HomeMy WebLinkAboutWEST RANGE FORT COLLINS - FDP - FDP130022 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSCOLLEGE AVE
OLIVE ST.
MAGNOLIA ST.
MULBERRY ST.
MYRTLE ST.
MASON ST.
HOWES ST.
MELDRUM ST.
SHERWOOD ST.
WHITCOMB ST.
LOOMIS ST.
REMMINGTON ST.
MATHEWS ST.
PETERSON ST.
WHEDBEE ST.
SMITH ST.
MOUNTAIN AVE.
CANYON AVE.
RIVERSIDE AVE.
LAUREL ST.
UNIVERSITY AVE.
GRANT AVE.
WASHINGTON ST.
MAC ST.
PLUM ST.
LOCUST ST.
ELIZABETH ST.
GARFIELD ST.
NORTH DR.
SOUTH DR.
WEST DR.
EAST DR.
OVAL DR.
C0.00
COVER SHEET
N.A.
D. Fry
N.A.
C0.00 COVER SHEET
C0.01 GENERAL AND CONSTRUCTION NOTES
C3.00 OVERALL GRADING & EROSION CONTROL PLAN
EXISTING CONDITIONS AND DEMOLITION PLAN
DEVELOPER/APPLICANT
Epsilon Theta Corporation
Brandon Grebe, LEED AP
5232 Southern Cross Lane
Fort Collins, Colorado 80528
970.556.9111
SITE ENGINEER
Northern Engineering Services, Inc.
Nick Haws, PE, LEED, AP
200 South College Avenue, Suite 10
Fort Collins, Coloraod 80524
970.221.4158
C1.00
MAY, 2013
SURVEYOR
Northern Engineering Services, Inc.
Gary Gilliland, PLS
200 South College Avenue, Suite 10
C0.01
NOTES
GENERAL AND CONSTRUCTION N.A.
N.A.
N.A.
No. Revisions:
By: Date:
REVIEWED BY:
N. Haws
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
05.29.13
PROJECT:
875-001
Sheet
Of 9 Sheets
WEST RANGE FORT COLLINS
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
05.29.13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
A. GENERAL NOTES
1. All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the
Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and
the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the
City of Fort Collins.
2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise.
3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins
Engineer. Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to
commencement of any work shown in these plans.
4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as
beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort
Collins Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by
law, the engineer hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all
liabilities, claims, and demands which may arise from any errors and omissions contained in these plans.
5. All sanitary sewer, storm sewer and water line construction, as well as power and other "dry" utility installations, shall conform to the City of
Fort Collins standards and specifications current at the date of approval of the plans by the City of Fort Collins Engineer.
6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the
responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing
new construction. The Developer shall be responsible for unknown underground utilities.
7. The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning
excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to
be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading.
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/ /
/ /
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / /
/ / / / / / / / / / / / /
/ / / / / / / / / / / /
/ / / / / / / / /
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / /
/ / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
/ / / /
/ / / / / / / / / / / / / / / / / / / / / / / / / /
/ / / / / / / / / / / / / / / / / / / / / / / / / / /
X
W
C S
ELEC VAULT
T S
W
G
S
WV
G
WV
WV
S
D ELEC VAULT
D
S
G
4' SIDEWALK (TO BE REMOVED)
5' SIDEWALK
EXISTING 1-STORY
WOOD BUILDING
TO BE REMOVED
EXISTING 1-STORY
WOOD/BRICK BUILDING
TO BE REMOVED
EXISTING 1-STORY
WOOD BUILDING
TO BE REMOVED
EXISTING
1-STORY
GARAGE
COVERED
CONCRETE
PORCH
LOT LINE
LOT LINE
4.8' WALK
X
ELEC VAULT
T S
W
S
WV
WV
WV
S
D ELEC VAULT
D
S
W. LAUREL STREET
(VARIES)
S. MELDRUM STREET
(100' RIGHT-OF-WAY)
PUBLIC ALLEY
(20' RIGHT-OF-WAY)
PROPOSED
MULTIFAMILY
BUILDING
G G
G G
S
F
GM
EM
W
ET
E
E E E E E E
E
ARTHUR IRRIGATION DITCH
22' APPROXIMATE
ASPHALT PATCHING
LIMITS (SEE NOTE 7)
10' APPROXIMATE
ASPHALT PATCHING
LIMITS (SEE NOTE 7)
PROPERTY LINE
ROW LINE
ROW LINE
LOT 1
BLOCK 1
6' DETACHED SIDEWALK
13' ATTACHED
SIDEWALK TO REMAIN
6' UTIL. ESMT.
9' UTIL. ESMT.
15' UTILITY
EASEMENT
10' APPROXIMATE
ASPHALT PATCHING
LIMITS (SEE NOTE 7)
6' UTIL. ESMT.
10' APPROXIMATE
ASPHALT PATCHING
LIMITS (SEE NOTE 7)
NOTES:
1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
X
D
D
7.5' WALK
PATIO
PATIO
5' WALK
PROPOSED
MULTIFAMILY BUILDING
ARTHUR DITCH
W. LAUREL STREET
(VARIES)
S. MELDRUM STREET
(100' RIGHT-OF-WAY)
PUBLIC ALLEY
(20' RIGHT-OF-WAY)
PROPERTY LINE
PROPERTY LINE
ROW LINE
ROW LINE
LOT 1
BLOCK 1
6' DETACHED SIDEWALK
13' ATTACHED
SIDEWALK TO REMAIN
6' UTIL. ESMT.
9' UTIL. ESMT.
6' UTIL. ESMT.
FFE=3.15
FFE=1.74
T
T T
T
T
T
NORTH
( IN FEET )
1 inch = ft.
20 0 20 Feet
20
40 60
GRAPHIC SCALE:
LEGEND:
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'� �����.
C��� ������ ��� ���.
R
5013
PROPOSED CONTOUR 93
PROPOSED SWALE
EXISTING CONTOUR
PROPOSED SPOT ELEVATION 33.43
PROPOSED SLOPES
NOTES:
2.0%
EXISTING SPOT ELEVATION (47.45)
EXISTING STORM SEWER LINE W/ MH ST �
PROPERTY BOUNDARY
X
D
D
acres
A
0.87 0.46
1.00
acres
B
0.56 0.13
0.71
acres
C
0.68 0.12
0.85
B
C
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
W. LAUREL STREET
S. MELDRUM STREET
PROPOSED
MULTIFAMILY
BUILDING
LOT 1
BLOCK 1
A
POND A
No. Revisions:
By: Date:
REVIEWED BY:
N. Haws
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
05.29.13
PROJECT:
875-001
Sheet
Of 9 Sheets
WEST RANGE FORT COLLINS
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
6"
2"R.
2"
6" 6"
12"
1 1/2"R.
2'-6"
6"
4 1/2"
30"
9"
R 0.5"
4.5"
18"
3.63"
21.75"
R 0.13"
7"
2"
3.75"
12"
ROLL-OVER
VERTICAL
(LOVELAND)
G����� ���� ��� ��
������� �� ��������.
(T������ ��� ��� C��� &
& G����� T����)
DATE: 03/01/02
CURB AND GUTTER
URBAN AREA
STREET STANDARDS
LARIMER COUNTY
CONSTRUCTION DRAWINGS REVISION NO: 1 701
DRAWING
S�������
D�������
LIP
F.L.
T.C.
