Loading...
HomeMy WebLinkAboutLITTLE BEAR'S CHILD CARE - PDP - PDP120017 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTE FINAL DRAINAGE AND EROSION CONTROL REPORT LITTLE BEARS CHILD CARE FINAL DRAINAGE & EROSION CONTROL REPORT LITTLE BEARS CHILD CARE INC. Prepared for: Little Bears Child Care 1900 South Lemay Avenue Fort Collins, CO 80525 Prepared by: North Star Design 700 Automation Drive, Unit I Windsor, Colorado 80550 (970) 686-6939 May 29, 2012 Job Number 331-01 May 29, 2012 Glen Schlueter City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80522 RE: Final Drainage and Erosion Control Report for Little Bears Child Care, Inc. Dear Glen, I am pleased to submit for your review and approval, this Final Drainage and Erosion Control Report for the Little Bears Child Care project. I certify that this report for the drainage design of the Little Bears was prepared in accordance with the criteria in the City of Fort Collins Storm Drainage Manual. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Prepared by: Patricia Kroetch P.E. Project Manager 700 Automation Drive, Unit I Windsor, CO 80550 Phone: 970-686-6939 Fax: 970-686-1188 iii TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................... iii 1. GENERAL LOCATION AND DESCRIPTION 1.1 Location ...................................................................................................................1 1.2 Description of Property ............................................................................................1 1.3 Major Basin Description ..........................................................................................2 1.4 Sub Basin Description .............................................................................................2 2. DRAINAGE DESIGN CRITERIA 2.1 Regulations ..............................................................................................................2 2.2 Development Criteria Reference and Constraints ...................................................2 2.3 Hydrologic Criteria ..................................................................................................3 2.4 Hydraulic Criteria ....................................................................................................3 3. DRAINAGE FACILITY DESIGN 3.1 General Concept ......................................................................................................3 3.2 Specific Flow Routing .............................................................................................3 3.3 Drainage Summary ..................................................................................................4 4. EROSION CONTROL 4.1 Written Analysis .....................................................................................................4 4.2 Stormwater Management Controls ..........................................................................6 4.3 Four Step BMP Selection Process ...........................................................................7 5. CONCLUSIONS 5.1 Compliance with Standards ....................................................................................8 5.2 Drainage Concept ....................................................................................................8 6. REFERENCES ....................................................................................................................9 APPENDICES A Vicinity Map B Hydrologic Computations C Hydraulic Calculations E Figures and Tables 1 1. GENERAL LOCATION AND DESCRIPTION 1.1. Location The Little Bears Child Care project is located at 1247 Riverside Avenue and 1230 Elizabeth Street. The proposed project is located on the Riverside II Condo Amended (1247 Riverside) and Lot 3, Viking I Subdivision (1230 Elizabeth) in the Northeast Quarter of Section 13, Township 7 North, Range 69 West of the Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. See the location map in Appendix A. This project is bounded on the northeast by Riverside Avenue, on the south by Elizabeth Street and on all other boundaries by existing commercial development. 