Loading...
HomeMy WebLinkAboutASPEN HEIGHTS STUDENT HOUSING - FDP - FDP130010 - PLANS - UTILITY PLANS (243)B A 65 1-800-922-1987 400' GRAPHIC SCALE 100' 0' 50' 100' 200' 1 INCH = 100 FEET OVERALL PHASING PLAN Note: See Section 3.4.1 of the Land Use Code for allowable uses within the Natural habitats Buffer Zone No. Revision/Issue Date 7711 WINDSONG DR, WINDSOR, CO 80550 deanne@TFGcolorado.com (970) 278-0240 PLANNERS / LANDSCAPE ARCHITECTS SHEET OF PROJECT: 155-101FC DATE: DRAWN BY: OCG SCALE: By: THIS DOCUMENT IS AN INSTRUMENT OF PROFESSIONAL SERVICE OF THE FREDERICKSON GROUP, LLC. THE FREDERICKSON GROUP SHALL, TO THE FULLEST EXTENT PERMITTED BY LAW, BE HELD HARMLESS AND RELEASED OF ANY DAMAGE,LIABILITY, OR COST ALLEGEDLY ARISING OUT OF UNAUTHORIZED MODIFICATION, CHANGE, OR REUSE OF THIS DOCUMENT BY OTHERS. 3715 Shallow Pond Drive Ft. Collins, CO 80528 Phone: (970) 226-0264 larrycowen@comcast.net 3 JULY 2013 69 ASPEN HEIGHTS, FORT COLLINS 1"=100' LUPINE DRIVE BLUE SPRUCE DRIVE OSIANDER STREET BLUE SPRUCE DRIVE CONIFER STREET CONIFER STREET CONIFER STREET BLUE SPRUCE DRIVE BLUE SPRUCE DRIVE BLONDEL DRIVE OSIANDER STREET CAJETAN STREET CONIFER STREET (NEW VINE-TBD) (NEW VINE-TBD) (NEW VINE-TBD) LUPINE DRIVE LUPINE DRIVE REDWOOD STREET YARROW CIRCLE SPURGE CIRCLE REDWOOD STREET REDWOOD STREET REDWOOD STREET ASPEN HEIGHTS FORT COLLINS CONSTRUCTION PHASING 1. THE GEOGRAPHICAL EXTENT OF EACH OF THE RESPECTIVE CONSTRUCTION PHASES IS HIGHLIGHTED IN COLOR ON THE PHASING PLAN. x THE CONSTRUCTION PHASES REPRESENT MORE A SEQUENTIAL PROGRESSION OF THE CONSTRUCTION ACTIVITIES, MORE THAN DISTINCT, TIME-SEPARATED PHASES OF THE PROJECT. x THE SEQUENCE OF IMPLEMENTATION OF THE DEVELOPMENT PROJECT WILL LIKELY BE NE, SE, NW AND SW / OFFSITE, BUT THE DEVELOPER MAY CHOSE TO CHANGE THE 6(48(1&(2572&20%,1(7:225025(³3+$6(6´72$''5(660$5.(7'(0$1' 2. 7+(6&23(2):25.7+$7:,//%(&203/(7(',1($&+³3+$6(´:,//,1&/8'( x ALL ROAD AND UTILITIES IMPROVEMENTS, INCLUDING SERVICE CONNECTIONS, THAT ARE /2&$7(':,7+,17+(%281'$5,(62)7+(³3+$6(´ x $//87,/,7<0$,167+$7$5(/2&$7('2876,'(7+(%281'$5,(62)7+(³3+$6(´%87 :+,&+$5(1(&(66$5<7268332577+(,1)5$6758&785(:,7+,17+(³3+$6(´ INCLUDING: a. DOWNSTREAM SANITARY SEWER OR STORM DRAIN MAINS. b. WATER MAINS TO COMPLETE A TRUNK LOOP. c. DRY UTILITIES NECESSARY TO COMPLETE A TRUNK LOOP. x 87,/,7<0$,16$1'6(59,&(6$662&,$7(':,7+)8785(³3+$6(6´%87:+,&+$5( /2&$7('%(1($7+52$'672%(&216758&7('$63$572)7+(&855(17³3+$6(´ x ALL TEMPORARY TERMINATION REQUIREMENTS, AS CALLED OUT ON THE PHASING PLAN, INCLUDING: a. TEMPORARY HYDRANTS AT THE ENDS OF MAINS THAT WILL BE EXTENDED INTO A 68%6(48(17³3+$6(´ b. CAPS, PLUGS OR BULKHEADS AT THE UPSTREAM ENDS OF SANITARY SEWER AND 67250'5$,13,3,1*7+$7:,//%((;7(1'(',172$68%6(48(17³3+$6(´ c. NOTE THAT TEMPORARY TERMINATION INFRASTRUCTURE TYPICALLY ONLY $33/,(6727+(,1,7,$/³3+$6(´,1)5$6758&785()2568%6(48(17³3+$6(6´:,// BE INFILL IN NATURE. FEMA/FIRM 100 YEAR FLOODWAY BOUNDARY FEMA/FIRM 100 YEAR FLOODPLAIN BOUNDARY REDWOOD STREET CONIFER STREET CONIFER STREET BLUE SPRUCE DRIVE CONIFER STREET SPURGE CIRCLE YARROW CIRCLE LUPINE DRIVE BLONDEL STREET VINE DRIVE VINE DRIVE OSIANDER STREET OSIANDER STREET OSIANDER STREET REDWOOD STREET REDWOOD STREET VINE DRIVE MULLEN DRIVE BLUE SPRUCE DRIVE LUPINE DRIVE LUPINE DRIVE BLUE SPRUCE DRIVE CONIFER STREET KEYMAP NOT TO SCALE INSTALL TEMPORARY CAP AND STAKE AT END OF SEWER MAIN STUB. INSTALL TEMPORARY HYDRANTS AT ENDS OF WATER MAIN STUB. INSTALL TEMPORARY HYDRANTS AT ENDS OF WATER MAIN STUB. INSTALL TEMPORARY CAP AND STAKE AT END OF SEWER MAIN STUB. SOUTHEAST PHASE NORTH EAST PHASE NORTHWEST PHASE SOUTHWEST PHASE OFFSITE PHASE INTERIM OUTFALL WILL BE COMPLETED TO LAKE CANAL DISCHARGE POINT PROPOSED INTERIM DETENTION BASIN PRELIMINARY