max.)
Property Line
t
1/4" PER FT.
N.T.S.
SECTION A-A 2"
t
1:12 (max.)
t
X = Curb Transition Length
Y = Parkway Width in Type I Approach
W = Driveway Width (See Drawing 707)
t = Concrete Thickness - minimum 6"
Type I = With Detached Sidewalk
Type II = With Attached Sidewalk
TYPE I TYPE II
1:12 (max.) 1:48
A
A
PERSPECTIVE
X=6'-0"
1:48 SLOPE
1:12 max.
B
B
WALK
Y
t
t
WALK
t 2"
FLOWLINE
JOINT
EXPANSION
BOW
1:12 (max.)
1:24
SECTION B-B
N.T.S.
LARIMER COUNTY DRAWINGS CONSTRUCTION REVISION NO: 2 706 DRAWING
STREET STANDARDS
URBAN AREA DATE: 04/01/07
STANDARD DRIVEWAY APPROACH (TYPES I & II)
Ramp if necessary
1:12
max.
BOW
Expansion joint if drive
continues as concrete
WALK
6"
(max.)
1/2"
2"R.
ONLY
PARKING
RESIDENTIAL
AND EMPLOYEE
VEHICLE
ONLY
PARKING
RESIDENTIAL
AND EMPLOYEE
VEHICLE
ONLY
PARKING
RESIDENTIAL
AND EMPLOYEE
VEHICLE
ONLY
PARKING
RESIDENTIAL
AND EMPLOYEE
VEHICLE
15
NOT TO SCALE
1 SIGN POST
Max. Sign Panel
1. Attach the sign panels tightly to the post and use oversized washers to keep the sign from breaking loose
from the post when hit by a vehicle.
2. Sign panels should be mounted a minimum of 7 feet above the pavement or ground.
Cross section of post
3" - 6" ABOVE GRADE
2 1/4" Anchor
3. Signs larger than 36 inches in length or width require wind bracing and special post design.
NOTES:
4. Anchor Stub and post are square steel tube (perforated).
Anchor/Stub Post Size
CRITERIA FOR SINGLE POST
36" x 36" 2.25" x 2.25" x 3'-0" 2" x 2" x 12'-0"
5. All "No Parking" signs shall be installed at 45� from Flow Line.
* *
2" x 2" x 10' OR 12'
12 GAUGE TELESPAR POST
(22F12A31)
7'-0" MIN. CLEARANCE
2' - 3'
FROM F
Street Curb
REVISION NO: 1
DATE: 04/01/07
STREET STANDARDS CONSTRUCTION DRAWINGS SIGN POST
URBAN AREA
LARIMER COUNTY DRAWING
1401
See Figure 16-1
SW SAMPLE AVE
2400
R1-1 "STOP" SIGN 30" HIGH DENSITY/DIAMOND
GRADE. SIGN MOUNTED TO POST WITH 1 EACH
DRIVE RIVET WITH NYLON WASHER AGAINST SIGN
FACE (ON TOP OF THE SIGN). THE BOTTOM OF THE
SIGN SHALL BE MOUNTED WITH 1 EACH
5/16"x2-1/2" HEW BOLT WITH METAL AND FROM
NYLON WASHERS (NYLON WASHER AGAINST SIGN
FACE) AND SECURED WITH 1 EACH 5/16" HEX NUT
ON THE BACK SIDE OF POST.
L
2-1/4" x 2-1/4" x 3'
ANCHOR/STUB
2 EACH 8" BLADES
MOUNTED TO POST
WITH 4 EACH DRIVE
RIVETS WITH
NYLON WASHERS
* 12 Gauge
30" 8" 8"
NOT TO SCALE
3 DRIVEWAY APPROACH
NOT TO SCALE
2 PARKING LOT SIGNS
MODIFIED R7-5
4
DETAIL 1 DETAIL 2
DETAIL 3 DETAIL 4
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
VEHICLE CONTROL TRACKING PAD
NOT TO SCALE
COMPACTED BACKFILL
FLOW
SILT TRENCH FENCE AND FABRIC ATTACHED (ASTM TO D6461) POST. ANCHORED IN
24" MIN
6' MAX
FLOW
TRENCH AND ATTACHED TO POST.
4"x4" TRENCH
SILT FENCE FABRIC (ASTM D6461) ANCHORED IN
18" MIN
24" MIN
42" MIN
POSTS
{PREASSEMBLED SILT FENCE}
JOIN FIRST
ROTATE SECOND
POSTS SHALL OVERLAP
AT JOINTS SO THAT NO
GAPS EXIST IN SILT FENCE.
NOTE:
THICKNESS OF GEOTEXTILE
HAS BEEN EXAGGERATED.
POST SHALL BE JOINED AS SHOWN, THEN ROTATED 180� IN DIRECTION SHOWN AND DRIVEN INTO THE GROUND.
{SILT FENCE JOINTS}
DRIVE POSTS VERTICALLY INTO THE GROUND TO A MINIMUM DEPTH OF 18".
EXCAVATE A TRENCH APPROXIMATELY 4" WIDE AND 4" DEEP ALONG THE LINE OF POSTS AND UPSLOPE FROM THE
BARRIER.
ANCHOR TRENCH SHALL BE EXCAVATED BY HAND, WITH TRENCHER, OR WITH SILT FENCE INSTALLATION MACHINE.
NO ROAD GRADERS, BACKHOES, ETC. SHALL BE USED.
NOT LESS THAN THE BOTTOM 1' OF THE SILT FENCE FABRIC SHALL BE BURIED IN THE TRENCH.
THE TRENCH SHALL BE COMPACTED BY HAND, WITH "JUMPING JACK" OR BY WHEEL ROLLING. COMPACTION SHALL
BE SUCH THAT THE SILT FENCE RESISTS BEING PULLED OUT OF ANCHOR TRENCH BY HAND.
SILT FENCE INDICATED IN THE PLANS SHALL BE INSTALLED PRIOR TO ANY LAND-DISTURBING ACTIVITIES.
USE WOOD POSTS OR OTHER MATERIAL AS ACCEPTED BY THE CITY.
{INSTALLATION NOTES:
}1.
2.
3.
4.
5.
6.
7.
THE CONTRACTOR SHALL INSPECT SILT FENCE EVERY TWO WEEKS AND AFTER SIGNIFICANT STORM
EVENTS AND MAKE REPAIRS OR CLEAN OUT UPSTREAM SEDIMENT AS NECESSARY.
SEDIMENT ACCUMULATED UPSTREAM OF SILT FENCE SHALL BE REMOVED WHEN THE UPSTREAM
SEDIMENT REACHES A DEPTH OF 6".
SILT FENCE SHALL BE REMOVED WHEN THE UPSTREAM DISTURBED AREA IS STABILIZED AND GRASS
COVER IS ACCEPTED BY THE CITY. IF ANY DISTURBED AREA EXISTS AFTER REMOVAL, IT SHALL BE SEEDED
AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE CITY.
{MAINTENANCE NOTES:
}1.
2.
3.
4" MIN.
4" MIN.
{1 " x 1 " WOODEN FENCE POSTS}
COMPACTED BACKFILL
MANHOLE
ROCK BERM SHALL
2"x 4" WOOD STUD EXTENDED
INTO CONCRETE BLOCKS
WIRE ENCLOSED
1 1/2" WASHED ROCK CONCRETE
BLOCKS
CURB INLET
GRAVEL FILTER WIRE SHALL ENCLOSED BE 2"x4" WOOD STUD
OVERFLOW
FILTERED
RUNOFF
%SECTION A-A
A
A
%PLAN VIEW
{CURB INLET GRAVEL FILTER
(CONTINUOUS GRADE)}
%SECTION B-B
%PLAN VIEW
B
B
ROCK BERM SHALL BE PLACED TIGHTLY AGAINST CURB FACE
WIRE ENCLOSED 1 1/2"
WASHED ROCK
CURB AND GUTTER
CURB AND GUTTER
BE PLACED TIGHTLY
AGAINST CURB FACE
GRAVEL FILTER
1/2" TO 1" BELOW TOP OF CURB
TUBULAR
MARKER
IF AREA ADJACENT TO CURB INLET BOX IS NOT STABILIZED, INSTALL A TEMPORARY SEDIMENT/EROSION CONTROL BMP UNTIL THE SURROUNDING AREA IS SUFFICIENTLY STABILIZED.
TUBULAR
MARKER
TUBULAR
MARKER
2' 3'
4'
CURB INLET
WIRE ENCLOSED
SETTLED
RUNOFF
GRAVEL FILTER
CURB INLET MANHOLE
{CURB INLET BLOCK AND GRAVEL FILTER
(INLET IN SUMP)}
INTERIM CONFIGURATION INLET PROTECTION IN STREETS SHALL BE INSTALLED WITHIN 48 HOURS OF POURING INLET. INLET PROTECTION (AFTER PAVING) SHALL BE INSTALLED WITHIN 48
HOURS AFTER PAVING IS PLACED.
WASHED ROCK SHALL COMPLY WITH A 1-1/2" MINUS GRADATION.
WIRE MESH SHALL BE FABRICATED OF 10 GAUGE WIRE TWISTED INTO A MESH WITH A MAXIMUM OPENING OF 1" (COMMONLY TERMED "CHICKEN WIRE"). ROLL WIDTH SHALL BE 48".
TUBULAR MARKERS SHALL MEET REQUIREMENTS OF MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
OTHER CURB INLET PROTECTION METHODS WILL BE ALLOWED IF ACCEPTED BY THE CITY.
{GENERAL NOTES:
}1.
2.
3.
4.
5.
THE CONTRACTOR SHALL INSPECT INLET PROTECTION EVERY TWO WEEKS AND AFTER SIGNIFICANT STORM EVENTS AND MAKE REPAIRS OR CLEAN OUT AS NECESSARY.
SEDIMENT ACCUMULATED UPSTREAM OF INLET PROTECTION SHALL BE REMOVED WHEN THE SEDIMENT DEPTH UPSTREAM OF ROCK BERM IS 2 1/2" OF THE CREST.
INLET PROTECTION IS TO REMAIN IN PLACE UNTIL THE UPSTREAM DISTURBED AREA IS STABILIZED AND GRASS COVER IS ACCEPTED. UNLESS THE CITY ACCEPTS EARLIER REMOVAL OF
INLET PROTECTION IN STREETS.
{MAINTENANCE NOTES:
}1.
2.
3.
4" MIN
5" MAX
BMP WIDTH VARIES BMP WIDTH VARIES
BMP WIDTH VARIES BMP WIDTH VARIES
TUBULAR MARKER TUBULAR MARKER
SILT FENCE
NOT TO SCALE
SF
CURB INLET PROTECTION
NOT TO SCALE
IP
WATTLE INSTALLATION
NOT TO SCALE
WATTLES - DETAIL A
FLOW
3'-4'
ADJACENT ROLLS SHALL
TIGHTLY ABUT
W1 NOTES:
INSTALLATION:
WHEN INSTALLING RUNNING LENGTHS OF WATTLES, BUTT THE SECOND
WATTLE TIGHTLY AGAINST THE FIRST, DO NOT OVERLAP THE ENDS. STAKE
THE WATTLES AT EACH END AND FOUR FOOT ON CENTER. FOR EXAMPLE:
A 25 FOOT WATTLE USES 6 STAKES
A 20 FOOT WATTLE USES 5 STAKES
A 12 FOOT WATTLE USES 4 STAKES
STAKES SHOULD BE DRIVEN THROUGH THE MIDDLE OF THE WATTLE.
LEAVING 2 - 3 INCHES OF THE STAKE PROTRUDING ABOVE THE WATTLE. A
HEAVY SEDIMENT LOAD WILL TEND TO PICK THE WATTLE UP AND COULD
PULL IT OFF THE STAKES IF THEY ARE DRIVEN DOWN TOO LOW. IT MAY BE
NECESSARY TO MAKE A HOLE IN THE WATTLE WITH A PICK END OF YOUR
MADDOX IN ORDER TO GET THE STAKE THROUGH THE STRAW. WHEN
STRAW WATTLES ARE USED FOR FLAT GROUND APPLICATIONS, DRIVE THE
STAKES STRAIGHT DOWN; WHEN INSTALLING WATTLES ON SLOPES, DRIVE
THE STAKES PERPENDICULAR TO THE SLOPE.
DRIVE THE FIRST END STAKE OF THE SECOND WATTLE AT AN ANGLE
TOWARD THE FIRST WATTLE IN ORDER TO HELP ABUT THEM TIGHTLY
TOGETHER. IF YOU HAVE DIFFICULTY DRIVING THE STAKE INTO EXTREMELY
HARD OR ROCKY SLOPES, A PILOT BAR MAY BE NEEDED TO BEGIN THE
STAKE HOLE.
1"x 1" WOOD STAKES
18"-24"
BAILING WIRE OR
NYLON ROPE
WATTLE "A" WATTLE "B"
1' 2'
TYP.
1' 1'
WATTLES - DETAIL B
W2 NOTES:
INSTALLATION:
STAKES SHOULD BE DRIVEN ACROSS FROM EACH OTHER
AND ON EACH SIDE OF THE WATTLE. LEAVING 4"-6" OF
STAKE PROTRUDING ABOVE THE WATTLE. BAILING WIRE OR
NYLON ROPE SHOULD BE TIED TO THE STAKES ACROSS
THE WATTLE. STAKES SHOULD THEN BE DRIVEN UNTIL THE
BAILING WIRE OR NYLON ROPE IS SUFFICIENTLY SNUG TO
THE WATTLE.
WHEN INSTALLING RUNNING LENGTHS OF WATTLES, TO
PREVENT SHIFTING, BUTT THE SECOND WATTLE TIGHTLY
AGAINST THE FIRST. DO NOT OVERLAP THE ENDS. STAKES
SHOULD BE DRIVEN 1 FT. FROM END, ACROSS FROM AND
ON EACH SIDE OF WATTLE LEAVING 4"-6" OF STAKE
PROTRUDING ABOVE THE WATTLE. BAILING WIRE OR
NYLON ROPE SHOULD BE TIED TO STAKES IN AN HOUR
GLASS FORMATION (FRONT TO BACK OF WATTLE "A",
ACROSS TO FRONT OF WATTLE "B", ACROSS TO BACK AND
BACK TO FRONT OF WATTLE "A"). STAKES SHOULD THEN BE
DRIVEN IN UNTIL BAILING WIRE OR NYLON ROPE IS
SUFFICIENTLY SNUG TO THE WATTLE.
SEDIMENT
DEPOSITION
ZONE
STORM WATER LINE
WEIGHTED WATTLE
LIP OF GUTTER
SIDEWALK EXISTING OR
PROPOSED INLET
TOP BACK CURB
FLOW LINE
%CURB INLET WATTLE PROTECTION SETUP%
SEDIMENT
DEPOSITION
ZONE
STORM WATER LINE
LIP OF GUTTER
WEIGHTED WATTLE
AT 45 DEG. TO CURB
SIDEWALK
TOP BACK CURB
FLOW LINE
SIDEWALK
TOP BACK CURB
FLOW LINE
W4 NOTES:
1. NUMBER OF WATTLES AND SPACING SHOULD BE DETERMINED BY THE SLOPE AND SITE CONDITIONS.
2. TUBULAR MARKERS SHALL MEET THE REQUIREMENTS OF MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)
3. CITY RECOMMENDS INSTALLING AT LEAST 3 CHECKDAMS WHEN USING THIS SETUP.
LIP OF GUTTER
WEIGHTED WATTLE
W1 & W2 INSTALLATION NOTES:
1. THE LOCATION AND LENGTH OF WATTLE IS DEPENDENT ON THE CONDITIONS OF EACH SITE.
2. WATTLES SHALL BE INSTALLED PRIOR TO ANY LAND-DISTURBING ACTIVITIES.
3. WATTLES SHALL CONSIST OF STRAW, COMPOST, EXCELSIOR, OR COCONUT FIBER.
4. NOT FOR USE IN CONCENTRATED FLOW AREAS.
5. THE WATTLES SHALL BE TRENCHED INTO THE GROUND A MINIMUM OF TWO (2) INCHES.
6. WATTLES SHALL BE INSTALLED PER MANUFACTURERS SPECIFICATIONS.
7. ON SLOPES, WATTLES SHOULD BE INSTALLED ON CONTOUR WITH A SLIGHT DOWNWARD ANGLE AT THE END OF THE ROW IN ORDER TO PREVENT
PONDING AT THE MID SECTION.
8. RUNNING LENGTHS OF WATTLES SHOULD BE ABUTTED FIRMLY TO ENSURE NO LEAKAGE AT THE ABUTMENTS.
9. SPACING - DOWNSLOPE:
10. VERTICAL SPACING FOR SLOPE INSTALLATIONS SHOULD BE DETERMINED BY SITE CONDITIONS. SLOPE GRADIENT AND SOIL TYPE ARE THE MAIN
FACTORS. A GOOD RULE OF THUMB IS:
1:1 SLOPES = 10 FEET APART
2:1 SLOPES = 20 FEET APART
3:1 SLOPES = 30 FEET APART
4:1 SLOPES = 40 FEET APART, ETC.
11. HOWEVER, ADJUSTMENTS MAY HAVE TO BE MADE FOR THE SOIL TYPE: FOR SOFT, LOAMY SOILS - ADJUST THE ROWS CLOSER TOGETHER; FOR HARD,
ROCKY SOILS - ADJUST THE ROWS FURTHER APART. A SECONDARY WATTLE PLACED BEHIND THE ABUTMENT OF TWO WATTLES IS ENCOURAGED ON
STEEP SLOPES OR WHERE JOINTS HAVE FAILED IN THE PAST.
12. STAKING: THE CITY RECOMMENDS USING WOOD STAKES TO SECURE THE WATTLES. 1/2" TO 5/8" REBAR IS ALSO ACCEPTABLE. BE SURE TO USE A
STAKE THAT IS LONG ENOUGH TO PROTRUDE SEVERAL INCHES ABOVE THE WATTLE: 18" IS A GOOD LENGTH FOR HARD, ROCKY SOIL. FOR SOFT LOAMY
SOIL USE A 24" STAKE.
SNUG WITH WATTLE.