1.2. Description of Property The project consists of approximately 0.85 acres of land inclusive of both lots. The project site consists of an existing building, parking lot, walks and landscaping on the Riverside II lot and a majority of these improvements will remain. Lot 3 is currently undeveloped and ground cover consists of grasses and weeds. This lot will be developed as a playground for use by the proposed child care facility on the Riverside II lot. Existing vegetation at 1247 Riverside site consists of mature trees, established grasses and other landscaping along Riverside Avenue and adjacent to the existing building. No developed landscaping exists on the site at 1230 Elizabeth. Stormwater runoff currently sheet flows to the adjacent streets and is conveyed in the curb and gutter to the existing storm inlets and ultimately conveyed to the Poudre River. The existing slopes onsite are approximately 1% to 3% to the adjacent streets. Currently water quality and detention measures have not been provided for the existing development and, since only minor improvements are proposed on the Riverside lot, no detention or water quality enhancement measures are being proposed for the Riverside lot. For the proposed development on the Elizabeth lot, the City of Fort Collins Stormwater Criteria allows a site to construct up to 1,000 square feet of additional impervious area before the City requires water quality and detention. On the Elizabeth lot, it is proposed to construct approximately 3,000 square feet of concrete walk in the playground area. Since there is a greater than 1,000 square feet of impervious area being 2 constructed, water quality and detention will be required for the new impervious area on the playground. The site has been divided into 2 drainage basins coinciding with the existing lot definitions. The majority of the improvements to the site will occur in Basin 1 which is the Elizabeth lot and encompasses the proposed playground. DRAINAGE BASINS AND SUB-BASINS 1.3. Major Basin Description This site is located in the Spring Creek Basin. The site is not located within a City or FEMA designated 100 year floodplain. 1.4. Sub-basin Description The existing Riverside lot (Basin 2) drains to Riverside Avenue via sheet flow, piped flow and channelized flow. The drainage patterns for this lot will not be altered. Runoff from the Elizabeth lot (Basin 1) currently flows north and then east in a grassed swale to a concrete channel that conveys the runoff to McHugh Street. This drainage pattern will be maintained to the greatest extent possible. See Section 4 of this report for specific details for each sub-basin. 2. DRAINAGE DESIGN CRITERIA 2.1. Regulations Drainage for this site has been designed to meet or exceed the “City of Fort Collins Stormwater Criteria Manual” specifications and the City of Fort Collins Spring Creek Basin Master Plan. Where applicable, the criteria established in the “Urban Storm Drainage Criteria Manual” (UDFCD), 2001 has been used. 2.2. Development Criteria Reference and Constraints Stormwater runoff from this site has been routed to conform to the requirements of the City Stormwater Department. Detention is required for this site and will be provided for Basin 1. 3 Water quality facilities are required for the improvements and are being provided by water quality extended detention within the proposed pond. 2.3. Hydrologic Criteria Runoff computations were prepared for the 2 year and 10 year minor and 100 year major storm frequency utilizing the Rational Method. All hydrologic calculations associated with the basins are included in Appendix B of this report. 2.4. Hydraulic Criteria All hydraulic calculations within this report have been prepared in accordance with the City of Fort Collins Drainage Criteria, Urban Area Drainage Criteria Manual and are included in Appendix C. 3. DRAINAGE FACILITY DESIGN 3.1. General Concept All of the runoff from this site historically flows to Riverside Avenue. With the construction of the proposed improvements, onsite stormwater from Basin 1 will be collected in the detention pond and released at the 2 year historic rate. Runoff from Basin 2 will not be altered. 3.2. Specific Flow Routing A summary of the drainage patterns within each basin is provided in the following paragraphs. Basin 1 is located in the south part of the site and includes all of Lot 3, Viking I Subdivision. The playground for the child care facility is proposed to be developed on this lot. Runoff from this basin will sheet flow to the north and enter the proposed detention & water quality pond. Runoff will be attenuated to the 2 year historic relase rate and then be released to the east and into an existing concrete channel that will convey the runoff to McHugh Street. Basin 2 is located in the north portion the site. This basin includes an existing building, existing asphalt drive and parking lot, existing concrete sidewalks and significant established landscape improvements. Runoff is routed via curb and gutter to an existing 4 pipe in the parking lot that will convey the water east to a sidewalk chase and into Riverside Avenue. A small portion of the runoff will be collected in the existing concrete channel on the south side of the existing building and will also flow to McHugh Street. 