DRIVEWAY SIDEWALK
SECTION A-A
NOTE:
1. S������� ����� ����� ������ ���������� ������ ��������
3. T��� ������ ������� �� R���������� & C��������� ���������.
6"
6" R����������
D������� S�������
A������� S�������
1/2" E��������
J���� M������� 1/2" E��������
J���� M�������
A
A
2. F�� �������� ������ ������������, ��� CONST. DWG. 706 & 707.
DETACHED ATTACHED
3'-0" 6'-0"
A�� S������� T�������� S���� B� 6" �������.
M��.
STANDARD SIDEWALK
12" (W���� & S����)
I� ���� ������� �� ���� ����
4' �� �������� �������/��������,
�� ���� �� ������� ��� ��������.
E��� �� P������� ��
L�� �� E������� G�����
C��������
L���� �� S�������
M��������
P�������
T��������
V�����
V�����
1" (���.)
(S�� N��� 9 ����� ��� S����.)
4" (���.)
6" (���.)
T����� W����
V�����
2'
(���.)
B������ M�������
U���������� S���
U������ C������
N�� A������/C�������
C���� R��� B���
E������� R��� B���
6" F��� D���� A������ ��
X/Y C�������� S������
NOTES:
1. A�� �������� ����� �� ���������� �� ���������� ���� ��� ����� ������ ������ ��������� ��������� �� ���
L���� E����� E�������.
2. P���� �� ��������� �� �������/��������, �������� ���� ����� �� ��� ��� �� � �����, ��������, ��� ��������
����.
3. W���� ��� ����������� ����� ��� ���-���������, � ����/������ ������ (1 ���� ���) ��� �� ����������� ���
�������� ��������.
4. T����� ����� ����� ��� �� ���� ���� 16" ��� ���� ���� 12" ����� ���� ��� ������� �������� �� ��� ����.
5. U�� � #4 ����� �� ������� ����� ��� ��������� �� �������� ����������� ��������.
6. R���� �� C������ 22, M�������� & C����������� S������������� ��� ���������� ��� ������� ������������.
7. I� ���������� �����, ��� ��������� ����� ����� �� ��������, ������ & �������.
8. I� �������� ��������, � ������� �� ��� ������ �������� ����� ���� �� ��������.
9. B������ �������� ����� ���� ���������� ����� ����� ����� �� �� �� ������ ����, ������ �� ����� ��
���������� ��������; ����, ������� �������� ����� �� ������ �� � ����� 12" ����� ����.
LARIMER COUNTY
URBAN AREA
STREET STANDARDS CONSTRUCTION DRAWINGS REVISION NO: 1 DRAWING 2201
DATE: 08/07/00
TRENCH DETAIL
PLAN VIEW
48" DIA.
BEFORE BACKFILLING
ARMOUR-FLEX TUBING
AND GROUT KNOCKOUT
BOX
CURB
FLOW
2' (MAX.)
1" DIA. IRON
(TYP) PIPE BRACE
MANHOLE RUNGS
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'� �����.
C��� ������ ��� ���.
R
City UTILITY of Fort PLAN Collins, APPROVAL Colorado
Date
Date
Date
Date
Date
Date
APPROVED:
City Engineer
Traffic Engineer
Parks & Recreation
Stormwater Utility
Water & Wastewater Utility
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
COMPACTED GRANULAR MATERIAL
CONFORMING TO CDDH #67
LOWER LIMIT OF
TRENCH WALL
SLOPING
INITIAL LIFT *
12 IN. MIN.
PIPE O.D.
4 IN. MIN.
TRENCH WIDTH AS SPECIFIED
IN SECTION 02221
COMPACTED GRANULAR MATERIAL
CONFORMING TO CDDH #67
*
DATE REVISED:
SEWER CONSTRUCTION DETAILS APPROVED: DRAWN BY: DETAIL
BEDDING REQUIRMENTS
WW-1
NBJ
4/11/11
PLAN VIEW
CROSS VIEW
45 ELBOW
SERVICE WYE
8 IN. PVC SEWER PIPE
COMPACTED GRANULAR MATERIAL
AIR-TIGHT PLUG WITH
4 IN. X 4 IN. MARKER
UNYIELDING PIPE BEDDING
OF COMPACTED ROCK OR
LEAN CONCRETE
PVC SEWER PIPE
NOTE: WYE CONNECTION NOT
ALLOWED ON VCP
LEAN CONCRETE
o
20 o MIN.
45 o MAX.
TRENCH
UNYIELDING PIPE BEDDING
OF COMPACTED ROCK OR
MARKER
AIR-TIGHT PLUG
DATE REVISED:
SEWER CONSTRUCTION DETAILS APPROVED: DRAWN BY: DETAIL
SERVICE WYE DETAIL
WW-9
NBJ
4/11/11
CLASS B BEDDING
LOWER LIMIT OF
UNIFORM GRADED
CLASS A BEDDING
LOWER LIMIT OF
LOWER LIMIT OF
MATERIAL
12 IN. MIN.
12 IN. MIN.
TRENCH WIDTHS SHALL BE AS SPECIFIED ON PLANS.
REFER TO THE STORM SRAINAGE CONSTRUCTION STANDARDS,
SECTION 6, "BEDDING MATERIALS" FOR GRADATIONS.
SUBDRAIN DETAIL
TRENCH WIDTH AS SPECIFIED
TRENCH WIDTH AS SPECIFIED
ROCK EXCAVATION
TRENCH WIDTH AS SPECIFIED
GRANULAR MATERIAL
UNSTABLE SUBGRADE
TRENCH WIDTH AS SPECIFIED
ROCK
1 1/2 IN.
COMPACTED
GRANULAR OR
TRENCH WALL
SLOPE
COMPACTED
MATERIAL GRANULAR
NOTES:
2.
1.
6 IN. MIN.
4 IN. MIN.
12 IN. MIN.
1/8 PIPE O.D.
OR 4 IN. MIN.
SLOTTED PIPE
PERFORATED OR
GRAVEL
FILTER
BACKFILL
COMPACTED
DENSELY
TRENCH WIDTH AS SPECIFIED
CLASS C BEDDING
TRENCH WIDTH AS SPECIFIED
1/4 PIPE O.D.
SLOPE
MATERIAL
COMPACTED
TRENCH DENSELY WALL
PIPE O.D. + 8 IN.
1/4 PIPE O.D.
MATERIAL
COMPACTED
DENSELY
SLOPE
TRENCH WALL
MATERIAL
PIPE O.D.
12 IN. MIN.
3000 CONCRETE 1/P.8 S.PIPE I. OR 6 IN. MIN. O.D.
TRENCH WALL
LOWER LIMIT OF
UNIFORMLY
SELECTED GRADED
SLOPE
GRADED COMPACTED ROCK OR
MATERIAL
GRANULAR
COMPACTED
PIPE O.D.
12 IN. MIN.
TRENCH WALL
LOWER LIMIT OF
SLOPE
COMPACTED
DENSELY
FILTER
6 IN. MIN.
PIPE O.D.
1/OR 8 4 PIPE IN. MIN. O.D.
PIPE O.D.
BROKEN LARGE (IF CONCRETE, REQUIRED) STONES, ETC.
MATERIAL
LOWER LIMIT OF
TRENCH WALL
SLOPE
DETAIL
FORT COLLINS CONSTRUCTION STORMWATER DETAILS
FORT COLLINS, CO.
