Loading...
HomeMy WebLinkAboutBDR FOUR-PLEX, 621 S. MELDRUM ST. - FDP - FDP130002 - MAPS/GRAPHICS - UTILITY PLANSC0.00 C0.00 COVER SHEET C0.01 GENERAL AND CONSTRUCTION NOTES C3.00 GRADING PLAN EXISTING CONDITIONS AND DEMOLITION PLAN Big Deal Real Estate Inc. Jeff Eggleston 2519 Ridge Creek Road Fort Collins, Colorado 80528 970.566.3000 Northern Engineering Services, Inc. Nick Haws, PE, LEED, AP 200 South College Avenue, Suite 10 Fort Collins, Colorado 80524 970.221.4158 C1.00 JUNE, 2013 Northern Engineering Services, Inc. Gary Gilliland, PLS 200 South College Avenue, Suite 10 Fort Collins, Colorado 80524 970.221.4158 BEING A REPLAT OF LOT 11, BLOCK 86, PLAT OF SUBDIVISION OF BLOCKS 76, 77, 85, 86, 87, LOCATED IN THE NORTHEAST QUARTER OF SECTION 14, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO (621 SOUTH MELDRUM STREET) UTILITY PLANS FOR These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com C2.00 UTILITY PLAN Big Deal Four Plex N O R T H E RN N O R T H E RN CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R CONTACT INFORMATION PROJECT TEAM: UTILITY CONTACT LIST: * SHEET INDEX I hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort Collins and State of Colorado standards and statutes, C0.01 These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com A. GENERAL NOTES 1. All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort Collins. 2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise. 3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer. Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of any work shown in these plans. 4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 5. $OOVDQLWDU\VHZHUVWRUPVHZHUDQGZDWHUOLQHFRQVWUXFWLRQDVZHOODVSRZHUDQGRWKHU³GU\´XWLOLW\LQVWDOODWLRQVVKDOOFRQIRUPWRWKH/RFDO Entity standards and specifications current at the date of approval of the plans by the Local Entity Engineer. 6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The Developer shall be responsible for unknown underground utilities. 7. The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans. 8. The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required. 9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction. 10. The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the utility companies. 11. No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to commencement of any work. 12. The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be constructed prior to installation of the water lines and dry utilities. 13. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. 14. A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is discharged into a storm sewer, channel, irrigation ditch or any waters of the United States. 15. The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan. 16. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of COLLEGE AVE OLIVE ST. MAGNOLIA ST. MULBERRY ST. MYRTLE ST. MASON ST. HOWES ST. MELDRUM ST. SHERWOOD ST. WHITCOMB ST. LOOMIS ST. REMMINGTON ST. MATHEWS ST. PETERSON ST. WHEDBEE ST. SMITH ST. MOUNTAIN AVE. CANYON AVE. RIVERSIDE AVE. LAUREL ST. UNIVERSITY AVE. GRANT AVE. WASHINGTON ST. MAC ST. PLUM ST. LOCUST ST. ELIZABETH ST. GARFIELD ST. NORTH DR. SOUTH DR. WEST DR. EAST DR. OVAL DR. BIG DEAL FOUR PLEX BIG DEAL FOUR PLEX NOTICE: According to Colorado law you must commence any legal action based upon any defect in this survey within three years after you discover such defect. In no event may any action based upon any defect in this survey be commenced more than ten years after the date of the certificate shown 200 South College Avenue, Suite 10 hereon. Fort Collins, Colorado 80524 N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com MAINTENANCE GUARANTEE: The Owner hereby warrants and guarantees to the City, for a period of two (2) years from the date of completion and first acceptance by the City of the improvements warranted hereunder, the full and complete maintenance and repair of the improvements to be constructed in connection with the Development which is the subject of this Plat. This warranty and guarantee is made in accordance with the City Land Use Code and/or the Transitional Land Use Regulations, as applicable. This guarantee applies to the streets and all other appurtenant structures and amenities lying within the rights-of-way, Easements and other public properties, including, without limitation, all curbing, sidewalks, bike paths, drainage pipes, culverts, catch basins, drainage ditches and landscaping. Any maintenance and/or repair required on utilities shall be coordinated with the owning utility company or department. The Owner shall maintain said improvements in a manner that will assure compliance on a consistent basis with all construction standards, safety requirements and environmental protection requirements of the City. The Owner shall also correct and repair, or cause to be corrected and repaired, all damages to said improvements resulting from development-related or building-related activities. In the event the Owner fails to correct any damages within thirty (30) days after written notice thereof, then said damages may be corrected by the City and all costs and charges billed to and paid by the Owner. The City shall also have any other remedies available to it as authorized by law. Any damages which occurred prior to the end of said two (2) year period and which are unrepaired at the termination of said period shall remain the responsibility of the Owner. REPAIR GUARANTEE: ARTHUR DITCH / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / S. MELDRUM STREET (100' PUBLIC ROW) ALLEY (20' PUBLIC ROW) PROPERTY LINE PROPERTY LINE ROW LINE PROPOSED MULT-IFAMILY BUILDING E E E E E E E G G G G G G G ARTHUR DITCH NOTES: These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com C2.00 NORTH GRAPHIC SCALE: LEGEND: CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R ST SS CTV E G W OHU D G C S UD E LOT 1 BLOCK 1 S. MELDRUM STREET (100' PUBLIC ROW) ALLEY (20' PUBLIC ROW) PROPERTY LINE PROPERTY LINE A A B B NORTH GRAPHIC SCALE: LEGEND: CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R NOTES: ST D These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com C3.00 CROSS SECTION A-A NTS CROSS SECTION B-B NTS ALLEY (20' PUBLIC ROW) PROPERTY LINE S. MELDRUM STREET (100' PUBLIC ROW) POND A LOT 11 BLOCK 86 PROPOSED MULTI-FAMILY BUILDING A1 B3 B2 B1 B2 B1 ARTHUR DITCH B3 C1 PROPERTY LINE C1 A1 C2 C2 C4.00 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R NORTH GRAPHIC SCALE: LEGEND: A NOTES: A These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com DEVELOPED HYDROLOGY SUMMARY DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com C5.00 Know what's R 6" 2"R. 2" 6" 6" 12" 1 1/2"R. 2'-6" 6" 4 1/2" 30" 9" R 0.5" 4.5" 18" 3.63" 21.75" R 0.13" 7" 2" 3.75" 12" ROLL-OVER VERTICAL (LOVELAND) Gutter edge may be tapered or battered. (Typical for all Curb & & Gutter Types) ATTACHED SIDEWALK DETAIL Slope sidewalk to curb 1/4" per foot. NOTE: Construct sidewalk with joints at 10' intervals R 1/8" WEAKENED PLANE JOINT EXPANSION JOINT R1/4" and aligned with scoring on curb. INSTALL IN LOCATIONS SPECIFIED IN CHAPTER 22 1/2" 1/4" 1/4 SLAB THICKNESS 1/4" These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com DWG SIZE A SCALE 1:40 SHEET 1 OF 1 DWG NO. 7001-110-042 REV C 3130 VERONA AVE BUFORD, GA 30518 PHN (770) 932-2443 FAX (770) 932-2490 www.nyloplast-us.com 8 IN - 30 IN TYPICAL INSTALLATION OPTIONS TITLE PROJECT NO./NAME MATERIAL DATE APPD BY DATE 8-10-00 THIS PRINT DISCLOSES SUBJECT MATTER IN WHICH DRAWN BY AWA NYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPT OR POSSESSION OF THIS PRINT DOES NOT CONFER, TRANSFER, OR LICENSE THE USE OF THE DESIGN OR TECHNICAL INFORMATION SHOWN HEREIN REPRODUCTION OF THIS PRINT OR ANY INFORMATION CONTAINED HEREIN, OR MANUFACTURE OF ANY ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS IS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN PERMISSION FROM NYLOPLAST. 8-10-00 CJA DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST T L A S P O L Y N D U C T I L E I R O N T S SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU C6.00 DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R NORTH LEGEND: NOTES: SF These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION Project: MAX Flats CONSTRUCTION PHASE PHASE I PHASE II PHASE III PHASE IV Grading (Include Offsite) Overlot Pipeline Installation Stormwater Concrete Installation Site Walls Building Structure Miscellaneous Hardscape Amenities BEST MANAGEMENT PRACTICES CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU C6.01 DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO R These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com VEHICLE CONTROL TRACKING PAD SILT FENCE WATTLE INSTALLATION FLOW 3'-4' ADJACENT ROLLS SHALL TIGHTLY ABUT W1 NOTES: INSTALLATION: WHEN INSTALLING RUNNING LENGTHS OF WATTLES, BUTT THE SECOND WATTLE TIGHTLY AGAINST THE FIRST, DO NOT OVERLAP THE ENDS. STAKE THE WATTLES AT EACH END AND FOUR FOOT ON CENTER. FOR EXAMPLE: A 25 FOOT WATTLE USES 6 STAKES A 20 FOOT WATTLE USES 5 STAKES A 12 FOOT WATTLE USES 4 STAKES STAKES SHOULD BE DRIVEN THROUGH THE MIDDLE OF THE WATTLE. LEAVING 2 - 3 INCHES OF THE STAKE PROTRUDING ABOVE THE WATTLE. A HEAVY SEDIMENT LOAD WILL TEND TO PICK THE WATTLE UP AND COULD PULL IT OFF THE STAKES IF THEY ARE DRIVEN DOWN TOO LOW. IT MAY BE NECESSARY TO MAKE A HOLE IN THE WATTLE WITH A PICK END OF YOUR MADDOX IN ORDER TO GET THE STAKE THROUGH THE STRAW. WHEN STRAW WATTLES ARE USED FOR FLAT GROUND APPLICATIONS, DRIVE THE STAKES STRAIGHT DOWN; WHEN INSTALLING WATTLES ON SLOPES, DRIVE THE STAKES PERPENDICULAR TO THE SLOPE. DRIVE THE FIRST END STAKE OF THE SECOND WATTLE AT AN ANGLE TOWARD THE FIRST WATTLE IN ORDER TO HELP ABUT THEM TIGHTLY TOGETHER. IF YOU HAVE DIFFICULTY DRIVING THE STAKE INTO EXTREMELY HARD OR ROCKY SLOPES, A PILOT BAR MAY BE NEEDED TO BEGIN THE STAKE HOLE. 1"x 1" WOOD STAKES 18"-24" BAILING WIRE OR NYLON ROPE WATTLE "A" WATTLE "B" 1' 2' TYP. 1' 1' W2 NOTES: INSTALLATION: STAKES SHOULD BE DRIVEN ACROSS FROM EACH OTHER AND ON EACH SIDE OF THE WATTLE. LEAVING 4"-6" OF STAKE PROTRUDING ABOVE THE WATTLE. BAILING WIRE OR NYLON ROPE SHOULD BE TIED TO THE STAKES ACROSS THE WATTLE. STAKES SHOULD THEN BE DRIVEN UNTIL THE BAILING WIRE OR NYLON ROPE IS SUFFICIENTLY SNUG TO THE WATTLE. WHEN INSTALLING RUNNING LENGTHS OF WATTLES, TO PREVENT SHIFTING, BUTT THE SECOND WATTLE TIGHTLY AGAINST THE FIRST. DO NOT OVERLAP THE ENDS. STAKES SHOULD BE DRIVEN 1 FT. FROM END, ACROSS FROM AND ON EACH SIDE OF WATTLE LEAVING 4"-6" OF STAKE PROTRUDING ABOVE THE WATTLE. BAILING WIRE OR NYLON ROPE SHOULD BE TIED TO STAKES IN AN HOUR GLASS FORMATION (FRONT TO BACK OF WATTLE "A", ACROSS TO FRONT OF WATTLE "B", ACROSS TO BACK AND BACK TO FRONT OF WATTLE "A"). STAKES SHOULD THEN BE DRIVEN IN UNTIL BAILING WIRE OR NYLON ROPE IS SUFFICIENTLY SNUG TO THE WATTLE. SEDIMENT DEPOSITION ZONE STORM WATER LINE WEIGHTED WATTLE LIP OF GUTTER SIDEWALK EXISTING OR PROPOSED INLET TOP BACK CURB FLOW LINE SEDIMENT DEPOSITION ZONE STORM WATER LINE LIP OF GUTTER WEIGHTED WATTLE AT 45 DEG. TO CURB SIDEWALK TOP BACK CURB FLOW LINE SIDEWALK TOP BACK CURB FLOW LINE W4 NOTES: 1. NUMBER OF WATTLES AND SPACING SHOULD BE DETERMINED BY THE SLOPE AND SITE CONDITIONS. 