Loading...
HomeMy WebLinkAboutMAGNUM MOTORS OF LOVELAND (5900 S. COLLEGE AVE.) - PDP/FDP - FDP130016 - CORRESPONDENCE - (3)June  2013 Courtney  Levingston City  of  Fort  Collins  –  Community  Development  &  Neighborhood  Services 281  N.  College  Ave.,  Fort  Collins,  CO  80522 Re:  Magnum  Motors  of  Loveland  -­‐  5900  S  College  Ave  FDP  Submittal Comment  Summary  and  Responses: Department:  Current  Planning Contact:  Courtney  Levingston,  970-­‐416-­‐2283,  clevingston@fcgov.com Topic:  General Comment  Number:  1  Comment  Originated:  05/22/2013 05/22/2013:  Please  delineate  where  vehicles  will Topic:  Lighting  Plan Comment  Number:  1  Comment  Originated:  05/21/2013 05/21/2013:  Staff  is  concerned  with  the  sufficiency  of  the  plans  demonstrating  that Section  3.2.4,  Site  Lighting,  will  be  met  with  the  proposal.  The  code  requires  the  site  to be  brought  up  to  current  lighting  standards  and  there  are  questions  if  the  existing canopy  lighting  meets  today's  lighting  standards. Response:  See  site to  be  rebuilt  in  accordance  with  LCUASS  detail  707  to  ensure  ADA  compliance  across  the driveways. Response:  See  sheet  LS101  and  LS401  for  access  ramps  and  drive  access  improvements. Comment  Number:  3  Comment  Originated:  05/22/2013 05/22/2013:  The  comment  was  made  at  the  conceptual  that  the  property  would  need to  be  obligated  for  the  local  street  portion  of  College  Avenue  in Department:  Environmental  Planning Contact:  Lindsay  Ex,  970-­‐224-­‐6143,  lex@fcgov.com Topic:  General Comment  Number:  1  Comment  Originated:  05/20/2013 05/20/2013:  No  comments. Response:  Acknowledged Department:  Forestry Contact:  Tim  Buchanan,  970-­‐221-­‐6361,  tbuchanan@fcgov.com Topic:  Landscape  Plans Comment  Number:  1  Comment  Originated:  05/21/2013 05/21/2013:  All  existing  trees  are  inventoried  as  to  species,  size  and  condition  and shown  to  be  preserved.  No  tree  removal  will  occur  on Response:  No  bioswale  exists  on  the  proposed  plans. Comment  Number:  6  Comment  Originated:  05/21/2013 05/21/2013:  Please  identify  with  a  landscape  note  the  type  of  mulch  that  will  be  used on  the  project. Response:  Acknowledged Department:  Light  And  Power Contact:  Doug  Martine,  970-­‐224-­‐6152,  dmartine@fcgov.com Topic:  General Comment  Number:  1  Comment  Originated:  05/09/2013 05/09/2013:  If  any  changes  to  the  electric  system  is Topic:  General Comment  Number:  2  Comment  Originated:  05/22/2013 05/22/2013:  Please  provide  as-­‐built  survey  information  for  the  existing  detention  pond and  design  the  water  quality  extended  detention  using  actual  pond  volumes. Response:  Acknowledged Department:  Technical  Services Contact:  Jeff  County,  970-­‐221-­‐6588,  jcounty@fcgov.com Topic:  Building  Elevations Comment  Number:  1  Comment  Originated:  05/16/2013 05/16/2013:  The  photos  on  sheet  LS102  are  with  the  wrong  titles. Response:  Acknowledged Comment  Number:  8  Comment  Originated:  05/16/2013 05/16/2013:  Please  add  the  legal  description  of  the  property  that  this  project  is  located on  to  sheet  LS001. Response:  Acknowledged Comment  Number:  10  Comment  Originated:  05/16/2013 05/16/2013:  There  are  line  over  text  issues  on  sheets  LS101  &  LP102.  See  redlines. Response:  Acknowledged Comment  Number:  11  Comment  Originated:  05/16/2013 05/16/2013:  Please  darken  up  all  of  the  lighter  background  text  &  linework  on  all sheets. Response:  Acknowledged Comment  Number:  12  Comment  Originated:  05/16/2013 05/16/2013:  Please  show  the  complete  Subdivision  Plat  name  for  Lot  2  to  the  east  and Lot  3  to  the  south. Response:  Per  surveyor’s  recommendations  only  the  lot  numbers  were  displayed. Department:  Traffic  Operation Contact:  Ward  Stanford,  970-­‐221-­‐6820,  wstanford@fcgov.com Topic:  General Comment  Number:  1  Comment  Originated:  05/21/2013 05/21/2013:  TIS  was  waived  for  the  project  as  he  previous  use  generated  as  much  or more  traffic  than  the  new  proposed  use. Response:  Acknowledged Comment  Number:  2  Comment  Originated:  05/21/2013 05/21/2013:  No  additional  comments. Response:  Acknowledged  Please  swap  the  titles or  photos.  For  example,  the  north  elevation  photo  is  titled  as  the  south  elevation.  See redlines. Response:  Acknowledged Topic:  Landscape  Plans Comment  Number:  2  Comment  Originated:  05/16/2013 05/16/2013:  Please  rotate  all  text  so  that  it  is  plan  readable.  See  redlines. Response:  Acknowledged Comment  Number:  3  Comment  Originated:  05/16/2013 05/16/2013:  There  are  line  over  text  issues  on  sheets  LP101  &  LP102.  