W3 NOTE:
IF THE AREA BEHIND THE INLET IS NOT STABILIZED, A
BMP SHOULD BE USED TO PREVENT SEDIMENT FROM
ENTERING THE INLET
1"x 1" WOOD STAKES
18"-24"
W1
THE CONTRACTOR SHALL INSPECT WATTLES EVERY TWO WEEKS AND AFTER ANY SIGNIFICANT STORM EVENT AND MAKE REPAIRS OR REMOVE SEDIMENT
ACCUMULATED BEHIND WATTLE AS NECESSARY.
SEDIMENT ACCUMULATED BEHIND WATTLE SHALL BE REMOVED WHEN THE SEDIMENT HAS ACCUMULATED TO ONE HALF THE DIAMETER OF THE WATTLE.
WATTLES SHALL REMAIN IN PLACE UNTIL THE UPSTREAM DISTURBED AREA IS STABILIZED AND IS ACCEPTED BY THE CITY.
WATTLE MAINTENANCE NOTES:
1.
2.
3.
ENDS SHALL ABUT TIGHTLY
TO BACK OF CURB
END SHALL ABUT TIGHTLY
TO BACK OF CURB
ENDS OF ADJACENT WATTLES
SHALL BE TIGHTLY ABUTTED
TO PREVENT SEDIMENT BYPASS
4' MAX.
{IMPERVIOUS INSTALLATION}
SEDIMENT
DEPOSITION ZONE
W3
W2 NOTE:
ONLY WATTLES MADE WITH COCONUT
FIBERS SHALL BE USED WHEN
INSTALLATION COMES IN CONTACT WITH A
WATER BODY.
SIDEWALK CULVERT/CHASE/PAN
W4
W3, W4 & W5 NOTES:
1. WHEN USING STRAW WATTLE, THE STRAW WATTLE MUST HAVE A WEIGHTED
CORE.
2. ALL PRODUCTS SHALL BE INSTALLED PER THE MANUFACTURER'S
SPECIFICATIONS.
3. OTHER PRODUCTS MAY BE USED IN PLACE OF WEIGHTED WATTLES UPON
WRITTEN APPROVAL FROM THE CITY. NOTE: A COPY OF DETAILS AND
SPECIFICATIONS WILL NEED TO BE INCORPORATED INTO THE SWMP.
END SHALL
TIGHTLY ABUT TO
BACK OF CURB
SEDIMENT
DEPOSITION ZONE
W5
TUBULAR
MARKER
EXISTING OR
PROPOSED INLET
CONCRETE CHASE/TRICKLE CHANNEL SETUP
END SHALL
TIGHTLY ABUT TO
BACK OF CURB
CURBSIDE CHECKDAMS SETUP
VEHICLE TRACKING CONTROL PAD SHALL BE LOCATED AT EVERY ACCESS POINT TO THE CONSTRUCTION SITE.
A SIGN SHALL BE PLACED NEXT TO THE VEHICLE TRACKING CONTROL PAD TO DESIGNATE THE LOCATION AS THE CONSTRUCTION ENTRANCE/EXIT.
VEHICLE TRACKING CONTROL PADS SHALL CONSIST OF HARD, DENSE, DURABLE STONE, ANGULAR IN SHAPE AND RESISTANT TO WEATHERING. ROUNDED STONE (i.e. RIVER ROCK AND COBBLES) SHALL NOT BE USED.
THE
STONES SHALL BE A MINIMUM OF 3" AND A MAXIMUM OF 6" DIAMETER. THE STONES SHALL HAVE A SPECIFIC GRAVITY OF AT LEAST 2.6. CONTROL OF GRADATION WILL BE BY VISUAL INSPECTION.
ANY CRACKED OR DAMAGED CURB AND GUTTER AND SIDEWALK SHALL BE REPLACED BY CONTRACTOR.
INSTALLATION NOTES:
1.
2.
3.
4.
CONTRACTOR SHALL INSPECT VEHICLE TRACKING CONTROL PAD DAILY. ROCK SURFACE SHALL BE CLEAN AND LOOSE ENOUGH TO RUT SLIGHTLY UNDER WHEEL LOADS AND CAUSE
LOOSE ROCK TO DISLODGE MUD FROM TIRES. WHEN ROCK BECOMES COMPACTED OR FILLED WITH SEDIMENT SO THAT THE EFFECTIVENESS OF THE PAD IS DIMINISHED, CONTRACTOR
SHALL RIP, TURN OVER, OR OTHERWISE LOOSEN ROCK, PLACE ADDITIONAL NEW ROCK, OR REPLACE WITH NEW ROCK AS NECESSARY TO RESTORE EFFECTIVENESS.
SEDIMENT AND OTHER MATERIAL SPILLED, DROPPED OR TRACKED ONTO PAVED SURFACES SHALL BE REMOVED IMMEDIATELY OR BY THE END OF EACH WORKING DAY.
VEHICLE TRACKING CONTROL PAD SHALL BE REMOVED AT THE END OF CONSTRUCTION. THE AREA SHOULD BE TOPSOILED, SEEDED, CRIMPED, AND MULCHED OR OTHERWISE
STABILIZED.
MAINTENANCE NOTES:
1.
2.
3.
3" - 6" ROCK
CONSTRUCTION FENCE, TYP., TO DISCOURAGE
VEHICLE ACCESS SIGN EXCEPT "CONSTRUCTION AT VTC ENTRANCE"
R=5'
PAVED SURFACE
20' MIN.
A
SECTION A
NO MATERIALS INCLUDING 2x4'S, PIPES, DIRT, GRAVEL OR ASPHALT, SHALL BE PLACED IN GUTTER TO FACILITATE MOUNTING CURB; HOWEVER, CURB MAY BE CUT DOWN TO A HEIGHT OF 2" OR HIGHER FOR EASIER
ACCESS AND REPLACED AT PROJECT COMPLETION. OTHER ACCESS DEVICES MAY BE USED AS ACCEPTED BY THE CITY. 3" - 6" ROCK
%PLAN%
CURB CUT
50' MIN.
2" MIN. 6" MIN.
6" MIN.
ALTHOUGH NOT NORMALLY USED, THE CITY RESERVES THE RIGHT TO REQUIRE VEHICLE TRACKING CONTROL WITH A TEMPORARY CATTLE GUARD
AND/OR WHEEL WASH FACILITIES AT SITES WHERE TRACKING ONTO PAVED AREAS BECOMES A SIGNIFICANT PROBLEM AS DETERMINED BY THE CITY
INSPECTOR.
IF VEHICLE TRACKING CONTROL WITH WHEEL WASH FACILITIES ARE REQUIRED, ALL WHEELS ON EVERY VEHICLE LEAVING THE SITE SHALL BE
CLEANED OF MUD USING A PRESSURE-WASHER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A WATER SOURCE AND CONSTRUCTING
A WASHWATER SEDIMENT TRAP.
5.
6.
IF VEHICLE WHEEL WASH FACILITIES ARE REQUIRED, CONTRACTOR SHALL INSPECT VEHICLE TRACKING CONTROL AND WHEEL WASH FACILITIES DAILY.
ACCUMULATED SEDIMENTS SHALL BE REMOVED FROM THE PAD SURFACE.
ACCUMULATED SEDIMENT IN THE WASHWATER/SEDIMENT TRAP SHALL BE REMOVED WHEN THE SEDIMENT REACHES AN AVERAGE DEPTH OF 12-INCHES.
4.
5.
VTC
CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT ON SITE.
VEHICLE TRACKING CONTROL IS REQUIRED IF ACCESS TO CONCRETE WASHOUT AREA IS OFF PAVEMENT.
SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE WASHOUT AREA, AND ELSEWHERE AS NECESSARY TO CLEARLY
INDICATE THE LOCATION OF THE CONCRETE WASHOUT AREA TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS.
THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND ENLARGED OR CLEANED OUT AS NECESSARY TO MAINTAIN CAPACITY FOR
WASTED CONCRETE.
AT THE END OF CONSTRUCTION, ALL CONCRETE SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT AN ACCEPTED WASTE SITE.
WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED IN
A MANNER ACCEPTED BY THE CITY.
LOCATION OF CONCRETE WASHOUT AREA ON SHEET EC1 IS CONCEPTUAL ONLY. FINAL LOCATION TO BE DETERMINED IN THE FIELD AT
CONTRACTOR'S DISCRETION.
{NOTES:
}1.
2.
3.
4.
5.
6.
7.
3H:1V OR FLATTER
SIDE SLOPES
12" MIN
8'x 8' MIN
OR AS REQUIRED TO
CONTAIN WASTE CONCRETE
12" 2'-0" MIN.
COMPACTED EMBANKMENT
MATERIAL, TYP.
BERM AROUND PERIMETER
GROUND SURFACE
SIGN TO INDICATE THE
LOCATION OF THE
CONCRETE WASHOUT AREA
CONCRETE WASHOUT AREA
NOT TO SCALE
CWA
SF
1 2 3
4 5
WP
DETAIL
FORT COLLINS CONSTRUCTION STORMWATER DETAILS
FORT COLLINS, CO.
UTILITIES
CITY OF
(970) 221-6700
APPROVED: DATE:
DRAWN BY:
SEDIMENT TRAP
12/27/00 D-22
NBJ
PIPE OUTLET WITH GRAVEL FILTER
GENERAL NOTES:
OR OVER EXCAVATE PERMANENT POND BY
ESTIMATED SEDIMENT LOAD
4 FT.
5 FT. MAX
V=100 YARD 3/AC
4:1
4:1
1 FT.
FLOW 1 FT. MIN.
48 IN. MIN.
1/2 IN. WIRE MESH
TOP OF SPILLWAY
SPILLWAY MUST PASS
10 YEAR STORM RUNOFF
12 IN. (MIN.) ABOVE TOP OF PIPE
1 1/2 IN. AGGREGATE PILED
1. SEDIMENT SHALL BE REMOVED WHEN TWELVE-INCHES OF
SEDIMENT HAS ACCUMULATED.
2. REMOVED SEDIMENT SHALL BE DEPOSITED IN AN AREA
TRIBUTARY TO A SEDIMENT BASIN.
ST
SEDIMENT TRAP
NOT TO SCALE
6
NYLOPLAST 2 FT X 2FT CURB INLET STRUCTURE:30 _ _ AGS _ _ X
1 - 12" - 30" FRAMES, GRATES, HOODS, & BASE PLATES SHALL BE DUCTILE
IRON PER ASTM A536 GRADE 70-50-05.
2 - DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN
DETAILS.
3 - DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO
ASTM D3212 FOR CORRUGATED HDPE (ADS N-12/HANCOR DUAL WALL),
N-12 HP, & PVC SEWER (4" - 24").
4 - ADAPTERS CAN BE MOUNTED ON ANY ANGLE 0� TO 360�. TO
DETERMINE MINIMUM ANGLE BETWEEN ADAPTERS SEE DRAWING
NO. 7001-110-012.
5 - ALL CURB INLET GRATE OPTIONS (STANDARD & DIAGONAL) SHALL MEET
H-20 LOAD RATING
DWG SIZE A SCALE 1:40 SHEET 1 OF 1 DWG NO. 7002-110-032 REV F
3130 VERONA AVE
BUFORD, GA 30518
PHN (770) 932-2443
FAX (770) 932-2490
���.���������-��.���
DRAIN BASIN WITH 2 FT X 2 FT CURB INLET
QUICK SPEC INSTALLATION DETAIL
TITLE
PROJECT NO./NAME
MATERIAL
DATE
REVISED BY
DATE 1-23-06
DRAWN BY EBC
3-17-10
EBC
(2) VARIABLE SUMP DEPTH
ACCORDING TO PLANS
(6" MIN ON 12" - 24", 10" MIN ON 30"
BASED ON MANUFACTURING REQ.)
4" MIN ON 12" - 24"
6" MIN ON 30"
MINIMUM PIPE BURIAL
DEPTH PER PIPE
MANUFACTURER
RECOMMENDATION
(MIN. MANUFACTURING
REQ. SAME AS MIN. SUMP)
(2) VARIABLE INVERT HEIGHTS
AVAILABLE (ACCORDING TO
PLANS/TAKE OFF)
(2) VARIABLE INVERT
HEIGHTS
AVAILABLE (ACCORDING TO
PLANS/TAKE OFF)
18" MIN WIDTH GUIDELINE
8" MIN THICKNESS GUIDELINE
(1) INTEGRATED DUCTILE IRON
BASE PLATE TO MATCH BASIN O.D.
WATERTIGHT JOINT
(CORRUGATED HDPE SHOWN)
ASPHALT
CONCRETE CURB & GUTTER
(1) DUCTILE IRON
FRAME, GRATE, & HOOD
12" - 30"
(3) VARIOUS TYPES OF INLET & OUTLET ADAPTERS AVAILABLE:
4" - 30" FOR CORRUGATED HDPE (ADS N-12/HANCOR DUAL WALL,
ADS/HANCOR SINGLE WALL), N-12 HP, PVC SEWER (EX: SDR 35),
PVC DWV (EX: SCH 40), PVC C900/C905, CORRUGATED & RIBBED PVC
THE BACKFILL MATERIAL SHALL BE CRUSHED STONE OR OTHER
GRANULAR MATERIAL MEETING THE REQUIREMENTS OF CLASS II
MATERIAL AS DEFINED IN ASTM D2321. BEDDING & BACKFILL FOR
SURFACE DRAINAGE INLETS SHALL BE PLACED & COMPACTED
UNIFORMLY IN ACCORDANCE WITH ASTM D2321.
TRAFFIC LOADS:CONCRETE SLAB DIMENSIONS ARE FOR GUIDELINE
PURPOSES ONLY. ACTUAL CONCRETE SLAB MUST BE DESIGNED
TAKING INTO CONSIDERATION LOCAL SOIL CONDITIONS, TRAFFIC
LOADING, & OTHER APPLICABLE DESIGN FACTORS.
THIS PRINT DISCLOSES SUBJECT MATTER IN WHICH
NYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPT
OR POSSESSION OF THIS PRINT DOES NOT CONFER,
TRANSFER, OR LICENSE THE USE OF THE DESIGN OR
TECHNICAL INFORMATION SHOWN HEREIN
REPRODUCTION OF THIS PRINT OR ANY INFORMATION
CONTAINED HEREIN, OR MANUFACTURE OF ANY
ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS
IS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN
PERMISSION FROM NYLOPLAST.
®
�2010 NYLOPLAST
(4) ADAPTER
ANGLES
VARIABLE 0� - 360�
ACCORDING TO
PLANS
SEDIMENT TRAP
NOT TO SCALE
7
14
EXISTING LID AND
RIM/COVERS TO BE
REMOVED AND REPLACED
56.93
57.18
60.05
FINISHED GRADE
(LANDSCAPE)
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
CAD FILE NAME:
DETAILS
DRAWN BY: T. COX
D46.dwg
OUTLET STRUCTURE
DATE DRAWN: 8/15/05
C C
A
A
B
B
CONTROL
PLATE
Ls 3'-6"
1'
(MIN.) 6"
Ws
6"
6"
VARIES VARIES
6"
Ws/2 Ws/2
OUTLET CENTERLINE PIPE OF
SECTION C-C
SECTION A-A SECTION B-B
WELL SCREEN FLOW CONTROL PLATE
#4@#4@12" 12"
#4@18"
#4@12"
6"
Wo
Wo Wo
Wp
(Wo+6")
4"
(TYP.) TABLE
1/4" (MIN.) THICK
STEEL FLOW CONTROL
PLATE
STAINLESS STEEL
ANCHOR BOLT (TYP.)
1'
(MAX.)
INTO CONCRETE SIDES
STEEL CHANNEL FORMED
3/8"x1" FLAT
BAR HOLDING
FRAME
INTERMITTANT WELDS ON TOP AND SIDES
STAINLESS STEEL ANCHOR BOLTS OR
PLATE
FLOW CONTROL
51"x51" GRATING
(3/8" ROUND OR
TWISTED CROSS
BARS AT 3" O.C.,
WELDED TO 1"x3/8"
BEARING BARS AT
2 1/2" O.C.)
3/8" ROUND OR
TWISTED CROSS
BAR
BAR
1"x3/BEARING 8"
PLAN
3" CLR.
TO FASTEN GRATE DOWN
3/8"x6" THREADED BOLT
D
4. ALL TRASH RACKS SHALL BE MOUNTED USING STAINLESS STEEL HARDWARE AND
PROVIDED WITH HINGED AND LOCKABLE OR BOLTABLE ACCESS PANELS.
5. TRASH RACKS SHALL BE STAINLESS STEEL, ALUMINUM, OR STEEL. STEEL TRASH
RACKS SHALL BE HOT DIP GALVANIZED AND MAY BE HOT POWDER PAINTED
AFTER GALVANIZING.
3 1/2"
x1 1/2"
KEY
OUTLET PIPE
4% 4%
CLR.
3"
BAR
#4 HOOP
PIPE
CONCRETE
METAL OR
F
LAP
12"
#4@12" O.C.
O.C.
#4@12"
CONCRETE SHALL BE CLASS B. MAY BE CAST-IN-PLACE OR PRECAST.
GENERAL NOTES
1.
2.
3. STEPS SHALL BE PROVIDED WHEN VERTICAL DIMENSION EXCEEDS 3'-6"
AND SHALL BE IN ACCORDANCE WITH AASHTO M 199.
HAVE A MINIMUM 2" CLEARANCE.
REINFORCING BARS SHALL BE EPOXY COATED AND DEFORMED, AND SHALL
#4 DIAGONAL
(TYP.)
SECTION D-D
HOLE (TYP.), SEE
ELEV. B
ELEV. A
ELEV. C
WQ
SPILL ELEV.
WATER QUALITY
100-YEAR OUTLET
D
D
CONCRETE OF WING WALLS PAD WITH USE
ELEV. A (POND INV.)
ELEV. B (WQCU ELEV)
ELEV. C
SPILL ELEV.
WQ
HOLE DIA.
# OF COLUMNS # OF ROWS
SECTION LINE A-A (ARROWS
A A POINT IN DIRECTION SECTION
OPP. OPPOSITE
CLR. CLEARANCE
ABBREVIATIONS
MINIMUM
MAXIMUM
ON CENTER
DIAMETER
TYPICAL
WIDTH OF CONCRETE OPENING
WIDTH OF PLATE
NUMBER
@ AT
#
Wp
Wo
TYP.