2. TUBULAR MARKERS SHALL MEET THE REQUIREMENTS OF MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) 3. CITY RECOMMENDS INSTALLING AT LEAST 3 CHECKDAMS WHEN USING THIS SETUP. LIP OF GUTTER WEIGHTED WATTLE W1 & W2 INSTALLATION NOTES: 1. THE LOCATION AND LENGTH OF WATTLE IS DEPENDENT ON THE CONDITIONS OF EACH SITE. 2. WATTLES SHALL BE INSTALLED PRIOR TO ANY LAND-DISTURBING ACTIVITIES. 3. WATTLES SHALL CONSIST OF STRAW, COMPOST, EXCELSIOR, OR COCONUT FIBER. 4. NOT FOR USE IN CONCENTRATED FLOW AREAS. 5. THE WATTLES SHALL BE TRENCHED INTO THE GROUND A MINIMUM OF TWO (2) INCHES. 6. WATTLES SHALL BE INSTALLED PER MANUFACTURERS SPECIFICATIONS. 7. ON SLOPES, WATTLES SHOULD BE INSTALLED ON CONTOUR WITH A SLIGHT DOWNWARD ANGLE AT THE END OF THE ROW IN ORDER TO PREVENT PONDING AT THE MID SECTION. 8. RUNNING LENGTHS OF WATTLES SHOULD BE ABUTTED FIRMLY TO ENSURE NO LEAKAGE AT THE ABUTMENTS. 9. SPACING - DOWNSLOPE: 10. VERTICAL SPACING FOR SLOPE INSTALLATIONS SHOULD BE DETERMINED BY SITE CONDITIONS. SLOPE GRADIENT AND SOIL TYPE ARE THE MAIN FACTORS. A GOOD RULE OF THUMB IS: 1:1 SLOPES = 10 FEET APART 2:1 SLOPES = 20 FEET APART 3:1 SLOPES = 30 FEET APART 4:1 SLOPES = 40 FEET APART, ETC. 11. HOWEVER, ADJUSTMENTS MAY HAVE TO BE MADE FOR THE SOIL TYPE: FOR SOFT, LOAMY SOILS - ADJUST THE ROWS CLOSER TOGETHER; FOR HARD, ROCKY SOILS - ADJUST THE ROWS FURTHER APART. A SECONDARY WATTLE PLACED BEHIND THE ABUTMENT OF TWO WATTLES IS ENCOURAGED ON STEEP SLOPES OR WHERE JOINTS HAVE FAILED IN THE PAST. 12. STAKING: THE CITY RECOMMENDS USING WOOD STAKES TO SECURE THE WATTLES. 1/2" TO 5/8" REBAR IS ALSO ACCEPTABLE. BE SURE TO USE A STAKE THAT IS LONG ENOUGH TO PROTRUDE SEVERAL INCHES ABOVE THE WATTLE: 18" IS A GOOD LENGTH FOR HARD, ROCKY SOIL. FOR SOFT LOAMY SOIL USE A 24" STAKE. 4"-6" ABOVE WATTLE AFTER BAILING WIRE OR NYLON ROPE IS ATTACHED. STAKES NEED TO BE TAMPED UNTIL WIRE/ROPE IS SNUG WITH WATTLE. W3 NOTE: IF THE AREA BEHIND THE INLET IS NOT STABILIZED, A BMP SHOULD BE USED TO PREVENT SEDIMENT FROM ENTERING THE INLET 1"x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emporary Inlet Protection (IP) Vehicle Tracking Control (VTC) Flow Barriers (Bales, Wattles, etc.) (WD) Concrete Washout Area (CWA) Preventative Maintenance Activities/Meetings/etc. Silt Fence (SF) Permanent Mulching/Sealant Permanent Seed Planting Sewer Service Water Service Curb and Gutter A L P O L Y N D U C T I L E I R O N DUCTILE IRON DO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST WHEN ARE DRAIN BASINS USED? 2808AG _ _ X 2810AG _ _ X 2812AG _ _ X 2815AG _ _ X 2818AG _ _ X 2824AG _ _ X 2830AG _ _ X TYPICAL INSTALLATIONS TYPICAL INSTALLATION OF NYLOPLAST DRAIN BASIN AND INLINE DRAIN 1: TO ENTER AN EXISTING LINE USING A TEE & RISER 2: AT THE BEGINNING OF A DRAIN LINE USING AN ELBOW & RISER TEE ELBOW 12" DRAIN BASIN 2 INLET & OUTLET ADAPTERS CAN BE PUT ON ANY ANGLE 1: TO CHANGE ELEVATION 2: TO CHANGE PIPE DIAMETER 3: TO CHANGE PIPE TYPE 4: FOR SHALLOW APPLICATIONS 5: TO CHANGE DIRECTION $ƒ RISER DRAIN BASIN INLINE DRAIN 10" INLINE DRAIN 3 VARIABLE ELEVATION WATERTIGHT ADAPTERS AVAILABLE FOR MOST COMMON PLASTIC PIPING SYSTEMS 8" 6" CORRUGATED HDPE PIPE SMOOTH WALL PVC 1 - STRUCTURES & ADAPTERS AVAILABLE IN SIZES 8" - 30" $'$37(56&$1%(02817('21$1<$1*/(ƒ72ƒ72'(7(50,1( MINIMUM ANGLE BETWEEN ADAPTERS SEE DRAWING NO. 7001-110-012, 7001-110-013, & 7001-110-014 3 - DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS RISERS ARE NEEDED FOR BASINS OVER 84" DUE TO SHIPPING RESTRICTIONS SEE DRAWING NO. 7001-110-065 NYLOPLAST CLEANOUT END CAP ADJUST GRADE PER ENGINEERS PLAN INSERT INJECTION MOLDED, GASKETED SPIGOT BY BELL REDUCER INJECTION MOLDED WT TEE FUSED PE 3608/3408 DR-17 PIPE AND INTEGRAL FITTINGS PROVIDE 4"x4" CUTOUT FOR EMERGENCY OVERFLOW BUILDING FACE FINISHED GRADE HEAT TRACE (RE: ELECTRICAL PLANS) RUN VERTICAL PE 3608/3408 DR-17 PIPE 8" ABOVE GRADE AND PROVIDE DOWNSPOUT TO CIRCULAR 6" DIAMETER PIPE ADAPTER 3 TYPICAL NYLOPLAST INSTALLATION DETAILS PLAN VIEW CROSS VIEW 45 ELBOW SERVICE WYE 8 IN. PVC SEWER PIPE COMPACTED GRANULAR MATERIAL AIR-TIGHT PLUG WITH 4 IN. X 4 IN. MARKER UNYIELDING PIPE BEDDING OF COMPACTED ROCK OR LEAN CONCRETE PVC SEWER PIPE NOTE: WYE CONNECTION NOT ALLOWED ON VCP LEAN CONCRETE o 20 MIN. o 45 MAX. o TRENCH UNYIELDING PIPE BEDDING OF COMPACTED ROCK OR 4 IN. X 4 IN. MARKER AIR-TIGHT PLUG SERVICE WYE DETAIL WW-9 4 OUTLET STRUCTURE DETAILS ORIFICE PLATE SUMMARY TABLE STRUCTURE ORIFICE DIA. PLATE LOCATION Know what's R City of Fort Collins, Colorado Date Date Date Date Date Date City Engineer Traffic Engineer Parks & Recreation Stormwater Utility Water & Wastewater Utility C5.01 C C A A B B SECTION C-C SECTION A-A SECTION B-B WELL SCREEN FLOW CONTROL PLATE PLAN GENERAL NOTES SECTION D-D D D A A ABBREVIATIONS LEGEND 1/2" Expansion Joint material DETACHED SIDEWALK DETAIL Variable Landscaping Slope sidewalk to curb 1/4" per foot. 2' min. Slope: Minumum 1 4"/ft Maximum 3"/ft 1. NO JOINTS ARE ALLOWED IN THE FLOWLINE. SIX INCH WIDE CURB OR "DUMMY JOINT" MAY BE TOOLED NO CLOSER THAN 6 INCHES FROM FLOW LINE AS SHOWN. 2. MINIMUM CONCRETE THICKNESS IS 6 INCHES. 3. JOINT PATTERN TO BE ACCORDING TO 'INTERSECTION GUTTER DETAIL' OR AS DETERMINED BY THE LOCAL ENTITY. 4. WOOD FLOAT FINISH IS REQUIRED OVER THE SLOPED SURFACE OF RAMP AND FLARES. 