July 1,2013 Project File #: 11-385
City of Fort Collins
Engineering Development Review
281 N. College Ave
Fort Collins, CO 80522
Attention: Ms. Sheri Langenberger
RE: Aspen Heights Student Housing
Utility Crossings - Depth of Cover
Dear Sheri,
There are two locations where we believe that it is not practical to provide three feet of cover
over utility pipes crossing beneath public streets. Accordingly, we are hereby requesting that a
Modification of Standards be allowed at each of these two locations. Details of the subject crossings
are presented below in support of our request.
The first location is at the crossing beneath Lupine Drive of the culvert pipes in the main north
south drainage channel. The design presented in the FDP drawings for the Aspen Heights project
provides 2.0 feet of cover at the street centerline. The attached figure shows a cross-section
through the channel, the culverts and the underlying NECCO piping at the crossing point.
The elevation and gradient of the main drainage channel are governed by 1) the invert
elevations of the existing culverts beneath Conifer Street, at the upstream end of the channel, 2) the
design of the NECCO detention basin, at the downstream end of the channel, and 3) the design of
the underlying NECCO storm drain piping, throughout the length of the channel. The size of the
culverts beneath Lupine Drive is driven by the hydraulic capacity required to convey the ultimate
design flow in the channel, per the NECCO hydrologic analysis and the drainage analysis for the
Aspen Heights site. In order to convey the ultimate 100-year design flow in the channel (159.4 cfs)
beneath Lupine Drive, without overtopping the street, four 24" x 38" HERCP culverts are required.
In the near term, prior to completion of the NECCO system upstream and downstream of the
Aspen Heights site, the north-south channel through the site will also carry flows that will ultimately
be conveyed in the NECCO storm drain beneath the channel. Thus, the near term peak flow in the
channel will be somewhat greater than the ultimate 1 OO-year flow. The near-term peak flow in the
channel is estimated to be 239.7 cfs. If this 1 OO-yr flow is experienced, prior to the completion of the
NECCO system, a portion of the flow in the channel will overtop the street. Analysis shows that the
depth of overtopping will be slightly less than 6 inches. However, in order for the overtopping to
occur at the channel crossing, and for the overtopping flow to reenter the channel downstream of the
street, the profile of Lupine Drive must include a low point coincident with the channel crossing. That
is the condition presented in the current design.
The profile of Lupine Drive is mandated by the overall grading of the development site. To raise
the elevation of Lupine Drive at the channel crossing would necessitate raising grades throughout a
substantial area of the site in order for the site to drain efficiently. Because there is very little relief
throughout the site, overall, the street profile grades are also relatively flat, both east and west of the
channel crossing. Raising the elevation of the street by one foot at the channel crossing would
reduce the profile grade west of the crossing to approximately 0.51 % and would reverse the gradient
3715 Shallow Pond Dr., Fort Collins, CO 80528 Phone (970) 226-0264 Fax (970) 226-3760
Ms. Sheri Langenberger
RE: Aspen Heights Student Housing - Request for Modification of Standards
July 1, 2013
Page 20f2
east of the crossing, such that the street gradient would fall continuously from Blue Spruce Drive to a
point well east of the channel crossing. This would substantially alter the site drainage regime, as
well as adding substantially to the amount of fill required to grade the site. Thus, we are requesting
that the proposed design at the Lupine Drive crossing be approved.
To minimize the risk of reflective cracking of the pavement in the vicinity of the channel crossing,
we propose, as part of this request, to replace the asphalt pavement, throughout the full width of the
street and the length of the channel crossing, with a reinforced concrete slab pavement. Details of
the slab design, as well as the backfill around the culverts supporting the slab, will be finalized in
conjunction with the final design of the pavement section(s) throughout the balance of the site.
The second location for which a Modification of Standards is requested is the crossing of the
detention basin interim outfall piping beneath Redwood Street. As currently designed, the cover
over the pipe is 2.22 feet at the west flow line of the street, 3.07 feet at the street center line, and
2.78 feet at the east flow line.