3.3. Drainage Summary Drainage for this site was designed to conform to the City of Fort Collins stormwater requirements. Detention and water quality extended detention is provided for Basin 1 and disturbance in Basin 2 will be kept to a minimum. 4. EROSION CONTROL 4.1. Written Analysis A. Developed Conditions A portion of the site is being used as it is currently developed and a portion of the site is being developed into a playground to be used in conjunction with the remainder of the site. The amount of disturbance on the site is approximately 0.36 acres which will not require the site to obtain a State Stormwater Mangement Permit. B. Rainfall Erodibility This site lies within the Moderate Rainfall and Wind Erodibility Zone per the City of Fort Collins. A majority of the site has been developed with building, pavement and landscaping which will be maintained to the greatest extent possible, therefore further reducing the site erodibility. C. Sediment Control Methods Erosion and sediment control BMP’s are the BMP’s intended to control the amount of sediment becoming suspended and transported off-site by on-site stormwater runoff. Drainage and Erosion/Sediment Control Standard to be followed shall be the City of Fort Collins’s Stormwater Criteria Manual and Sediment/Erosion Control Standards at the time of commencing construction. Temporary BMP’s Structural Practices: All BMP’s shall be inspected and repaired or replaced as 5 required to satisfy the City Erosion Control Inspector. All temporary BMP’s must be maintained and repaired as needed to assure continued performance of their intended function. Temporary, structural erosion and sediment control BMP’s are described in detail in the following paragraphs. Perimeter silt fence shall be installed along the perimeter of the project as shown on the Drainage and Erosion Control plan. Silt fence shall be in place prior to commencement of any construction activity. During clearing and grubbing necessary for perimeter silt fence installation, all cleared material shall be placed on the uphill side of the 6”x6” trench described in City of Fort Collins Silt Fence Detail, so that if erosion occurs during the silt fence installation from the cleared material, sediment/erosion will be trapped in the above mentioned trench and not transported downstream. Wattles shall be implemented in swales and in the curb and gutter as shown on the Drainage and Sediment/Erosion Control Plan. Wattles shall be installed upon completion of overlot grading. Non-Structural Practices: Temporary non-structural BMP’s for the site will consist of water trucks as needed. Water trucks shall apply water to the ground to wet the soil to reduce the amount of wind erosion and dust being transported off-site. Watering will occur when environmental conditions are conducive to causing excessive amounts of dust and wind erosion. Permanent BMP’s Permanent BMP’s include vegetative swales, a water quality pond, the completion of all site improvements and permanent vegetative soil stabilization. No soils in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed unless otherwise approved by the City of Fort Collins Erosion Control Inspector. Final stabilization shall be considered achieved once all proposed site improvements have been installed, proposed grassed areas have been permanently seeded, and the vegetation is considered established. Vegetation shall not be 6 considered established until a ground cover is achieved which is demonstrated to be mature enough to control soil erosion, typically a minimum of 70%. Tracking Mud on City Streets It is unlawful to track or cause to be tracked mud or other debris onto city streets or public rights-of-way. Wherever construction vehicles access paved public roads, provisions must be made to minimize the transport of sediment (mud) by runoff or vehicles tracking onto the paved surface. The contractor will be responsible for clearing mud tracked onto city streets on a daily basis and after any rain event which causes sediment to be transported offsite. Maintenance All erosion and sediment control practices shall be maintained, repaired, and/or replaced as needed to ensure the continued performance of their intended function. Temporary erosion and sediment control practices shall be inspected at least once every two weeks and after any significant storm event. Permanent erosion and sediment control practices shall be inspected at least twice per year and after any significant storm event. A significant storm event is a storm event that causes runoff. 