5. A 6 INCH WIDE CURB MAY BE POURED AT THE BACK OF THE RAMP AS SHOWN IF REQUIRED. IF CURB IS USED IT SHALL MATCH THE CURB AND GUTTER STYLE OF ADJACENT CURB AND GUTTER. 6. MINIMUM RAMP WIDTH SHALL BE FOUR FEET, OR THE SAME AS THE WIDEST ADJACENT SIDEWALK, WHICHEVER IS GREATER, UP TO A MAXIMUM WIDTH OF 8 FEET. 7. THE RAMP LANDING MAY BE POURED MONOLITHIC WITH THE ADJACENT TRANSITIONS PROVIDED THAT AN APPROVED "SHAKE-ON" PIGMENT BE USED TO COLOR THE LANDING AREA. 8. T= THICKNESS (AS SPECIFIED ON PLANS OR LOCAL ENTITY ENGINEER). STANDARD GRAY CONCRETE RAMP WITH PARTIALLY COLORED CONCRETE SECTION A-A LIP OF GUTTER PLAN VIEW FLOWLINE CURB A A 0.5' TYP. N.T.S. 6" CURB 0.5' 4' MIN. N.T.S. FLARE OPTION CURB OPTION 6" CURB 0" CURB 1' R 2' NOTES: t=6" or as specified 1"/ft. Max 1"/ft. Max 1.5' TRANSITION 1.5' TRANSITION Flared Option 2' FL 1:25 slope (max.) Truncated Dome Warning Detection Truncated Dome Warning Detection Varies 2'-0" 2'-0" Varies 6" Ramp Width: 4.5' 5.0' 6.0' 7.0' 8.0' Note: Truncated dome panels are available in 2'x2' squares and 2'x2.5' rectangles. Combine the widths to fit the ramp. Panels may be cut to no less than a 2'x1.5' size. Panel Width Combinations: 2'+2.5' 2.5'+2.5' 2'+2'+2' 2.5'+2'+2.5' 2'+2'+2'+2' Note: 1. Truncated dome warning panel: Install panels along with the concrete pour for the ramp. The panel material shall be "Cast In Tact Warning Panels" or an equivalent material that must be first approved by the City Engineer prior to installation. The panel color shall be red, no other color is approved. Specifications for the panel and installation instructions will be provided upon request. 2. This drawing shows vertical curb. For Drive Over Curb the warning detection location shall be placed in the same position 6" back from the Face of Curb or . Varies 2'-0" 6" 6" FL 2' FORT COLLINS ONLY City of Fort Collins, Colorado Date Date Date Date Date Date City Engineer Traffic Engineer Parks & Recreation Stormwater Utility Water & Wastewater Utility PLAN A A C B B C SECTION A-A SECTION B-B SECTION C-C DETAIL 1 12" (Water & Sewer) If this section is less than 4' of existing asphalt/concrete, it must be removed and replaced. Edge of Pavement or Lip of Existing Gutter Compacted Lifts of Suitable Materials Pavement Thickness Varies Varies 1" (min.) (See Note 9 below for Storm.) 4" (min.) 6" (max.) Trench Width Varies 2' (min.) Bedding Material Undisturbed Soil Utility Conduit New Asphalt/Concrete Clean Road Base Existing Road Base 6" Full Depth Asphalt or X/Y Composite Section NOTES: 1. All trenches shall be backfilled in accordance with the above detail unless otherwise specified by the Local Entity Engineer. 2. Prior to placement of asphalt/concrete, pavement edge shall be saw cut to a clean, vertical, and straight edge. 3. Where the surrounding soils are non-expansive, a sand/cement slurry (1 sack mix) may be substituted for backfill material. 4. Trench width shall not be more than 16" nor less than 12" wider than the outside diameter of the pipe. 5. Use a #4 rebar at centers along the perimeter of concrete replacement sections. 6. Refer to Chapter 22, Materials & Construction Specifications for compaction and testing requirements. 7. In unimproved areas, all disturbed areas shall be regraded, seeded & mulched. 8. In concrete roadways, a minimum of one entire concrete panel must be replaced. 9. Bedding material depth when installing storm sewer shall be up to spring line, except in areas of unsuitable backfill; then, bedding material shall be placed to a level 12" above pipe. 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 VALVE (TYPICAL) STREET HYDRANT SECONDARY FIRE HYDRANT (TYPICAL) LOCATOR STATION PVC MAIN TRACER WIRE NOTES: 1. TRACER WIRE TO BE PLACED ALONG TOP CENTERLINE OF MAIN AND SECURED AS NECESSARY TO PREVENT MOVEMENT OF WIRE. TRACER WIRE SHALL BE SINGLE CONDUCTOR #12 STRANDED COPPER WITH TYPE THNN OR THWN FOR LOCATOR STATION DETAILS SEE DETAIL 25 2. 3. 4. 800' MAXIMUM DISTANCE BETWEEN LOCATOR STATIONS TRACER WIRES FOR PERPENDICULAR MAINS AT STREET INTERSECTIONS ARE NOT TO BE SPLICED TOGETHER. 6 SEE NOTE 4 (TYPICAL) INSULATION DESIGNATED FOR DIRECT BURY. TRACER WIRE SHALL BE CONTINUOUS (WITHOUT SPLICES) WHENEVER POSSIBLE. WHEN SPLICES ARE REQUIRED, ALL SPLICES OF TRACER WIRE SHALL BE MADE USING BRASS SPLIT-BOLT CONNECTORS AND ROYSTON "MINI SPLICE-RIGHT" SPLICE KITS. 1 PRIVATE INFLOW VERTICAL CURB & GUTTER 2 PRIVATE OUTFALL VERTICAL CURB & GUTTER 100-yr Tc (min) Q2 (cfs) Q100 (cfs) A1 A1 0.10 0.69 0.87 5.0 5.0 0.20 0.85 B1 B1 0.02 0.62 0.78 5.0 5.0 0.04 0.18 B2 B2 0.03 0.84 1.00 5.0 5.0 0.08 0.35 N/A B2 (Roof Area) 0.02 0.95 1.00 5.0 5.0 0.06 0.22 N/A B2 (Finished Grade) 0.01 0.69 0.86 5.0 5.0 0.02 0.09 B3 B3 0.04 0.65 0.82 5.0 5.0 0.08 0.34 C1 C1 0.01 0.28 0.35 5.0 5.0 0.008 0.036 C2 C2 0.01 0.25 0.31 5.0 5.0 0.006 0.028 DETENTION POND SUMMARY DETENTION POND A - SUMMARY Storage Volume Required (ft3) 887 Storage Volume Provided (ft3) 887 100-year WSE 5001.39 2-year Release Rate (cfs) 0.50 / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / S. MELDRUM STREET (100' PUBLIC ROW) ALLEY (20' PUBLIC ROW) PROPERTY LINE PROPERTY LINE ROW LINE / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / NORTH GRAPHIC SCALE: LEGEND: CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R ST SS CTV E G W OHU S D X G W C S These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com C1.00 E In consideration of the approval of this final Plat and other valuable consideration, the Owner does hereby agree to hold the City harmless for a five (5) year period, commencing