The elevation of the outfall pipe has been lowered as much as possible, and use of HERCP pipe
has been specified to reduce the vertical dimension of the pipe. Further lowering of the pipe is
prevented by the existing sanitary sewer main in Redwood St. The sewer main is laid at minimum
gradient, so it cannot be lowered. Consideration was given to lowering the profile of the outfall such
that it would pass beneath the sanitary sewer main, however, to do so would result in this section of
the outfall being at an elevation more than nine feet below grade and more than five feet below the
invert of the Lake Canal at the discharge point.
As we have discussed previously, the shallow invert elevation of the Lake Canal (4952.2 ft), will
result in all outfall piping set below that elevation remaining continuously surcharged, or partially
inundated, until such time as the permanent NECCO outfall is installed. By installing this section of
the outfall at the elevation shown in the current design, none of the interim outfall piping, with the
exception of the section crossing New Vine Drive, will remain completely surcharged. Several runs
of pipe near the downstream end will remain partially inundated, but none completely. A backflow
prevention flap at the outfall will prevent water from the Lake Canal entering the outfall piping.
A request for a Modification of Standards is requested for this location. Given the limited
magnitude of the reduced cover over the outfall pipe, no other mitigating design revisions are
proposed for this location.
I trust that you will find the information presented here to be sufficient and acceptable. If you
have further questions or comments regarding these requests, please contact me immediately to
discuss them. Thank you for your consideration.
Larry C. Owen , P.E.
Attachments
LOW PT STA: 15+18.73
--++--_---- +LOW 1PVI PT STA: ELEV: 15+4963.06.99_16 -++-1----_.-.-.+.-.--_----+--i_---_---i-+---_ _f___+_ _ 4980
-+-------:-+. PVI ELEV: 4963.07 --,---+-----+---+---~-~
§;O)~ +::: ~ ~. I') ··LVC: K: 57.70.37 00 g ~I') ~ +~ ~ co ~ iii LJ
--I----r-11I .• ... ~ • It) .... .:J u: <i l~ LIS I 4970 Z
HIll) a ~ 1&.1 STAt ' 15+ 18. 73 bI ROAD CENTER I OF
-I--- it a.. V .........EL.E\f. 4963.1 P LI I LINE PROFILE
~ . I
I -r- T--_ I -nA: ¥ 7 T - 1 ~
~~ -= "\. W
!- ~ 1"\ '\. , / / ~ ~ DEPTH OF COVER @ -l
N I '\.. \ I Y / " ROAD CENTER LINE W
v
I
66" DIA. RCP NECCO
STORM MAIN II- 4950
o o • o
It) o .+ ... .o co + ... It) .co + ... HORIZ: SCALES: 1" = 30'
.... . A I II Nll ~I \ 7 ;:::I:' - I I 4960
I .~ I') ..... LJ. )1 11 11 U j(~~.c: 15+80.21 -1
-I v: 4963.37""1
-~
- ~ STORMWATER CHANNEL
--1-1----- 20' 4:1 BOTTOM SIDE SLOPES WIDTH WI v I __ Ir\ \ I
r
) I') m It) 0Cl It) I"")
I') m 0 -.;t -.;t- It) m
.) It) m I') I' ~ N I') I"") It)
. • • m . N • m . ...• . I"") N • N • . ~ 0 0 .