UTILITIES
CITY OF
(970) 221-6700
APPROVED: DATE:
DRAWN BY:
STORMWATER BEDDING REQUIREMENTS
1/12/00 D-1
SKC
No. Revisions:
By: Date:
REVIEWED BY:
N. Haws
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
05.29.13
PROJECT:
875-001
Sheet
Of 9 Sheets
WEST RANGE FORT COLLINS
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
05.29.13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
C5.02
DETAILS
SITE AND UTILITY N/A
N/A
N/A
CP
TEST STATION
U
S
A
1 1/8"
7/16"
3 1/2"
7 5/16"
5/2" 8"
A
S
U
I
E
J
W
STATION
LOCATOR
LID PLAN VIEW
LID SECTION VIEW
VALVE BOX SECTION VIEW
9"
6 1/8"
10"
7 9/16"
2 1/16"
CLOSED PICKHOLE
(TYPICAL OPPOSITE
SIDE)
1/2" RAISED LETTERING
(RECESSED FLUSH)
REFERENCE SPECIFICATIONS 02622-2
THROUGH 02622-4 FOR LOCATOR
FOR CP TEST STATION INFORMATION.
REFERENCE SPECIFICATIONS 16640-5
STATION BOX INFORMATION.
REVISED DATE:
DETAIL
TITLE OF DRAWING
FIELD OPERATIONS
(970) 221-6700
UTILITIES - WATER
FORT COLLINS, CO. 80550
CITY OF FORT COLLINS
P.O. BOX 580
CP TEST AND LOCATOR STATION BOX
25
4/11/11
W
J
E
I
������
������
VALVE (TYPICAL)
HYDRANT SECONDARY
FIRE HYDRANT
(TYPICAL)
LOCATOR
STATION
PVC MAIN
TRACER WIRE
NOTES:
1. TRACER WIRE TO BE PLACED ALONG TOP CENTERLINE OF MAIN AND SECURED AS NECESSARY TO
PREVENT MOVEMENT OF WIRE.
TRACER WIRE SHALL BE SINGLE CONDUCTOR #12 STRANDED COPPER WITH TYPE THNN OR THWN
FOR LOCATOR STATION DETAILS SEE DETAIL 25
2.
3.
4.
800' MAXIMUM DISTANCE BETWEEN LOCATOR STATIONS
TRACER WIRES FOR PERPENDICULAR MAINS AT STREET INTERSECTIONS ARE NOT TO BE SPLICED TOGETHER.
SEE NOTE 4
(TYPICAL)
INSULATION DESIGNATED FOR DIRECT BURY. TRACER WIRE SHALL BE CONTINUOUS (WITHOUT SPLICES)
WHENEVER POSSIBLE. WHEN SPLICES ARE REQUIRED, ALL SPLICES OF TRACER WIRE SHALL BE MADE
USING BRASS SPLIT-BOLT CONNECTORS AND ROYSTON "MINI SPLICE-RIGHT" SPLICE KITS.
REVISED DATE:
DETAIL
TITLE OF DRAWING
FIELD OPERATIONS
(970) 221-6700
UTILITIES - WATER
FORT COLLINS, CO. 80550
CITY OF FORT COLLINS
P.O. BOX 580
PVC WATER MAIN
TRACER WIRE DETAIL
30
4/11/11
NOT TO SCALE
C5.02
OUTLET STRUCTURE DETAILS
STAINLESS STEEL
ANCHOR BOLTS
@12" O.C. MIN.
5/16" THICK
GALVANIZED
STEEL PLATE
3/4" BOTTOM OF
ORIFICE TO BOTTOM
OF PLATE
WATER QUALITY ORIFICE
PLATE CENTERED
OVER OPENING IN
WALL FOR OUTLET PIPE
100-YR ORIFICE PLATE DETAIL
INVERT OUT: 4999.41
OUTLET PIPE
OUTER DIA. + 6"
OUTLET PIPE
OUTER DIA. + 3"
ORIFICE PLATE SUMMARY
TABLE
STRUCTURE ORIFICE DIA. PLATE
LOCATION
HEADWALL 1/2" UPSTREAM INVERT (N)
HEADWALL 3-1/2" UPSTREAM INVERT (N)
** NOTES: N/A
SEE TABLE FOR DIA.
WATER QUANTITY ORIFICE
INVERT OUT: 5000.33
SEE TABLE FOR DIA.
BELOW LID)
METER (PLACED
12" O.C.
24" DIA.
PRECAST CONCRETE
MANHOLE
8" x 8" CONCRETE
BLOCK (TYP.)
AND REMOVABLE PLUG)
WITH 1 27/32" DIA. HOLE
YOKE BOX LID PART #YL-TP
PART #YUC-7 WITH FORD
AMR POD (FORD YOKE BOX
%GENERAL NOTES:
1. LOCATION AND ALIGNMENT OF AMR POD ON PIT TOP CAN VARY.
2. SEE DETAIL 16-A FOR ADDITIONAL METER PIT INFORMATION.
REVISED DATE:
DETAIL
TITLE OF DRAWING
FIELD OPERATIONS
(970) 221-6700
UTILITIES - WATER
FORT COLLINS, CO. 80550
CITY OF FORT COLLINS
P.O. BOX 580
STANDARD SETTING FOR 1 1/2 IN. AND
2 IN. WATER METERS (PLAN VIEW) 16B
4/11/11
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'� �����.
C��� ������ ��� ���.
R
City UTILITY of Fort PLAN Collins, APPROVAL Colorado
Date
Date
Date
Date
Date
Date
APPROVED:
City Engineer
Traffic Engineer
Parks & Recreation
Stormwater Utility
Water & Wastewater Utility
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
BOTTOM OF PIPE AND A MINIMUM OF 12 INCHES ABOVE TOP OF PIPE.
GRANULAR BEDDING MATERIAL SHALL BE A MINIMUM OF 4 INCHES BELOW
INITIAL 12 IN. LIFT MIN.
PIPE O.D.
4 IN. MIN.
GRANULAR MATERIAL
BEDDING ZONE
NOTE:
* INITIAL LIFT SHALL NOT EXCEED 2 FEET IN DEPTH.
TRENCH WALL
LOWER LIMIT OF
SLOPING
TRENCH IN WIDTH SECTION AS 02221 SPECIFIED
*
REVISED DATE:
DETAIL
TITLE OF DRAWING
FIELD OPERATIONS
(970) 221-6700
UTILITIES - WATER
FORT COLLINS, CO. 80550
CITY OF FORT COLLINS
P.O. BOX 580
WATER MAIN BEDDING
REQUIREMENTS (DIP & PVC) 1
4/8/11
PIPE
SIZE BENDSTEE OR
DEAD
END
22 1/2 45 90
6"
8"
12"
1.0
1.5
3.0
1.5
2.5
4.5
2.5
4.5
9.0
4.5
8.0
16.5
3.5
5.5
12.0
MINIMUM BEARING SURFACE AREA
(SQ. FT.)
Bearing surface areas shown in chart are minimum.
All fittings to be wrapped with polyethylene.
Pipe installed under conditions different from those
normally encountered shall require thrust blocks
designed for those particular conditions.
Thrust blocks on pipe larger than 16 inches diameter
shall be designed for conditions existing at the
installation site.
Refer to Section 03300 for concrete requirements.
1.
2.
3.
4.
5.
GENERAL NOTES:
UNDISTURBED
SOIL
POLYETHYLENE
BOND BREAKER
UNDISTURBED
SOIL
BOND BREAKER
POLYETHYLENE BEARING
SURFACE
POLYETHYLENE
BOND BREAKER
UNDISTURBED
SOIL
BEARING
SURFACE
SOIL
UNDISTURBED
BEARING
SURFACE
POLYETHYLENE
BOND BREAKER
BEDDING
MATERIAL
2/3 DIA.