upon the date of completion and first acceptance by the City of the improvements to be constructed in connection with the development which is the subject of this Plat, from any and all claims, damages, or demands arising on account of the design and construction of public improvements of the property shown herein; and the Owner furthermore commits to make necessary repairs to said public improvements, to include, without limitation, the roads, streets, fills, embankments, ditches, cross pans, sub-drains, culverts, walls and bridges within the right-of-way, Easements and other public properties, resulting from failures caused by design and/or construction defects. This agreement to hold the City harmless includes defects in materials and workmanship, as well as defects caused by or consisting of settling trenches, fills or excavations. Further, the Owner warrants that he/she owns fee simple title to the property shown hereon and agrees that the City shall not be liable to the Owner or his/her successors in interest during the warranty period, for any claim of damages resulting from negligence in exercising engineering techniques and due caution in the construction of cross drains, drives, structures or buildings, the changing of courses of streams and rivers, flooding from natural creeks and rivers, and any other matter whatsoever on private property. Any and all monetary liability occurring under this paragraph shall be the liability of the Owner. I further warrant that I have the right to convey said land according to this Plat. NOTICE OF OTHER DOCUMENTS : All persons take notice that the Owner has executed certain documents pertaining to this Development which create certain rights and obligations of the Development, the Owner and/or subsequent Owners of all or portions of the Development site, many of which obligations constitute promises and covenants that, along with the obligations under this Plat, run with the land. The said documents may also be amended from time to time and may include, without limitation, the Development Agreement, Site And Landscape Covenants, Final Site Plan, Final Landscape Plan, and Architectural Elevations, which documents are on file in the office of the clerk of the City and should be closely examined by all persons interested in purchasing any portion of the Development site. SURVEYOR'S STATEMENT I, Gerald D. Gilliland, a Colorado Registered Professional Land Surveyor do hereby state that this Subdivision Plat was prepared from an actual survey under my personal supervision, that the monumentation as indicated hereon were found or set as shown, and that the foregoing plat is an accurate representation thereof, all this to the best of my knowledge, information and belief. __________________________________ Gerald D. Gilliland Colorado Registered Professional Land Surveyor No. 14823 CERTIFICATE OF DEDICATION: The Owner does hereby dedicate and convey to the City of Fort Collins, Colorado (hereafter ³&LW\´  for public use, forever, a permanent right-of-way for street purposes and the ³(DVHPHQWV´ as laid out and designated on this Plat; provided, however, that (1) acceptance by the City of this dedication of Easements does not impose upon the City a duty to maintain the Easements so dedicated, and (2) acceptance by the City of this dedication of streets does not impose upon the City a duty to maintain streets so dedicated until such time as the provisions of the Maintenance Guarantee have been fully satisfied. The streets dedicated on this Plat are the fee property of the City as provided in Section 31-23-107 C.R.S. The City's rights under the Easements include the right to install, operate, access, maintain, repair, reconstruct, remove and replace within the Easements public improvements consistent with the intended purpose of the Easements; the right to install, maintain and use gates in any fences that cross the Easements; the right to mark the location of the Easements with suitable markers; and the right to permit other public utilities to exercise these same rights. Owner reserves the right to use the Easements for purposes that do not interfere with the full enjoyment of the rights hereby granted. The City is responsible for maintenance of its own improvements and for repairing any damage caused by its activities in the Easements, but by acceptance of this dedication, the City does not accept the duty of maintenance of the Easements, or of improvements in the Easements that are not owned by the City. Owner will maintain the surface of the Easements in a sanitary condition in compliance with any applicable weed, nuisance or other legal requirements. Except as expressly permitted in an approved plan of development or other written agreement with the City, Owner will not install on the Easements, or permit the installation on the Easements, of any building, structure, improvement, fence, retaining wall, sidewalk, tree or other landscaping (other than usual and customary grasses and other ground cover). In the event such obstacles are installed in the Easements, the City has the right to require the Owner to remove such obstacles from the Easements. If Owner does not remove such obstacles, the City may remove such obstacles without any liability or obligation for repair and replacement thereof, and charge the Owner the City's costs for such removal. If the City chooses not to remove the obstacles, the City will not be liable for any damage to the obstacles or any other property to which they are attached. The