April 12, 2013
Cathy Mathis
TB Group
444 Mountain Avenue
Berthoud, CO 80513
RE: Prospect Station, PDP130004, Round Number 2
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Seth Lorson, at 970-224-6189 or
slorson@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Andrew Gingerich, 970-221-6603, agingerich@fcgov.com
Topic: Construction Drawings
Comment Number: 4 Comment Originated: 03/04/2013
04/09/2013: Acknowledged that letter will be recieved prior to hearing. 03/04/2013: Sheet 3 -
Letter of intent will be required from the adjacent property owner prior to hearing for emergency
access easement, parking lot improvements, fire line, grading, etc. This letter will need to be
recorded to reference the property or in lieu of a letter we would accept a temporary
construction easement.
RESPONSE: The Letter was given to the City.
Comment Number: 6 Comment Originated: 03/04/2013
04/09/2013: Bike parking in the Right of Way cannot be approved per this development review
process. However a revokable encroachment permit can be applied for after the pans have
been approved. Please add reference to the bike parking that it is "not approved per this
plan" 03/04/2013: Sheet 3 - Bike parking is not allowed within the public right of way. Please
remove the bicycle parking from this sheet.
RESPONSE: Bike parking is not shown on the construction plans.
Comment Number: 11 Comment Originated: 03/05/2013
04/09/2013: I was unable to find which plan had this note added to it per the response to
comments. 03/05/2013: Sheet 3 - Some consideration should be taken into vacating portions
of the existing easement on lot 1. Specifically the Access and emergency access easement
portions that will now have the parking and sidewalk improvements included inside of them.
RESPONSE: We intend to vacate the use on a portion of an easement as shown on civil sheet 3.
Topic: General
Comment Number: 2 Comment Originated: 02/28/2013
04/09/2013: Acknowledged that letter will be recieved prior to hearing. 02/28/2013: A letter of
understanding will be required from the property owners to the south stating that they are aware
of the proposed portion of Tamasag easement vacation and do not take issue to the impact on
their property.
RESPONSE: Acknowledged
Topic: Plat
Comment Number: 10 Comment Originated: 03/05/2013
04/09/2013: Please add the following note to the cover of the plat, "The transit easement
dedicated on this plat is intended for use by the City of Fort Collins for construction, operation,
maintenance, repair, and replacement of improvements and structures associated with the
Public Transportation or transit corridors. 03/05/2013: Easement should be included for the
Max Bus Station. This will be a transit easement and specific language may need to be added
to the plat for what is included in a transit easement.
RESPONSE: The note has been added directly below the easement on the map.
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/21/2013
02/21/2013: No comments.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 03/06/2013
03/06/2013:
Contact the City Forester for an on-site meeting to review existing trees and any need to
provide mitigation and the need to provide identification, condition assessment and size.
RESPONSE: Mitigation schedule has been updated on sheet LS2 per Site Visit with City Forester.
Comment Number: 2 Comment Originated: 03/06/2013
03/06/2013:
Existing trees to retain along Prospect need to be labeled as to species. The curb for the
proposed Transfort pull out appears to be close to an existing tree and may impact the root
system. Review the curbs placement with City Forester at the on-site meeting.
RESPONSE: Bus pull-out has been revised and trees have been labeled accordingly
Comment Number: 3 Comment Originated: 04/10/2013
04/10/2013: The trees shown along prospect in back of the sidewalk are very close to the walk.
Move them further away from the walk for better clearance.
RESPONSE:. Trees have been located further away from walk
Comment Number: 4 Comment Originated: 04/10/2013
04/10/2013:
Contact the City Forester for an on-site meeting to review existing trees and need to provide
mitigation. The plan will need to provide information on the identification, condition assessment,
size and mitigation. Tree protection note #1 needs to be modified accordingly.
RESPONSE: Mitigation schedule has been updated on sheet LS2 per Site Visit with City Forester. And
note #1 has been updated
Comment Number: 5 Comment Originated: 04/10/2013
04/10/2013:
Landscape notes.
Please add information to note #6 that says tree separations are 10 feet between trees and
water and sewer mains and 6 feet between trees and water and sewer service lines.
Please add a landscape note that says street trees to be maintained based on City codes and
policies.
RESPONSE: Note # 6 has been updated. Note #28 has been added per above
Comment Number: 6 Comment Originated: 04/10/2013
04/10/2013:
One of the two trees labeled to retain at the NE corner of the site is a shrub.
RESPONSE: Existing shrubs have been removed from plan to avoid confusion
Department: Historical Preservation
Contact: Josh Weinberg, 970-221-6206, jweinberg@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/25/2013
The proposed plans appear to not have an adverse impact on the adjacent building, 303 West
Prospect, that has been determined individually eligible for designation as a Fort Collins
Landmark. The open parking areas to the west and south serve as a buffer between the
proposed project and the historic building, which maintains a historic view corridor, and
preserves the spatial relationships and character of the historic building and surrounding area,
thus ensuring compliance with LUC 3.4.7.
Department: Light And Power
Contact: Doug Martine, 970-224-6152, dmartine@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/19/2013
02/19/2013: The building height of 4 stories typically triggers the need for a fire buster pump,
which will likely need 3 phase power. Please coordinate power and special metering
requirements with Light & Power Engineering (970)221-6700.
RESPONSE:The building is now 3 stories but will require 3-phase power, special metering will be
coordinated with Light & Power Engineering.
