HomeMy WebLinkAboutASPEN HEIGHTS STUDENT HOUSING - FDP - FDP130010 - PLANS - UTILITY PLANS (222)BLUE SPRUCE DRIVE
FIREWEED LANE
(PRIVATE DRIVE)
COPPER MOUNTAIN STREET
(PRIVATE DRIVE)
STEAMBOAT STREET
(PRIVATE DRIVE)
MARY JANE WAY
(PRIVATE DRIVE)
LUPINE DRIVE
WALLFLOWER LANE
(PRIVATE DRIVE)
BLUE SPRUCE DRIVE
SANGRE DE CRISTO LANE
(PRIVATE DRIVE)
(PRIVATE DRIVE)
TEN-MILE RANGE LANE
(PRIVATE DRIVE)
FORGET-ME-NOT LANE
(PRIVATE DRIVE)
TEN-MILE RANGE
LANE
LA GARITA LANE
(PRIVATE DRIVE)
ECHO MOUNTAIN LANE
(PRIVATE DRIVE)
COPPER MOUNTAIN STREET
(PRIVATE DRIVE)
(PRIVATE DRIVE)
STEAMBOAT STREET
(PRIVATE DRIVE)
SOL VISTA LANE
(PRIVATE DRIVE)
MARY JANE WAY
CONIFER STREET
CONIFER STREET
CONIFER STREET
CONIFER STREET
SPURGE
CIRCLE
YARROW
CIRCLE
BLONDEL STREET
JEROME STREET
OSIANDER STREET
OSIANDER STREET
OSIANDER STREET
BLUE
SPRUCE
DRIVE
REDWOOD
STREET
REDWOOD STREET
LUPINE
DRIVE
CONIFER
STREET
CAJETAN STREET
B
A
1
2 3
4
6a
7
5a
8
9a
16
12
13
14
19
20
21
10
11 15
18
17
6b
5b
9b
22
_
6
OVERALL DRAINAGE PLAN
1-800-922-1987
400'
GRAPHIC SCALE
100' 0' 50' 100' 200'
1 INCH = 100 FEET
LEGEND
8
OUTLET CONTROL
STRUCTURE OF
INTERIM
DETENTION
BASIN
INTERIM
DETENTION BASIN
DISCHARGE PIPE
NOTE: SEE SHEETS 7-11 FOR FLOW ARROWS.
NOTE: SEE
LANDSCAPE
PLANS FOR
REVEGATATION
INFORMATION.
FEMA/FIRM
100 YEAR
FLOODWAY
BOUNDARY
NOTES:
1. A FLOODPLAIN USE PERMIT WILL BE
REQUIRED FOR ALL IMPROVEMENTS
(CURB, GUTTER, ROADWAY,
UTILITIES, LANDSCAPING, ETC.)
LOCATED IN THE FLOODPLAIN.
2. STORAGE OF MATERIALS OR
EQUIPMENT IS NOT ALLOWED IN THE
FLOODWAY, WHETHER TEMPORARY
(DURING CONSTRUCTION) OR
PERMANENT.
3. A CONDITIONAL LETTER OF MAP
REVISION (CLOMR) MUST BE
APPROVED BY FEMA PRIOR TO
DOING ANY WORK (CURB, GUTTER,
ROADWAY, UTILITIES, EXCAVATION,
LANDSCAPING, ETC.) WITHIN THE
FLOODWAY.
4. UPON COMPLETION OF WORK WITHIN
THE FLOODWAY, A LETTER OF MAP
REVISION (LOMR) MUST BE
APPROVED BY FEMA.
5. FEMA/FIRM FLOODPLAIN AND
FLOODWAY ELEVATIONS ARE ON
NAVD88 DATUM. ALL OTHER
ELEVATIONS ARE ON NGVD29 + 3.00'.
A FLOODPLAIN USE PERMIT WILL BE
REQUIRED FOR CONSTRUCTION
WITHIN THE FLOODPLAIN.
FEMA/FIRM
100 YEAR
FLOODPLAIN
BOUNDARY
VINE/REDWOOD - SEE
SEPARATE OFFSITE
PLANS
TEMPORARY
ARMORED
RUNDOWN
NOTE: FINISH FLOOR/TOF
ELEVATIONS AND FINE
GRADING WILL BE DETERMINED
PRIOR TO FDP MYLAR.
INSTALL SITE
PORTIONS OF NECCO
STORM DRAINS FOR
FUTURE USE
TRICKLE
PAN
1"=100'
No. Revision/Issue Date
7711 WINDSONG DR, WINDSOR, CO 80550
deanne@TFGcolorado.com (970) 278-0240
PLANNERS / LANDSCAPE ARCHITECTS
SHEET
OF
PROJECT:
155-101FC
DATE: DRAWN BY:
OCG
SCALE:
By:
THIS DOCUMENT IS AN INSTRUMENT OF PROFESSIONAL SERVICE OF THE FREDERICKSON GROUP, LLC. THE FREDERICKSON GROUP SHALL, TO THE FULLEST EXTENT PERMITTED BY LAW, BE HELD HARMLESS AND RELEASED
OF ANY DAMAGE,LIABILITY, OR COST ALLEGEDLY ARISING OUT OF UNAUTHORIZED MODIFICATION, CHANGE, OR REUSE OF THIS DOCUMENT BY OTHERS.
3715 Shallow Pond Drive
Ft. Collins, CO 80528
Phone: (970) 226-0264
larrycowen@comcast.net
3 JULY 2013
69
ASPEN HEIGHTS, FORT COLLINS
XS# 15190.94 4962.04FT NAVD88
XS# NAVD88
XS# NAVD88
160' EMERGENCY