RE: Harmony Technology Park Third Filing, Second Replat - Custom Blending #FDP130021
Please see the following summary of comments from City staff and outside reviewing agencies for your
Round Number 1 submittal of the above referenced project. If you have questions about any comments,
you may contact the individual commenter or direct your questions through the Project Planner, Pete
Wray, at 970-221-6754, or pwray@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Pete Wray, 970-221-6754, pwray@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/04/2013
The Combined PDP/FDP is scheduled for two rounds a review for the PDP and FDP. Staff will assess
number of rounds required based on completeness of submittal and compliance of applicable standards.
RESPONSE: Acknowledged. Thank you.
Comment Number: 2 Comment Originated: 06/05/2013
In reference to the Zoning comment for ROW landscaping, the parkway planting east of drive isle needs
to include 4 street shade trees extending to east property line and in centerline of parkway strip between
curb and detached sidewalk. The proposed Shumard Red Oak (located just east of drive isle - behind
sidewalk) should be moved into parkway tree row and included as group of 4 trees mentioned above.
RESPONSE: We have added the requested shade trees to the landscape plan.
Custom Blending PDP/FDP #FDP 13002 – Round 1 Comment Letter Page 2
June 7, 2013
Comment Number: 3 Comment Originated: 06/05/2013
Proposed street trees in front of new building extension and in parkway (west of new drive isle) should
be of another tree species than group of 4 street trees on east side of drive isle. If the Red Oak is used,
for one group, identify different type per LCUASS Streetscape standards.
RESPONSE: We added English Oaks in this area.
Comment Number: 4 Comment Originated: 06/05/2013
For Landscape Plan, show limits of existing landscaping to delineate proposed landscaping.
RESPONSE: Added.
Comment Number: 5 Comment Originated: 06/05/2013
New building foundation: The 5' planting area facing street and east side should have landscape
foundation planting in most areas vs. turf and cobble between footprint of building and sidewalk.
RESPONSE: Foundation planting added.
Comment Number: 6 Comment Originated: 06/05/2013
New building street facing entrance, need to show connecting sidewalk to street sidewalk.
RESPONSE: Walk added to plans.
Comment Number: 7 Comment Originated: 06/05/2013
Site Plan: Show existing sidewalk connection in front of new building from street to entrance area
consistent with other plans.
RESPONSE: Walk added to plans.
Comment Number: 8 Comment Originated: 06/05/2013
The Applicant owes $286.0 for initial submittal, plus $250.0 for PFA fee.
RESPONSE: Fees paid in full.
Comment Number: 9 Comment Originated: 06/05/2013
Planting Plan: Include 5' landscape planting along east parking lot edge to screen minimum of 30" in
height and along south drive isle.
RESPONSE: Planting added to landscape plan.
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: Construction Drawings
Custom Blending PDP/FDP #FDP 13002 – Round 1 Comment Letter Page 2
June 7, 2013
Comment Number: 3 Comment Originated: 06/05/2013
On the construction plans please look to fade back the existing utilities to make discernment between
existing and proposed more recognizable.
RESPONSE: Existing items have been faded back as requested.
Topic: General
Comment Number: 2 Comment Originated: 06/05/2013
Figure 19-6 of LCUASS specifies the minimum setback for a parking stall along a driveway from a
public street. The range varies from 20 feet to 50 feet, but needs ADT information from a traffic study in
order to determine. Depending on the information provided in the traffic study, there may need to be a
couple of parking spaces removed on the west side of the drive aisle in order to meet this requirement (it
appears that two parking spaces could be provided on the east side of the drive aisle that would still meet
the 50 foot requirement).
RESPONSE: The handicap parking stalls were shifted south and additional spaces were added on the
east.
Comment Number: 4 Comment Originated: 06/05/2013
Pending confirmation at staff review, we may either need a new development agreement to apply to the
property, or a note added on the plat stating that the development agreement for the original Custom
Blending will apply to the replat property.
RESPONSE: Acknowledged. Thank you.
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/05/2013
The project owes an additional $36 for the Final TDR Fee.
RESPONSE: Fees paid in full.
Department: Light and Power
Contact: Rob Irish, 970-224-6167, rirish@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/03/2013
The existing building is currently fed by a 300KVA 277/480v pad mount transformer at the NW corner
of the building. Any relocation or modification to the existing electric facilities will be at the owner’s
expense.
RESPONSE: Acknowledged. Thank you.
Custom Blending PDP/FDP #FDP 13002 – Round 1 Comment Letter Page 2
June 7, 2013
Comment Number: 2 Comment Originated: 06/03/2013
Electric Capacity Fee and Building Site charges will apply to any increase in KVA load above existing.
Also, development charges will apply to Lot 3.
RESPONSE: Acknowledged. Thank you.
Comment Number: 3 Comment Originated: 06/03/2013
A C-1 Form and a One-line Diagram will need to be submitted for any change in KVA load. Contact
Light & Power Engineering @ 970-221-6700 to coordinate power needs and associated fees.
RESPONSE: Acknowledged. Thank you.
Department: Outside Agencies
Contact: Pete Wray, 970-221-6754, pwray@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/05/2013
The FCLWD/SFCSD has reviewed the project and has no comments.
RESPONSE: Acknowledged.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 01 Comment Originated: 06/04/2013
The submitted HMIA is currently under review. All other fire department concerns have been resolved.
