Loading...
HomeMy WebLinkAboutASPEN HEIGHTS STUDENT HOUSING - FDP - FDP130010 - PLANS - UTILITY PLANS (222)BLUE SPRUCE DRIVE FIREWEED LANE (PRIVATE DRIVE) COPPER MOUNTAIN STREET (PRIVATE DRIVE) STEAMBOAT STREET (PRIVATE DRIVE) MARY JANE WAY (PRIVATE DRIVE) LUPINE DRIVE WALLFLOWER LANE (PRIVATE DRIVE) BLUE SPRUCE DRIVE SANGRE DE CRISTO LANE (PRIVATE DRIVE) (PRIVATE DRIVE) TEN-MILE RANGE LANE (PRIVATE DRIVE) FORGET-ME-NOT LANE (PRIVATE DRIVE) TEN-MILE RANGE LANE LA GARITA LANE (PRIVATE DRIVE) ECHO MOUNTAIN LANE (PRIVATE DRIVE) COPPER MOUNTAIN STREET (PRIVATE DRIVE) (PRIVATE DRIVE) STEAMBOAT STREET (PRIVATE DRIVE) SOL VISTA LANE (PRIVATE DRIVE) MARY JANE WAY CONIFER STREET CONIFER STREET CONIFER STREET CONIFER STREET SPURGE CIRCLE YARROW CIRCLE BLONDEL STREET JEROME STREET OSIANDER STREET OSIANDER STREET OSIANDER STREET BLUE SPRUCE DRIVE REDWOOD STREET REDWOOD STREET LUPINE DRIVE CONIFER STREET CAJETAN STREET B A 1 2 3 4 6a 7 5a 8 9a 16 12 13 14 19 20 21 10 11 15 18 17 6b 5b 9b 22 _ 6 OVERALL DRAINAGE PLAN 1-800-922-1987 400' GRAPHIC SCALE 100' 0' 50' 100' 200' 1 INCH = 100 FEET LEGEND 8 OUTLET CONTROL STRUCTURE OF INTERIM DETENTION BASIN INTERIM DETENTION BASIN DISCHARGE PIPE NOTE: SEE SHEETS 7-11 FOR FLOW ARROWS. NOTE: SEE LANDSCAPE PLANS FOR REVEGATATION INFORMATION. FEMA/FIRM 100 YEAR FLOODWAY BOUNDARY NOTES: 1. A FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR ALL IMPROVEMENTS (CURB, GUTTER, ROADWAY, UTILITIES, LANDSCAPING, ETC.) LOCATED IN THE FLOODPLAIN. 2. STORAGE OF MATERIALS OR EQUIPMENT IS NOT ALLOWED IN THE FLOODWAY, WHETHER TEMPORARY (DURING CONSTRUCTION) OR PERMANENT. 3. A CONDITIONAL LETTER OF MAP REVISION (CLOMR) MUST BE APPROVED BY FEMA PRIOR TO DOING ANY WORK (CURB, GUTTER, ROADWAY, UTILITIES, EXCAVATION, LANDSCAPING, ETC.) WITHIN THE FLOODWAY. 4. UPON COMPLETION OF WORK WITHIN THE FLOODWAY, A LETTER OF MAP REVISION (LOMR) MUST BE APPROVED BY FEMA. 5. FEMA/FIRM FLOODPLAIN AND FLOODWAY ELEVATIONS ARE ON NAVD88 DATUM. ALL OTHER ELEVATIONS ARE ON NGVD29 + 3.00'. A FLOODPLAIN USE PERMIT WILL BE REQUIRED FOR CONSTRUCTION WITHIN THE FLOODPLAIN. FEMA/FIRM 100 YEAR FLOODPLAIN BOUNDARY VINE/REDWOOD - SEE SEPARATE OFFSITE PLANS TEMPORARY ARMORED RUNDOWN NOTE: FINISH FLOOR/TOF ELEVATIONS AND FINE GRADING WILL BE DETERMINED PRIOR TO FDP MYLAR. INSTALL SITE PORTIONS OF NECCO STORM DRAINS FOR FUTURE USE TRICKLE PAN 1"=100' No. Revision/Issue Date 7711 WINDSONG DR, WINDSOR, CO 80550 deanne@TFGcolorado.com (970) 278-0240 PLANNERS / LANDSCAPE ARCHITECTS SHEET OF PROJECT: 155-101FC DATE: DRAWN BY: OCG SCALE: By: THIS DOCUMENT IS AN INSTRUMENT OF PROFESSIONAL SERVICE OF THE FREDERICKSON GROUP, LLC. THE FREDERICKSON GROUP SHALL, TO THE FULLEST EXTENT PERMITTED BY LAW, BE HELD HARMLESS AND RELEASED OF ANY DAMAGE,LIABILITY, OR COST ALLEGEDLY ARISING OUT OF UNAUTHORIZED MODIFICATION, CHANGE, OR REUSE OF THIS DOCUMENT BY OTHERS. 3715 Shallow Pond Drive Ft. Collins, CO 80528 Phone: (970) 226-0264 larrycowen@comcast.net 3 JULY 2013 69 ASPEN HEIGHTS, FORT COLLINS XS# 15190.94 4962.04FT NAVD88 XS# NAVD88 XS# NAVD88 160' EMERGENCY OVERFLOW WEIR