DIA.
O.C.
MAX.
LEGEND
WATER QUALITY (WQ)
WQ WATER QUALITY
D WQ
INV. INVERT
ELEV. ELEVATION
6"
Ls
Ws
6"
CONCRETE DOWEL WITH PAD USE OF
Ls LENGTH OF STRUCTURE
Ws WIDTH OF STRUCTURE
Wo
(12" MIN.)
STEEL OR EQUAL)
(NOTE 5)
TRASH RACK
(U.S. FILTER STAINLESS
WELL SCREEN NO. 93
TRASH RACK
STEEL OR EQUAL)
(U.S. FILTER STAINLESS
WELL SCREEN NO. 93
EQUAL)
FILTER STAINLESS
NO. 93 (U.S.
WELL SCREEN
STEEL OR
DETAIL
D-46
INVERT OF PLATE
HOLES TO BE AT
BOTTOM ROW OF
LAST DATE REVISED: 4/7/11
3/8"x6" THREADED BOLT
TO FASTEN GRATE DOWN
GRATE (TYP. OPP. SIDE)
2 1/4" FROM EDGE OF
TO HOLD HINGE IN PLACE,
3/8"x6" BOLTS 12" O.C.
FLOW
TO COVER OPENING
(FASTEN WITH 3/8"x6"
TREADED 1/4" METAL BOLTS) PLATE
TO GRATE, WITH
TO GRATE, WITH
(TYP. OPP. SIDE)
GRATE (TYP. OPP. SIDE)
2 1/4" FROM EDGE OF
TO HOLD HINGE IN PLACE,
3/8"x6" BOLTS 12" O.C.
1/4" PLATE, WELDED
1/4" PLATE, WELDED
STORMWATER CONSTRUCTION DETAILS
(970) 221-6700
P.O. BOX 580, FORT COLLINS, CO. 80522
CITY OF FORT COLLINS UTILITIES
4951.50
4952.30
4952.30
4953.50
1.00-FT
48-INCH
48-INCH
12-INCH
1/4-INCH
3
1
DETAIL
FORT COLLINS CONSTRUCTION STORMWATER DETAILS
FORT COLLINS, CO.
UTILITIES
CITY OF
(970) 221-6700
APPROVED: DATE:
DRAWN BY:
CONCRETE END SECTIONS
01/31/01 D-15
NBJ
E
{DIA.}
{D}
{A} C B
E
E
E
E
F F
PLAN
C B
D
A RISE SPAN
END VIEW
PLAN E
F
M 206 SEE FOR FIGURE ACTUAL 1 OF AASHTO SIZES
SECTION D F-FA RISSEPAN
END VIEW
F
3 IN.
5 IN.
5 IN.
3 IN.
F
2 FT. 5 IN.
3/4 IN. GALVANIZED ANCHOR BOLTS, NUTS AND WASHERS,
MILD STEEL, ASTM A 307. ROD LUG SHALL BE COATED
WITH COAL-TAR EPOXY PAINT OR APPROVED EQUAL.
3/4 IN. "CANOPY" APPROVED, TYPE ROD EQUAL LUG, OR
2 FT. 7 IN.
PIPE
DIAMETER
F
18 IN. - 30 IN.
36 IN. - 42 IN.
48 IN. - 60 IN.
72 IN. - 84 IN.
5 IN.
6 IN.
9 IN.
CONCRETE JOINT
FASTENER.
LOCATION OF 1 IN.
DIA. HOLES
END SECTION FOR REINFORCED CONCRETE
CIRCULAR PIPE
END SECTION FOR REINFORCED
CONCRETE ELLIPTICAL PIPE
END SECTION FOR REINFORCED
CONCRETE ARCH PIPE
DIMENSIONS
A B C D E
PIPE
I.D.
IN.
12
15
18
24
30
36
42
48
54
60
72
5 1/2
11 1/2
12
17
18
24
28
27
36
34 1/2
23
26
26
43
53
60
61
70
65
58
75
49
47
48
54
43
37
36
28
35
40
21
72
73
74
97
96
97
97
98
100
98
96
24
29
36
48
60
71
78
84
90
96
108
IN. IN. IN. IN. IN.
SECTION F-F
24
30
36
42
48
54
60
30
38
45
53
60
68
76
19
24
29
34
38
43
48
8 1/2
9 1/2
11 1/8
15 3/4
21
25 1/2
30
39
54
60
60
60
60
60
33
18
24
36
36
36
36
72
72
84
96
96
96
96
48
60
72
78
84
90
96
EQUIVALENT (INCHES)
CIRCULAR
DIAM. (IN.)
NOMINAL (IN.) DIMENSIONS
SPAN RISE A B C D E
24
30
36
48
54
DIAM. (IN.)
CIRCULAR
EQUIVALENT
42
60
72
96
96
96
96
96
(INCHES)
96
8 1/2
9 1/2
11 1/8
25 1/2
A
DIMENSIONS
15 3/4
SPAN RISE
30
21
NOMINAL (IN.)
B C
60
60
60
60
50
60
39
36
36
36
36
46
35
33
78
90
96
84
D
60
72
48
E
29
36
43
50
58
65
72
86
18
22
27
31
36
40
44
54 31 120
72 60 39 99
PLAN
SECTION X-X
GENERAL NOTES:
1. REVISED CDOH M-603-10
2. CONCRETE END SECTIONS ARE TO BE
FURNISHED WITH TOUGE OR GROOVE AS
REQUIRED.
3. INSIDE CONFIGURATION AND JOINT OF CONCRETE
END SECTION AND PIPE SHALL MATCH.
4. CONCRETE PIPE JOINT FASTENERS, WHERE SHOWN
ON PLANS, SHALL BE INSTALLED SO THAT A MINIMUM
OF 15 LINEAR FEET OF THE OUTLET END OF THE
ARE MECHANICALLY LOCKED TOGETHER. END SECTION
LENGHTS, WHEN USED, WILL BE INCLUDED IN THE
15 L.F. REQUIRED.
END VIEW
+
STANDARD CONCRETE NOTES
1. ALL CONCRETE WORK SHALL BE IN ACCORDANCE WITH THE LATEST VERSION OF ACI 318, ACI 304,
AND ACI 315.
ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI AT 28 DAYS WITH
4%-6% ENTRAINED AIR AND TYPE II CEMENT UNLESS NOTED OTHERWISE.
REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60, DEFORMED UNLESS NOTED
OTHERWISE. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185 WELDED STEEL WIRE FABRIC
UNLESS NOTED OTHERWISE. SPLICES SHALL BE CLASS "B". ALL HOOKS SHALL BE STANDARD
UNLESS NOTED OTHERWISE.
THE FOLLOWING MINIMUM CONCRETE COVER SHALL BE PROVIDED FOR REINFORCING STEEL UNLESS
SHOWN OTHERWISE ON DRAWINGS:
CONCRETE CAST AGAINST EARTH = 3"
CONCRETE EXPOSED TO EARTH OR WEATHER:
#6 AND LARGER = 2"
#5 AND SMALLER AND WWF = 1 1/2"
CONCRETE NOT EXPOSED TO WEATHER NOR CAST AGAINST EARTH:
SLAB AND WALL = 3/4"
BEAMS AND COLUMNS = 1 1/2"
A 3/4" CHAMFER SHALL BE PROVIDED AT ALL EXPOSED EDGES OF CONCRETE UNLESS NOTED
OTHERWISE IN ACCORDANCE WITH ACI 301 SECTION 4.2.4.
HOLES TO RECEIVE EXPANSION/WEDGE ANCHORS SHALL BE 1/8" LARGER IN DIAMETER THAT THE
ANCHOR BOLT, DOWEL OR ROD AND SHALL CONFORM TO MANUFACTURER'S RECOMMENDATION FOR
EMBEDDMENT DEPTH OR AS SHOWN ON THE DRAWINGS. LOCATE AND AVOID CUTTING EXISTING
REBAR WHEN DRILLING HOLES IN ELEVATED CONCRETE SLABS.
USE AND INSTALLATION OF CONCRETE EXPANSION/WEDGE ANCHORS SHALL BE PER ICBO AND
MANUFACTURER'S WRITTEN RECOMMENDED PROCEDURES.
2.
3.
5.
6.
7.
4.
DETAIL
FORT COLLINS CONSTRUCTION STORMWATER DETAILS
FORT COLLINS, CO.
UTILITIES
CITY OF
(970) 221-6700
APPROVED: DATE:
DRAWN BY:
STANDARD CONCRETE NOTES
2/22/05 D-41
TDC
CLASS B BEDDING
LOWER LIMIT OF
UNIFORM GRADED
CLASS A BEDDING
LOWER LIMIT OF
LOWER LIMIT OF
MATERIAL
12 IN. MIN.
12 IN. MIN.
TRENCH WIDTHS SHALL BE AS SPECIFIED ON PLANS.
REFER TO THE STORM SRAINAGE CONSTRUCTION STANDARDS,
SECTION 6, "BEDDING MATERIALS" FOR GRADATIONS.
SUBDRAIN DETAIL
TRENCH WIDTH AS SPECIFIED
TRENCH WIDTH AS SPECIFIED
ROCK EXCAVATION
TRENCH WIDTH AS SPECIFIED
GRANULAR MATERIAL
UNSTABLE SUBGRADE
TRENCH WIDTH AS SPECIFIED
ROCK
1 1/2 IN.
COMPACTED
GRANULAR OR
TRENCH WALL
SLOPE
COMPACTED
MATERIAL GRANULAR
NOTES:
2.
1.
6 IN. MIN.
4 IN. MIN.
12 IN. MIN.
1/8 PIPE O.D.
OR 4 IN. MIN.
SLOTTED PIPE
PERFORATED OR
GRAVEL
FILTER
BACKFILL
COMPACTED DENSELY
TRENCH WIDTH AS SPECIFIED
CLASS C BEDDING
TRENCH WIDTH AS SPECIFIED
1/4 PIPE O.D.
SLOPE
MATERIAL
COMPACTED
TRENCH DENSELY WALL
PIPE O.D. + 8 IN.
1/4 PIPE O.D.
MATERIAL
COMPACTED
DENSELY
SLOPE
TRENCH WALL
MATERIAL
PIPE O.D.
12 IN. MIN.
OR 6 IN. MIN.
1/8 PIPE O.D.
3000 CONCRETE P.S.I.
TRENCH WALL
LOWER LIMIT OF
UNIFORMLY
SELECTED GRADED
SLOPE
GRADED COMPACTED ROCK OR
MATERIAL
GRANULAR
COMPACTED
PIPE O.D.
12 IN. MIN.
TRENCH WALL
LOWER LIMIT OF
SLOPE
COMPACTED
DENSELY
FILTER
6 IN. MIN.
PIPE O.D.
1/OR 8 4 PIPE IN. MIN. O.D.
PIPE O.D.
BROKEN LARGE (IF CONCRETE, REQUIRED) STONES, ETC.
MATERIAL
LOWER LIMIT OF
TRENCH WALL
SLOPE
DETAIL
FORT COLLINS CONSTRUCTION STORMWATER DETAILS
FORT COLLINS, CO.
UTILITIES
CITY OF
(970) 221-6700
APPROVED: DATE:
DRAWN BY:
STORMWATER BEDDING REQUIREMENTS
1/12/00 D-1
SKC
DETAIL
FORT COLLINS CONSTRUCTION STORMWATER DETAILS
FORT COLLINS, CO.
UTILITIES
CITY OF
(970) 221-6700
APPROVED: DATE:
DRAWN BY:
SHALLOW MANHOLE WITH FLAT TOP
11/8/00 D-4
NBJ
PIPE SIZE MIN. MANHOLE
DIAMETER
24 IN. OR LESS
27 IN. TO 42 IN. (INCL.)
OVER 42 IN. 72 IN.
60 IN.
48 IN.
NOTE: MINIMUM INSIDE DIAMETER OF
MANHOLE SHALL BE AS FOLLOWS:
ALTERNATE BASE
POURED INVERT
RECAST MANHOLE
BASE
8 IN. MIN.
6 IN.
2 IN. MIN.
SLOPE
1 IN./FT.
BRICK &/OR CONCRETE
ADJUSTMENT SHIM
GROUTED INSIDE AND OUT
FLAT SLAB TOP SECTION
IN LIEU OF CONICAL TOP
ASTM C-478
MANHOLE SECTIONS
GROUT BASE TO CONE
INSIDE AND OUT
POURED CONCRETE
BASE
SEE NOTE
MANHOLE RUNGS
12 IN. O.C.
FINISHED GRADE
24 IN. RING AND COVER - 400 LB.
DENVER HEAVY BY MACLEAR
OR APPROVED EQUAL
8 IN.
1 FT.
5 FT. MAX.
16 IN. MAX
SLOPE
1 IN./FT.
18 IN. MAX
2 IN.
8 IN. MIN.
28 IN. MAX
ASTM C-478
AS NEEDED
GENERAL NOTES:
1. AREA INLETS MAY BE USED FOR
DRAINAGEWAY OTHER THAN STREETS.
(EXAMPLE, PARKING LOTS, MEDIANDS,
SUMP BASINS)
NO. 12 GRATE AND FRAME BY
MaCLEAR OR APPROVED EQUAL.
PLAN VIEW
A
A
B B
35 3/4 IN.
6 IN. 23 3/4 IN.
3 IN. CIR. O.F.
2 IN. CIR L.F.
#4 @ 12 IN.
CTRS. (TYP.)
#4 @ 12 IN. CTRS.
F
#4 BAR CONCRETE
PIPE O.D.
3 IN.
CIR.
CONCRETE PIPE
I.D. D
SECTION A-A SECTION B-B
12 IN.
LAP
DRAINAGE
SLOPE FOR
INLET AND
FLOW LINE OF
CONDUIT
PIPE
AROUND
#4
12 IN. MIN. INLET GRATES
CTRS. (TYP.)
#4 @ 12 IN.
2 IN. CIR L.F.
3 IN. CIR. O.F.
28 1/4 IN.
6 IN. 16 1/4 IN.
H
AND FLOOR
6 IN. TYPICAL WALLS
12 IN. SPACING STEP MAX.
DETAIL
FORT COLLINS CONSTRUCTION STORMWATER DETAILS
FORT COLLINS, CO.
UTILITIES
CITY OF
(970) 221-6700
APPROVED: DATE:
DRAWN BY: NBJ
12/8/00 D-9A
AREA INLET
WEST WATER QUALITY STRUCTURE
LID ADJUSTMENT
PROPOSED
42"X72" HATCH
EXISTING LID AND
RIM/COVERS TO BE
REMOVED AND REPLACED
56.46
56.75
60.44
FINISHED GRADE
(LANDSCAPE)
EAST WATER QUALITY STRUCTURE
LID ADJUSTMENT
* MODIFIED BY NORTHERN ENGINEERING
13
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
F
Curb
Flare
Varies
Curb
2'-0"
Flare
Ramp
concrete ramps
Panels embedded in the
Apron
Gutter
or
Curb and Gutter
Flow line
1:20 Slope 1:12 MAX Slope
Section A-A
NTS
Varies Varies
Curb
Curb
Flare
Ramp
2'-0"
Varies
Panels
Panels
6"
A
A
CL
Pedestrian flow
Aligned with
Ramp
Width:
4.5'
5.0'
6.0'
7.0'
8.0'
Note:
Truncated dome panels are
available in 2'x2' squares
and
2'x2.5' rectangles. Combine
the widths to fit the ramp.
Panels may be cut to no
less
than a 2'x1.5' size.
Panel Width
Combinations:
2'+2.5'
2.5'+2.5'
2'+2'+2'
2.5'+2'+2.5'
2'+2'+2'+2'
Note:
1. Truncated dome warning panel:
Install panels along with the concrete
pour for the ramp. The panel material
shall be "Cast In Tact Warning Panels"
or an equivalent material that must
be first approved by the City Engineer
prior to installation. The panel color
shall be red, no other color is approved.
Specifications for the panel and
installation instructions will be
provided upon request.
2. This drawing shows vertical curb. For
Drive Over Curb the warning detection
location shall be placed in the same
position 6" back from the Face of
Curb or .
Case 1-Directional Ramps Case 2-Non-Directional Ramps
Varies
Panels
Ramp
Panels
Flare
2'-0"
Curb
Case 3-Mid-Block Ramps
6"
Panels Panels
Apron
Gutter
or
Flare
6"
Flare
(Center line of ramp)
CL -Center line of ramp
BOC
BOC
BOC
FOC
L
or
FL
FOC
BOC
FL
-Back of Curb
-Face of Curb
-Flow line
2'
REVISION NO:
DATE: 04/01/07
DRAWING
STREET STANDARDS DRAWINGS 1607
URBAN AREA
LARIMER COUNTY
TRUNCATED DOME WARNING FOR ACCESS RAMPS
CONSTRUCTION
FORT COLLINS ONLY
6" 1"
1 1/2"R.
1'-6"
2" R.
4-1/2"
12"
6"
OUT FALL CURB & GUTTER
1-1/2"
6"
1-1/2" TO
NOT TO SCALE
PRIVATE CURB & GUTTER
Sidewalk
Driveway
LIP
F.L.
T.C.
DRIVEWAY SIDEWALK
SECTION A-A
NOTE:
1. Sidewalk grade shall remain consistent across driveway
3. This detail applies to Residential & Commercial driveways.
6"
6" Residential
Detached Sidewalk
Attached Sidewalk
1/2" Expansion
Joint Material 1/2" Expansion
Joint Material
A
A
2. For driveway design requirements, see CONST. DWG. 706 & 707.
DETACHED ATTACHED
3'-0" 6'-0"
All Sidewalk Thickness Shall Be 6" minimum.
Min.
STANDARD SIDEWALK
STREET STANDARDS
LARIMER URBAN COUNTY AREA REVISION NO: 1
CONSTRUCTION DRAWINGS DATE: 04/01/07 1601 DRAWING
SIDEWALK
8" Commercial
6"
1"
1 1/2"R.
1'-6"
2" R.
4-1/2"
12"
6"
VERTICAL CURB & GUTTER
1-1/2"
6"
1-1/2" TO
All residential water service shall be installed in the center of the lot
All water and sanitary sewer service shall have a minimum
of the curb stop and meter pit, and no trees within 10 feet of curb and meter pit.