I') -.;t- I') -.;t- I') I"") I')
I') • -.;t-
-.;t- I')•
l I') -.;t- I') m -.;t-
.) ) co m CD co m CD co m CD co m CD co m L() 0) co m CD co m CD co m CD
I ~ -.;t ~ -.;t ~ -.;t- ~ -.;t ~ -.;t ~ -.;t ~ -.;t ~ -.;t
VERT: 1" = 6'
It) co
I') co •
~
iYlILY£~ - dr/l?n~
(j~),'T/a"/
Culvert Calculator Report
Aspen Heights - Lupine Street Culverts
Solve For: Headwater Elevation
Culvert Summary
Allowable HW Elevation 4,964.00 ft Headwater Depth/Height 1.81
Computed Headwater Elev, 4,962.81 ft Discharge 159.40 cfs
Inlet Control HW Elev. 4,962.44 ft Tailwater Elevation 4,960.54 ft
Outlet Control HW Elev. 4,962.81 ft Control Type Outlet Control
Grades
Upstream Invert 4,959.18 ft Downstream Invert 4,958.80 ft
Length 124.00 ft Constructed Slope 0.003065 tuft
Hydraulic Profile
Profile CompositeM2PressureProfile Depth, Downstream 1.74 ft
Slope Type Mild Normal Depth N/A ft
Flow Regime Subcritical Critical Depth 1.74 ft
Velocity Downstream 8.44 tus Critical Slope 0.007616 tuft
Section
Section Shape Horizontal Ellipse Mannings Coefficient 0.013
Section Material Concrete Span 3.15 ft
Section Size 24x38 inch Rise 2.00 ft
Number Sections 4
Outlet Control Properties
Outlet Control HW Elev. 4,962.81 ft Upstream Velocity Head 0.95 ft
Ke 0.20 Entrance Loss 0.19 ft
Inlet Control Properties
Inlet Control HW Elev. 4,962.44 ft Flow Control Submerged
Groo+alet1~i1h headwall (horizontal ellipse) Area Full 20.4 ft2
K 0.00180 HDS 5 Chart 29
M 2.50000 HDS 5 Scale 2
C 0.02920 Equation Form
y 0.74000
Project Engineer: LARRYOWEN8BBF\Administrator
main channel culverts under lupine - revised 12-02... CAiHE Academic SiteExton CulvertMaster v3.3 [03.03.00.04J
C~t/Ee7S
.:z;;,t£el# ('~,JA rJ/CJ,J
Culvert Calculator Report
Aspen Heights - Lupine Street Culverts
Solve For: Headwater Elevation
Culvert Summary
Allowable HW Elevation 4,964.00 ft Headwater Depth/Height 3.30
Computed Headwater Elev, 4,965.77 ft Discharge 239.67 cfs
Inlet Control HW Elev. 4,964.93 ft Tailwater Elevation 4,960.98 ft
Outlet Control HW Elev. 4,965.77 ft Control Type Outlet Control
Grades
Upstream Invert 4,959.18 ft Downstream Invert 4,958.80 ft
Length 124.00 ft Constructed Slope 0.003065 ftlft
Hydraulic Profile
Profile PressureProfile Depth, Downstream 2.18 ft
Slope Type N/A Normal Depth N/A ft
Flow Regime N/A Critical Depth 1.93 ft
Velocity Downstream 11 .75 ftls Critical Slope 0.017022 ftlft
Section
Section Shape Horizontal Ellipse Mannings Coefficient 0.013
Section Material Concrete Span 3.15 ft
Section Size 24x38 inch Rise 2.00 ft
Number Sections 4
Outlet Control Properties
Outlet Control HW Elev. 4,965.77 ft Upstream Velocity Head 2.15 ft
Ke 0.20 Entrance Loss 0.43 ft
Inlet Control Properties
Inlet Control HW Elev. 4,964.93 ft Flow Control Submerged
GhdeveJlDll!l projecting (horizontal ellipse) Area Full 20.4 ft2
K 0.00450 HDS 5 Chart 29
M 2.00000 HDS 5 Scale 3
C 0.03170 Equation Form
Y 0.69000
Project Engineer: LARRYOWEN8BBF\Administrator