4.2 Stormwater Management Controls A. SWMP Administrator The SWMP Administrator for this site is Sean Rogers, Hillside Construction, 970- 567-1821. B. Potential Pollutant Sources Disturbed soils shall be watered to prevent air borne sediment transport. No soils are anticipated to be stored on site. Vehicle tracking of mud will require the streets to be cleaned on a daily basis. No vehicle tracking control pad is being proposed but may be required by the City Erosion Control Inspector if tracking of mud becomes problematic. Loading and unloading of materials will not occur on this site. Materials will be stored in the existing building. 7 Equipment will not be maintained or fueled on site. A porta-potty will be provided for the construction workers on site and will be maintained by a qualified waste management company. The majority of the site construction will be installation of concrete for the playground and for the sidewalk along Riverside. If concrete construction exceeds one day in duration a concrete washout will be installed on site per the Drainage and Erosion Control Plan. No dedicated asphalt or concrete batch plants will be allowed on site. C. Dry Land Vegetation The onsite soils are Kim Loam and Satanta Loam which are well drained and have a moderately high to high capacity to transmit water. It is anticipated that the soil will not remain disturbed for more than 30 days but, if that does occur, the dry land seed mix specified on the Drainage and Erosion Control Plan will be installed. Final landscape treatments (seeded and sodded areas) and the anticipated soil amendments are shown on the Landscape Plan. D. Sequence of Construction Activities Construction Activity EC measures implemented Strip ground cover Silt Fence around perimeter Grading of site to final sub grade Wattles in concrete channels And water truck as needed Install concrete sidewalk & outlet structure Concrete washout if needed Install playground equipment Maintain EC measures above Install seed/sod/trees per the landscape plan Remove silt fence & washout E. Erosion Control Security Calculations Refer to calculations in the Appendix. 4.3 Four Step BMP Selection Process A. Employ Runoff Reduction Practices Runoff from the playground is primarily from the concrete sidewalks and play areas. This runoff is routed through the grassed areas prior to enter the detention area. This routing will provide additional opportunities for particulates to be 8 removed from the runoff and will slow the runoff time allowing the water to percolate into the pervious areas to the greatest extent possible. Existing amenities are being preserved (including existing grass and trees) on the Riverside lot in every possible location which will minimize site disturbances. B. Implement BMPS with WQ Capture Volume & Slow Release The site will include a water quality extended detention element in the detention pond which will provide additional capture volume and a slow release through a restriction plate. C. Stabilize Drainageways The conveyances utilized for this site include an existing pipe which discharges into a concrete channel on the Riverside lot. This situation will remain although the metal sidewalk culvert will be removed and replaced. On the Elizabeth lot, a grassed swale will be used to convey water adjacent to the playground and will route the water to the detention pond. The release from the detention pond will discharge into an existing concrete channel that will convey the water to McHugh Street. In essence, all drainageways on site will be grassed or concrete lined. D. Implement Source Control BMPS No permanent contamination sources are proposed on site. The water quality element of the detention pond will address potential sediment transport from the site which would be the primary contamination source. 5. CONCLUSIONS 5.1. Compliance with Standards All computations that have been completed within this report are in compliance with the City of Fort Collins Erosion Control Reference Manual for Construction Sites and the City of Fort Collins Stormwater Criteria Manual. 5.2. Drainage Concept The proposed drainage concepts presented in this report, and on the construction plans, adequately provide for stormwater quality treatment for the proposed improvements and 9 to minimize the disturbance to the existing site. The site is designed to convey developed playground flows to the proposed detention and water quality pond and ultimately into McHugh Street. If, at the time of construction, groundwater is encountered, a Colorado Department of Health Construction Dewatering Permit will be required. 