RESPONSE: Acknowledged.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/07/2013
The development is required to meet the City's LID requirements which include 50% of the land area
draining through an infiltration device and 25% of all private parking and drive aisles be porous
pavement. The regulations also include an equal to or better option. If 50% of the existing site were to
drain through and infiltration device, the City would agree that this option were equal to or better.
RESPONSE: The pre-sedimentation basins have been sized to provide for ponding to a 1’ depth, then
overtop and spill south into the existing detention pond. The design has been coordinated with Basil
Hamdan and Wes Lamarque and LID basins sized accordingly. The LID basins will serve the existing
and expanded site, and will offset the need for porous pavers, as the 50% is covered by the LID basins.
Custom Blending PDP/FDP #FDP 13002 – Round 1 Comment Letter Page 2
June 7, 2013
Comment Number: 2 Comment Originated: 06/07/2013
A meeting should be planned to discuss the design parameters for these infiltration devices.
RESPONSE: This has been discussed with Basil Hamdan and Wes Lamarque as noted in comment (1).
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 1 Comment Originated: 06/05/2013
Please remove "Custom Blending" from the title.
RESPONSE: “Custom Blending” has been removed.
Comment Number: 2 Comment Originated: 06/05/2013
There are lines over text issues on sheet A2. See redlines.
RESPONSE: The text has been relocated.
Topic: Construction Drawings
Comment Number: 3 Comment Originated: 06/05/2013
Please remove "Custom Blending" from the title and title block on all sheets.
RESPONSE: The title has been updated accordingly.
Comment Number: 4 Comment Originated: 06/05/2013
There are lines over text issues on sheet C-004. See redlines.
RESPONSE: These have been corrected.
Comment Number: 5 Comment Originated: 06/05/2013
Please rotate all text on sheet C-004 to read from the bottom and/or right of the plan sheet. See redlines.
RESPONSE: The text has been rotated accordingly.
Topic: Landscape Plans
Comment Number: 6 Comment Originated: 06/05/2013
Please remove "Custom Blending" from the title block on all sheets.
RESPONSE: Removed.
Comment Number: 7 Comment Originated: 06/05/2013
There are lines over text issues on sheet LS1. See redlines.
RESPONSE: Fixed, except the plant blocks.
Comment Number: 8 Comment Originated: 06/05/2013
Please mask all text in hatched areas on sheet LS1. See redlines.
RESPONSE: Text masked.
Topic: Lighting Plan
Comment Number: 9 Comment Originated: 06/05/2013
Custom Blending PDP/FDP #FDP 13002 – Round 1 Comment Letter Page 2
June 7, 2013
Please remove "Custom Blending" from the title on sheet E1.
RESPONSE: “Custom Blending” has been removed.
Comment Number: 10 Comment Originated: 06/05/2013
Please add a north arrow to sheet E1.
RESPONSE: A north arrow has been added.
Topic: Plat
Comment Number: 11 Comment Originated: 06/05/2013
Please remove "Custom Blending" from the title and titles block on sheets 1 & 2, and the Statement of
Ownership and Subdivision on sheet 1.
RESPONSE: This has been updated accordingly.
Comment Number: 12 Comment Originated: 06/05/2013
The boundary and legal description close.
RESPONSE: Acknowledged. Thank you.
Comment Number: 13 Comment Originated: 06/05/2013
Please add a Lienholders signature block as a placeholder. This may later be removed, if/when it turns
out that there are no lienholders for this property.
RESPONSE: Lien Holder block has been added as a place holder. Owner’s will be providing an
updated title commitment as the project progresses, with any lien holders listed on the plat, as
applicable.
Comment Number: 14 Comment Originated: 06/05/2013
The title commitment note is acknowledged. The note will need to be changed when the commitment is
received.
RESPONSE: Owners will provide an updated title commitment as the project progresses, with the
information provided, as applicable.
Comment Number: 15 Comment Originated: 06/05/2013
Please provide current monument records for the public land corners shown for control. Per
Development Review Submittal Requirement 3 (v) you do not need to tie to section control, if the
boundary is entirely all or a portion of an existing subdivision.
RESPONSE: Monument records have been provided.
Topic: Site Plan
Comment Number: 16 Comment Originated: 06/05/2013
Please remove "Custom Blending" from the title on sheet A1.
RESPONSE: “Custom Bending” has been removed.
Comment Number: 17 Comment Originated: 06/05/2013
There are lines over text issues on sheet A1. See redlines.
RESPONSE: The text has been relocated.
Custom Blending PDP/FDP #FDP 13002 – Round 1 Comment Letter Page 2
June 7, 2013
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 06/03/2013
Please remove the Stop Bars, Crosswalk striping and Stop signs on the two access drives intersecting
Precision Drive. Traffic Op's does not sign or stripe driveway accesses.
RESPONSE: The existing west and east access drives contains the existing striping, stop bars, and stop
signs, with this information now called out as existing in the plans. The existing east drive will be
removed along with the striping, stop bar, and stop sign. The new proposed access drive will not
contain striping, a stop bar, or a stop sign, as shown in the revised civil plans.
Topic: Traffic Impact Study
Comment Number: 1 Comment Originated: 06/03/2013
Traffic Op's acknowledges allowance of a late submitted TIS.
RESPONSE: Thank you. TIS was submitted on June 5.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 05/24/2013
The ROW landscape improvements need to be carried all the way through to the east property line.
RESPONSE: Landscape added.
Comment Number: 2 Comment Originated: 05/24/2013
Loading area the minimum average should be 5 foot candle. The proposed average is less than 5 fc.
RESPONSE: The lighting has been revised to bring the minimum average light level for the loading
dock above 5 foot candles