TEE
TYPICAL BEND
TYPICAL CROSS-SECTION
DEAD END
BEARING SURFACES ARE A MINIMUM REQUIREMENT
AND DO NOT RELIEVE DESIGN ENGINEER OF
RESPONSIBILITY TO DESIGN EACH THRUST BLOCK.
16" 4.8 9.6 18.9 34.7 24.5
REVISED DATE:
DETAIL
TITLE OF DRAWING
FIELD OPERATIONS
(970) 221-6700
UTILITIES - WATER
FORT COLLINS, CO. 80550
CITY OF FORT COLLINS
P.O. BOX 580
STANDARD CONCRETE
THRUST BLOCKS
2
4/8/11
All residential water service shall be installed in the center of the lot
All water and sanitary sewer service shall have a minimum
of the curb stop and meter pit, and no trees within 10 feet of curb and meter pit.
No landscaping (shrubs, boulders, etc.), retaining walls or fences allowed within 4 feet
Use type K copper for the service from the corporation stop to a minimum of 5 feet
up to and including the curb stop. The owner is responsible for service from the
The City is responsible for maintaining the water main, corporation stop, and service piping
Locate curb box and meter pit according to the approved utility drawings.
Install 1 1/2 inch and 2 inch services with tapped tee and corporation stop at time of
Use direct tap (as shown) for 3/4 inch and 1 inch services unless water main is PVC,
unless otherwise approved by the Utility.
horizontal separation of ten feet.
past the meter pit.
No couplings allowed between curb stop and meter setting.
curb stop, including the outlet coupling to the building.
construction or use a tapping saddle.
in which case, use a tapping saddle.
GENERAL NOTES
9.
8.
4.
6.
7.
5.
WATER MAIN
3.
2.
1.
IN FACE OF CURB
CUT 4 INCH CROSS
CORPORATION STOP FOR
PAVEMENT
CURB STOP
CURB
BOX
66 INCH MAX.
54 INCH MIN.
CURB, GUTTER AND
SIDEWALK
DISTANCE VARIES 1 FT.
PROPERTY OR EASEMENT LINE
FINAL LANDSCAPED GRADE
REVISED DATE:
DETAIL
TITLE OF DRAWING
FIELD OPERATIONS
(970) 221-6700
UTILITIES - WATER
FORT COLLINS, CO. 80550
CITY OF FORT COLLINS
P.O. BOX 580
TYPICAL WATER SERVICE
11
4/12/11
1 1/2 INCH OR GREATER
CORPORATION STOP FOR 3/4
AND 1 INCH SERVICES
SERVICES
1 INCH SERVICES
6"
CONNECTION
COMPRESSION
8" LAYER OF 3/4" TO 1 1/2" GRAVEL
SUPPORT METER SETTERS BY (2) 18 INCH LENGTHS OF 1 INCH IRON PIPE INSERTED THROUGH
IF A PRESSURE REDUCING VALVE IS REQUIRED BY PLUMBING CODE, IT SHALL BE INSTALLED INSIDE THE BUILDING,
GRADE ACCEPTANCE AFTER METER PIT INSTALLATION REQUIRES THAT THE OWNER ADJUST METER PIT COVER
ALL TEES, COUPLINGS AND CONNECTION FITTINGS TO BE A MINIMUM OF 5 FEET FROM METER PIT WALL ON OUTLET
NO LANDSCAPING (TREES, SHRUBS, BOULDERS, ETC.) OR RETAINING WALLS TO BE WITHIN 4 FEET OF METER PIT
DO NOT INSTALL IN ANY STREET, ALLEY, PARKING AREA, DRIVEWAY, SIDEWALK, DRAINAGE DITCH OR DETENTION
AND NO TREES WITHIN 10 FEET.
BRACE PIPE EYELETS AND SET ATOP (4) 8 INCH SQUARE CONCRETE BLOCKS.
IMMEDIATELY FOLLOWING THE MAIN SHUT-OFF VALVE.
TO 1/2 INCH ABOVE LANDSCAPED FINAL GRADE.
MAKE NO PLUMBING CONNECTIONS (TEES, COUPLINGS, ETC.) IN METER PIT.
SLOPE GROUND SURROUNDING METER PIT AWAY FROM LID AT 2% GRADE OR GREATER.
9.
8.
7.
6.
5.
1.
3.
2.
%GENERAL NOTES: 8"
12"
(MIN.)
PIPE BRACE
1" DIA. IRON
(TYP.)
2' (MAX.)
2% SLOPE
GRADE RINGS (IF REQUIRED)
PRE-CAST CONCRETE
BEFORE BACKFILLING
AND GROUT KNOCKOUT
ARMOUR-FLEX TUBING
MANHOLE
PRECAST CONCRETE
CURB BOX
(TYP. ALL JOINTS)
PLASTIC GASKETS
PRE-FORMED
1-1/2" METERS
FLOW
2" METERS
17 1/4" FOR
13 1/4" FOR
SETTER
METER
12" O.C.
MANHOLE RUNGS
48"
ALUMINUM MANHOLE RING AND
COVER WITH LOCK NUT
24"
54" (MIN.)
66" (MAX.)
INSTALL LID 1/2 IN. ABOVE
FINAL LANDSCAPED GRADE
MASTIC
MORTAR OR
16" (MAX.)
7" (MIN.)
FINISHED GRADE
AMR POD (FORD YOKE BOX
PART #YUC-7 WITH FORD
YOKE BOX LID PART #YL-TP
WITH 1 27/32" DIA. HOLE
AND REMOVABLE PLUG)
3" (MAX.)
1" (MAX.)
1/2" EMT OR PVC
VAULT OR PIT TOP
INTO YOKEBOX
2' (MAX.)
3/4" ROCK FOR GRADE
ADJUSTMENT (IF REQ'D)
12"
(MIN.)
(MAX.)
(TYP.)
TOP OF AMR LID TO
BE 1/2" ABOVE
FINISHED GRADE
CONDUIT THROUGH
10. A SEPERATE AMR POD MUST BE INSTALLED FOR EACH METER REGISTER.
4. THE METER PIT AND AMR POD(S) MUST REMAIN OPEN AND ACCESSABLE FOR METER READING AND MAINTENANCE.
CURB STOP
REVISED DATE:
DETAIL
TITLE OF DRAWING
FIELD OPERATIONS
(970) 221-6700
UTILITIES - WATER
FORT COLLINS, CO. 80550
CITY OF FORT COLLINS
P.O. BOX 580
STANDARD SETTING FOR 1-1/2 IN.
AND 2 IN. WATER METERS
16A
4/11/11
SIDE.
BASIN.
No. Revisions:
By: Date:
REVIEWED BY:
N. Haws
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
05.29.13
PROJECT:
875-001
Sheet
Of 9 Sheets
WEST RANGE FORT COLLINS
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
05.29.13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
C5.01
DETAILS
SITE AND UTILITY N/A
N/A
N/A
STREET STANDARDS
LARIMER URBAN AREA COUNTY REVISION NO: 1
CONSTRUCTION DRAWINGS DATE: 04/01/07 1601 DRAWING
SIDEWALK
8" C���������
ATTACHED SIDEWALK DETAIL
S���� �������� �� ���� 1/4" ��� ����.
NOTE: C�������� �������� ���� ������ �� 10' ���������
R 1/8"
WEAKENED PLANE JOINT EXPANSION JOINT
R1/4"
��� ������� ���� ������� �� ����.
INSTALL IN LOCATIONS SPECIFIED
IN CHAPTER 22
1/2"
1/4"
1/4 SLAB THICKNESS
1/4"
1/2" E��������
J���� ��������
DETACHED SIDEWALK DETAIL
V�������
L����������
S���� �������� �� ���� 1/4" ��� ����.