rights granted to the City by this Plat inure to the benefit of the City's agents, licensees, permittees and assigns. ATTORNEY'S CERTIFICATION I hereby certify that this Subdivision Plat has been duly executed as required pursuant to Section 2.2.3(C)(3)(a) through (e) inclusive of the Land Use Code of the City of Fort Collins and that all persons signing this Subdivision Plat on behalf of a corporation or other entity are duly authorized signatories under the laws of the State of Colorado. This Certification is based upon the records of the Clerk and Recorder of Larimer County, Colorado as of the date of execution of the Plat and other information discovered by me through reasonable inquiry and is limited as authorized by Section 2.2.3(C)(3)(f) of the Land Use Code. Attorney:________________________________________ Address: ________________________________________ ________________________________________ Registration No.:__________________________________ NOTICE ALL RESPONSIBILITIES AND COSTS OF OPERATION, MAINTENANCE AND RECONSTRUCTION OF THE PRIVATE STREETS AND/OR DRIVES LOCATED ON THE PRIVATE PROPERTY THAT IS THE SUBJECT OF THIS PLAT SHALL BE BORNE BY THE OWNERS OF SAID PROPERTY, EITHER INDIVIDUALLY, OR COLLECTIVELY, THROUGH A PROPERTY OWNERS' ASSOCIATION, IF APPLICABLE. THE CITY OF FORT COLLINS SHALL HAVE NO OBLIGATION OF OPERATION, MAINTENANCE OR RECONSTRUCTION OF SUCH PRIVATE STREETS AND/OR DRIVES NOR SHALL THE CITY HAVE ANY OBLIGATION TO ACCEPT SUCH STREETS AND/OR DRIVES AS PUBLIC STREETS OR DRIVES. APPROVED AS TO FORM, CITY ENGINEER By the City Engineer of the City of Fort Collins, Colorado this ______day of _____________ A.D., 20_____. ____________________________________________________ City Engineer PLANNING APPROVAL By the Director of Planning the City of Fort Collins, Colorado this _____ day of ___________ A.D., 20_____. ____________________________________________________ Director of Planning NOTES: 1) The Basis of Bearings is the North line of Lot 11, Block 86, Plat of Subdivision of Block 76, 77, 85, 86, 87 bearing South ƒ  East (assumed bearing). 2) All information regarding easements, right-of-way or title of record, Northern Engineering relied upon Commitment Number 580-F0428808-383-LKE, dated October 8, 2012, prepared by Fidelity National Title Insurance Company. 3) All linear units of measurement for this plat are U.S. Survey Feet . 4) Sight Distance Easement - The sight distance easement is an easement required by the City at some street intersections where it is necessary to protect the line of sight for a motorist needing to see approaching traffic and to react safely for merging their vehicle into the traffic flow. The following are requirements for certain objects that may occupy a sight distance easement for level grade: (1) Structures and landscaping within the easement shall not exceed 24 inches in height with the following exceptions: (a) Fences up to 42 inches in height may be allowed as long as they do not obstruct the line of sight for motorists. (b) Deciduous trees may be allowed as long as all branches of the trees are trimmed so that no portion thereof or leaves thereon hang lower than six (6) feet above the ground, and the trees are spaced such that they do not obstruct line of sight for motorists. Deciduous trees with trunks large enough to obstruct line of sight for motorists shall be removed by the owner. For non-level areas these requirements shall be modified to provide the same degree of visibility. 5) There shall be no private conditions, covenants or restrictions that prohibit or limit the installation of resource conserving equipment or landscaping that are allowed by Sections 12-120 - 12-122 of the City Code. OWNER: BIG DEAL REAL ESTATE, LLC By: ________________________________ Title:_______________________________ STATE OF COLORADO ) )SS COUNTY OF LARIMER ) The foregoing instrument was acknowledged before me this _____ day of ___________________, 20____, by __________________________________ as ___________________________of Big Deal Real Estate, LLC Witness my hand and official seal My commission expires: ________________ _______________________________ Notary Public STATEMENT OF OWNERSHIP AND SUBDIVISION : Know all persons by these presents, that the undersigned owner(s) of the following described land: A tract of land located in the Northeast Quarter of Section 14, Township 7 North, Range 69 West of the 6th P.M., City of Fort Collins, County of Larimer, State of Colorado being more particularly described as follows: Considering the North line of Lot 11, Block 86, Plat of Subdivision of Block 76, 77, 85, 86, 87 as bearing South ƒ 45' 54" East and with all bearings contained herein relative thereto: %(*,11,1*DWWKH1RUWKHDVW&RUQHURI/RW%ORFN3ODWRI6XEGLYLVLRQRI%ORFNWKHQFH6RXWKƒ :HVWIHHW WKHQFH1RUWKƒ :HVWIHHWWKHQFH1RUWKƒ (DVWIHHWWKHQFH6RXWKƒ (DVWIHHWWRWKH32,172) BEGINNING, contains 9,513 square feet, more or less. For themselves and their successors in interest (collectively "Owner") have caused the above described land to be surveyed and subdivided into lots, tracts and streets as shown on this Plat to be known BIG DEAL FOUR PLEX (the "Development"), subject to all easements and rights-of-way now of record or existing or indicated on this Plat. The rights and obligations of this Plat shall run with the land. BEING A REPLAT OF LOT 11, BLOCK 86, PLAT OF SUBDIVISION OF BLOCKS 76, 77, 85, 86, 87, LOCATED IN THE NORTHEAST QUARTER OF SECTION 14, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO 1 PROJECT LOCATION VICINITY MAP 1"=1000' NORTH ( U.S. SURVEY FEET ) 1 inch = ft. 0 Feet SET #4 REBAR w/1" PLASTIC CAP, LS 14823 BOUNDARY LINE EASEMENT LINE LOT LINE RIGHT-OF-WAY FOUND PROPERTY CORNER AS DESCRIBED 40 60 20 20 20 NORTH NW CORNER LOT 15 FND 1" IRON PIPE SE CORNER BLOCK 86 FND CHISELED 'X' IN CONCRETE ARTHUR DITCH APPROVAL By Mark Taylor of Arthur Ditch this _____ day of ___________ A.D., 20_____. ____________________________________________________ Mark Taylor onsite drainage facilities shall be the responsibility of the property owner(s). 