HomeMy WebLinkAboutLITTLE BEAR'S CHILD CARE - PDP - PDP120017 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYL1TILE BEARS DAY CARE
TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
MAY 2012
Prepared for:
Hillside Construction, Inc.
216 Hemlock Street, Suite B
Fort Collins, CO 80534
Prepared by:
DELICH ASSOCIATES
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034
TABLE OF CONTENTS
I. INTRODUCTION........................................................................................................ 1
II. EXISTING CONDITIONS .......................................................................................... 2
Land Use......................................................................................................................... 2
Roads.............................................................................................................................. 2
Existing Traffic................................................................................................................. 2
Existing Operation........................................................................................................... 2
Pedestrians Facilities ...................................................................................................... 7
Bicycle Facilities..............................................................................................................7
Transit Facilities ..............................................................................................................7
III. PROPOSED DEVELOPMENT................................................................................. 8
Trip Generation ............................................................................................................... 8
Trip Distribution ...............................................................................................................8
Background Traffic Projections ....................................................................................... 8
Trip Assignment ............................................................................................................ 12
Signal Warrants............................................................................................................. 12
Operation Analysis ........................................................................................................ 12
Geometry ...................................................................................................................... 12
Pedestrian Level of Service........................................................................................... 16
Bicycle Level of Service ................................................................................................ 16
Transit Level of Service................................................................................................. 16
IV. CONCLUSIONS/RECOMMENDATIONS .............................................................. 17
DELICH Little Bears Day Care TIS, May 2012
ASSOCIATES
LIST OF TABLES
1. Current Peak Hour Operation.................................................................................... 6
2. Trip Generation ......................................................................................................... 8
3. Short Range (2017) Background Peak Hour Operation .......................................... 15
4. Short Range (2017) Total Peak Hour Operation ..................................................... 15
LIST OF FIGURES
1. Site Location ............................................................................................................. 3
2. Existing Geometry..................................................................................................... 4
3. Recent Peak Hour Traffic .......................................................................................... 5
4. Site Plan.................................................................................................................... 9
5. Trip Distribution ....................................................................................................... 10
6. Short Range (2017) Background Peak Hour Traffic................................................ 11
7. Site Generated Peak Hour Traffic ........................................................................... 13
8. Short Range (2017) Total Peak Hour Traffic ........................................................... 14
APPENDICES
A. Base Assumptions Form/Recent Peak Hour Traffic
B. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins LOS
Standards
C. Short Range (2017) Background Peak Hour Operation
D. Short Range (2012) Total Peak Hour Operation
E. Pedestrian/Bicycle Level of Service
DELICH Little Bears Day Care TIS, May 2012
ASSOCIATES
I. INTRODUCTION
This intermediate transportation impact study (TIS) addresses the capacity,
geometric, and control requirements at and near the proposed development of Little Bears
Day Care. The proposed Little Bears Day Care site is located in the northwest quadrant of
the Riverside/McHugh intersection in Fort Collins, Colorado.
During the course of the analysis, numerous contacts were made with the project
developer (Hillside Construction, Inc.), the project planning consultant/architect (Hauser
Architects), the project civil engineer (North Star Design), and the Fort Collins Traffic
Engineering staff. This study generally conforms to the format set forth in the Fort Collins
transportation impact study guidelines contained in the “Larimer County Urban Area Street
Standards” (LCUASS). A Base Assumptions Form and related information are provided in
Appendix A. The study involved the following steps:
• Collect physical, traffic, and development data;
• Perform trip generation, trip distribution, and trip assignment;
• Determine peak hour traffic volumes;
• Conduct capacity and operational level of service analyses on key intersections;
• Analyze signal warrants;
• Conduct level of service evaluation of pedestrian, bicycle, and transit modes of
transportation.
DELICH Little Bears Day Care TIS, May 2012
ASSOCIATES Page 1
II. EXISTING CONDITIONS
The location of Little Bears Day Care is shown in Figure 1. It is important that a
thorough understanding of the existing conditions be presented.
