HomeMy WebLinkAboutASPEN HEIGHTS STUDENT HOUSING - FDP - FDP130010 - PLANS - UTILITY PLANS (187)4.5' MIN.
5.5' MAX.
LUPINE DRIVE
SOL VISTA LANE
(PRIVATE DRIVE)
MARY JANE WAY
(PRIVATE DRIVE)
21+00 22+00 23+00
B
37
1-800-922-1987
KEYMAP
NOT TO SCALE
WATER PLAN/PROFILE
No. Revision/Issue Date
7711 WINDSONG DR, WINDSOR, CO 80550
deanne@TFGcolorado.com (970) 278-0240
PLANNERS / LANDSCAPE ARCHITECTS
SHEET
OF
PROJECT:
155-101FC
DATE: DRAWN BY:
OCG
SCALE:
By:
THIS DOCUMENT IS AN INSTRUMENT OF PROFESSIONAL SERVICE OF THE FREDERICKSON GROUP, LLC. THE FREDERICKSON GROUP SHALL, TO THE FULLEST EXTENT PERMITTED BY LAW, BE HELD HARMLESS AND RELEASED
OF ANY DAMAGE,LIABILITY, OR COST ALLEGEDLY ARISING OUT OF UNAUTHORIZED MODIFICATION, CHANGE, OR REUSE OF THIS DOCUMENT BY OTHERS.
3715 Shallow Pond Drive
Ft. Collins, CO 80528
Phone: (970) 226-0264
larrycowen@comcast.net
3 JULY 2013
69
ASPEN HEIGHTS, FORT COLLINS
1"=50'
SOL VISTA LANE
MARY JANE WAY
200'
GRAPHIC SCALES
50' 0' 25' 50' 100'
HORIZ: 1 INCH = 50 FEET
5' 0' 2.5' 5' 10' 20'
VERT: 1 INCH = 5 FEET
WATER PROFILE NOTES:
1. ALL WATERLINE CONSTRUCTION SHALL CONFORM TO THE
CITY OF FORT COLLINS WATER, WASTEWATER, AND
STORMWATER DEVELOPMENT CONSTRUCTION
STANDARDS AND DETAILS.
2. ALL WATERLINE TO BE CONSTRUCTED A MINIMUM OF 4.5'
AND A MAXIMUM OF 5.5' (5' TYPICAL) BELOW FINISHED
GRADE UNLESS NOTED OTHERWISE.
3. ALL WATERLINE SERVICES TO BE 3/4" UNLESS NOTED
OTHERWISE.
4. PROVIDE 10' HORIZONTAL CLEARANCE BETWEEN WATER
AND SEWER MAINS.
5. ALL GATE VALVES SHALL BE INSTALLED WITH BOXES.
6. IF WATERLINES ARE IN DEFLECTION, 10' ON BOTH SIDES
OF THE CROSSING ARE TO BE STRAIGHT, FOLLOWED BY
THE APPROPRIATE DEFLECTION.
7. WATER SERVICES THAT CONFLICT WITH STORM SEWER
AND CANNOT MAINTAIN 4.5' OF COVER AND 18" VERTICAL
SEPARATION SHALL BE LOWERED TO A MINIMUM 18"
BELOW THE STORM SEWER AND 2" POLY-ENCASED.
8. EXACT LOCATION OF EXISTING WATER MAIN TAP
LOCATIONS HAVE NOT BEEN POTHOLE LOCATED AND ARE
NOT KNOWN. CONTRACTOR TO POTHOLE AND DETERMINE
EXACT LOCATIONS AND OBTAIN REVIEW AND APPROVAL
FROM ENGINEER PRIOR TO CONSTRUCTION.