10 6. REFERENCES 1. City of Fort Collins, “Storm Drainage Criteria Manual”, (SDCM), dated March 1999. 2. Urban Drainage and Flood Control District, “Urban Storm Drainage Criteria Manual”, Volumes 1 and 2, dated June 2001, and Volume 3 dated September 2001. APPENDIX A VICINITY MAP B APPENDIX B HYDROLOGIC COMPUTATIONS North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: Little Bears PROJECT NO: 331-01 COMPUTATIONS BY: PPK DATE: 5/29/2012 Recommended % Impervious from Urban Storm Drainage Criteria Manual % Impervious Roofs: 90% Streets and Parking (Asphalt) 100% Concrete Drives and Walks 90% Packed Gravel: 40% Landscaped Areas (Clayey soil, 0-1% slopes): 0% SUBBASIN TOTAL TOTAL ROOF ASPHALT CONCRETE GRAVEL LANDSCAPE % RUNOFF RUNOFF RUNOFF RUNOFF ID AREA AREA AREA AREA AREA AREA AREA Impervious COEFF. COEFF. COEFF. COEFF. (ac.) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (sq.ft) C2 C5 C10 C100 1 (exist) 0.36 15,498 0 694 0 1115 13,689 7% 0.09 0.20 0.29 0.52 1 (playground) 0.36 15,498 0 694 2,967 0 11,837 22% 0.18 0.27 0.35 0.56 2 (existing lot/bldg) 0.51 22,124 6,260 7,690 1,160 0 7,014 65% 0.45 0.49 0.54 0.65 RUNOFF COEFFICIENTS & % IMPERVIOUS Flow.xls Cval North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: Little Bears PROJECT NO: 331-01 COMPUTATIONS BY: PPK DATE: 5/29/2012 SUB-BASIN DATA INITIAL / OVERLAND TIME TRAVEL TIME / GUTTER OR CHANNEL FLOW tc CHECK FINAL REMARKS (ti)(tt) (URBANIZED BASIN) tc DESIGN SUBBASIN Area C5 Length Slope ti Length Slope Chan. Cv Vel. tt tc = Total L tc=(l/180)+10 POINT ID (ac) (ft) (ft/ft) (min) (ft) (ft/ft) Type (ft/s) (min) ti + tt (ft) (min) (min) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) 1 1 (exist) 0.36 0.20 142 0.028 14.0 40 0.005 E 15 1.1 0.6 14.6 182 11.0 11.0 1 1 (playground) 0.36 0.27 117 0.020 13.1 75 0.005 E 15 1.1 1.2 14.3 192 11.1 11.1 2 2 (existing lot/bldg) 0.51 0.49 90 0.010 10.6 130 0.005 F 20 1.4 1.5 12.1 220 11.2 11.2 EQUATIONS: Channel Type Cv tc = t i + tt A 2.5 B 5.0 ti = [0.395 (1.1 - C 5 ) L 0.5 ] / S 1/3 C 7.0 D 10.0 tt = L/V V = C v*S 0.5 E 15.0 F 20.0 final tc = minimum of t i + tt and urbanized basin check minimum tc = 5 minutes TIME OF CONCENTRATION Paved Grassed Waterway Bare Ground Short Pasture/ Lawn Tillage / Field Heavy Meadow Flow.xls TOC5 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: Little Bears PROJECT NO: 331-01 COMPUTATIONS BY: PPK DATE: 5/29/2012 DIRECT RUNOFF TOTAL Inlet Capacity REMARKS RATIONAL METHOD PEAK RUNOFF (2-YEAR) DESIGN SUBBASIN A C2 tc iQ2 Q2 Total POINT ID (ac) (min) (in/hr) (cfs) (cfs) (cfs) 1 1 (exist) 0.36 0.09 11.0 2.14 0.07 0.1 1 1 (playground) 0.36 0.18 11.1 2.14 0.14 0.1 2 2 (existing lot/bldg) 0.51 0.45 11.2 2.14 0.48 0.5 Q = C i A Q = peak discharge (cfs) C = runoff coefficient i = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) Flow.xls Q2 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: Little Bears PROJECT NO: 331-01 COMPUTATIONS BY: PPK DATE: 5/29/2012 DIRECT RUNOFF TOTAL Inlet Capacity REMARKS DESIGN SUBBASIN A C10 tc iQ10 Q10 Total POINT ID (ac) (min) (in/hr) (cfs) (cfs) (cfs) 1 1 (exist) 0.36 0.29 11.0 3.66 0.38 0.4 1 1 (playground) 0.36 0.35 11.1 3.65 0.46 0.5 2 2 (existing lot/bldg) 0.51 0.54 11.2 3.64 1.00 1.0 Q = C i A Q = peak discharge (cfs) C = runoff coefficient i = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) RATIONAL METHOD PEAK RUNOFF (10-YEAR) Flow.xls Q10 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: Little Bears PROJECT NO: 331-01 COMPUTATIONS BY: PPK DATE: 5/29/2012 DIRECT RUNOFF TOTAL Inlet Capacity REMARKS DESIGN SUBBASIN A C100 t c iQ100 Q100 Total POINT ID (ac) (min) (in/hr) (cfs) (cfs) (cfs) RATIONAL METHOD PEAK RUNOFF (100-YEAR) 1 1 (exist) 0.36 0.52 11.0 7.48 1.40 1.4 1 1 (playground) 0.36 0.56 11.1 7.46 1.47 1.5 2 2 (existing lot/bldg) 0.51 0.65 11.2 7.44 2.47 2.5 Q = C i A Q = peak discharge (cfs) C = runoff coefficient i = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) Flow.xls Q100 C APPENDIX C HYDRAULIC CALCULATIONS Project: Basin ID: Design Information (Input): Catchment Drainage Imperviousness Ia = 22.00 percent Catchment Drainage Area A = 0.3600 acres Predevelopment NRCS Soil Group Type = A A, B, C, or D Return Period for Detention Control T = 2 years (2, 5, 10, 25, 50, or 100) Time of Concentration of Watershed Tc = 11 minutes Allowable Unit Release Rate (See Table A) q = 0.28 cfs/acre One-hour