2' ���.
S����: M������
1
4"/��
M������ 3"/��
CONSTRUCTION
SIDEWALK DETAIL
LARIMER COUNTY
STREET URBAN STANDARDS AREA DRAWINGS 1602
DRAWING
REVISION DATE: 04/NO: 01/07 2
1:12 ���.
X=2' ���. D������� W���� V�����
2'-0"
6"
A�������
S�������
L��
FL
B��� �� ����
R���� �� W�� ����
D�������
A�������
R���� �� W�� L���
D�������
S�������
1:24 (���.)
NOTE:
1. C������� �������� ���� ��
�������� �� ��� �������� ����.
R���� �� C������ 25��� ������� ������� ����������.
X
Y
W
X
Y
W = W����
1:12 (���.)
P������� L���
�
1/4" PER FT.
N.T.S.
SECTION A-A 2"
�
1:12 (���.)
�
X = C��� T��������� L�����
Y = P������ W���� �� T��� I A�������
W = D������� W���� (S�� D������ 707)
� = C������� T�������� - ������� 6"
T��� I = W��� D������� S�������
T��� II = W��� A������� S�������
TYPE I TYPE II
1:12 (���.) 1:48
A
A
PERSPECTIVE
X=6'-0"
1:48 SLOPE
1:12 ���.
B
B
WALK
Y
�
�
WALK
� 2"
FLOWLINE
JOINT
EXPANSION
BOW
1:12 (���.)
1:24
SECTION B-B
N.T.S.
LARIMER COUNTY DRAWINGS CONSTRUCTION REVISION NO: 2 706 DRAWING
STREET STANDARDS
URBAN AREA DATE: 04/01/07
STANDARD DRIVEWAY APPROACH (TYPES I & II)
R��� �� ���������
1:12
���.
BOW
E�������� ����� �� �����
��������� �� ��������
WALK
6"
(���.)
1/2"
2"R.
NEW ASPHALT
SURFACE
NEW BASE AGGREGATE COURSE
12"
EXISTING ASPHALT
SURFACE
EXISTING AGGREGATE
NOTE:
BASE
THE EXISTING ASPHALT SURFACE SHALL BE SAW-CUT AND REMOVED FROM THE EXISTING
AGGREGATE BASE TO A LINE ONE FOOT FROM AND PARALLEL TO THE EDGE OF EXISTING
PAVEMENT.
THE ASPHALT SURFACE SHALL BE SAWED TO FORM A PERPENDICULAR CLEAN JOINT AND A
COATING OF BITUMINOUS MATERIALS (PRIME COAT) SHALL BE APPLIED TO THE JOINT PRIOR
TO THE PROPOSED SURFACING OPERATION.
NOT TO SCALE
1
C5.00
ASPHALT PAVEMENT JOINT DETAIL
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'� �����.
C��� ������ ��� ���.
R
City UTILITY of Fort PLAN Collins, APPROVAL Colorado
Date
Date
Date
Date
Date
Date
APPROVED:
City Engineer
Traffic Engineer
Parks & Recreation
Stormwater Utility
Water & Wastewater Utility
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
No. Revisions:
By: Date:
REVIEWED BY:
N. Haws
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
05.29.13
PROJECT:
875-001
Sheet
Of 9 Sheets
WEST RANGE FORT COLLINS
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
05.29.13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
C5.00
SITE DETAILS
N/A
N/A
N/A
6"
VARIES (2' MIN.)
1' (MIN.) 1' (MIN.) 1 1/2"
DETAIL
FORT COLLINS CONSTRUCTION STORMWATER DETAILS
FORT COLLINS, CO.
UTILITIES
CITY OF
(970) 221-6700
APPROVED: DATE:
DRAWN BY: NBJ
12-25-00 D-20B
CONCRETE TRICKLE PAN
6" 1"
1 1/2"R.
1'-6"
2" R.
4-1/2"
12"
6"
OUTFALL CURB & GUTTER
1-1/2"
6"
1-1/2" TO
NOT TO SCALE
2
C5.00
PRIVATE CURB & GUTTER
6" 1"
1 1/2"R.
1'-6"
2" R.
4-1/2"
12"
6"
INFLOW CURB & GUTTER
1-1/2"
6"
1-1/2" TO
1. NO JOINTS ARE ALLOWED IN THE FLOWLINE. SIX INCH WIDE CURB OR "DUMMY JOINT" MAY BE TOOLED NO
CLOSER THAN 6 INCHES FROM FLOW LINE AS SHOWN.
2. MINIMUM CONCRETE THICKNESS IS 6 INCHES.
3. JOINT PATTERN TO BE ACCORDING TO 'INTERSECTION GUTTER DETAIL' OR AS DETERMINED BY THE LOCAL
ENTITY.
4. WOOD FLOAT FINISH IS REQUIRED OVER THE SLOPED SURFACE OF RAMP AND FLARES.
5. A 6 INCH WIDE CURB MAY BE POURED AT THE BACK OF THE RAMP AS SHOWN IF REQUIRED. IF CURB IS
USED IT SHALL MATCH THE CURB AND GUTTER STYLE OF ADJACENT CURB AND GUTTER.
6. MINIMUM RAMP WIDTH SHALL BE FOUR FEET, OR THE SAME AS THE WIDEST ADJACENT SIDEWALK,
WHICHEVER IS GREATER, UP TO A MAXIMUM WIDTH OF 8 FEET.
7. THE RAMP LANDING MAY BE POURED MONOLITHIC WITH THE ADJACENT TRANSITIONS PROVIDED THAT AN
APPROVED "SHAKE-ON" PIGMENT BE USED TO COLOR THE LANDING AREA.
8. T= THICKNESS (AS SPECIFIED ON PLANS OR LOCAL ENTITY ENGINEER).
STANDARD GRAY CONCRETE
RAMP WITH PARTIALLY COLORED CONCRETE
SECTION A-A
LIP OF GUTTER
PLAN VIEW
FLOWLINE
CURB
A
A
0.5' TYP.
N.T.S.
6"
1:12 SLOPE MAX.
CURB
0.5'
4' MIN.
N.T.S.
FLARE OPTION
CURB OPTION
6" CURB 0" CURB
1' R
2'
NOTES:
�=6" �� �� ���������
1"/��. M��
1"/��.
M��
1.5' TRANSITION 1.5' TRANSITION
F�����
O�����
2'
FL
REVISION NO: 1
DATE: 04/01/07
DRAWING
STREET STANDARDS DRAWINGS 1606
URBAN AREA
LARIMER COUNTY
PEDESTRIAN RAMP DETAIL (For New Const. & Alterations)
CONSTRUCTION
1:25 �����
(���.)
T�������� D���
W������ D��������
T�������� D���
W������ D��������
F
C���
F����
V�����
C���
2'-0"
F����
R���
�������� �����
P����� �������� �� ���
A����
G�����
��
C��� ��� G�����
F��� ����
1:20 S���� 1:12 MAX S����
S������ A-A
NTS
V����� V�����
C���
C���
F����
R���
2'-0"
V�����
P�����
P�����
6"
A
A
CL
P��������� ����
A������ ����
R���
W����:
4.5'
5.0'
6.0'
7.0'
8.0'
N���:
T�������� ���� ������ ���
��������� �� 2'�2' �������
���
2'�2.5' ����������. C������
��� ������ �� ��� ��� ����.
P����� ��� �� ��� �� ��
����
���� � 2'�1.5' ����.