See  redlines. Response:  Acknowledged Comment  Number:  4  Comment  Originated:  05/16/2013 05/16/2013:  There  are  text  over  text  issues  on  sheet  LP101.  See  redlines. Response:  Acknowledged Comment  Number:  5  Comment  Originated:  05/16/2013 05/16/2013:  Please  darken  up  all  of  the  lighter  background  text  &  linework  on  all sheets. Response:  Acknowledged Comment  Number:  6  Comment  Originated:  05/16/2013 05/16/2013:  Please  show  the  complete  Subdivision  Plat  name  for  Lot  3  to  the  south. Response:  Per  surveyor’s  recommendations  only  the  lot  numbers  were  displayed. Topic:  Site  Plan Comment  Number:  7  Comment  Originated:  05/16/2013 05/16/2013:  Please  rotate  all  text  so  that  it  is  plan  readable.  See  redlines.  required,  please  coordinate  with Light  &  Power  Engineering  at  (970)221-­‐6700. Response:  Acknowledged Department:  Outside  Agencies Contact:  Bob  Rulli,  , Topic:  General Comment  Number:  1  Comment  Originated:  05/21/2013 05/21/2013:  The  existing  building  at  5900  S.  College  Ave.  has  a  25  pair  entrance  cable (in  property  owner  2"  entrance  conduit)  and  an  inside  terminal.  It  is  fed  from  cable  to the  northeast  on  Saturn  Drive.  The  inside  terminal  and  cable  does  not  appear  to  be impacted  by  the  plan  and  should  be  sufficient  for  any  telecom  needs  for  the  project. However,  any  changes  (relocations,  modifications,  ect.)  to  the  existing  cable  and terminal  are  billable  in  advance  to  Magnum  Motors.  The  CTL  process  is  time  consuming and  must  be  coordinated  in  advance  with  Engineering  and  billing,  prior  to  working  being done.  The  General  Contractor  and  owner  need  to  contact  CTL  engineering  in  advance, for  site  meet,  proposal  and  billing  to  be  sent  to  Denver  for  processing  before  a construction  job  will  be  released. The  feed  pedestal  on  Saturn  Dr.  also  does  not  appear  to  conflict  with  any  planned  uses, however  if  landscaping  or  street  modifications  require  it  to  be  relocated,  the  above billing  process  is  also  in  affect. -­‐Bob  Rulli,  970-­‐490-­‐7503 Response:  Acknowledged Department:  Stormwater  Engineering Contact:  Wes  Lamarque,  970-­‐416-­‐2418,  wlamarque@fcgov.com  this  project. Response:  Acknowledged Comment  Number:  2  Comment  Originated:  05/21/2013 05/21/2013:  New  trees  are  shown  on  the  east  side  of  the  project  where  there  are existing  trees.  These  proposed  trees  include  4  Southwest  White  Pine  and  3  Honeylocust. It  appears  that  the  existing  trees  in  this  area  are  of  a  quantity  and  size  that  they  would limit  the  successful  planting  of  the  7  proposed  trees  for  this  area.  Please  clarify  that there  is  adequate  space  to  add  these  7  trees  where  existing  trees  are  shown. Response:  Acknowledged Comment  Number:  3  Comment  Originated:  05/21/2013 05/21/2013:  Show  the  actual  locations  of  all  existing  trees  on  Sheet  LP102  so  they  can be  displayed  as  part  of  the  landscape  design. Response:  Acknowledged  –  all  existing  trees  and  their  locations  are  shown  per  the survey  provided. Comment  Number:  4  Comment  Originated:  05/21/2013 05/21/2013:  Evaluate  adding  two  canopy  shade  trees  to  function  as  street  trees  at  the NW  part  of  the  site  in  the  landscape  area  along  the  front  of  the  project  just  to  the  south of  Saturn. Response:  Two  additional  trees  cannot  be  added  to  this  area  due  to  utility  conflicts. Comment  Number:  5  Comment  Originated:  05/21/2013 05/21/2013:  Where  is  the  location  of  the  bioswale?  Will  it  impact  any  of  the  existing trees.  the  development agreement  due  to  the  frontage  of  College  Avenue  not  being  in  conformance  with  the long-­‐term  access  control  plan  for  south  College  Avenue.  Since  the  conceptual,  the  City has  modified  its  approach  to  addressing  satisfying  the  local  street  obligation.  The outstanding  obligation  for  the  local  street  portion  of  College  Avenue  is  no  longer  in  this case  viewed  as  to  include  pavement,  curb  and  gutter;  the  outstanding  portion  of  local street  would  be  for  sidewalk  only,  reducing  the  amount  of  local  street  obligation attributable  to  the  property  owner.  That  said,  rather  than  looking  for  the  satisfaction  of the  local  street  obligation  for  sidewalk  to  be  tied  with  future development/redevelopment,  the  proposal  would  need  to  either  build  the  sidewalk along  College  Avenue,  or  provide  for  the  local  street  portion  of  sidewalk  at  this  time.  