Comment Number: 2 Comment Originated: 02/19/2013
02/19/2013: The developer will need to coordinate power requirements and transformer
location with Light & Power Engineering. The electric transformer pad must be a minimum of 2
feet from any sidewalk. A Commercial Service Information (C-1) form will be needed for all
non-residential services.
RESPONSE: Acknowledged
Comment Number: 3 Comment Originated: 02/19/2013
02/19/2013: After the plans are final, a 1-line diagram of the electric service(s) will need to be
provided to Light & Power Engineering.
RESPONSE: Acknowledged
Comment Number: 4 Comment Originated: 02/19/2013
02/19/2013: An off-site utility easement adjacent to Prospect Rd. along the front of the adjacent
property to the west may be required to bring 3 phase power to the site.
RESPONSE: We will coordinate the size of the easement with Light and Power during Final Plan review.
Comment Number: 5 Comment Originated: 02/19/2013
02/19/2013: After the plans are final, an Autocad drawing (versiion 2008) of the utility plan will
need to be sent to Terry Cox at TCOX@FCGOV.COM.
RESPONSE: Acknowledged
Department: Outside Agencies
Contact: Seth Lorson, 970-224-6189, slorson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/14/2013
03/14/2013: From GIS:
1. This project requires the Unit Level Addressing form be submitted to the GIS Department
once plans have met final approval through Development Review and are recorded with the
City. This can occur anytime during construction, but before any utilities are set within the
structure to ensure the meter banks match the official addressing for the structure.
The Unit Level Addressing form can be obtained by contacting the GIS office at
gis@fcgov.com or (970) 416-2483. Addressing will be determined by the GIS Department.
RESPONSE: Acknowledged
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 03/04/2013
03/04/2013: The site disturbs more than 10,000 sq-ft therefore Erosion and Sediment Control
Materials need to be submitted for FDP. The erosion control requirements are in the
Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. If you
need clarification concerning this section, or if there are any questions please contact Jesse
Schlam 970-218-2932 or email @ jschlam@fcgov.com
RESPONSE: An Erosion control plan and report is included in this submittal.
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 4 Comment Originated: 04/09/2013
04/09/2013: Stormwater is ready for a hearing.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 16 Comment Originated: 04/10/2013
04/10/2013: There are line over text & text over text issues on sheets A1 & A2.
RESPONSE: Line over text issues have been resolved to the best of our knowledge
Topic: Landscape Plans
Comment Number: 11 Comment Originated: 03/06/2013
04/09/2013: There are still line over text issues on sheet L2.
03/06/2013: There are line over text issues on sheet L2.
RESPONSE: Line over text issues have been resolved to the best of our knowledge
Comment Number: 12 Comment Originated: 03/06/2013
04/09/2013: This has not been corrected, and the 21' utility & drainage easement shown on the
west side of the property is a 20' utility & drainage easement. These easements need to match
the Subdivision Plat.
RESPONSE: Easement labels have been updated
03/06/2013: The 15' utility & drainage easement does not match the Subdivision Plat. The Plat
shows this easement as a 20'.
RESPONSE: Easement labels have been updated
Topic: Plat
Comment Number: 1 Comment Originated: 03/06/2013
03/06/2013: The boundary and legal description close.
Comment Number: 8 Comment Originated: 03/06/2013
04/09/2013: These will need to be added prior to recording mylars.
03/06/2013: Please provide the reception numbers for the easements shown to be vacated by
separate document.
RESPONSE: WE will start preparing and recording legals after this round of review. The vacations will not
be shown at all on the Plat.
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com
Topic: Site Plan
Comment Number: 3 Comment Originated: 04/08/2013
04/08/2013: Site Plan needs to be revised to show the revised bus pull-out curbline on
Prospect. This can happen in the FDP period.
RESPONSE: The bus pull-out has been revised.
Department: Transportation Planning
Contact: Seth Lorson, 970-224-6189, slorson@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 03/06/2013
03/06/2013: The TIS for Prospect Station concludes that the Pedestrian LOS cannot be
achieved for two criteria. We will need to have more information about the specific reasons the
Ped LOS cannot be achieved, and what would be needed to meet the standard. The way it is
left in the TIS provides no recommendations or mitigation. We need more information so that
we can decide whether or not this project needs to make off-site improvements to meet the
LOS standard.
RESPONSE: This comment was addressed with the previous round.
Department: Water-Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 04/09/2013
04/09/2013: As related to this project, the sewer service to the old gas station building needs
to be located and plugged behind the curb. The service that was exposed and abandoned a
couple weeks ago was not an active service. This may involve a dye test to determine the
location.
RESPONSE: Note added.
Comment Number: 3 Comment Originated: 04/09/2013
04/09/2013: HDPE can be used on 1.5" and 2" service lines. I can get you specs.
RESPONSE: Note added.
Comment Number: 4 Comment Originated: 04/09/2013
04/09/2013: See redlined utility plans for other comments.
RESPONSE: All comments are addressed.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 02/27/2013
02/27/2013: LUC 3.5.1(I) Mechanical/utility equipment (vents, flues, rtu, meters, boxes,
conduit...) locations need to be identified on the plans with notes on how such equipment is
screen/painted.
How is the transformer screened? Can the transformer be located closer to the building behind
a wall or screening fence?
RESPONSE: Transformer has been located closer to and behind building. It is screened by the parking lot
Island on one side.