No landscaping (shrubs, boulders, etc.), retaining walls or fences allowed within 4 feet
Use type K copper for the service from the corporation stop to a minimum of 5 feet
up to and including the curb stop. The owner is responsible for service from the
The City is responsible for maintaining the water main, corporation stop, and service piping
Locate curb box and meter pit according to the approved utility drawings.
Install 1 1/2 inch and 2 inch services with tapped tee and corporation stop at time of
Use direct tap (as shown) for 3/4 inch and 1 inch services unless water main is PVC,
unless otherwise approved by the Utility.
horizontal separation of ten feet.
past the meter pit.
No couplings allowed between curb stop and meter setting.
curb stop, including the outlet coupling to the building.
construction or use a tapping saddle.
in which case, use a tapping saddle.
GENERAL NOTES
9.
8.
4.
6.
7.
5.
WATER MAIN
3.
2.
1.
IN FACE OF CURB
CUT 4 INCH CROSS
CORPORATION STOP FOR
PAVEMENT
CURB STOP
CURB
BOX
66 INCH MAX.
54 INCH MIN.
CURB, GUTTER AND
SIDEWALK
DISTANCE VARIES 1 FT.
PROPERTY OR EASEMENT LINE
GRADE
FINAL LANDSCAPED
REVISED DATE:
DETAIL
TITLE OF DRAWING
FIELD OPERATIONS
(970) 221-6700
UTILITIES - WATER
FORT COLLINS, CO. 80550
CITY OF FORT COLLINS
P.O. BOX 580
TYPICAL WATER SERVICE
11
4/12/11
1 1/2 INCH OR GREATER
CORPORATION STOP FOR 3/4
AND 1 INCH SERVICES
SERVICES
1 INCH SERVICES
6"
CONNECTION
COMPRESSION
8" LAYER OF 3/4" TO 1 1/2" GRAVEL
SUPPORT METER SETTERS BY (2) 18 INCH LENGTHS OF 1 INCH IRON PIPE INSERTED THROUGH
IF A PRESSURE REDUCING VALVE IS REQUIRED BY PLUMBING CODE, IT SHALL BE INSTALLED INSIDE THE BUILDING,
GRADE ACCEPTANCE AFTER METER PIT INSTALLATION REQUIRES THAT THE OWNER ADJUST METER PIT COVER
ALL TEES, COUPLINGS AND CONNECTION FITTINGS TO BE A MINIMUM OF 5 FEET FROM METER PIT WALL ON OUTLET
NO LANDSCAPING (TREES, SHRUBS, BOULDERS, ETC.) OR RETAINING WALLS TO BE WITHIN 4 FEET OF METER PIT
DO NOT INSTALL IN ANY STREET, ALLEY, PARKING AREA, DRIVEWAY, SIDEWALK, DRAINAGE DITCH OR DETENTION
AND NO TREES WITHIN 10 FEET.
BRACE PIPE EYELETS AND SET ATOP (4) 8 INCH SQUARE CONCRETE BLOCKS.
IMMEDIATELY FOLLOWING THE MAIN SHUT-OFF VALVE.
TO 1/2 INCH ABOVE LANDSCAPED FINAL GRADE.
MAKE NO PLUMBING CONNECTIONS (TEES, COUPLINGS, ETC.) IN METER PIT.
SLOPE GROUND SURROUNDING METER PIT AWAY FROM LID AT 2% GRADE OR GREATER.
9.
8.
7.
6.
5.
1.
3.
2.
%GENERAL NOTES: 8"
12"
(MIN.)
PIPE BRACE
1" DIA. IRON
(TYP.)
2' (MAX.)
2% SLOPE
GRADE RINGS (IF REQUIRED)
PRE-CAST CONCRETE
BEFORE BACKFILLING
AND GROUT KNOCKOUT
ARMOUR-FLEX TUBING
MANHOLE
PRECAST CONCRETE
CURB BOX
(TYP. ALL JOINTS)
PLASTIC GASKETS
PRE-FORMED
1-1/2" METERS
FLOW
2" METERS
17 1/4" FOR
13 1/4" FOR
SETTER
METER
12" O.C.
MANHOLE RUNGS
48"
ALUMINUM MANHOLE RING AND
COVER WITH LOCK NUT
24"
54" (MIN.)
66" (MAX.)
INSTALL LID 1/2 IN. ABOVE
FINAL LANDSCAPED GRADE
MASTIC
MORTAR OR
16" (MAX.)
7" (MIN.)
FINISHED GRADE
AMR POD (FORD YOKE BOX
PART #YUC-7 WITH FORD
YOKE BOX LID PART #YL-TP
WITH 1 27/32" DIA. HOLE
AND REMOVABLE PLUG)
3" (MAX.)
1" (MAX.)
1/2" EMT OR PVC
VAULT OR PIT TOP
INTO YOKEBOX
2' (MAX.)
3/4" ROCK FOR GRADE
ADJUSTMENT (IF REQ'D)
12"
(MIN.)
(MAX.)
(TYP.)
TOP OF AMR LID TO
BE 1/2" ABOVE
FINISHED GRADE
CONDUIT THROUGH
10. A SEPERATE AMR POD MUST BE INSTALLED FOR EACH METER REGISTER.
4. THE METER PIT AND AMR POD(S) MUST REMAIN OPEN AND ACCESSABLE FOR METER READING AND MAINTENANCE.
CURB STOP
REVISED DATE:
DETAIL
TITLE OF DRAWING
FIELD OPERATIONS
(970) 221-6700
UTILITIES - WATER
FORT COLLINS, CO. 80550
CITY OF FORT COLLINS
P.O. BOX 580
STANDARD SETTING FOR 1-1/2 IN.
AND 2 IN. WATER METERS
16A
4/11/11
SIDE.
BASIN.
PLAN VIEW
48" DIA.
BEFORE BACKFILLING
ARMOUR-FLEX TUBING
AND GROUT KNOCKOUT
BOX
CURB
FLOW
2' (MAX.)
1" DIA. IRON
(TYP) PIPE BRACE
MANHOLE RUNGS
BELOW LID)
METER (PLACED
12" O.C.
24" DIA.
PRECAST CONCRETE
MANHOLE
8" x 8" CONCRETE
BLOCK (TYP.)
AND REMOVABLE PLUG)
WITH 1 27/32" DIA. HOLE
YOKE BOX LID PART #YL-TP
PART #YUC-7 WITH FORD
AMR POD (FORD YOKE BOX
%GENERAL NOTES:
1. LOCATION AND ALIGNMENT OF AMR POD ON PIT TOP CAN VARY.
2. SEE DETAIL 16-A FOR ADDITIONAL METER PIT INFORMATION.
REVISED DATE:
DETAIL
TITLE OF DRAWING
FIELD OPERATIONS
(970) 221-6700
UTILITIES - WATER
FORT COLLINS, CO. 80550
CITY OF FORT COLLINS
P.O. BOX 580
STANDARD SETTING FOR 1 1/2 IN. AND
2 IN. WATER METERS (PLAN VIEW) 16B
4/11/11
DETAIL "A"
8 8.5 WITH 1 1/2 IN. DIA. HOLE
OUTSIDE EDGE OF WALL.
3 IN.
RAD.
6 IN.
WALL
8 IN.
IN CENTER - EXTEND CHANNEL TO
GENERAL NOTES:
1. SIDEWALK SHALL BE 6 IN. THICK FOR 3 FT. ON
EITHER SIDE OF CULVERT.
2. TOP SLAB OF CULVERT SHALL BE SLOPE TO
MATCH SIDEWALK. SEE D-6.
3. EXPOSED STEEL SHALL BE GALVANIZED IN
ACCORDANCE WITH AASHTO M-111.
4. KEY JOINTS WHERE WALLS CONNECT TO TOP
SLAB AND BASE.
5. REINFORCEMENT IN WALLS AND BASE SHALL
BE 3 IN. FROM THE SIDE EXPOSED TO EARTH.
REINFORCEMENT IN TOP SLAB SHALL BE
1 1/2 IN CLEAR.
SECTION C-C
# 4 BARS # 5 BARS
ADD 1 # 4 BARS
11 FT. 0 IN.
14 1/2 IN.
1 FT.
6 IN.
ADD 1 # 4 BARS
# 4 BARS-12 IN. O.C.
BOTHWAYS
4 FT. 0 IN.
SECTION B-B
WARPED GUTTER DEPRESSED GUTTER
3 FT. 6 IN.
WARPED GUTTER
3 FT. 6 IN.
NORMAL
FLOW LINE
ALTERED
TOP OF CURB
SECTION A-A
WITH CURB FACE
8 IN.
6 IN.
2 IN.
# 5 BAR
1 1/2 IN. PIPE SPACER
AND 1 1/4 IN. LOCK NUT
2:1
2 IN. 4:1
1/4 IN.-1 IN. LEG
6 IN.
18 IN. LONG
#4 BAR
3 IN. X 3 IN. X 3/8 IN.
1 1/4 IN. DIA. X 14 IN. GALV.
STEEL 3 1/2 IN. ROD AT - TOP. THREADED
PLATE
6 IN.
8 8.5 FLUSH
6 IN. DETAIL "B"
3 IN.
BACK OF CURB
SEE DETAIL "A"
FLOWLINE
WARPED CURB &
GUTTER (TYP.)
#4 BARS AT
12 IN. O.C.
11 IN.
6 IN.
2 #5 BARS AT
6 IN. O.C.
5 #5 BARS AT
9 IN. O.C.
3:1
EXTEND WALK 1 FT.
BEYOND NORMAL BACK
OF WALK.
6#4 BARS
AT 11 IN. O.C.
6 IN. THICK
SIDEWALK
(TYP.)
3 FT.
1 FT.
4 FT.
6 IN.
2 FT.
3 FT. 6 IN.
11 FT.
4 FT. OPENING
9 IN.
1 FT.
(TYP.)
DETAIL "B"
3 FT. 6 IN.
6 IN.
A
A
B
C C
B
#4 BARS-12 IN. O.C.
BOTHWAYS
#4 BARS
#5 BARS
1% SLOPE
SEE DETAIL
"B"
2 FT. 0 IN. 5 FT. 6 IN.
6 IN.
#4 BARS
6 IN.
8 1/2 IN.
6 IN.
(REINFORCEMENT NOT SHOWN)
2 IN.
DETAIL
FORT COLLINS CONSTRUCTION STORMWATER DETAILS
FORT COLLINS, CO.
UTILITIES
CITY OF
(970) 221-6700
APPROVED: DATE:
DRAWN BY: NBJ
12/19/00 D-12
CONCRETE SIDEWALK CULVERT FOR VERT. CURB, GUTTER AND SIDEWALK
NOT TO SCALE
CURB & GUTTER - TYPE II-B SPECIAL
6"
2"
1 1/2"R.
3'-6"
2" R.
1'-4 1/2"
12"
6"
VERTICAL CURB & GUTTER
1-1/2"
6"
1-1/2" TO
1'-6"
LINDEN STREET
PAVEMENT DETAIL (PRIVATE DEVELOPMENT AREAS)
HEAVY DUTY
{ASPHALT SECTION}
NOTE: SEE THE GEOTECHNICAL ENGINEERING REPORT TITLED "SUBSURFACE EXPLORATION REPORT, 418 LINDEN STREET, FORT COLLINS, COLORADO EEC PROJECT NO. 1112066" PREPARED BY EARTH ENGINEERING
CONSULTANTS, INC FOR ADDITIONAL INFORMATION.
4.5" HOT BITUMIOUS
PAVEMENT
(S OR SX)
7" AGGREGATE
BASE COURSE
(CLASS 5 OR 6)
APPROVED
SUBGRADE
6" PORTLAND
CEMENT CONCRETE
HEAVY DUTY
APPROVED
SUB-GRADE
CONCRETE PAVEMENT
12
OS3
OS1
3
100-YR FLOOD ELEV.=4953 (FT.COLLINS NGVD29)
4956 (NAVD88)
FEMA CROSS-SECTION "CA"
W5
W3
VTC
RP
WD
SF
SF
WD
IP
IP
ST
EXISTING 36" STORM DRAIN
1
4
SF
SF
SF
SF
SF
SF SF
SF
SF
SF
SF SF
SF
DRAINAGE SUMMARY TABLE
DESIGN
POINT
BASIN
ID
TOTAL
AREA
(�����)
C10 C100
10-��
T�
(���)
100-�
�
T�
(���)
Q10
(���)
Q100
(���)
1 1 0.05 0.95 1.00 5.0 5.0 0.2 0.5
2 2 0.30 0.95 1.00 5.0 5.0 1.4 3.0
3 3 0.02 0.34 0.42 5.0 5.0 0.0 0.1
4 4 0.59 0.62 0.77 5.7 5.0 1.7 4.5
5 5 0.07 0.25 0.31 5.0 5.0 0.1 0.2
OS1 OS1 0.63 0.67 0.84 5.0 5.0 2.1 5.3
OS2 OS2 0.38 0.72 0.90 5.0 5.0 1.3 3.4
OS3 OS3 0.12 0.55 0.68 5.0 5.0 0.3 0.8
No. Revisions:
By: Date:
REVIEWED BY:
R. Provencio
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
06/19/13
PROJECT:
685-002
Sheet
RIVER DISTRICT BLOCK ONE MIXED USE
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
of 47 Sheets
C600
EROSION CONTROL PLAN
DRAINAGE AND J. Prelog
J. Prelog
1"=20'
NORTH
( IN FEET )
1 inch = ft.
20 0 20 Feet
20
40 60
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'� �����.
C��� ������ ��� ���.
R
LEGEND:
Date
Date
Date
Date
Date
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
City Engineer
Water & Wastewater Utility
Stormwater Utility
Parks & Recreation
Traffic Engineer
Environmental Planner
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
WATER QUALITY POND SUMMARY
VOLUME REQ'D (ac-ft) VOLUME PROVIDED (ac-ft) POND INVERT WQ WATER SURFACE POND SPILL ELEV.
0.01 0.01 4951.50 4952.30 4953.50
PROPOSED STORM SEWER
PROPOSED STORM DRAINAGE INLET
PROPOSED CONTOURS
80
79
EXISTING STORM SEWER
PROPERTY BOUNDARY
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
5015
5013
EXISTING TREES
A
DESIGN POINT
FLOW ARROW
DRAINAGE BASIN LABEL
BASIN
DESIGNATION
BASIN
AREA (AC)
DRAINAGE BASIN BOUNDARY
B2
1.45 ac
EXISTING RIGHT-OF-WAY
EXISTING TOP OF BANK
PROPOSED RETAINING WALL
EXISTING 100-YEAR FLOODPLAIN
EXISTING 0.5-FOOT FLOODWAY
EXISTING RIVER'S EDGE
EXISTING 500-YEAR FLOODPLAIN
EXISTING TOP OF BERM TO REMAIN
1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL
UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN
UNDERGROUND UTILITIES.
2.EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS
SHALL FOLLOW CITY REGULATIONS.
3.SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON SEEDING/PLANTING,
REVEGETATION, EROSION FABRIC/BLANKETS, IRRIGATION, HARDSCAPE AND OTHER
TEMPORARY AND PERMANENT SITE STABILIZATION METHODS.
{
4.SEE EROSION CONTROL NOTES ON THIS SHEET AND GRADING & EROSION
CONTROL NOTES ON SHEET C001, AS WELL AS DETAILS ON SHEET C702.
}5.REFER TO THE "FINAL DRAINAGE REPORT FOR BLOCK ONE' BY NORTHERN
ENGINEERING, DATED JUNE 19, 2013 FOR ADDITIONAL INFORMATION.
6.THE FINISHED FLOOR ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS
REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM.
7.A FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR THE SITE CONSTRUCTION
ELEMENTS (WATER QUALITY PONDS, BIKE PATHS, PARKING LOTS, UTILITIES, ETC.) IN
THE FLOODPLAIN.
8.ANY FLOATABLE ITEMS (PICNIC TABLES, BIKE RACKS, ETC.) WITHIN THE
FLOODPLAIN SHALL BE ANCHORED APPROPRIATELY.
{9.A FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR THE REMOVAL OF EXISTING
FEATURES AND CONSTRUCTION OF THE PROPOSED TRAIL, PROPOSED PARKING LOT
AND BANK STABILIZATION WITHIN THE FEMA FLOODWAY. NOTE THAT ANY
CONSTRUCTION WITHIN THE FEMA FLOODWAY WILL REQUIRE A CITY NO-RISE
CERTIFICATION. CONTRACTOR SHALL CONTACT THE CITY OF FORT COLLINS
FLOODPLAIN ADMINISTRATOR PRIOR TO CONSTRUCTION TO OBTAIN ALL
REQUIREMENTS FOR DEMOLITION/CONSTRUCTION WITHIN THE FEMA 0.5-FOOT
FLOODWAY. ONCE CONSTRUCTION WITHIN THE FEMA FLOODWAY IS COMPLETE A
POST-CONSTRUCTION NO-RISE CERTIFICATION WILL BE REQUIRED.
10.THE FOLLOWING FLOODWAY REGULATIONS MUST BE MET:
-NO FILL IS ALLOWED IN THE FLOODWAY UNLESS A HYDRAULIC ANALYSIS SHOWS
"NO RISE".
-LANDSCAPING MEETS REQUIREMENTS FOR NO ENCROACHMENT IN THE FLOODWAY
WITHOUT A HYDRAULIC ANALYSIS TO SHOW "NO RISE".
-NO STORAGE OF MATERIALS OR EQUIPMENT IN THE FLOODWAY.
-NO RISE CERTIFICATION REQUIRED BOTH FOR PRE-CONSTRUCTION AND
POST-CONSTRUCTION FOR THE POND OUTLET PIPE AND ANY OTHER WORK IN THE
FLOODWAY.
GENERAL NOTES:
VEHICLE TRACKING CONTROL PAD
SILT FENCE
PLANTED RIPRAP PROTECTION
SF
SWALE WATTLE DIKE WD
RP
SF
IP
W5
NOTE:
ALL BMP'S SHOWN ON THIS PLAN ARE GRAPHIC
REPRESENTATIONS ONLY. FINAL DETERMINATION OF SIZE
AND LOCATION SHALL BE DETERMINED BY THE CONTRACTOR.