P���� W����
C�����������:
2'+2.5'
2.5'+2.5'
2'+2'+2'
2.5'+2'+2.5'
2'+2'+2'+2'
N���:
1. T�������� ���� ������� �����:
I������ ������ ����� ���� ��� ��������
���� ��� ��� ����. T�� ����� ��������
����� �� "C��� I� T��� W������ P�����"
�� �� ���������� �������� ���� ����
�� ����� �������� �� ��� C��� E�������
����� �� ������������. T�� ����� �����
����� �� ���, �� ����� ����� �� ��������.
S������������� ��� ��� ����� ���
������������ ������������ ���� ��
�������� ���� �������.
2. T��� ������� ����� �������� ����. F��
D���� O��� C��� ��� ������� ���������
�������� ����� �� ������ �� ��� ����
�������� 6" ���� ���� ��� F��� ��
C��� �� .
C��� 1-D���������� R���� C��� 2-N��-D���������� R����
V�����
P�����
R���
P�����
F����
2'-0"
C���
C��� 3-M��-B���� R����
6"
P����� P�����
A����
G�����
��
F����
6"
F����
(C����� ���� �� ����)
CL -C����� ���� �� ����
BOC
BOC
BOC
FOC
L
��
F
FOC
BOC
FL
-B��� �� C���
-F��� �� C���
-F��� ����
2'
REVISION NO:
DATE: 04/01/07
DRAWING
STREET STANDARDS DRAWINGS 1607
URBAN AREA
LARIMER COUNTY
TRUNCATED DOME WARNING FOR ACCESS RAMPS
CONSTRUCTION
FORT COLLINS ONLY
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
05.29.13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
C4.00
DRAINAGE EXHIBIT
NORTH
( IN FEET )
1 inch = ft.
20 0 20 Feet
20
40 60
GRAPHIC SCALE:
K��� ����'� �����.
C��� ������ ��� ���.
R
BENCHMARK/BASIS OF BEARING
BENCHMARK #1:
City of Fort Collins Benchmark 6-00
Located on a catch basin at the northwest corner of Mulberry Street
and College Avenue.
Elevation = 4990.68 (NGVD 29 - Unadjusted)
BENCHMARK #2:
City of Fort Collins Benchmark CSU 2
Standard brass Larimer County Geodetic Control Disk set in 2002,
located in the campus of Colorado State University approximately
240.8 feet south from the center line of North Drive, 46.6 feet northeast
from the edge of the CSU Lagoon, 33 feet southwest from the center of
the delivery road to the University Club and 1.1 feet southwest from the
edge of the sidewalk.
Elevation = 5003.12 (NGVD 29 - Unadjusted)
Basis of Bearings
Considering the East line of Lot 8, Block 87, City of Fort Collins and its
southerly extension as bearing South 00�21'57' West (assumed
bearing).
LEGEND:
4953
PROPOSED CONTOUR 93
PROPOSED STORM SEWER
PROPOSED SWALE
EXISTING CONTOUR
PROPOSED CURB & GUTTER
PROPERTY BOUNDARY
PROPOSED INLET
A
DESIGN POINT
FLOW ARROW
DRAINAGE BASIN LABEL
DRAINAGE BASIN BOUNDARY
PROPOSED SWALE SECTION
1 1
PROPOSED 100-YEAR WATER SURFACE ELEVATION
NOTES:
1.REFER TO THE "FINAL DRAINAGE REPORT FOR WEST RANGE FORT COLLINS" BY NORTHERN ENGINEERING, DATED {MAY 29, 2013} FOR
ADDITIONAL INFORMATION.{
}
PROPOSED BIO-RETENTION
BASIN
DESIGNATION
BASIN
AREA (AC)
acres
RUNOFF
COEFFICIENTS 0.XX
0.XX X.XXX
A
EXISTING INLET GRATE
PROPOSED RIBBON CURB
PROPOSED INFLOW CURB & GUTTER
PROPOSED OUTFALL CURB & GUTTER
Date
Date
Date
Date
Date
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
City Engineer
Water & Wastewater Utility
Stormwater Utility
Parks & Recreation
Traffic Engineer
Environmental Planner
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
No. Revisions:
By: Date:
REVIEWED BY:
N. Haws
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
05.29.13
PROJECT:
875-001
Sheet
Of 9 Sheets
WEST RANGE FORT COLLINS
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
05.29.13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
C3.00
OVERALL GRADING PLAN
C. Snowdon
C. Snowdon
1" = 20'
PROPOSED CURB TRANSITION T
1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE
WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR
TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK.
BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN
UNDERGROUND UTILITIES.
2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY
EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION.
3.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM; NGVD 29
(UNADJUSTED). SEE COVER SHEET FOR BENCHMARK REFERENCES.
4.ALL CURB SPOTS ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE
ELEVATIONS.
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF
THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR
ALL UNKNOWN UNDERGROUND UTILITIES.
2.ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS
STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION.
3.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO
SCALE.
4.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL
BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO
CHANGE IN THE FIELD.
5.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL
SANITARY SEWER MAINS, WATER MAINS & SERVICES.
6.FIRE LINES SHALL BE STUBBED INSIDE THE RISER ROOM AND CAPPED 1' ABOVE THE
FINISHED FLOOR ELEVATION.
{
}7.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS TO BE DETERMINED IN THE FIELD
BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY
STREET REPAIR STANDARDS.
8.ALL EXISTING SANITARY SEWER SERVICES SHALL BE LOCATED BY CAMERA INVESTIGATION
AND ABANDONED AT THE MAIN PER CITY OF FORT COLLINS STANDARD CONSTRUCTION
SPECIFICATIONS, LATEST EDITION.
No. Revisions:
By: Date:
REVIEWED BY:
N. Haws
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
05.29.13
PROJECT:
875-001
Sheet
Of 9 Sheets
WEST RANGE FORT COLLINS
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
05.29.13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
C2.00
OVERALL UTILITY PLAN
C. Snowdon
C. Snowdon
1" = 20'
NORTH
( IN FEET )
1 inch = ft.
20 0 20 Feet
20
40 60
GRAPHIC SCALE:
LEGEND:
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'� �����.
C��� ������ ��� ���.
R
ST
SS
EXISTING BURIED FIBER-OPTICS CTV
EXISTING BURIED ELECTRIC E
EXISTING BURIED GAS G
EXISTING WATER LINE W
EXISTING BURIED TELEPHONE T
EXISTING SANITARY SEWER LINE W/ MH
EXISTING STORM SEWER LINE W/ MH
EXISTING OVERHEAD UTILITY OHU
�
PROPERTY BOUNDARY
EXISTING INLET GRATE
EXISTING GAS METER �
EXISTING SIGN
VAULT
EXISTING ELECTRIC VAULT ELEC
EXISTING WATER METER �
EXISTING LIGHT POLE
EXISTING TRAFFIC SIGNAL POLE
EXISTING CABLE PEDESTAL
WV
EXISTING WATER VALVE
EXISTING CONIFEROUS SHRUB
EXISTING DECIDUOUS TREE
�
�
EXISTING WATER CURB STOP
Date
Date
Date
Date
Date
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
City Engineer
Water & Wastewater Utility
Stormwater Utility
Parks & Recreation
Traffic Engineer
Environmental Planner
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
T S
EXISTING POWER POLE
PROPOSED WATER LINE W/ FITTING
PROPOSED DOMESTIC SERVICE W
PROPOSED FIRE SERVICE F
PROPOSED STORM DRAIN
LOT LINE
W. LAUREL STREET
(VARIES)
S. MELDRUM STREET
(100' RIGHT-OF-WAY)
PUBLIC ALLEY
(20' RIGHT-OF-WAY)
ARTHUR IRRIGATION DITCH
22' APPROXIMATE
ASPHALT PATCHING
LIMITS (SEE NOTE 2)
10' APPROXIMATE
ASPHALT PATCHING
LIMITS (SEE NOTE 2)
13' ATTACHED
SIDEWALK TO REMAIN
COVERED CONCRETE
PORCH
NORTH
( IN FEET )
1 inch = ft.