If providing  funds  in  lieu  of  construction,  the  City  has  determined  that  for  2013,  the established  local  street  portion  of  sidewalk  is  $35.00  per  foot,  which  equates  to $9,435.30  based  on  269.58  feet  of  College  frontage.  Under  the  scenario  of  payment  in lieu  of  construction,  payment  would  need  to  be  provided  prior  to  final  plan  approval,  or a  development  agreement  would  be  needed  tying  payment  of  this  prior  to  issuance  of  a building  permit.  Otherwise,  the  sidewalk  would  need  to  be  designed  and  shown  on  the drawings  (7  feet  in  width,  detached)  and  would  need  to  be  completed  in  conjunction with  the  required  sidewalk  along  Saturn  Drive,  prior  to  issuance  of  a  certificate  of occupancy. Response:  Acknowledged Comment  Number:  4  Comment  Originated:  05/22/2013 05/22/2013:  Information  on  the  plans  including  grading  and  utility  information  isn't legible  with  the  lineweight  used  and  needs  to  be  updated  for  review. Response:  Acknowledged Comment  Number:  5  Comment  Originated:  05/22/2013 05/22/2013:  A  15  foot  utility  easement  behind  the  College  Avenue  right-­‐of-­‐way  along with  a  9  foot  utility  easement  behind  Saturn  Drive  would  need  to  be  dedicated  unless agreed  to  otherwise  by  the  utility  providers. Response:  Acknowledged  plan  sheets  for  required  notes  provided  by  City  staff. Topic:  Site  Plan Comment  Number:  1  Comment  Originated:  05/22/2013 05/22/2013:  The  site  plan  is  difficult  to  read  with  the  contours  and  engineering information  grayed  on  the  plans.  Please  turn  these  layers  off  to  clean  up  the  site  plan. Response:  Acknowledged  -­‐  see  revised  site  plan  sheets. Comment  Number:  2  Comment  Originated:  05/22/2013 05/22/2013:  The  location  of  the  bike  parking  is  not  optimal  as  it  is  in  a  low  visibility  back of  the  building  area  and  not  near  and  main  entrance.  Safety  could  be  a  concern  in  this location. Response:  Acknowledged Department:  Engineering  Development  Review Contact:  Marc  Virata,  970-­‐221-­‐6567,  mvirata@fcgov.com Topic:  General Comment  Number:  1  Comment  Originated:  05/22/2013 05/22/2013:  The  construction  of  sidewalk  along  Saturn  Drive  abutting  the  property  and tying  into  the  sidewalk  network  directly  east  should  be  provided  with  the  proposal.  The sidewalk  would  ideally  be  a  minimum  5  feet  in  width,  detached  a  minimum  6  feet  from the  curb.  The  existing  trees  along  the  Saturn  Drive  frontage  may  result  in  the  need  to explore  other  sidewalk  configurations  along  all  or  a  portion  of  the  property.  ADA compliance  for  grade  would  need  to  be  ensured  and  additional  right-­‐of-­‐way  or  access easement  may  be  needed  if  the  sidewalk  placement  falls  outside  of  existing right-­‐of-­‐way. Response:  See  sheet  LS101  and  LS401  for  sidewalk  alignment  and  grading. Comment  Number:  2  Comment  Originated:  05/22/2013 05/22/2013:  Access  ramps  across  the  driveways  for  the  sidewalk  installation  would  be needed  and  the  sidewalk  would  need  to  carry  through  the  driveways  in  accordance  with LCUASS  detail  707.  The  sidewalk  would  tie  into  the  depressed  curb  with  an  access  ramp at  the  Saturn  Drive  /  College  Avenue  intersection.  The  driveway  approaches  may  need  be  displayed  and  customer  parking spaces. Response:  See  sheet  LS101 Comment  Number:  2  Comment  Originated:  05/24/2013 05/24/2013:  The  required  sidewalks  will  need  to  be  formally  depicted  on  the  site  plans and  provided  via  a  second  round  of  review.  Staff  is  willing  to  meet  on  site  to  discuss  the existing  conditions  and  proposed  configurations,  however  we  will  need  to  see  this  on the  plans  before  we  move  forward  to  the  Planning  and  Zoning  Board  hearing. Response:  See  sheet  LS101  for  required  sidewalk  improvements  per  meetings  with  City staff. Comment  Number:  3  Comment  Originated:  05/24/2013 05/24/2013:  Since  this  project  is  a  combined  PDP  and  Final  Plan,  all  comments  must  be resolved  through  formal  rounds  of  review  prior  to  proceeding  to  hearing. Response:  Acknowledged Comment  Number:  4  Comment  Originated:  06/11/2013 06/11/2013:  Please  add  the  following  note  on  the  plans: All  conduit,  meters  vents  and  other  equipment  attached  to  the  building  shall  be  painted to  match  surrounding  building  surfaces. Response:  Acknowledged