PERMANENT BMP'S
TEMPORARY BMP'S
VTC
SEDIMENT TRAP ST
A.IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A
GUIDELINE TO THE CONTRACTOR. STAGING AND/OR PHASING OF BEST MANAGEMENT
PRACTICES (BMPs) IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMPs FROM THOSE
ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO
CHANGING SITE CONDITIONS OR AS REQUIRED BY LOCAL AUTHORITIES.
B.THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL
SYMBOLS MAY NOT BE TO SCALE, NOR ARE THEY NECESSARILY SHOWN IN THEIR
EXACT LOCATION.
C.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITTING (CITY, STATE
DISCHARGE PERMIT, ETC.) AND COMPLIANCE WITH GOVERNING AUTHORITIES. IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO
ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND
FOLLOWED.
D.CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL
MEASURES ACCORDING THE THE CONSTRUCTION SEQUENCING AND LEVEL OF SITE
STABILIZATION.
E.CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL
STORM DRAINS, SWALES, PONDS AND RAIN GARDENS UNTIL SITE IS FULLY
STABILIZED.
F.INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY, TO THE SURROUNDING
SURFACE TYPE AND CONDITION (i.e., STAKE-DRIVEN WATTLES FOR BARE SOIL, SAND
BAGS OR GRAVEL SOCKS FOR PAVEMENT, ETC.)
G.CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES, PARTICULARLY
THOSE STEEPER THAN 6:1. CRIMP MULCHING, HYDRO MULCHING, EROSION MATS,
TEMPORARY IRRIGATION, AND ADDITIONAL WATTLES OR SILT FENCING MAY BE
NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABILIZE THE SLOPE.
H.ADDITIONAL WATTLES, SILT FENCE, OR OTHER MEASURES, MAY BE NECESSARY
TO INSURE THAT EACH BUILDING PAD IS STABILIZED THROUGHOUT CONSTRUCTION.
AT NO TIME SHALL SEDIMENT BE ALLOWED TO CROSS THE PUBLIC SIDEWALKS.
I.FUELING FACILITIES SHALL BE LOCATED AT LEAST ONE HUNDRED (100) FEET FROM
NATURAL BODY OF WATER, WETLAND, NATURAL DRAINAGE WAY OR MANMADE
DRAINAGE WAY. THE FUEL TANKS AND FUELING AREA MUST BE SET IN A
CONTAINMENT AREA THAT WILL NOT ALLOW A FUEL SPILL TO DIRECTLY FLOW, SEEP,
RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR DRAINAGE WAY.
J.CONSTRUCTION WASTE STORAGE (DUMPSTERS) AND PORTABLE SANITATION
UNITS (CONSTRUCTION TOILETS) SHALL BE LOCATED AT LEAST FIFTY (50) FEET FROM
ANY STORMWATER INLET, WETLAND, OR DRAINAGE WAY. SAID FACILITIES MUST BE
SET IN A CONTAINMENT AREA THAT WILL NOT ALLOW POLLUTANTS TO DIRECTLY
FLOW, SEEP, RUN OFF, OR BE WASHED INTO A BODY OF WATER, WETLAND OR
DRAINAGE WAY. DUMPSTERS SHALL BE LOCATED ON FLAT, STABLE GROUND, AND
CONSTRUCTION TOILETS SHALL BE STAKED DOWN.
K.CONSTRUCTION STAGING IS GENERALLY EXPECTED TO OCCUR ON TRACT A. THIS
INCLUDES TEMPORARY SOIL STOCKPILES, MATERIAL STORAGE, CONSTRUCTION
TRAILERS, DUMPSTERS, PORTABLE TOILETS, ETC. PROPER BMPs SHALL BE
IMPLEMENTED AND MAINTAINED ACCORDINGLY FOR SAID COMPONENTS, AND
ADAPTED AS NECESSARY AS CONSTRUCTION PROGRESSES AND/OR OCCURS IN
OTHER LOCATIONS.
L.THE CONTRACTOR AND ALL SUBCONTRACTORS WILL COOPERATE WITH THE
EROSION CONTROL NOTES:
11
4965
4970
9+75 10+00 11+00 11+25
4950
4955
4960
4965
4970
4950
4955
4960
4965
4970
9+75 10+00 11+00 11+25
4950
4955
4960
4965
4970
4950
4955
4960
4965
4970
9+75 10+00 11+00 11+25
No. Revisions:
By: Date:
REVIEWED BY:
R. Provencio
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
06/19/13
PROJECT:
685-002
Sheet
RIVER DISTRICT BLOCK ONE MIXED USE
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
of 47 Sheets
C500
ROAD PLAN AND PROFILES
J. Prelog
J. Prelog
1"=20'
NORTH
( IN FEET )
1 inch = ft.
30 0 30 Feet
30
60 90
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
Date
Date
Date
Date
Date
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
City Engineer
Water & Wastewater Utility
Stormwater Utility
Parks & Recreation
Traffic Engineer
Environmental Planner
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
RAMP CENTERLINE
PARKING GARAGE
SCALE : 1" = 30' (H) 1" = 5' (V)
FLOWLINE
LINDEN STREET
SCALE : 1" = 30' (H) 1" = 5' (V)
LEFT RAMP EDGE
PARKING GARAGE
SCALE : 1" = 30' (H) 1" = 5' (V)
RIGHT RAMP EDGE
PARKING GARAGE
SCALE : 1" = 30' (H) 1" = 5' (V)
NORTH
LEGEND:
NOTES:
1.FOR BUILDING LAYOUT REFERENCE ARCHITECTURAL PLANS. LAYOUT
AND DIMENSION INFORMATION SHOWN REPRESENTS OUTSIDE FACE OF
WALL AND IS SHOWN FOR INFORMATION ONLY.
2.REFER TO APPROVED SITE ELECTRICAL PLANS FOR ALL SITE LIGHTING
AS SHOWN ON THIS DRAWING.
3.ALL DIMENSIONS AND LINE AND CURVE INFORMATION ARE MEASURED TO
CURB FLOW LINE OR EDGE OF PAVEMENT UNLESS OTHERWISE NOTED.
4.CONTRACTOR SHALL REFER TO AND COORDINATE WITH THE LANDSCAPE
DRAWINGS FOR ALL LANDSCAPE AND SITE FEATURES SUCH AS BIKE RACKS,
BENCHES, SEAT WALLS, LANDSCAPE WALLS TRASH RECEPTACLES,
LANDSCAPE ROCK AND MULCH, ETC.
5.CONTRACTOR SHALL REFER TO AND COORDINATE WITH THE APPROVED
ARCHITECTURAL DRAWINGS FOR ALL STAIR AND HANDRAIL DETAILS AND
SPECIFICATIONS.
6.ALL HANDICAP RAMPS (PRIVATE AND PUBLIC) SHALL BE INSTALLED WITH
TRUNCATED DOME WARNING DETECTION SYSTEMS PER LARIMER COUNTY
URBAN AREA STREET STANDARD DETAILS.
7.ALL SYMBOLS, INCLUDING CROSSWALKS, STOP BARS, ETC. SHALL BE
PREFORMED THERMO-PLASTIC APPLICATIONS.
8.THIS SEGMENT OF PROPOSED BANK STABILIZATION IMPROVEMENTS WILL
BE FUNDED BY THE CITY CONTINGENT UPON CITY COUNCIL APPROVAL.
9.THIS SEGMENT OF PROPOSED BANK STABILIZATION IMPROVEMENTS WILL
BE FUNDED BY THE DEVELOPER.
10.ALL PROPOSED PAVEMENT SECTIONS WITHIN THE PUBLIC
RIGHT-OF-WAY SHALL BE SUBMITTED TO AND APPROVED BY THE CITY OF
FORT COLLINS PRIOR TO CONSTRUCTION. SEE GENERAL NOTES FOR
ADDITIONAL DETAILS.
11.ALL PROPOSED PAVEMENT SECTIONS FOR PRIVATE DEVELOPMENT, SEE
LATEST GEOTECHNICAL REPORT BY EEC AND PAVEMENT SECTION DETAILS
FOR MORE INFORMATION.
12.ALL PRIVATE CONCRETE WALKS SHALL BE SEALED AS RECOMMENDED
BY LATEST GEOTECHNICAL REPORT BY EEC AND/OR RECOMMENDED BY
EEC.
13.EPOXY APPLICATORS SHALL BE APPLIED AS SPECIFIED IN THE CDOT
STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
14.ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO
APPLICATION OF STRIPING AND MARKING.
15.ALL REGULATORY SIGNAGE ALONG LINDEN STREET SHALL BE BE
"ENHANCED LINDEN STREET STYLE REGULATORY SIGNAGE" TO MATCH
PROPOSED SIGN
PROPOSED STORM INLET
PROPOSED "HEAVY DUTY" CONCRETE
FOR PARKING LOT PAVEMENT AND GARAGE RAMP
(SEE NOTE 11)
PROPOSED 1.5-FOOT VERTICAL CURB & GUTTER SECTION
PROPOSED SWALE
EXISTING CURB & GUTTER
EXISTING TREES
EXISTING CONCRETE
PROPOSED COLORED CONCRETE
PROPOSED ASPHALT PAVEMENT
(SEE NOTE 10)
EXISTING TOP OF BANK
PROPOSED RETAINING WALL
EXISTING WATER'S EDGE
PROPERTY BOUNDARY
APPROXIMATE LIMITS OF CONSTRUCTION
EXISTING RIGHT-OF-WAY
EXISTING 100-YEAR FLOODPLAIN
EXISTING 0.5-FOOT FLOODWAY
EXISTING 500-YEAR FLOODPLAIN
EXISTING TOP OF BERM TO REMAIN
PROPOSED 1.5-FOOT OUTFALL CURB & GUTTER SECTION
PROPOSED MILL AND OVERLAY
10
K��� ����'� �����.
C��� ������ ��� ���.
R
LEGEND:
NOTES:
Date
Date
Date
Date
Date
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
City Engineer
Water & Wastewater Utility
Stormwater Utility
Parks & Recreation
Traffic Engineer
Environmental Planner
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
1.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE
UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST
INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT
GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY
MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON
THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL
ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY
CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS.
2.SPOT ELEVATIONS SHOWN ARE FLOWLINE, EDGE OR PAVEMENT, OR
EDGE OF WALK UNLESS NOTED OTHERWISE.
3.ALL DISTURBED AREAS SHALL BE REVEGETATED PER THE APPROVED
LANDSCAPE PLANS.
4.ALL SOIL (NOT MULCH) IN LANDSCAPE BEDS ADJACENT TO BUILDINGS
SHALL BE PLACED SUCH THAT THE TOP OF SOIL IS AT THE SAME
ELEVATION AS ADJACENT SIDEWALK TO ALLOW FOR PROPER DRAINAGE.
5.THE FINISHED FLOOR ELEVATIONS SHOWN ARE THE MINIMUM
ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM.
6.A FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR THE SITE
CONSTRUCTION ELEMENTS (WATER QUALITY PONDS, BIKE PATHS,
PARKING LOTS, UTILITIES, ETC.) IN THE FLOODPLAIN.
7.ANY FLOATABLE ITEMS (PICNIC TABLES, BIKE RACKS, ETC.) WITHIN THE
FLOODPLAIN SHALL BE ANCHORED APPROPRIATELY.
{8.A FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR THE REMOVAL OF
EXISTING FEATURES AND CONSTRUCTION OF THE PROPOSED TRAIL,
PROPOSED PARKING LOT AND BANK STABILIZATION WITHIN THE FEMA
FLOODWAY. NOTE THAT ANY CONSTRUCTION WITHIN THE FEMA
FLOODWAY WILL REQUIRE A CITY NO-RISE CERTIFICATION. CONTRACTOR
SHALL CONTACT THE CITY OF FORT COLLINS FLOODPLAIN
ADMINISTRATOR PRIOR TO CONSTRUCTION TO OBTAIN ALL
REQUIREMENTS FOR DEMOLITION/CONSTRUCTION WITHIN THE FEMA
0.5-FOOT FLOODWAY. ONCE CONSTRUCTION WITHIN THE FEMA
FLOODWAY IS COMPLETE A POST-CONSTRUCTION NO-RISE CERTIFICATION
WILL BE REQUIRED.
9.THE FOLLOWING FLOODWAY REGULATIONS MUST BE MET:
-NO FILL IS ALLOWED IN THE FLOODWAY UNLESS A HYDRAULIC ANALYSIS
SHOWS "NO RISE".
-LANDSCAPING MEETS REQUIREMENTS FOR NO ENCROACHMENT IN THE
FLOODWAY WITHOUT A HYDRAULIC ANALYSIS TO SHOW "NO RISE".
-NO STORAGE OF MATERIALS OR EQUIPMENT IN THE FLOODWAY.
-NO RISE CERTIFICATION REQUIRED BOTH FOR PRE-CONSTRUCTION AND
POST-CONSTRUCTION FOR THE POND OUTLET PIPE AND ANY OTHER
WORK IN THE FLOODWAY.
10.THE FLOODWAY SHALL BE STAKED IN THE FIELD PRIOR TO START OF
CONSTRUCTION.
11.PLEASE REFER TO SECTION 3.4.1 OF THE LAND USE CODE FOR
ALLOWABLE USES WITHIN THE BUFFER ZONE.
PROPOSED STORM SEWER
PROPOSED STORM DRAINAGE INLET
77.71
(77.90)
PROPOSED SPOT ELEVATION
EXISTING SPOT ELEVATION
PROPOSED GRADE 1.8%
EXISTING GRADE (1.8%)
PROPOSED CONTOURS
80
TC - TOP OF CONCRETE
TW - TOP OF WALL
TS - TOP OF STAIR
BS - BOTTOM OF STAIR
GRND - ELEVATION OF GROUND AT EXTERIOR WALL OR DOOR
79
BW - BOTTOM OF WALL
EXISTING STORM SEWER
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
5015
5013
EXISTING TREES
EXISTING TOP OF BANK
PROPOSED RETAINING WALL
EXISTING WATER'S EDGE
PROPERTY BOUNDARY
APPROXIMATE LIMITS OF CONSTRUCTION
EXISTING RIGHT-OF-WAY
EXISTING 100-YEAR FLOODPLAIN
EXISTING 0.5-FOOT FLOODWAY
EXISTING 500-YEAR FLOODPLAIN
EXISTING TOP OF BERM TO REMAIN
2' at 3:1
15' at 3:1
PROPERTY LINE
1 NORTH WEST ENTRANCE, PATIO AND RAISED WALKS
2 NORTH EAST WALK AND GARAGE ENTRANCE
3 SOUTH EAST PATIOS
7 SECTION A-A
6 PARKING GARAGE ENTRANCE AND WALL
4 SPOT ELEVATIONS CONCRETE SLAB ABOVE WALL
5 SPOT ELEVATIONS FOR EXTENDED WALL
RAISED WALK
0.5'
XX.XX
TC
BW
XX.XX
WALL
HEIGHT
VARIES
RAISED PATIO/WALK
XX.XX
TW
BW
XX.XX
WALL
HEIGHT
VARIES
XX.XX
TC
SEE ARCHITECTURAL PLANS FOR DETAILS
PROPOSED WALL
PROPOSED WALL
SEE ARCHITECTURAL PLANS FOR DETAILS
XX.XX
TW
BXWX.XX
WALL
HEIGHT
PROPOSED WALL VARIES
XX.XX
1" 1' 1"1'
XX.XX
TW
BW XX.XX
XX.XX
WALL
HEIGHT
VARIES PROPOSED
WALL
SEE ARCHITECTURAL PLANS FOR DETAILS
9
GRADE BREAK
GRADE BREAK
RIVER DISTRICT BLOCK ONE MIXED USE
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
of 47 Sheets
C400
GRADING PLAN
K. Brazelton
K. Brazelton
1"=20'
NORTH
( IN FEET )
1 inch = ft.
20 0 20 Feet
20
40 60
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'� �����.
C��� ������ ��� ���.
R
Date
Date
Date
Date
Date
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
City Engineer
Water & Wastewater Utility
Stormwater Utility
Parks & Recreation
Traffic Engineer
Environmental Planner
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
LEGEND:
NOTES:
1.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE
UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST
INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT
GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY
MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON
THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL
ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY
CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS.
2.SPOT ELEVATIONS SHOWN ARE FLOWLINE, EDGE OR PAVEMENT, OR
EDGE OF WALK UNLESS NOTED OTHERWISE.
3.ALL DISTURBED AREAS SHALL BE REVEGETATED PER THE APPROVED
LANDSCAPE PLANS.
4.ALL SOIL (NOT MULCH) IN LANDSCAPE BEDS ADJACENT TO BUILDINGS
SHALL BE PLACED SUCH THAT THE TOP OF SOIL IS AT THE SAME
ELEVATION AS ADJACENT SIDEWALK TO ALLOW FOR PROPER DRAINAGE.
5.THE FINISHED FLOOR ELEVATIONS SHOWN ARE THE MINIMUM
ELEVATIONS REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM.
6.A FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR THE SITE
CONSTRUCTION ELEMENTS (WATER QUALITY PONDS, BIKE PATHS,
PARKING LOTS, UTILITIES, ETC.) IN THE FLOODPLAIN.
7.ANY FLOATABLE ITEMS (PICNIC TABLES, BIKE RACKS, ETC.) WITHIN THE
FLOODPLAIN SHALL BE ANCHORED APPROPRIATELY.
{8.A FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR THE REMOVAL OF
EXISTING FEATURES AND CONSTRUCTION OF THE PROPOSED TRAIL,
PROPOSED PARKING LOT AND BANK STABILIZATION WITHIN THE FEMA
FLOODWAY. NOTE THAT ANY CONSTRUCTION WITHIN THE FEMA
FLOODWAY WILL REQUIRE A CITY NO-RISE CERTIFICATION. CONTRACTOR
SHALL CONTACT THE CITY OF FORT COLLINS FLOODPLAIN
ADMINISTRATOR PRIOR TO CONSTRUCTION TO OBTAIN ALL
REQUIREMENTS FOR DEMOLITION/CONSTRUCTION WITHIN THE FEMA
0.5-FOOT FLOODWAY. ONCE CONSTRUCTION WITHIN THE FEMA
FLOODWAY IS COMPLETE A POST-CONSTRUCTION NO-RISE
CERTIFICATION WILL BE REQUIRED.