Precipitation P1 = 0.95 inches Design Rainfall IDF Formula I = C1* P1/(C2+Tc)^C3 Coefficient One C1 = 28.50 Coefficient Two C2 = 10.00 Coefficient Three C3 = 0.79 Determination of Average Outflow from the Basin (Calculated): Runoff Coefficient C = 0.07 Inflow Peak Runoff Qp-in = 0.06 cfs Allowable Peak Outflow Rate Qp-out = 0.10 cfs Ratio of Qp-out/Qp-in Ratio = 1.63 5 <- Enter Rainfall Duration Incremental Increase Value Here (e.g. 5 for 5-Minutes) Rainfall Rainfall Inflow Average Outflow Storage Adjustment Average Outflow Storage Duration Intensity Volume Outflow Volume Volume Factor Outflow Volume Volume minutes inches / hr cubic feet (FAA, cfs) (FAA, cf) (FAA, cf) (Modified) (Mod, cfs) (Mod, cf) (Mod, cf) (input) (output) (output) (output) (output) (output) (output) (output) (output) (output) 5 3.19 24 0.10 30 -6 1.00 0.10 30 -6 10 2.54 38 0.10 60 -22 1.00 0.10 60 -22 15 2.13 48 0.10 90 -42 0.87 0.09 78 -30 20 1.84 56 0.10 120 -64 0.78 0.08 93 -38 25 1.63 62 0.10 150 -88 0.72 0.07 108 -47 30 1.47 67 0.10 180 -113 0.69 0.07 123 -57 35 1.34 71 0.10 210 -139 0.66 0.07 138 -67 40 1.23 74 0.10 240 -166 0.64 0.06 153 -79 45 1.14 78 0.10 270 -192 0.62 0.06 168 -91 50 1.07 81 0.10 300 -219 0.61 0.06 183 -103 55 1.00 83 0.10 330 -247 0.60 0.06 198 -115 60 0.94 86 0.10 360 -274 0.59 0.06 213 -128 65 0.89 88 0.10 390 -302 0.59 0.06 228 -140 70 0.85 90 0.10 420 -330 0.58 0.06 243 -153 75 0.81 92 0.10 450 -358 0.57 0.06 258 -166 80 0.77 94 0.10 480 -386 0.57 0.06 273 -180 85 0.74 95 0.10 510 -415 0.57 0.06 288 -193 90 0.71 97 0.10 540 -443 0.56 0.06 303 -206 95 0.69 98 0.10 570 -472 0.56 0.06 318 -220 100 0.66 100 0.10 600 -500 0.56 0.06 333 -233 105 0.64 101 0.10 630 -529 0.55 0.06 348 -247 110 0.62 103 0.10 660 -557 0.55 0.06 363 -261 115 0.60 104 0.10 690 -586 0.55 0.05 378 -274 120 0.58 105 0.10 720 -615 0.55 0.05 393 -288 125 0.56 106 0.10 750 -644 0.54 0.05 408 -302 130 0.55 107 0.10 780 -673 0.54 0.05 423 -316 135 0.53 108 0.10 810 -702 0.54 0.05 438 -330 140 0.52 109 0.10 840 -731 0.54 0.05 453 -344 145 0.50 110 0.10 870 -760 0.54 0.05 468 -358 150 0.49 111 0.10 900 -789 0.54 0.05 483 -372 155 0.48 112 0.10 930 -818 0.54 0.05 498 -386 160 0.47 113 0.10 960 -847 0.53 0.05 513 -400 165 0.46 114 0.10 990 -876 0.53 0.05 528 -414 170 0.45 115 0.10 1,020 -905 0.53 0.05 543 -428 175 0.44 116 0.10 1,050 -934 0.53 0.05 558 -442 180 0.43 117 0.10 1,080 -963 0.53 0.05 573 -457 Project: Basin ID: Rainfall Storage Average Outflow Duration Volume Outflow Volume minutes cubic feet cfs cubic feet (input) (output) (Modified) (Modified) 5.00 -6 0.10 30 10.00 -22 0.10 60 15.00 -30 0.09 78 20.00 -38 0.08 93 25.00 -47 0.07 108 30.00 -57 0.07 123 35.00 -67 0.07 138 40.00 -79 0.06 153 45.00 -91 0.06 168 50.00 -103 0.06 183 55.00 -115 0.06 198 60.00 -128 0.06 213 65.00 -140 0.06 228 70.00 -153 0.06 243 75.00 -166 0.06 258 80.00 -180 0.06 273 85.00 -193 0.06 288 90.00 -206 0.06 303 95.00 -220 0.06 318 100.00 -233 0.06 333 105.00 -247 0.06 348 110.00 -261 0.06 363 115.00 -274 0.05 378 120.00 -288 0.05 393 125.00 -302 0.05 408 130.00 -316 0.05 423 135.00 -330 0.05 438 140.00 -344 0.05 453 145.00 -358 0.05 468 150.00 -372 0.05 483 155.00 -386 0.05 498 160.00 -400 0.05 513 165.00 -414 0.05 528 170.00 -428 0.05 543 175.00 -442 0.05 558 180.00 -457 0.05 573 185.00 -471 0.05 588 UDFCD DETENTION VOLUME ESTIMATING WORKBOOK Version 2.02, Released January 2007 1 (Playground) MINOR DETENTION VOLUME BY FAA & MODIFIED FAA METHOD (See USDCM Volume I Runoff Chapter for description of method) Little Bears Day Care 0 200 400 600 800 1,000 1,200 0 20 40 60 80 100 120 140 160 180 200 Volume (Cubic Feet) Duration (Minutes) Inflow and Outflow Volumes vs. Rainfall Duration Intersection of Modified and FAA Outflow Plots is at maximum detention volume Project: Basin ID: Design Information (Input): Catchment Drainage Imperviousness Ia = 22.00 percent Catchment Drainage Area A = 0.3600 acres Predevelopment NRCS Soil Group Type = A A, B, C, or D Return Period for Detention Control T = 100 years (2, 5, 10, 25, 50, or 100) Time of Concentration of Watershed Tc = 11 minutes Allowable Unit Release Rate (See Table A) q = 0.28 cfs/acre One-hour Precipitation P1 = 2.61 inches Design Rainfall IDF Formula I = C1* P1/(C2+Tc)^C3 Coefficient One C1 = 28.50 Coefficient Two C2 = 10.00 Coefficient Three C3 = 0.79 Determination of Average Outflow from the Basin (Calculated): Runoff Coefficient C = 0.34 Inflow Peak Runoff Qp-in = 0.82 cfs Allowable Peak Outflow Rate Qp-out = 0.10 cfs Ratio of Qp-out/Qp-in Ratio = 0.12 5 <- Enter Rainfall Duration Incremental Increase Value Here (e.g. 5 for 