20 0 20 Feet
20
40 60
GRAPHIC SCALE:
LEGEND:
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'� �����.
C��� ������ ��� ���.
R
ST
SS
EXISTING BURIED FIBER-OPTICS CTV
EXISTING BURIED ELECTRIC E
EXISTING BURIED GAS G
EXISTING WATER LINE W
EXISTING BURIED TELEPHONE T
EXISTING SANITARY SEWER LINE W/ MH
EXISTING STORM SEWER LINE W/ MH
EXISTING OVERHEAD UTILITY OHU
�
�
EXISTING MINOR CONTOUR
EXISTING EDGE OF ASPHALT
EXISTING EXISTING FENCE CURB AND GUTTER X
PROPERTY BOUNDARY
EXISTING MAJOR CONTOUR 4960
4958
EXISTING INLET GRATE
EXISTING GAS METER �
EXISTING SIGN
VAULT
EXISTING ELECTRIC VAULT ELEC
EXISTING WATER METER �
EXISTING LIGHT POLE
EXISTING TRAFFIC SIGNAL POLE
EXISTING CABLE PEDESTAL
WV
EXISTING WATER VALVE
EXISTING POST
EXISTING CONIFEROUS SHRUB
EXISTING DECIDUOUS TREE
�
�
EXISTING WATER CURB STOP
Date
Date
Date
Date
Date
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
City Engineer
Water & Wastewater Utility
Stormwater Utility
Parks & Recreation
Traffic Engineer
Environmental Planner
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
No. Revisions:
By: Date:
REVIEWED BY:
N. Haws
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
05.29.13
PROJECT:
875-001
Sheet
Of 9 Sheets
WEST RANGE FORT COLLINS
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
05.29.13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
C1.00
DEMOLITION PLAN
EXISTING CONDITIONS & N.A.
C. Snowdon
1" = 20'
T S
EXISTING ASPHALT PAINT
EXISTING ASPHALT PAINT
EXISTING ASPHALT PAINT
EXISTING ASPHALT PAINT
EXISTING ASPHALT PAINT
EXISTING POWER POLE
EXISTING CONCRETE TO BE REMOVED
NOTES:
1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF
THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR
ALL UNKNOWN UNDERGROUND UTILITIES.
{
}2.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS TO BE DETERMINED IN THE FIELD
BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY
STREET REPAIR STANDARDS.
3.ALL EXISTING SANITARY SEWER SERVICES SHALL BE LOCATED BY CAMERA INVESTIGATION
AND ABANDONED AT THE MAIN PER CITY OF FORT COLLINS STANDARD CONSTRUCTION
SPECIFICATIONS, LATEST EDITION.
It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these
plans.
8. The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for
any utility crossings required.
9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the
engineer to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction.
10. The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is
accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance,
all parties affected by any disruption of any utility service as well as the utility companies.
11. No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility
provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility
provider, a pre-construction meeting may be required prior to commencement of any work.
12. The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and
sanitary sewer should be constructed prior to installation of the water lines and dry utilities.
13. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the
Water Utility.
14. A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is
discharged into a storm sewer, channel, irrigation ditch or any waters of the United States.
15. The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department
of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan.
16. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of
onsite drainage facilities shall be the responsibility of the property owner(s).
17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be
submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at
least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be
submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed
prior to certification per the Development Agreement.
18. The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater
seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as
a result of the City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development.
19. All recommendations of the Preliminary Drainage Report for West Range Fort Collins dated December 12, 2012 by Northern Engineering
Services, Inc., shall be followed and implemented.
20. Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall
be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping.
21. The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and
debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.)
or as approved by the the City of Fort Collins street inspector.
22. No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction
Permit is obtained, if applicable.
23. The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction.
The Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control
Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all
public improvements. If the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the
Developer may commence work in the Engineer's absence. However, the City of Fort Collins reserves the right not to accept the
improvement if subsequent testing reveals an improper installation.
24. The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench
work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not
correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement
section or, the Developer may use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final
soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a
minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur
until the City of Fort Collins Engineer approves the final report.
25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter
flowline at all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must
certify in a letter to the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be
noted in the letter and then resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets.
26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction.
For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be
stubbed to the property lines and marked so as to reduce the excavation necessary for building connections.
27. Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional
criteria for roads within these districts.
28. All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as
established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval.
29. Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any
tree removal requiring a permit.
30. The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and
security. Refer to OSHA Publication 2226, Excavating and Trenching.
31. The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The
the City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way.
The Developer shall be responsible for providing any and all traffic control devices as may be required by the construction activities.
32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins
Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor
moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed.
33. The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the
Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing
traffic access to and from the Development.
34. There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site
construction activities on Sundays or holidays, unless there is prior written approval by the City of Fort Collins.
35. The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on
these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise.
36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer
for clarification, and annotate the dimension on the as-built record drawings.
37. The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and
specifications, and a copy of any permits and extension agreements needed for the job.
38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or
specifications, the Developer shall contact the Designer and the City of Fort Collins Engineer immediately.
39. The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available
to the Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort
Collins Engineer.
40. The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as
well as the basis of bearings. The information shall be as follows:
City of Fort Collins benchmark 6-00
Located on a catch basin at the Northwest corner of Mulberry Street and College Avenue
Elevation = 4990.68 (NGVD 29 - Unadjusted)
City of Fort Collins Benchmark CSU 2
Standard brass Larimer County Geodetic Control Disk set in 2002, located in the campus of Colorado State University approximately
240.8 feet south from the center line of North Drive, 46.6 feet northeast from the edge of the CSU Lagoon, 33 feet southwest from the
center of the delivery road to the University Club and 1.1 feet southwest from the edge of the sidewalk.
Elevation = 5003.12 (NGVD 29 - Unadjusted)
41. All stationing is based on centerline of roadways unless otherwise noted.
42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters,
landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored
in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements
and/or prior to the issuance of the first Certificate of Occupancy.
43. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The
existing street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be
done in accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing
surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the
entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the
Larimer County Engineer and/or the City of Fort Collins Inspector at the time the cuts are made.
44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before
construction, or to the grades and condition as required by these plans.
45. Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections.
46. After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and
workmanship defects for a minimum period of two years from the date of acceptance.
47. The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage
structures and pipes, for the following private streets: N.A.
48. Approved Variances are listed as follows:
a. NONE
CONSTRUCTION NOTES
A. Grading and Erosion Control Notes
1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site.
2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans.
3. All required perimeter silt and construction fencing shall be installed priorto any land disturbing activity (stockpiling, stripping, grading, etc).
All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the
approved project schedule, construction plans, and erosion control report.
4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the
property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining
all erosion control facilities shown herein.
5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be
limited to the area(s) required for immediate construction operations, and for the shortest practical period of time.
6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened
condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils
in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required
temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County.
7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall:
a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as
necessary in order to ensure the continued performance of their intended function.
b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control
inspector.
c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector.
8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment
and debris from all drainage infrastructure and other public facilities.