9.THE FOLLOWING FLOODWAY REGULATIONS MUST BE MET:
-NO FILL IS ALLOWED IN THE FLOODWAY UNLESS A HYDRAULIC ANALYSIS
SHOWS "NO RISE".
-LANDSCAPING MEETS REQUIREMENTS FOR NO ENCROACHMENT IN THE
FLOODWAY WITHOUT A HYDRAULIC ANALYSIS TO SHOW "NO RISE".
-NO STORAGE OF MATERIALS OR EQUIPMENT IN THE FLOODWAY.
-NO RISE CERTIFICATION REQUIRED BOTH FOR PRE-CONSTRUCTION AND
POST-CONSTRUCTION FOR THE POND OUTLET PIPE AND ANY OTHER
WORK IN THE FLOODWAY.
10.THE FLOODWAY SHALL BE STAKED IN THE FIELD PRIOR TO START OF
CONSTRUCTION.
11.PLEASE REFER TO SECTION 3.4.1 OF THE LAND USE CODE FOR
ALLOWABLE USES WITHIN THE BUFFER ZONE.
12.SEE APPROVED LANDSCAPE PLANS FOR RETAINING WALL
SPECIFICATIONS AND DETAILS.
PROPOSED STORM SEWER
PROPOSED STORM DRAINAGE INLET
77.71
(77.90)
PROPOSED SPOT ELEVATION
EXISTING SPOT ELEVATION
PROPOSED GRADE 1.8%
EXISTING GRADE (1.8%)
PROPOSED CONTOURS
80
TC - TOP OF CONCRETE
TW - TOP OF WALL
TS - TOP OF STAIR
BS - BOTTOM OF STAIR
GRND - ELEVATION OF GROUND AT EXTERIOR WALL OR DOOR
79
BW - BOTTOM OF WALL
EXISTING STORM SEWER
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
5015
5013
EXISTING TREES
EXISTING TOP OF BANK
PROPOSED RETAINING WALL
EXISTING WATER'S EDGE
PROPERTY BOUNDARY
APPROXIMATE LIMITS OF CONSTRUCTION
EXISTING RIGHT-OF-WAY
EXISTING 100-YEAR FLOODPLAIN
EXISTING 0.5-FOOT FLOODWAY
EXISTING 500-YEAR FLOODPLAIN
EXISTING TOP OF BERM TO REMAIN
8
T TV
RD
FO
PROPOSED
BUILDING
5' MH A2
STA 10+15.73
N: 132388.91
E: 196330.85
SSA2 - 6''X6''X6'' WYE
STA 10+24.33
N: 132455.39
E: 196203.20
SSA5 - 4'' 90� BEND
STA 10+49.72
N: 132436.58
E: 196218.03
SSA4 - 4'' 45� BEND
STA 10+29.72
N: 132450.00
E: 196203.20
SSA3 - 4''X4''X4'' WYE
STA 10+27.03
N: 132452.70
E: 196203.20
EXISTING
ELECTRIC/FIBER
OPTIC DUCT
BANK (4.5'X3')
LINDEN ST.
EXISTING R.O.W.
PROPOSED GREASE
INTERCEPTOR
(SEE NOTE 10)
CONNECT TO EX.
8" SANITARY SEWER
EXISTING
36" STORM
6"x4" REDUCER (S & SE)
6"X6"X6" WYE
4945
4950
4955
4960
4965
4970
4975
4980
4945
4950
4955
4960
4965
4970
4975
4980
9+50 10+00 11+00 11+25
PROPOSED 2"
INSULATION BOARD
(SEE NOTE 12)
PROPOSED
GROUND
EXISTING
GROUND
4935
4940
4945
4950
4955
4960
4965
4970
4935
4940
4945
4950
4955
4960
4965
4970
9+75 10+00 11+00
PROPOSED
GROUND
EXISTING
GROUND
4945
4950
4955
4960
4965
4970
4975
4980
4945
4950
4955
4960
4965
4970
4975
4980
9+75 10+00 11+00
PROPOSED
GROUND
EXISTING
GROUND
No. Revisions:
By: Date:
REVIEWED BY:
R. Provencio
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
06/19/13
PROJECT:
685-002
Sheet
RIVER DISTRICT BLOCK ONE MIXED USE
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
of 47 Sheets
C301
UTILITY PLAN AND PROFILES
J. Prelog
J. Prelog
1"=20'
NORTH
( IN FEET )
1 inch = ft.
30 0 30 Feet
30
60 90
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
Date
Date
Date
Date
Date
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
City Engineer
Water & Wastewater Utility
Stormwater Utility
Parks & Recreation
Traffic Engineer
Environmental Planner
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
PROFILE SCALE:
VERT. 1"=5'
HORIZ. 1"=30'
STORM LINE A STORM LINE B SANITARY SERVICE LINE A
NORTH NORTH
PROFILE SCALE:
VERT. 1"=5'
HORIZ. 1"=30'
PROFILE SCALE:
VERT. 1"=5'
HORIZ. 1"=30'
NOTES:
LEGEND:
E
CTV
EXISTING STORM SEWER
EXISTING CABLE TELEVISION
EXISTING ELECTRIC
EXISTING IRRIGATION BOX
EXISTING TELEPHONE PEDESTAL
EXISTING TREES
EXISTING SANITARY SEWER SS
EXISTING WATER W
X
EXISTING FIRE HYDRANT
EXISTING ELECTRIC VAULT VAULT
ELEC
�
�
�
CONTROL
IRR
EXISTING FIBER OPTICS FO
EXISTING GAS G
PROPOSED CURB & GUTTER
PROPOSED STORM SEWER
PROPOSED STORM INLET
PROPOSED UNDERGROUND ELECTRIC E
PROPOSED TELEPHONE T
PROPOSED GAS LINE G
PROPOSED EASEMENT
PROPOSED SITE LIGHTING
PROPOSED SWALE
PROPOSED SANITARY SEWER SS
PROPOSED DOMESTIC SERVICE 2" W
PROPOSED FIRE SERVICE 8" F
PROPOSED WATER APPURTENANCES
EXISTING TOP OF BANK
PROPOSED RETAINING WALL
EXISTING DUCT BANK E
FO
PROPOSED CABLE TELEVISION CTV
EXISTING WATER'S EDGE
PROPOSED SAWCUT
PROPERTY BOUNDARY
APPROXIMATE LIMITS OF CONSTRUCTION
EXISTING RIGHT-OF-WAY
EXISTING 100-YEAR FLOODPLAIN
EXISTING 0.5-FOOT FLOODWAY
EXISTING 500-YEAR FLOODPLAIN
EXISTING TOP OF BERM TO REMAIN
REFER TO APPROVED BANK STABILIZATION
DRAWINGS AND REPORT BY FLYWATER
7
RD
FO
EXISTING 100'
LINDEN
STREET
RIGHT-OF-WAY
TAGNUMBER
13'
34.13'
PROPOSED DRAINAGE
AND ACCESS EASEMENT
EXISTING BRIDGE WALL
EXISTING R.O.W.
EXISTING 36" STORM DRAIN
No. Revisions:
By: Date:
REVIEWED BY:
R. Provencio
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
06/19/13
PROJECT:
685-002
Sheet
RIVER DISTRICT BLOCK ONE MIXED USE
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
of 47 Sheets
C300
UTILITY PLAN
J. Prelog
J. Prelog
1"=20'
NORTH
( IN FEET )
1 inch = ft.
20 0 20 Feet
20
40 60
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'� �����.
C��� ������ ��� ���.
R
NOTES:
Date
Date
Date
Date
Date
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
City Engineer
Water & Wastewater Utility
Stormwater Utility
Parks & Recreation
Traffic Engineer
Environmental Planner
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
LEGEND:
E
CTV
EXISTING STORM SEWER
EXISTING CABLE TELEVISION
EXISTING ELECTRIC
EXISTING IRRIGATION BOX
EXISTING TELEPHONE PEDESTAL
EXISTING TREES
EXISTING SANITARY SEWER SS
EXISTING WATER W
X
EXISTING FIRE HYDRANT
EXISTING ELECTRIC VAULT VAULT
ELEC
�
�
�
CONTROL
IRR
EXISTING FIBER OPTICS FO
EXISTING GAS G
PROPOSED CURB & GUTTER
PROPOSED STORM SEWER
PROPOSED STORM INLET
PROPOSED UNDERGROUND ELECTRIC E
PROPOSED TELEPHONE T
PROPOSED GAS LINE G
PROPOSED EASEMENT
PROPOSED SITE LIGHTING
PROPOSED SWALE
PROPOSED SANITARY SEWER SS
PROPOSED DOMESTIC WATER SERVICE 2" W
PROPOSED FIRE SERVICE 8" F
PROPOSED WATER APPURTENANCES
KEY:
EXISTING WATER QUALITY
STRUCTURE LIDS TO BE
REPLACED AND RAISED
1
PROPOSED COMMERCIAL
SANITARY SEWER SERVICE
2
PROPOSED 6-INCH SANITARY
SEWER (SEE NOTE 10)
6
PROPOSED 2-INCH WATER
METER AND SERVICE
8
PROPOSED 8-INCH FIRE
SERVICE
9
10
PROPOSED ROOF DRAIN
3
PROPOSED INLET AND STORM DRAIN
RELOCATED {" METER,
CURB STOP AND
WATER SERVICE TO
RANCH-WAY PROPERTY}
11
CONNECT TO EXISTING TELEPHONE
LINE.
PEDESTAL TO BE REPLACED
(SEE NOTE 13)
PROPOSED RESIDENTIAL
SANITARY SEWER SERVICE
4
PROPOSED GREASE
INTERCEPTOR (SEE MECH.
DRAWINGS FOR CONTINUATION
AND DETAILS)
5
EXISTING TOP OF BANK
PROPOSED RETAINING WALL
EXISTING DUCT BANK E
FO
PROPOSED CABLE TELEVISION CTV
EXISTING WATER'S EDGE
PROPOSED SAWCUT
PROPERTY BOUNDARY
APPROXIMATE LIMITS OF CONSTRUCTION
EXISTING RIGHT-OF-WAY
EXISTING 100-YEAR FLOODPLAIN
EXISTING 0.5-FOOT FLOODWAY
EXISTING 500-YEAR FLOODPLAIN
EXISTING TOP OF BERM TO REMAIN
INSTALL 2" INSULATION
BOARD OVER SERVICE.
(SEE NOTE 17)
12
CONNECT TO EXISTING
FIBER OPTIC LINE.
13
6
PROPOSED DRAINAGE AND
ACCESS EASEMENT
CACHE LA POUDRE RIVER
LINDEN STREET
(100' ROW)
60' FT
(%%P)
(SEE NOTE
8)
100' FT
(%%P)
(SEE
NOTE 9)
15.95'
EXISTING BRIDGE WALL
10.03'
6.27'
EXISTING R.O.W.
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
Δ
1
2
3
4.2
4.2
4.2
4.2
OWNER:
RANCH-WAY INC.
(FIRST FLOOR)
13'
(TYP.)
13'
(TYP.)
C200
SIGNING AND STRIPING PLAN
HORIZONTAL CONTROL AND J. Prelog
J. Prelog
1"=20'
NORTH
( IN FEET )
1 inch = ft.
20 0 20 Feet
20
40 60
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'� �����.
C��� ������ ��� ���.
R
LEGEND:
NOTES:
D���
D���
D���
D���
D���
D���
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
C��� E�������
W���� & W��������� U������
S��������� U������
P���� & R���������
T������ E�������
E������������ P������
C��� �� F��� C������, C�������
UTILITY PLAN APPROVAL
1.FOR BUILDING LAYOUT REFERENCE ARCHITECTURAL PLANS. LAYOUT
AND DIMENSION INFORMATION SHOWN REPRESENTS OUTSIDE FACE OF
WALL AND IS SHOWN FOR INFORMATION ONLY.
2.REFER TO APPROVED SITE ELECTRICAL PLANS FOR ALL SITE LIGHTING
AS SHOWN ON THIS DRAWING.
3.ALL DIMENSIONS AND LINE AND CURVE INFORMATION ARE MEASURED
TO CURB FLOW LINE OR EDGE OF PAVEMENT UNLESS OTHERWISE NOTED.
4.CONTRACTOR SHALL REFER TO AND COORDINATE WITH THE
LANDSCAPE DRAWINGS FOR ALL LANDSCAPE AND SITE FEATURES SUCH
AS BIKE RACKS, BENCHES, SEAT WALLS, LANDSCAPE WALLS TRASH
RECEPTACLES, LANDSCAPE ROCK AND MULCH, ETC.
5.CONTRACTOR SHALL REFER TO AND COORDINATE WITH THE APPROVED
ARCHITECTURAL DRAWINGS FOR ALL STAIR AND HANDRAIL DETAILS AND
SPECIFICATIONS.
6.ALL HANDICAP RAMPS (PRIVATE AND PUBLIC) SHALL BE INSTALLED WITH
TRUNCATED DOME WARNING DETECTION SYSTEMS PER LARIMER COUNTY
URBAN AREA STREET STANDARD DETAILS.
7.ALL SYMBOLS, INCLUDING CROSSWALKS, STOP BARS, ETC. SHALL BE
PREFORMED THERMO-PLASTIC APPLICATIONS.
8.THIS SEGMENT OF PROPOSED BANK STABILIZATION IMPROVEMENTS
WILL BE FUNDED BY THE CITY CONTINGENT UPON CITY COUNCIL
APPROVAL.
9.THIS SEGMENT OF PROPOSED BANK STABILIZATION IMPROVEMENTS
WILL BE FUNDED BY THE DEVELOPER.
10.ALL PROPOSED PAVEMENT SECTIONS FOR PRIVATE DEVELOPMENT,
SEE LATEST GEOTECHNICAL REPORT BY EEC AND PAVEMENT SECTION
DETAILS FOR MORE INFORMATION.
11.ALL PROPOSED PAVEMENT SECTIONS WITHIN THE PUBLIC
RIGHT-OF-WAY SHALL BE SUBMITTED TO AND APPROVED BY THE CITY OF
FORT COLLINS PRIOR TO CONSTRUCTION. SEE GENERAL NOTES FOR
ADDITIONAL INFORMATION.
12.ALL PRIVATE CONCRETE WALKS SHALL BE SEALED AS RECOMMENDED
BY LATEST GEOTECHNICAL REPORT BY EEC AND/OR RECOMMENDED BY
EEC.
13.EPOXY APPLICATORS SHALL BE APPLIED AS SPECIFIED IN THE CDOT
STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
14.ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO
APPLICATION OF STRIPING AND MARKING.
15.ALL REGULATORY SIGNAGE ALONG LINDEN STREET SHALL BE BE
"ENHANCED LINDEN STREET STYLE REGULATORY SIGNAGE" TO MATCH
WHAT IS CURRENTLY INSTALLED ALONG LINDEN STREET.
16.FOR PARKING GARAGE SIGN LOCATIONS SEE APPROVED
ARCHITECTURAL PLANS
PROPOSED SIGN
PROPOSED STORM INLET
PROPOSED "HEAVY DUTY" CONCRETE
FOR PARKING LOT PAVEMENT AND GARAGE RAMP
(SEE NOTE 10)
PROPOSED 1.5-FOOT VERTICAL CURB & GUTTER SECTION
PROPOSED SWALE
EXISTING CURB & GUTTER
EXISTING TREES
EXISTING CONCRETE
PROPOSED COLORED CONCRETE
PROPOSED ASPHALT PAVEMENT
(SEE NOTE 11)
EXISTING TOP OF BANK
PROPOSED RETAINING WALL
EXISTING WATER'S EDGE
PROPERTY BOUNDARY
APPROXIMATE LIMITS OF CONSTRUCTION
EXISTING RIGHT-OF-WAY
EXISTING 100-YEAR FLOODPLAIN
EXISTING 0.5-FOOT FLOODWAY
EXISTING 500-YEAR FLOODPLAIN
EXISTING TOP OF BERM TO REMAIN
4" SOLID GREEN LINE,
PREFORMED THERMO PLASTIC PAVEMENT MARKING
4" SOLID WHITE LINE,
STRIPING LEGEND:
1
2
PREFORMED THERMO PLASTIC PAVEMENT MARKING
PREFORMED THERMO PLASTIC PAVEMENT MARKING
3 MOTORCYCLE STENCIL (SEE DETAIL SHEET)
No.
Revisions: By: Date:
REVIEWED BY:
R. Provencio
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
06/19/13
PROJECT:
685-002
Sheet
RIVER DISTRICT BLOCK ONE MIXED USE
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
of 47 Sheets
PROPOSED 1.5-FOOT OUTFALL CURB & GUTTER SECTION
PROPOSED MILL AND OVERLAY
PARKING LOT CONCRETE JOINT PATTERN
1 LONGITUDINAL JOINT WITH DOWEL.
CONSTRUCTION JOINT WITH DOWEL
2 CONTRACTION JOINT WITH DOWEL
3
NOTES:
1. JOINTS SHALL BE SPACED 13 FT ON CENTER UNLESS OTHERWISE NOTED.
2. SUGGESTED JOINT PATTERN. ALTERNATE JOINT PATTERN AS APPROVED BY EEC.
SCALE 1"=20'
5
4.2 PARKING SIGN (SEE DETAIL SHEET)
(SEE NOTE 16)
/ /
/
/ / /
/
/
/
/
/
/
/
/ / / / /
/
/ / / / /
/
/ /
/
/
/
/
/
/
/
/
/
/
/
/ /
/ /
/
/
/
/
/
/
/
/
/
/ /
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/ /
/
/ / /
/
/ /
/ /
/ /
/
/
/
/ / /
/
/ /
/
/ / /
/
/
/
/
/
/
/
/
/
/
/
/
/ /
/
/
/
/
/
/
/
/ /
/
/ / / / /
/
/
/ / / /
/
/ / / / /
/ / / /
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/ / /
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/ /
/
/ /
/
/
/
/
/ /
/
/
/
/
/
/
/ /
/
/
/
/
/
/
/
/
/
/ / / / / / / /
/
/ / / / / /
/
/ / / / /
/
/ / / / / / / / /
/
/
/
/ / / / / /
/ /
/
/ /
/
/ /
/
/
/
/
/ /
/
/ /
/
/
/
/
/
/
/
/
/
/ /
/
/
/ /
/ /
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/ /
/
/
/
/
/
/
/ /
/
/
/
/
/ /
/
/ /
/
/ /
/
/ /
/
/ / /
/ / /
/ /
/
/ / /
/ /
/ /
/
/
/
/
/ /
/
/ /
/
/
/
/ /
/
/
/
/
/
/
/ /
/
/
/
/
/ /
/
/
/ /
/
/
/
/ / /
/
/
/ / /
/
/
EXISTING 36" STORM DRAIN
EXISTING 100'
LINDEN
STREET
RIGHT-OF-WAY
EXISTING R.O.W.