17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 18. The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. 19. All recommendations of the Final Drainage Report for Big Deal Four Plex dated February 20, 2013 by Northern Engineering Services, Inc., shall be followed and implemented. 20. Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping. 21. The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the the City of Fort Collins street inspector. 22. No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit is obtained, if applicable. 23. The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work in the Engineer's absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an improper installation. 24. The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final report. 25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets. 26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the excavation necessary for building connections. 27. Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for roads within these districts. 28. All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval. 29. Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree removal requiring a permit. 30. The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 31. The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The the City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be responsible for providing any and all traffic control devices as may be required by the construction activities. 32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed. 33. The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the Development. 34. There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site construction activities on Sundays or holidays, unless there is prior written approval by the City of Fort Collins. 35. The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise. 36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for clarification, and annotate the dimension on the as-built record drawings. 37. The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any permits and extension agreements needed for the job. 38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the Developer shall contact the Designer and the City of Fort Collins Engineer immediately. 39. The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins Engineer. 40. The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of bearings. The information shall be as follows: City of Fort Collins benchmark 6-00 Located on a catch basin at the Northwest corner of Mulberry Street and College Avenue Elevation = 4990.68 (NGVD 29 - Unadjusted) City of Fort Collins Benchmark CSU 2 The mark is a standard brass larimer county geodetic control disk set in 2002, in the campus of Colorado State University approx. 240.8 feet south from the center line of north drive, 46.6 feet northeast from the edge of CSU lagoon, 33 feet southwest from the center of the delivery road to the university club and 1.1 feet southwest from the edge of the sidewalk. Elevation = 5003.12 (NGVD 29 - Unadjusted) 41. All stationing is based on centerline of roadways unless otherwise noted. 42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 43. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer and/or the City of Fort Collins Inspector at the time the cuts are made. 44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 45. Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections. 46. After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum period of two years from the date of acceptance. 47. The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following private streets: N.A. 48. Approved Variances are listed as follows: a. NONE CONSTRUCTION NOTES A. Grading and Erosion Control Notes 1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site. 2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans. 3. All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion control facilities shown herein. 5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area(s) required for immediate construction operations, and for the shortest practical period of time. 6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County. 7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall: a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order to ensure the continued performance of their intended function. b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector. c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector. 8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and debris from all drainage infrastructure and other public facilities. 9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of way, and make sure streets and walkways are cleaned at the end of each working day. 10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any waters of the United States. 11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched. 12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the City/County or Homeowners Association (HOA). 