5-Minutes) Rainfall Rainfall Inflow Average Outflow Storage Adjustment Average Outflow Storage Duration Intensity Volume Outflow Volume Volume Factor Outflow Volume Volume minutes inches / hr cubic feet (FAA, cfs) (FAA, cf) (FAA, cf) (Modified) (Mod, cfs) (Mod, cf) (Mod, cf) (input) (output) (output) (output) (output) (output) (output) (output) (output) (output) 5 8.76 322 0.05 16 305 1.00 0.10 30 292 10 6.98 512 0.05 33 480 1.00 0.10 60 452 15 5.85 644 0.05 49 595 0.87 0.09 78 566 20 5.06 744 0.05 65 679 0.78 0.08 93 651 25 4.48 823 0.05 82 742 0.72 0.07 108 715 30 4.04 889 0.05 98 791 0.69 0.07 123 766 35 3.68 945 0.05 114 831 0.66 0.07 138 807 40 3.38 994 0.05 131 863 0.64 0.06 153 840 45 3.14 1,037 0.05 147 890 0.62 0.06 168 869 50 2.93 1,076 0.05 163 912 0.61 0.06 183 892 55 2.75 1,111 0.05 180 931 0.60 0.06 198 912 60 2.59 1,143 0.05 196 947 0.59 0.06 213 929 65 2.46 1,172 0.05 212 960 0.59 0.06 228 944 70 2.33 1,200 0.05 229 971 0.58 0.06 243 956 75 2.22 1,225 0.05 245 980 0.57 0.06 258 967 80 2.13 1,249 0.05 261 988 0.57 0.06 273 976 85 2.04 1,272 0.05 278 994 0.57 0.06 288 984 90 1.96 1,293 0.05 294 999 0.56 0.06 303 990 95 1.88 1,313 0.05 310 1,003 0.56 0.06 318 995 100 1.81 1,333 0.05 327 1,006 0.56 0.06 333 999 105 1.75 1,351 0.05 343 1,008 0.55 0.06 348 1,003 110 1.69 1,369 0.05 359 1,009 0.55 0.06 363 1,005 115 1.64 1,385 0.05 376 1,010 0.55 0.05 378 1,007 120 1.59 1,401 0.05 392 1,010 0.55 0.05 393 1,008 125 1.54 1,417 0.05 408 1,009 0.54 0.05 408 1,009 130 1.50 1,432 0.05 425 1,007 0.54 0.05 423 1,009 135 1.46 1,446 0.05 441 1,005 0.54 0.05 438 1,008 140 1.42 1,460 0.05 457 1,003 0.54 0.05 453 1,007 145 1.38 1,474 0.05 474 1,000 0.54 0.05 468 1,005 150 1.35 1,487 0.05 490 997 0.54 0.05 483 1,004 155 1.32 1,499 0.05 506 993 0.54 0.05 498 1,001 160 1.29 1,512 0.05 523 989 0.53 0.05 513 998 165 1.26 1,524 0.05 539 985 0.53 0.05 528 995 170 1.23 1,535 0.05 555 980 0.53 0.05 543 992 175 1.20 1,547 0.05 572 975 0.53 0.05 558 988 180 1.18 1,558 0.05 588 970 0.53 0.05 573 984 Project: Basin ID: Rainfall Storage Average Outflow Duration Volume Outflow Volume minutes cubic feet cfs cubic feet (input) (output) (Modified) (Modified) 5.00 292 0.10 30 10.00 452 0.10 60 15.00 566 0.09 78 20.00 651 0.08 93 25.00 715 0.07 108 30.00 766 0.07 123 35.00 807 0.07 138 40.00 840 0.06 153 45.00 869 0.06 168 50.00 892 0.06 183 55.00 912 0.06 198 60.00 929 0.06 213 65.00 944 0.06 228 70.00 956 0.06 243 75.00 967 0.06 258 80.00 976 0.06 273 85.00 984 0.06 288 90.00 990 0.06 303 95.00 995 0.06 318 100.00 999 0.06 333 105.00 1,003 0.06 348 110.00 1,005 0.06 363 115.00 1,007 0.05 378 120.00 1,008 0.05 393 125.00 1,009 0.05 408 130.00 1,009 0.05 423 135.00 1,008 0.05 438 140.00 1,007 0.05 453 145.00 1,005 0.05 468 150.00 1,004 0.05 483 155.00 1,001 0.05 498 160.00 998 0.05 513 165.00 995 0.05 528 170.00 992 0.05 543 175.00 988 0.05 558 180.00 984 0.05 573 185.00 980 0.05 588 UDFCD DETENTION VOLUME ESTIMATING WORKBOOK Version 2.02, Released January 2007 1 (Playground) MAJOR DETENTION VOLUME BY FAA & MODIFIED FAA METHOD (See USDCM Volume I Runoff Chapter for description of method) Little Bears Day Care 0 200 400 600 800 1,000 1,200 1,400 1,600 1,800 0 20 40 60 80 100 120 140 160 180 200 Volume (Cubic Feet) Project: Basin ID: WQCV Design Volume (Input): Catchment Imperviousness, Ia = 22.0 percent Diameter of holes, D = 0.100 in. Time to Drain the Pond = 40 hours Catchment Area, A = 0.3600 acres Number of holes per layer, N = 1 Depth at WQCV outlet above lowest perforation, H = 12.00 inches OR Number of layers, NL = 3 Vertical distance between layers, h = 4.00 inches Height of slot, H = in. Orifice discharge coefficient, Co = 0.65 Width of slot, W = in. Outlet Design Information (Output): Water Quality Capture Volume (1.0 * (0.91 * I^3 - 1.19 * I^2 + 0.78 * I)), WQCV = 0.12 watershed inches Design Volume (WQCV / 12 * Area * 1.2) Vol = 0.0045 acre-feet 0.00 Recommended maximum outlet area per layer (based on 4" vertical spacing of layers), Ao = 0.0201 square inches Total opening area at each layer based on user-input above, Ao = 0.01 square inches Total opening area at each layer based on user-input above, Ao = 0.0001 square feet Calculation of Collection Capacity : Stage Layer 1 Layer 2 Layer 3 Layer 4 Layer 5 Layer 6 Layer 7 Layer 8 Layer 9 Layer 10 Layer 11 Layer 12 Layer 13 Layer 14 Layer 15 Layer 16 Layer 17 Layer 18 Flow ft 53.20 53.53 53.87 cfs (input) 53.20 0.000 0.000 0.000 0.00 53.30 0.000 0.000 0.000 0.00 53.40 0.000 0.000 0.000 0.00 53.50 0.000 0.000 0.000 0.00 53.60 0.000 0.000 0.000 0.00 53.70 0.000 0.000 0.000 0.00 53.80 0.000 0.000 