No. Revisions:
By: Date:
REVIEWED BY:
R. Provencio
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
06/19/13
PROJECT:
685-002
Sheet
RIVER DISTRICT BLOCK ONE MIXED USE
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
06/19/13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
of 47 Sheets
C100
& DEMOLITION PLAN
EXISTING CONDITIONS J. Prelog
J. Prelog
1"=20'
NORTH
( IN FEET )
1 inch = ft.
20 0 20 Feet
20
40 60
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'� �����.
C��� ������ ��� ���.
R
LEGEND:
E
CTV
EXISTING STORM SEWER
EXISTING CABLE TELEVISION
EXISTING DUCT BANK
EXISTING IRRIGATION BOX
EXISTING TELEPHONE PEDESTAL
EXISTING TREES
FIELD SURVEY BY:
NOTES:
ORIGINAL FIELD SURVEY
Northern Engineering Services, Inc.
Date: October, 2011
EXISTING SANITARY SEWER SS
EXISTING WATER W
X
EXISTING FIRE HYDRANT
EXISTING ELECTRIC VAULT
PROPERTY BOUNDARY
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
5015
5013
Date
Date
Date
Date
Date
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
City Engineer
Water & Wastewater Utility
Stormwater Utility
Parks & Recreation
Traffic Engineer
Environmental Planner
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
VAULT
ELEC
�
�
�
CONTROL
IRR
1.EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE
UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST
INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT
GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY
MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON
THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL
ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY
CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS.
2.CURB, GUTTER AND SIDEWALK SHALL BE REMOVED TO THE NEAREST
JOINT.
3.COORDINATE THE REMOVAL AND/OR SALVAGING OF ALL EXISTING
TREES SHOWN ON THIS DEMOLITION PLAN WITH APPROVED LANDSCAPE
DRAWINGS. COORDINATE THE REMOVAL OF ALL OTHER PLANTINGS WITH
APPROVED LANDSCAPE DRAWINGS.
4.COORDINATE THE REMOVAL AND/OR SALVAGING OF ALL LIGHT
FIXTURES, ELECTRICAL EQUIPMENT AND ELECTRICAL LINES WITH THE
ELECTRICAL PLANS.
5.THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES THAT ARE
NOT TO BE REMOVED ADJACENT TO THE CONSTRUCTION AREA
INCLUDING, BUT NOT LIMITED TO, SIDEWALKS, PRIVATE FENCES, AND
ABOVE GROUND OR UNDERGROUND UTILITIES. THE CONTRACTOR SHALL
BE RESPONSIBLE FOR ANY DAMAGE THAT SHOULD OCCUR TO ANY
ON-SITE, OFF-SITE, PUBLIC OR PRIVATE FACILITY OR FEATURE AS A
RESULT OF THE CONSTRUCTION PROCESS FOR THIS PROJECT.
6.SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES
WITHIN THE NATURAL HABITAT BUFFER ZONE.
7.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE
DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL
REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS.
8.CONTRACTOR SHALL CONTACT CENTURYLINK TO COORDINATE THE
RELOCATION OF THE EXISTING TELEPHONE PEDESTAL WITH THE
PLACEMENT OF NEW CENTURYLINK TELEPHONE LINES FOR THE PROJECT.
9.CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF ON-SITE
PRIVATE ELECTRICAL EQUIPMENT AND LIGHT POLE.
10.REFER TO APPROVED PLANS BY HINES IRRIGATION FOR IRRIGATION
SERVICE TO PROPOSED PLANTERS ALONG LINDEN STREET.
{11.A FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR THE REMOVAL
OF EXISTING FEATURES AND CONSTRUCTION OF THE PROPOSED TRAIL,
PROPOSED PARKING LOT AND BANK STABILIZATION WITHIN THE FEMA
FLOODPLAIN. NOTE THAT ANY CONSTRUCTION WITHIN THE FEMA
FLOODWAY WILL REQUIRE A CITY NO-RISE CERTIFICATION. CONTRACTOR
SHALL CONTACT THE CITY OF FORT COLLINS FLOODPLAIN
ADMINISTRATOR PRIOR TO CONSTRUCTION TO OBTAIN ALL
REQUIREMENTS FOR DEMOLITION/CONSTRUCTION WITHIN THE FEMA
0.5-FOOT FLOODWAY. ONCE CONSTRUCTION WITHIN THE FEMA
FLOODWAY IS COMPLETE A POST-CONSTRUCTION NO-RISE
CERTIFICATION WILL BE REQUIRED.
12.THE FOLLOWING FLOODWAY REGULATIONS MUST BE MET:
-NO FILL IS ALLOWED IN THE FLOODWAY UNLESS A HYDRAULIC ANALYSIS
SHOWS "NO RISE".
-LANDSCAPING MEETS REQUIREMENTS FOR NO ENCROACHMENT IN THE
FLOODWAY WITHOUT A HYDRAULIC ANALYSIS TO SHOW "NO RISE".
-NO STORAGE OF MATERIALS OR EQUIPMENT IN THE FLOODWAY.
-NO RISE CERTIFICATION REQUIRED BOTH FOR PRE-CONSTRUCTION AND
REMOVE EXISTING TREES
REMOVE EXISTING UNDERGROUND ELECTRIC / / / / / / / / / / / / / / / / / E / / / / / / / / / / / / / / / /
REMOVE EXISTING FENCE / / / / / / / / / / / / / / / / / X / / / / / / / / / / / / / / / /
EXISTING FIBER OPTICS FO
EXISTING GAS G
APPROXIMATE LIMITS OF CONSTRUCTION
EXISTING RIGHT-OF-WAY
EXISTING 100-YEAR FLOODPLAIN
REMOVE EXISTING CONCRETE PAVEMENT OR SIDEWALK
REMOVE EXISTING ASPHALT PAVEMENT
REMOVE EXISTING STRUCTURE
EXISTING ELECTRIC E
FO
EXISTING TOP OF BANK
EXISTING 0.5-FOOT FLOODWAY
EXISTING WATER'S EDGE
EXISTING 500-YEAR FLOODPLAIN
EXISTING TOP OF BERM
SAWCUT LINE
{
1.WITHIN THE DRIP LINE OF ANY PROTECTED EXISTING TREE THERE SHALL BE NO CUT OR FILL OVER A FOUR-INCH DEPTH UNLESS A QUALIFIED ARBORIST OR FORESTER HAS
EVALUATED AND APPROVED THE DISTURBANCE.
2.ALL PROTECTED EXISTING TREES SHALL BE PRUNED TO THE CITY OF FORT COLLINS TREE MANAGEMENT STANDARDS FOR THINNING AND CLEANING.
3.PRIOR AND DURING CONSTRUCTION, BARRIERS SHALL BE ERECTED AROUND ALL PROTECTED EXISTING TREES WITH SUCH BARRIERS TO BE OF ORANGE FENCING A MINIMUM OF
FOUR (4) FEET IN HEIGHT, SECURED WITH METAL T-POSTS, NO CLOSER THAN SIX (6) FEET FROM THE TRUNK OR AT THE DRIP LINE, WHICH EVER IS GREATER, THERE SHALL BE NO
STORAGE OR MOVEMENT OF EQUIPMENT, MATERIAL, DEBRIS OR FILL WITHIN THE FENCED TREE PROTECTION ZONE. MODIFICATION OF PROTECTIVE FENCE LOCATIONS TO
ACCOMMODATE CONSTRUCTION SHALL BE APPROVED BY THE CITY FORESTER PRIOR TO MOVING OR ERECTING A PROTECTIVE FENCE. WHERE THE DRIP LINE OF TREES TOUCH OR
OVERLAP, PLACE FENCE AROUND GROUPS OF TREES.
4.DURING CONSTRUCTION THERE SHALL BE NO CLEANING OF EQUIPMENT OR MATERIALS OR THE STORAGE AND DISPOSAL OF WASTE MATERIAL SUCH AS PAINTS, OILS,
SOLVENTS, ASPHALT, CONCRETE, MOTOR OIL OR ANY OTHER MATERIAL HARMFUL TO THE LIFE OF A TREE WITHIN THE DRIP LINE OF ANY PROTECTED TREE OR GROUP OF TREES.
5.NO DAMAGING ATTACHMENTS, WIRES, SIGNS OR PERMITS MAY BE FASTENED TO ANY PROTECTED TREE.
6.THE INSTALLATION OF UTILITIES, IRRIGATION LINES OR ANY UNDERGROUND FIXTURE REQUIRING EXCAVATION DEEPER THAN SIX (6) INCHES SHALL BE ACCOMPLISHED BY
BORING UNDER THE ROOT SYSTEM OF PROTECTED EXISTING TREES AT A MINIMUM DEPTH OF TWENTY-FOUR (24) INCHES. THE AUGER DISTANCE IS ESTABLISHED FROM THE FACE
OF THE TREE (OUTER BARK) AND IS SCALED FROM THE TREE DIAMETER AT BREAST HEIGHT AS DESCRIBED IN THE TREE PROTECTION CHART OF THE FORT COLLINS LAND USE CODE
SECTION 3.2.1.
7.CONSTRUCTION SHALL BE PERFORMED IN A MANNER TO NOT DAMAGE ANY EXISTING TREE. CLEARANCE PRUNING OF ANY TREE ON SITE SHALL ONLY BE BY A FORT COLLINS
LICENSED ARBORIST FOLLOWING CITY OF FORT COLLINS TREE MANAGEMENT STANDARDS UNDER THE DIRECTION OF THE CITY FORESTER.
8.EQUIPMENT ACCESS/DRIVES SHALL BE POSITIONED TO MINIMIZE TRAVEL OVER THE ROOT SYSTEM OF ANY EXISTING TREE. EQUIPMENT DRIVE LOCATIONS OVER THE ROOT
SYSTEM OF ANY SIGNIFICANT TREE SHALL BE APPROVED BY THE CITY FORESTER WITH REQUIREMENTS TO PROTECT THE SOIL FROM BEING COMPACTED.
9.LARGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATED FROM CONSTRUCTION OR LAND CLEARING AREAS, ROAD RIGHTS-OF-WAY AND UTILITY EASEMENTS
MAY BE "RIBBONED OFF," RATHER THAN ERECTING PROTECTIVE FENCING AROUND EACH TREE AS REQUIRED IN SUBSECTION (G)(#) ABOVE. THIS MAY BE ACCOMPLISHED BY
PLACING METAL T-POST STAKES A MAXIMUM OF FIFTY (50) FEET APART AND TYING RIBBON OR ROPE FROM STAKE-TO-STAKE ALONG THE OUTSIDE PERIMETERS OF SUCH AREAS
BEING CLEARED.}
TREE PROTECTION NOTES
4
1" PLASTIC CAP
LS 14823
24.98'
500-YR FLOODPLAIN
BOUNDARY
WATER'S EDGE AT
AT TIME OF SURVEY
(APRIL 2012)
N04�52'55"E 159.17'
N48�18'57"W
44.60'
N48�41'10"E
10.49'
N06�27'08"E
71.04'
N41�18'50"W
14.71'
N41�41'10"E
1.89'
20.00' 13.28' 28.42'
ENCROACHMENT EASEMENT
TO BE DEDICATED
BY SEPARATE DOCUMENT
REC. NO. _______________
ENCROACHMENT EASEMENT
TO BE DEDICATED
BY SEPARATE DOCUMENT
REC. NO. _______________
PERMANENT CONSTRUCTION
ACCESS & MAINTENANCE
EASEMENT TO BE DEDICATED
BY SEPARATE DOCUMENT
REC. NO. _______________
LANDSCAPE EASEMENT
TO BE DEDICATED
BY SEPARATE DOCUMENT
REC. NO. _______________
S04�53'10"W 231.00'
S04�22'00"W (R)
S38�36'00"E (R)
S38�04'50"E 163.45' 20.45'
N41�10'00"E (R)
N41�41'10"E 214.00'
LEGACY SENIOR RESIDENCES
REC. NO. 20120081209
XX XX
XX
XX XX
( IN FEET )
1 inch = ft.
0 Feet
NORTH
REVIEWED BY:
G. Gilliland
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
6/14/13
PROJECT:
685-002
Sheet
of 47 Sheet
RIVER DISTRICT BLOCK ONE MIXED USE NOTICE
:
According to Colorado law you must commence any legal action based
upon any defect in this survey within three years after you discover such
defect. In no event may any action based upon any defect in this survey
be commenced more than ten years after the date of the certificate shown
hereon.
RANGE:
TOWNSHIP:
SECTION:
200 S���� C������ A�����, S���� 10
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
3
MAINTENANCE GUARANTEE:
The Owner hereby warrants and guarantees to the City, for a period of two (2) years from the date of completion and first acceptance by the City of the
improvements warranted hereunder, the full and complete maintenance and repair of the improvements to be constructed in connection with the
Development which is the subject of this Plat. This warranty and guarantee is made in accordance with the City Land Use Code and/or the Transitional
Land Use Regulations, as applicable. This guarantee applies to the streets and all other appurtenant structures and amenities lying within the
rights-of-way, Easements and other public properties, including, without limitation, all curbing, sidewalks, bike paths, drainage pipes, culverts, catch
basins, drainage ditches and landscaping. Any maintenance and/or repair required on utilities shall be coordinated with the owning utility company or
department.
The Owner shall maintain said improvements in a manner that will assure compliance on a consistent basis with all construction standards, safety
requirements and environmental protection requirements of the City. The Owner shall also correct and repair, or cause to be corrected and repaired, all
damages to said improvements resulting from development-related or building-related activities. In the event the Owner fails to correct any damages
within thirty (30) days after written notice thereof, then said damages may be corrected by the City and all costs and charges billed to and paid by the
Owner. The City shall also have any other remedies available to it as authorized by law. Any damages which occurred prior to the end of said two (2)
year period and which are unrepaired at the termination of said period shall remain the responsibility of the Owner.
REPAIR GUARANTEE:
In consideration of the approval of this final Plat and other valuable consideration, the Owner does hereby agree to hold the City harmless for a five (5)
year period, commencing upon the date of completion and first acceptance by the City of the improvements to be constructed in connection with the
development which is the subject of this Plat, from any and all claims, damages, or demands arising on account of the design and construction of public
improvements of the property shown herein; and the Owner furthermore commits to make necessary repairs to said public improvements, to include,
without limitation, the roads, streets, fills, embankments, ditches, cross pans, sub-drains, culverts, walls and bridges within the right-of-way, Easements
and other public properties, resulting from failures caused by design and/or construction defects. This agreement to hold the City harmless includes
defects in materials and workmanship, as well as defects caused by or consisting of settling trenches, fills or excavations.
Further, the Owner warrants that he/she owns fee simple title to the property shown hereon and agrees that the City shall not be liable to the Owner or
his/her successors in interest during the warranty period, for any claim of damages resulting from negligence in exercising engineering techniques and
due caution in the construction of cross drains, drives, structures or buildings, the changing of courses of streams and rivers, flooding from natural creeks
and rivers, and any other matter whatsoever on private property. Any and all monetary liability occurring under this paragraph shall be the liability of the
Owner. I further warrant that I have the right to convey said land according to this Plat.
NOTICE OF OTHER DOCUMENTS:
All persons take notice that the Owner has executed certain documents pertaining to this Development
which create certain rights and obligations of the Development, the Owner and/or subsequent Owners of
all or portions of the Development site, many of which obligations constitute promises and covenants
that, along with the obligations under this Plat, run with the land. The said documents may also be
amended from time to time and may include, without limitation, the Development Agreement, Site And
Landscape Covenants, Final Site Plan, Final Landscape Plan, and Architectural Elevations, which
documents are on file in the office of the clerk of the City and should be closely examined by all persons
interested in purchasing any portion of the Development site.
SURVEYOR'S STATEMENT
I, Gerald D. Gilliland, a Colorado Registered Professional Land Surveyor do hereby state that this Subdivision Plat
was prepared from an actual survey under my personal supervision, that the monumentation as indicated hereon
were found or set as shown, and that the foregoing plat is an accurate representation thereof, all this to the best of
my knowledge, information and belief.
__________________________________
Gerald D. Gilliland
Colorado Registered Professional
Land Surveyor No. 14823
CERTIFICATE OF DEDICATION:
The Owner does hereby dedicate and convey to the City of Fort Collins, Colorado (hereafter “City”), for public use, forever, a permanent
right-of-way for street purposes and the “Easements” as laid out and designated on this Plat; provided, however, that (1) acceptance by the City of
this dedication of Easements does not impose upon the City a duty to maintain the Easements so dedicated, and (2) acceptance by the City of this
dedication of streets does not impose upon the City a duty to maintain streets so dedicated until such time as the provisions of the Maintenance
Guarantee have been fully satisfied. The streets dedicated on this Plat are the fee property of the City as provided in Section 31-23-107 C.R.S. The
City's rights under the Easements include the right to install, operate, access, maintain, repair, reconstruct, remove and replace within the Easements
public improvements consistent with the intended purpose of the Easements; the right to install, maintain and use gates in any fences that cross the
Easements; the right to mark the location of the Easements with suitable markers; and the right to permit other public utilities to exercise these same
rights. Owner reserves the right to use the Easements for purposes that do not interfere with the full enjoyment of the rights hereby granted. The
City is responsible for maintenance of its own improvements and for repairing any damage caused by its activities in the Easements, but by
acceptance of this dedication, the City does not accept the duty of maintenance of the Easements, or of improvements in the Easements that are not
owned by the City. Owner will maintain the surface of the Easements in a sanitary condition in compliance with any applicable weed, nuisance or
other legal requirements.