9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public
rights of way, and make sure streets and walkways are cleaned at the end of each working day.
10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not
to cause their release into any waters of the United States.
11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening,
watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched.
12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project
and before turning the maintenance over to the City/County or Homeowners Association (HOA).
13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any
pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete
truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are
necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and
federal regulations.
14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout
material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the
concrete washout material will be removed and properly disposed of prior to the area being restored.
15. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement
whatever measures are determined necessary, as directed by the City.
B. Street Improvement Notes
1. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed
here.
2. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for
approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt).
The job mix shall be submitted for approval prior to placement of any asphalt.
3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing
edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean
construction joint can be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins.
4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the
subgrade has been inspected and approved by the City of Fort Collins Engineer.
5. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting
rings are not allowed.
6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The
existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in
conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The
determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with
adjacent landowners such that future projects do not cut the new asphalt overlay work.
7. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement)
and as per the Right-of-Way Work Permit traffic control plan.
8. The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of
asphalt. Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain
properly.
9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a
full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will
be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than
50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall
not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as
determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface.
The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence
of an Inspector.
C. Traffic Signing and Pavement Marking Construction Notes
1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking
Construction Notes listed here.
2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic.
3. All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD.
4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads.
5. All lane lines for concrete pavement should be epoxy paint.
6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and
placement of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of
striping and symbols.
7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards.
8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction.
9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings.
10. All sign posts shall utilize break-away assemblies and fasteners per the Standards.
11. A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies
identified during the field inspection must be corrected before the 2-year warranty period will begin.
12. The Developer installing signs shall be responsible for locating and protecting all underground utilities.
13. Special care shall be taken in sign location to ensure an unobstructed view of each sign.
14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of
Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer
determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and
striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings).
15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail.
D. Storm Drainage Notes
1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of
onsite drainage facilities shall be the responsibility of the property owner(s).
2. All recommendations of the Preliminary Drainage Report for West Range Fort Collins dated December 12, 2012 by Northern Engineering
Services, Inc., shall be followed and implemented.
3. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by
submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at
least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by
submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed
prior to certification per the Development Agreement.
E. Utility Notes
1. All waterline and sanitary sewer construction shall conform to the Fort Utility standards and specifications current to date of construction.
2. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the
water utility.
3. Water mains shall be poly-wrapped D.I.P, or PVC with tracer wire.
4. HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and
ASTM. The HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections.
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'� �����.
C��� ������ ��� ���.
R
City UTILITY of Fort PLAN Collins, APPROVAL Colorado
Date
Date
Date
Date
Date
Date
APPROVED:
City Engineer
Traffic Engineer
Parks & Recreation
Stormwater Utility
Water & Wastewater Utility
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
Fort Collins, Colorado 80524
970.221.4158
A PART THEREOF BEING A REPLAT OF LOTS 7 AND 8, AND A PORTION OF LOT 6, BLOCK 87, CITY OF FORT
COLLINS, LOCATED IN THE NORTHEAST QUARTER OF SECTION 14, TOWNSHIP 7 NORTH, RANGE 69 WEST
OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
UTILITY PLANS FOR
No. Revisions:
By: Date:
REVIEWED BY:
N. Haws
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
05.29.13
PROJECT:
875-001
Sheet
Of 9 Sheets
WEST RANGE FORT COLLINS
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
05.29.13
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
C2.00 OVERALL UTILITY PLAN
WEST RANGE FORT COLLINS
E N G I N E E R I N G
� � � � � � ��
E N G I N E E R I N G
� � � � � � ��
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'� �����.
C��� ������ ��� ���.
R
City UTILITY of Fort PLAN Collins, APPROVAL Colorado
Date
Date
Date
Date
Date
Date
APPROVED:
City Engineer
Traffic Engineer
Parks & Recreation
Stormwater Utility
Water & Wastewater Utility
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CONTACT INFORMATION
PROJECT TEAM:
UTILITY CONTACT LIST: *
SHEET INDEX
I hereby affirm that these final
construction plans were prepared
under my direct supervision, in
accordance with all applicable City
of Fort Collins and State of
Colorado standards and statutes,
respectively; and that I am fully
responsible for the accuracy of all
design. revisions, and record
conditions that I have noted on
these plans.
These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility
by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness
of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities
required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort
Collins for additional quantities of items shown that may be required during the construction phase.
DISCLAIMER STATEMENT:
CERTIFICATION STATEMENT:
BENCHMARK #1:
City of Fort Collins Benchmark 6-00
Located on a catch basin at the northwest corner of Mulberry Street and College Avenue.
Elevation = 4990.68 (NGVD 29 - Unadjusted)
BENCHMARK #2:
City of Fort Collins Benchmark CSU 2
Standard brass Larimer County Geodetic Control Disk set in 2002, located in the campus of
Colorado State University approximately 240.8 feet south from the center line of North
Drive, 46.6 feet northeast from the edge of the CSU Lagoon, 33 feet southwest from the
center of the delivery road to the University Club and 1.1 feet southwest from the edge of
the sidewalk.
Elevation = 5003.12 (NGVD 29 - Unadjusted)
Basis of Bearings
Considering the East line of Lot 8, Block 87, City of Fort Collins and its southerly extension
as bearing South 00°21'57' West (assumed bearing).
Northern Engineering Services, Inc
NE Project No. 379-004
Date: August 8, 2008
ORIGINAL FIELD SURVEY BY:
Soilogic, Inc.
Geotechnical Exploration Report
406 West Laurel Street
Project No. 08-1051
Date: September 29, 2008
SUBSURFACE EXPLORATION BY:
PROJECT BENCHMARKS:
PROJECT
LOCATION
VICINITY MAP
NORTH 1"=1000'
SiteWise, LLC
7000 N. Broadway
Building 3, Suite 306
Denver, Colorado 80221
303.650.8680
SUBSURFACE UTILITY LOCATES**
Ripley Design, Inc.
Linda Ripley, ULI, ASLA
401 West Mountain Avenue
Fort Collins, Colorado 80521
970.224.5828
PLANNER/
LANDSCAPE ARCHITECT
■���� �������� ■��������� ������������ ■
■����� ������ ■����������� ■
������ ���� ������ ����������
VFLA, Inc.
Justin Larson
401 West Mountain Avenue
Fort Collins, Colorado 80521
970.224.1191
ARCHITECT
C4.00 DRAINAGE EXHIBIT
UTILITY COMPANY
* This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for
the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for
locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of
Colorado (UNCC) at 811 for additional information.
PHONE NUMBER
** The underground utility locates provided by SiteWise, LLC are based upon the best available information at
the time of locating. Contractor acknowledges that it is common for underground facility owner maps to have
errors and omissions of data shown. Consequently, it is the Contractor's sole responsibility to field verify the
location of all utilities prior to construction, and notify the Engineer of any discrepancies found.
GAS----------------- Xcel Energy----------------------------- Stephanie Rich (970) 225-7857
ELECTRIC-------- City of Fort Collins Light & Power-- Doug Martine (970) 224-6152
CABLE------------- Comcast---------------------------------- Don Kapperman (970) 567-0425
TELECOM.--------Centurylink------------------------------- William Johnson (970) 377-6401
WATER------------ City of Fort Collins Utilities----------- Roger Buffington (970) 221-6700
WASTEWATER--City of Fort Collins Utilities----------- Roger Buffington (970) 221-6700
STORMWATER- City of Fort Collins Utilities----------- Glen Schlueter (970) 221-6700
C5.00 - C5.02 DETAILS