0.000 0.00 53.90 0.000 0.000 0.000 0.00 54.00 0.000 0.000 0.000 0.00 54.10 0.000 0.000 0.000 0.00 54.20 0.000 0.000 0.000 0.00 54.30 0.000 0.000 0.000 0.00 54.40 0.000 0.000 0.000 0.00 54.50 0.000 0.000 0.000 0.00 54.60 0.000 0.000 0.000 0.00 54.70 0.000 0.000 0.000 0.00 54.80 0.000 0.000 0.000 0.00 54.90 0.000 0.000 0.000 0.00 55.00 0.000 0.000 0.000 0.00 55.10 0.000 0.000 0.000 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Detention Pond - Stage/Storage LOCATION: Little Bears Day Care PROJECT NO: 331-01 COMPUTATIONS BY: ppk DATE: 5/29/2012 V = 1/3 d ( A + B + sqrt(A*B)) where V = volume between contours, ft3 d = depth between contours, ft A = surface area of contour Detention Volume Required 1010 Cu-Ft Water quality Volume Required 196 Cu-Ft Surface Incremental Total Stage Area Storage Storage (ft) (ft2) (ac-ft) (ac-ft) 4953.2 0 4953.6 1475 197 197 <- WQ Volume 4954 4954.0 3135 888 888 4954.1 3588 336 1224 <- Det Volume 4954.5 5580 2322 3546 <- Top of Berm Detpond_rev.xls Detention Pond Outlet Sizing (100 yr event) LOCATION: Little Bears Day Care PROJECT NO: 331-01 COMPUTATIONS BY: ppk DATE: 5/29/2012 Submerged Orifice Outlet: release rate is described by the orifice equation, Qo = CoAo sqrt( 2g(h-Eo)) where Qo = orifice outflow (cfs) Co = orifice discharge coefficient g = gravitational acceleration = 32.20 ft/s Ao = effective area of the orifice (ft2) Eo = geometric center elevation of the orifice h = water surface elevation (ft) Qo = 0.10 cfs outlet pipe dia = D = 8.0 in Invert elev. = 4953.18 ft Eo = 4953.26 ft h = 4954.10 ft - 100 yr WSEL Co = 0.65 solve for effective area of orifice using the orifice equation Ao = 0.021 ft2 = 3.0 in2 orifice dia. = d = 1.96 in Use d = 2 in A o = 0.022 ft 2 = 3.14 in 2 Qmax = 0.10 cfs Detpond_rev.xls Emergency Overflow Spillway Sizing LOCATION: Little Bears Day Care PROJECT NO: 331-01 COMPUTATIONS BY: ppk DATE: 5/29/2012 Equation for flow over a broad crested weir Q = CLH3/2 where C = weir coefficient = 3.0 H = overflow height L = length of the weir Spillways will be designed with 0.5 ft max flow depth, thus H = 0.5 ft Q (100) = 1.5 cfs Spill elev = 4954.10 ft 100 yr WSEL = 4954.10 ft Min top of berm elev elev.= 4954 4954.50 Weir length required: L = 1 ft Use L = 4 ft v = 0.55 ft/s Detpond_rev.xls D APPENDIX D FIGURES AND TABLES #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Central Elevations of Layers of Holes in feet Collection Capacity for Each Layer of Holes in cfs STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET Little Bears Day Car 1 (playground) Water Quality Capture Volume Method Selected (40- Hour Release) UD-Detention_v2.02.xls, WQCV 5/29/2012, 3:38 PM Duration (Minutes) Inflow and Outflow Volumes vs. Rainfall Duration Intersection of Modified and FAA Outflow Plots is at maximum detention volume Inflow Volume Modified Outflow Volume FAA Outflow Volume UD-Detention_v2.02.xls, Modified FAA 5/29/2012, 3:37 PM 185 1.15 1,568 0.05 604 964 0.53 0.05 588 980 FAA Major Storage Volume (cubic ft.) = 1,010 Mod. FAA Major Storage Volume (cubic ft.) = 1,009 FAA Major Storage Volume (acre-ft.) = 0.0232 Mod. FAA Major Storage Volume (acre-ft.) = 0.0232 UDFCD DETENTION VOLUME ESTIMATING WORKBOOK Version 2.02, Released January 2007 Little Bears Day Care 1 (Playground) (Note: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) The user must fill in all of the blue cells for these sheets to function. Determination of MAJOR Detention Volume Using FAA & Modified FAA Method MAJOR DETENTION VOLUME BY FAA & MODIFIED FAA METHOD (See USDCM Volume I Runoff Chapter for description of method) (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) UD-Detention_v2.02.xls, Modified FAA 5/29/2012, 3:37 PM Inflow Volume Modified Outflow Volume FAA Outflow Volume UD-Detention_v2.02.xls, Modified FAA 5/29/2012, 3:37 PM 185 0.42 118 0.10 1,110 -992 0.53 0.05 588 -471 FAA Minor Storage Volume (cubic ft.) = -6 Mod. FAA Minor Storage Volume (cubic ft.) = -6 FAA Minor Storage Volume (acre-ft.) = -0.0001 Mod. FAA Minor Storage Volume (acre-ft.) = -0.0001 UDFCD DETENTION VOLUME ESTIMATING WORKBOOK Version 2.02, Released January 2007 Little Bears Day Care 1 (Playground) MINOR DETENTION VOLUME BY FAA & MODIFIED FAA METHOD (See USDCM Volume I Runoff Chapter for description of method) Determination of MINOR Detention Volume Using FAA & Modified FAA Method (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) (Note: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) The user must fill in all of the blue cells for these sheets to function. UD-Detention_v2.02.xls, Modified FAA 5/29/2012, 3:37 PM