Except as expressly permitted in an approved plan of development or other written agreement with the City, Owner will not install on the Easements,
or permit the installation on the Easements, of any building, structure, improvement, fence, retaining wall, sidewalk, tree or other landscaping (other
than usual and customary grasses and other ground cover). In the event such obstacles are installed in the Easements, the City has the right to
require the Owner to remove such obstacles from the Easements. If Owner does not remove such obstacles, the City may remove such obstacles
without any liability or obligation for repair and replacement thereof, and charge the Owner the City's costs for such removal. If the City chooses
not to remove the obstacles, the City will not be liable for any damage to the obstacles or any other property to which they are attached.
The rights granted to the City by this Plat inure to the benefit of the City's agents, licensees, permittees and assigns.
ATTORNEY'S CERTIFICATION
I hereby certify that this Subdivision Plat has been duly executed as required pursuant to Section
2.2.3(C)(3)(a) through (e) inclusive of the Land Use Code of the City of Fort Collins and that all
persons signing this Subdivision Plat on behalf of a corporation or other entity are duly authorized
signatories under the laws of the State of Colorado. This Certification is based upon the records of the
Clerk and Recorder of Larimer County, Colorado as of the date of execution of the Plat and other
information discovered by me through reasonable inquiry and is limited as authorized by Section
2.2.3(C)(3)(f) of the Land Use Code.
Attorney:________________________________________
Address: ________________________________________
________________________________________
Registration No.:__________________________________
NOTICE
ALL RESPONSIBILITIES AND COSTS OF OPERATION, MAINTENANCE AND
RECONSTRUCTION OF THE PRIVATE STREETS AND/OR DRIVES LOCATED ON THE
PRIVATE PROPERTY THAT IS THE SUBJECT OF THIS PLAT SHALL BE BORNE BY THE
OWNERS OF SAID PROPERTY, EITHER INDIVIDUALLY, OR COLLECTIVELY, THROUGH A
PROPERTY OWNERS' ASSOCIATION, IF APPLICABLE. THE CITY OF FORT COLLINS SHALL
HAVE NO OBLIGATION OF OPERATION, MAINTENANCE OR RECONSTRUCTION OF SUCH
PRIVATE STREETS AND/OR DRIVES NOR SHALL THE CITY HAVE ANY OBLIGATION TO
ACCEPT SUCH STREETS AND/OR DRIVES AS PUBLIC STREETS OR DRIVES.
APPROVED AS TO FORM, CITY ENGINEER
By the City Engineer of the City of Fort Collins, Colorado this ______day of _____________ A.D., 20_____.
____________________________________________________
City Engineer
PLANNING APPROVAL
By the Director of Planning the City of Fort Collins, Colorado this _____ day of ___________ A.D., 20_____.
____________________________________________________
Director of Planning
NOTES:
1) All information regarding easements, right-of-way or title of record, Northern Engineering relied upon
File Number 580-F0391069-383-JNB, dated October 4, 2011, prepared by Fidelity National Title Company.
2) The lineal unit of measurement for this plat is U. S. Survey Feet.
OWNER:
BY:_________________________________
TITLE:______________________________
STATE OF COLORADO )
)SS
COUNTY OF LARIMER )
The foregoing instrument was acknowledged before me this _____ day of ___________________, 20____, by
_____________________________________________, as ________________________________________
Witness my hand and official seal
My commission expires: ________________
_______________________________
Notary Public
STATEMENT OF OWNERSHIP AND SUBDIVISION:
Know all persons by these presents, that the undersigned owner(s) of the following described land: A tract of land being a portion of Block 1, City of Fort
Collins and a portion of the Northwest Quarter of Section 12, Township 7 North, Range 69 West of the 6th P.M., City of Fort Collins, County of Larimer,
State of Colorado being more particularly described as follows:
Considering the Northwest line of Block 1, City of Fort Collins bearing North 41°41'10" East and with all bearings contained herein relative thereto:
COMMENCING at the most westerly corner of said Block 1, thence along the northwesterly line of Block 1, North 41°41'10" East, 250.00 feet to the
POINT OF BEGINNING; thence continuing along said northwesterly line, North 41°41’10” East, 214.00 feet; thence, South 38°04’50” East, 163.45 feet;
thence, South 04°53’10” West, 231.00 feet; thence, North 48°18’50” West, 299.24 feet to the POINT OF BEGINNING, contains 1.030 acres, more or less.
For themselves and their successors in interest (collectively "Owner") have caused the above described land to be surveyed and subdivided into lots, tracts
and streets as shown on this Plat to be known RIVER DISTRICT BLOCK ONE MIXED USE (the "Development"), subject to all easements and
rights-of-way now of record or existing or indicated on this Plat. The rights and obligations of this Plat shall run with the land.
PLAT OF
RIVER DISTRICT BLOCK ONE MIXED USE
BEING A PORTION OF BLOCK 1, CITY OF FORT COLLINS AND A PORTION OF THE NORTHWEST QUARTER
OF SECTION 12, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS,
COUNTY OF LARIMER, STATE OF COLORADO
1
SECTION 12, T7N, R69W
CITY OF FORT COLLINS, COLORADO
N.A.
L. Smith
1"=30'
12 7N
69 W of the 6th PM
PROJECT
LOCATION
VICINITY MAP
NORTH 1"=2000'
N48�50'00"W (R) - RECORDED BEARING
PER RECEPTION NO. 20110068223
PROJECT BENCHMARKS:
BENCHMARK #1:
City of Fort Collins Benchmark 4-00
Located in the sidewalk at the southwest end of the Poudre River bridge on Linden Street.
Elevation= 4960.55
BENCHMARK #2:
City of Fort Collins Benchmark 5-00
Located on the top of curb at the signal pole base at the northwest corner of Linden Street and Jefferson Street.
Elevation= 4974.87
Basis of Bearings
Basis of Bearings is the Northwest line of Block 1, City of Fort Collins bearing North 41°41'10" East from a
set 1" brass tag & nail at the Westerly corner of Block 1 to a found #4 rebar with 1" plastic cap LS 14823 at the
Northerly corner of property (assumed bearing).
SET #4 REBAR w/1"
PLASTIC CAP, LS 14823
LEGEND
BOUNDARY LINE
CENTERLINE
EASEMENT LINE
LOT LINE
RIGHT-OF-WAY
FOUND PROPERTY CORNER
AS DESCRIBED
U.S. SURVEY FEET
EDGE OF RIVER
NORTH AZTLAN
COMMUNITY CENTER
REC. NO. 20060083144
It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these
plans.
8. The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for
any utility crossings required.
9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the
engineer to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction.
10. The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is
accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance,
all parties affected by any disruption of any utility service as well as the utility companies.
11. No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility
provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility
provider, a pre-construction meeting may be required prior to commencement of any work.
12. The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and
sanitary sewer should be constructed prior to installation of the water lines and dry utilities.
13. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the
Water Utility.
14. A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is
discharged into a storm sewer, channel, irrigation ditch or any waters of the United States.
15. The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department
of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan.
16. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of
onsite drainage facilities shall be the responsibility of the property owner(s).
17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be
submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at
least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be
submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed
prior to certification per the Development Agreement.
18. The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater
seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as
a result of the City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development.
19. All recommendations of the Final Drainage Report for River District Block One Mixed Use dated June 19, 2013 by Northern Engineering
Services, Inc., shall be followed and implemented.
20. Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall
be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping.
21. The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and
debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.)
or as approved by the the City of Fort Collins street inspector.
22. No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction
Permit is obtained, if applicable.
23. The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction.
The Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control
Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all
public improvements. If the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the
Developer may commence work in the Engineer's absence. However, the City of Fort Collins reserves the right not to accept the
improvement if subsequent testing reveals an improper installation.
24. The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench
work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not
correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement
section or, the Developer may use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final
soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a
minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur
until the City of Fort Collins Engineer approves the final report.
25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter
flowline at all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must
certify in a letter to the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be
noted in the letter and then resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets.
26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction.
For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be
stubbed to the property lines and marked so as to reduce the excavation necessary for building connections.
27. Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional
criteria for roads within these districts.
28. All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as
established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval.
29. Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any
tree removal requiring a permit.
30. The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and
security. Refer to OSHA Publication 2226, Excavating and Trenching.
31. The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The
the City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way.
The Developer shall be responsible for providing any and all traffic control devices as may be required by the construction activities.
32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins
Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor
moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed.
33. The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the
Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing
traffic access to and from the Development.
34. There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site
construction activities on Sundays or holidays, unless there is prior written approval by Larimer County.
35. The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on
these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise.
36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer
for clarification, and annotate the dimension on the as-built record drawings.
37. The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and
specifications, and a copy of any permits and extension agreements needed for the job.
38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or
specifications, the Developer shall contact the Designer and the City of Fort Collins Engineer immediately.
39. The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available
to the City of Fort Collins Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of
Fort Collins Engineer.
40. The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as
well as the basis of bearings. The information shall be as follows:
City of Fort Collins benchmark 4-00
Located in the sidewalk at the southwest end of the Poudre River bridge on Linden Street.
Elevation= 4960.55
City of Fort Collins benchmark 5-00
Located on the top of curb at the signal pole base at the northwest corner of Linden Street and Jefferson Street.
Elevation= 4974.87
41. All stationing is based on centerline of roadways unless otherwise noted.
42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters,
landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored
in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements
and/or prior to the issuance of the first Certificate of Occupancy.
43. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The
existing street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be
done in accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing
surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the
entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the
Larimer County Engineer and/or the City of Fort Collins Inspector at the time the cuts are made.
44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before
construction, or to the grades and condition as required by these plans.
45. Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections.
46. After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and
workmanship defects for a minimum period of two years from the date of acceptance.
47. The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage
structures and pipes, for the following private streets: N.A.
48. Approved Variances are listed as follows:
CONSTRUCTION NOTES
A. Grading and Erosion Control Notes
1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site.
2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans.
3. All required perimeter silt and construction fencing shall be installed priorto any land disturbing activity (stockpiling, stripping, grading, etc).
All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the
approved project schedule, construction plans, and erosion control report.
4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the
property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining
all erosion control facilities shown herein.
5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be
limited to the area(s) required for immediate construction operations, and for the shortest practical period of time.
6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened
condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils
in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required
temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County.
7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall:
a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as
necessary in order to ensure the continued performance of their intended function.
b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control
inspector.
c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector.
8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment
and debris from all drainage infrastructure and other public facilities.
9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public
rights of way, and make sure streets and walkways are cleaned at the end of each working day.
10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not
to cause their release into any waters of the United States.
11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening,
watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched.
12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project
and before turning the maintenance over to the City/County or Homeowners Association (HOA).
13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any
pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete
truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are
necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and
federal regulations.
14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout
material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the
concrete washout material will be removed and properly disposed of prior to the area being restored.
15. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement
whatever measures are determined necessary, as directed by the City.
B. Street Improvement Notes
1. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed
here.
2. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for
approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt).
The job mix shall be submitted for approval prior to placement of any asphalt.
3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing
edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean
construction joint can be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins.
4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the
subgrade has been inspected and approved by the City of Fort Collins Engineer.
5. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting
rings are not allowed.
6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The
existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in
conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The
determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with
adjacent landowners such that future projects do not cut the new asphalt overlay work.
7. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement)
and as per the Right-of-Way Work Permit traffic control plan.
8. The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of
asphalt. Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain
properly.
9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a
full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will
be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than
50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall
not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as
determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface.
The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence
of an Inspector.
C. Traffic Signing and Pavement Marking Construction Notes
1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking
Construction Notes listed here.
2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic.
3. All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD.
4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads.
5. All lane lines for concrete pavement should be epoxy paint.
6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and
placement of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of
striping and symbols.
7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards.
8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction.
9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings.
10. All sign posts shall utilize break-away assemblies and fasteners per the Standards.
11. A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer or their designate. All
discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin.
12. The Developer installing signs shall be responsible for locating and protecting all underground utilities.
13. Special care shall be taken in sign location to ensure an unobstructed view of each sign.
14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of
Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer
determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and
striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings).
15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail.
D. Storm Drainage Notes
1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of
onsite drainage facilities shall be the responsibility of the property owner(s).
2. All recommendations of the Final Drainage Report for River District Block One Mixed Use dated June 19, 2013 by Northern Engineering
Services, Inc., shall be followed and implemented.
3. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by
submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at
least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by
submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed
prior to certification per the Development Agreement.
E. Utility Notes
1. All waterline and sanitary sewer construction shall conform to the Fort Collins Utility standards and specifications current to date of
construction.
2. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the
water utility.
3. Water mains shall be poly-wrapped D.I.P, or PVC with tracer wire.
4. HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and
ASTM. The HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections.
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'� �����.
C��� ������ ��� ���.
R
Date
Date
Date
Date
Date
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
City Engineer
Water & Wastewater Utility
Stormwater Utility
Parks & Recreation
Traffic Engineer
Environmental Planner
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
2
of 47 Sheets
CONTACT INFORMATION
PROJECT TEAM:
BHA Design, Inc.
1603 Oakridge Drive, Suite 100
Fort Collins, CO 80525
(970) 223-7577
[AU] Workshop
F��� C������, CO 80524
(970) 430-5220
GAS----------------- Xcel Energy----------------------------- Stephanie Rich (970) 225-7828
ELECTRIC-------- City of Fort Collins Light & Power-- Doug Martine (970) 224-6152
CABLE------------- Xfinity-------------------------------------- Don Kapperman (970) 567-0245
TELECOM.--------Centurylink------------------------------- Bill Johnson (970) 490-7501
WATER------------ City of Fort Collins Utilities----------- Roger Buffington (970) 221-6854
WASTEWATER--City of Fort Collins Utilities----------- Roger Buffington (970) 221-6854
STORMWATER- City of Fort Collins Utilities----------- Glen Schlueter (970) 221-6700
UTILITY CONTACT LIST: *
UTILITY COMPANY
* This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for
the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for
locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of
Colorado (UNCC) at 811 for additional information.
Earth Engineering Consultants, Inc.
4396 Greenfield Drive
Windsor, Colorado 80550
(970) 545-3908
PHONE NUMBER
Northern Engineering Services, Inc.
200 South College Avenue, Suite 010
Fort Collins, Colorado 80524
(970) 221-4158
Northern Engineering Services, Inc.
200 South College Avenue, Suite 010
Fort Collins, Colorado 80524
(970) 221-4158
E N G I N E E R I N G
� � � � � � ��
E N G I N E E R I N G
� � � � � � ��
PLANNER/
LANDSCAPE ARCHITECT
SiteWise, LLC
7000 N. Broadway
Building 3, Suite 306
Denver, Colorado 80221
(303) 650-8680
** The underground utility locates provided by SiteWise, LLC are based upon the best available information at
the time of locating. Contractor acknowledges that it is common for underground facility owner maps to have
errors and omissions of data shown. Consequently, it is the Contractor's sole responsibility to field verify the
location of all utilities prior to construction, and notify the Engineer of any discrepancies found.
I hereby affirm that these final
construction plans were prepared
under my direct supervision, in
accordance with all applicable City
of Fort Collins and State of
Colorado standards and statutes,
respectively; and that I am fully
responsible for the accuracy of all
design. revisions, and record
conditions that I have noted on
these plans.
These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility
by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness
of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities
required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort
Collins for additional quantities of items shown that may be required during the construction phase.
DISCLAIMER STATEMENT:
CERTIFICATION STATEMENT:
PROJECT
LOCATION
Date
Date
Date
Date
Date
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
City Engineer
Water & Wastewater Utility
Stormwater Utility
Parks & Recreation
Traffic Engineer
Environmental Planner
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
VICINITY MAP
NORTH 1"=2000'
GEOTECHNICAL ENGINEER
SUBSURFACE UTILITY LOCATES**
BUILDING ARCHITECT
SITE ENGINEER
SURVEYOR
BENCHMARK #1:
City of Fort Collins Benchmark 4-00
Located in the sidewalk at the southwest end of the Poudre River bridge on Linden Street .
Elevation= 4960.55
BENCHMARK #2:
City of Fort Collins Benchmark 5-00
Located on the top of curb at the signal pole base at the northwest corner of Linden Street
and Jefferson Street.
Elevation= 4974.87
Basis of Bearings
Basis of Bearings is the Northwest line of Block 1, City of Fort Collins bearing North
41�41'10" East from a set 1" brass tag & nail at the Westerly corner of Block 1 to a found #4
rebar with 1" plastic cap LS 14823 at the Northerly corner of property (assumed bearing).
Northern Engineering Services, Inc
NE Project No. 685-001
Date: October, 2011
ORIGINAL FIELD SURVEY BY:
Earth Engineering Consultants, Inc.
"SUBSURFACE EXPLORATION REPORT
418 LINDEN STREET
FORT COLLINS, COLORADO"
EEC Project No. 1112066
Date: October 25, 2011
SUBSURFACE EXPLORATION BY:
PROJECT BENCHMARKS:
SHEET INDEX
C000 COVER SHEET
C001 GENERAL AND CONSTRUCTION NOTES
C100 EXISTING CONDITIONS & DEMOLITION PLAN
GRADING PLAN
C300
C400
UTILITY PLAN
C200
SUBDIVISION PLAT (FOR REFERENCE ONLY)
C500 ROAD PLAN AND PROFILES
HORIZONTAL CONTROL AND SIGNING AND STRIPING PLAN
RIVER DISTRICT BLOCK ONE MIXED USE
BEING A PORTION OF BLOCK 1, CITY OF FORT COLLINS AND A PORTION OF THE NORTHWEST QUARTER
OF SECTION 12, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS,
COUNTY OF LARIMER, STATE OF COLORADO
Encompass Technologies
324 J�������� S�����
F��� C������, CO 80524
(970) 449-8000
DEVELOPER/APPLICANT
C301 UTILITY PLAN AND PROFILES
C600 DRAINAGE AND EROSION CONTROL PLAN
C700-C703 CONSTRUCTION DETAILS
1-9 BANK STABILIZATION (BY FLYWATER, INC.)
C401 GRADING DETAILS
1