13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations. 14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 15. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever measures are determined necessary, as directed by the City. B. Street Improvement Notes 1. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here. 2. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins. 4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the City of Fort Collins Engineer. 5. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 7. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the Right-of-Way Work Permit traffic control plan. 8. The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt. Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly. 9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector. C. Traffic Signing and Pavement Marking Construction Notes 1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here. 2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic. 3. All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD. 4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads. 5. All lane lines for concrete pavement should be epoxy paint. 6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols. 7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards. 8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction. 9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings. 10. All sign posts shall utilize break-away assemblies and fasteners per the Standards. 11. A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin. 12. The Developer installing signs shall be responsible for locating and protecting all underground utilities. 13. Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings). 15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. D. Storm Drainage Notes 1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2. All recommendations of the Final Drainage Report for Big Deal Four Plex dated February 20, 2013 by Northern Engineering Services, Inc., shall be followed and implemented. 3. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. E. Utility Notes 1. All waterline and sanitary sewer construction shall conform to the City of Fort Collins Utility standards and specifications current to date of construction. 2. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the water utility. 3. Water mains shall be poly-wrapped D.I.P, or PVC with tracer wire. 4. HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and ASTM. The HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R respectively; and that I am fully responsible for the accuracy of all design. revisions, and record conditions that I have noted on these plans. These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. DISCLAIMER STATEMENT: CERTIFICATION STATEMENT: BENCHMARK #1: City of Fort Collins Benchmark 6-00 Located on a catch basin at the northwest corner of Mulberry Street and College Avenue. Elevation = 4990.68 (NGVD 29 - Unadjusted) BENCHMARK #2: City of Fort Collins Benchmark CSU 2 The mark is a standard brass larimer county geodetic control disk set in 2002, in the campus of Colorado State University approx. 240.8 feet south from the center line of north drive, 46.6 feet northeast from the edge of CSU lagoon, 33 feet southwest from the center of the delivery road to the university club and 1.1 feet southwest from the edge of the sidewalk. Elevation = 5003.12 (NGVD 29 - Unadjusted) Basis of Bearings Considering the north property line of Lot 11, Block 86 of the Plat of Subdivision of Block ZKLFKEHDUV6RXWKƒ (DVW Northern Engineering Services, Inc NE Project No. 876-001 Date: October 29, 2012 ORIGINAL FIELD SURVEY BY: PROJECT BENCHMARKS: PROJECT LOCATION VICINITY MAP NORTH SiteWise, LLC 7000 N. Broadway Building 3, Suite 306 Denver, Colorado 80221 303.650.8680 TB Group Jim Birdsall 444 Mountain Avenue Berthoud, Colorado 80513 970.532.5891 Aller-Lingle-Massey Architects Ian Shuff 712 Whalers Way, Bldg. B-100 Fort Collins, Colorado 80525 970.223.1820 C4.00 DRAINAGE EXHIBIT UTILITY COMPANY * This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of Colorado (UNCC) at 811 for additional information. PHONE NUMBER ** The underground utility locates provided by SiteWise, LLC are based upon the best available information at the time of locating. Contractor acknowledges that it is common for underground facility owner maps to have errors and omissions of data shown. Consequently, it is the Contractor's sole responsibility to field verify the location of all utilities prior to construction, and notify the Engineer of any discrepancies found. GAS----------------- Xcel Energy----------------------------- Stephanie Rich (970) 225-7857 ELECTRIC-------- City of Fort Collins Light & Power -- Doug Martine (970) 224-6152 CABLE------------- Comcast---------------------------------- Don Kapperman (970) 567-0425 TELECOM.--------Centurylink------------------------------- William Johnson (970) 377-6401 WATER------------ City of Fort Collins Utilities----------- Roger Buffington (970) 221-6700 WASTEWATER--City of Fort Collins Utilities----------- Roger Buffington (970) 221-6700 STORMWATER- City of Fort Collins Utilities----------- Glen Schlueter (970) 221-6700 SHEET 1 PLAT (FOR REFERENCE ONLY) ARTHUR DITCH APPROVAL By Mark Taylor of Arthur Ditch this _____ day of ___________ A.D., 20_____. ____________________________________________________ Mark Taylor C5.00 - C5.01 DETAILS C6.00 - C6.01 EROSION CONTROL SHEETS