main channel culverts under lupine - revised 12-02... CAiHE Academic SiteExton CulvertMaster v3.3 [03.03.00.04]
Culvert Calculator Report
Aspen Heights - Lupine Street Culverts
Solve For: Discharge
Culvert Summary
Allowable HW Elevation 4,964.00 ft Headwater Depth/Height 2.41
Computed Headwater Elev, 4,964.00 ft Discharge 190.28 cfs
Inlet Control HW Elev. 4,963.20 ft Tailwater Elevation 4,960.98 ft
Outlet Control HW Elev. 4,964.00 ft Control Type Outlet Control
Grades
Upstream Invert 4,959.18 ft
Length 124.00 ft
Hydraulic Profile
Profile PressureProfile
Slope Type N/A
Flow Regime N/A
Velocity Downstream 9.33 ftls
Downstream Invert
Constructed Slope
Depth, Downstream
Normal Depth
Critical Depth
Critical Slope
4,958.80 ft
0.003065 ftlft
2.18 ft
N/A ft
1.84 ft
0.010555 ftlft
Section
Section Shape Horizontal Ellipse Mannings Coefficient 0.013
Section Material Concrete Span 3.15 ft
Section Size 24x38 inch Rise 2.00 ft
Number Sections 4
Outlet Control Properties
Outlet Control HW Elev. 4,964.00 ft Upstream Velocity Head 1.35 ft
Ke 0.20 Entrance Loss 0.27 ft
Inlet Control Properties
Inlet Control HW Elev. 4,963.20 ft Flow Control Submerged
Grooilllelnllypah headwall (horizontal ellipse) Area Full 20.4 ft2
K 0.00180 HDS 5 Chart 29
M 2.50000 HDS 5 Scale 2
C 0.02920 Equation Form
Y 0.74000
Project Engineer: LARRYOWEN8BBF\Administrator
main channel culverts under lupine - revised 12-02... CAiHE Academic SiteExton CulvertMaster v3.3 [03.03.00.04]
Aspen Heights - Street Overtopping at Lupine Culverts - Interim
Project Description
Solve For Headwater Elevation
Input Data
Discharge 49.39 ft3/s
Crest Elevation 4964.00 ft
Tailwater Elevation 4960.98 ft
Crest Surface Type Paved
Crest Breadth 30.00 ft
Crest Length 55.00 ft
Results
Headwater Elevation 4964.45 ft
Headwater Height Above Crest 0.45 ft
Tailwater Height Above Crest -3.02 ft
Weir Coefficient 3.00 US
Submergence Factor 1.00
Adjusted Weir Coefficient 3.00 US
Flow Area 24.61 ft2
Velocity 2.01 fils
Wetted Perimeter 55.89 ft
Top Width 55.00 ft
Bentley Systems, Inc. Haestad Methods SolBBoH~Master V8i (SELECTseries 1) [08.11 .01 .03J
6/26/2013 12:43:20 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1
Alignment - (STORM 500) - (22) STA: -0+50.00 THRU 1+50.00
STATION
-0+50 0+00 1+00 1+50
JTI
r
rrI
~
::I
o z
4970 L L 4970
MANHOlE - (505)
STORM MANHOLE
TOP = 4956.75:1:
IE IE IN IN = = 4952.4952.75 75 ' \
IE OUT - 4952.09
t
1
-f-
PIPE - (505) \
60 - f- o 90 0.LF 20" OF GRADE. 19·X30· ERCP h \ \
49 4960
\
--- ----- +----r- -t \ -" -- - z
0
'" r 0 , F
N " M N N ~
N w
III ~
1 W
49
B V .... H I CROSSING ALTERNATE PROFILE PIPE I
50 4950
MANHOLE - (502) /'
1' Mi
STORM MANHOlE
TOP = 4957.25:1: I
PIPE - (506)
IE IN = 4951.41
IE IN = 4951.90 0 0.50" GRADE.
IE OUT = 4951.41 I
PIPE - (316) OITCH INLET (506)
15· PVC - STA 1+30.08
SAN. SEWER TYPE C DITCH INLET
RIM = 4954.64:1:
IE OUT = 4952.93
40 I
49 I I 4940
,
-0+50 0+00 1+00 1+50
STATION