Land Use
Land uses in the area are primarily either residential or commercial/office. Land
adjacent to the site is flat (<3% grade) from a traffic operations perspective. The center of
Fort Collins lies to the west of the proposed Little Bears Day Care.
Roads
The primary streets near the Little Bears Day Care site are Riverside Avenue and
McHugh Street. Figure 2 shows a schematic of the existing geometry at the key
intersections.
Riverside Avenue is to the east of (adjacent to) the Little Bears Day Care site. It is
a north-south street (a diagonal street northwest-southeast) designated as a four-lane
arterial street on the Fort Collins Master Street Plan. Currently, it has a four-lane cross
section, with a two-way continuous center-turn lane. At the Riverside/McHugh-Coloradoan
Access intersection, Riverside Avenue has northbound and southbound center left-turn
lanes and two travel lanes in each direction. The existing speed limit in this area is 35
mph. The Riverside/McHugh-Coloradoan Access intersection has stop sign control on
McHugh Street and the Coloradoan Access.
McHugh Street is to the south of the Little Bears Day Care site. It is classified as a
collector street on the Fort Collins Master Street Plan. Currently, McHugh Street has a
two-lane cross section in this area. At the Riverside/McHugh-Coloradoan Access
intersection, McHugh Street has all eastbound movements combined in a single lane.
Existing Traffic
Recent peak hour traffic counts at the Riverside/McHugh-Coloradoan Access and
Riverside/Site Access intersections are shown in Figure 3. Raw traffic data is provided
in Appendix A. The traffic data for the key intersections was collected in April 2012.
Existing Operation
The key intersections were evaluated using techniques provided in the 2000
Highway Capacity Manual. Using the recent peak hour traffic shown in Figure 3, the
current peak hour operation is shown in Table 1. Calculation forms are provided in
DELICH Little Bears Day Care TIS, May 2012
ASSOCIATES Page 2
Riverside
Elizabeth
McHugh
Mulberry
Lemay
SCALE: 1"=500'
SITE LOCATION Figure 1
DELICH
ASSOCIATES
Little Bears Day Care TIS, May 2012
Page 3
EXISTING GEOMETRY Figure 2
DELICH
ASSOCIATES
Little Bears Day Care TIS, May 2012
Page 4
McHugh
Riverside
Site Access
Coloradoan
- Denotes Lane
- Two-way Continuous Left-turn Lane
AM/PM
RECENT PEAK HOUR TRAFFIC Figure 3
DELICH
ASSOCIATES
Little Bears Day Care TIS, May 2012
Page 5
497/475
4/4
441/519
3/1
1/2
2/1
20/25
0/0
69/99
0/4
0/2
0/2
3/0
419/490
21/30
1/1
481/450
108/65
McHugh
Riverside
Site Access
Coloradoan
TABLE 1
Current Peak Hour Operation
Intersection Movement Level of Service
AM PM
EB LT/T/RT B B
WB LT/T/RT A B
NB LT A A
Riverside/McHugh-Coloradoan
(stop sign)
SB LT A A
Riverside/Site Access EB LT/RT B B
(stop sign) NB LT A A
DELICH Little Bears Day Care TIS, May 2012
ASSOCIATES Page 6
Appendix B. A description of level of service for unsignalized intersections from the 2000
Highway Capacity Manual and a table showing the Fort Collins Motor Vehicle LOS
Standards (Intersections) are provided in Appendix B. Little Bears Day Care is in a area
termed “other.” The key intersections operate acceptably during both the morning and
afternoon peak hours. At unsignalized intersections, acceptable operation is considered to
be at level of service E for any approach leg for an arterial/collector or arterial/local
intersection and level of service C for any approach leg for a collector/local intersection.
Pedestrian Facilities
Sidewalks exist along both sides of Riverside Avenue and McHugh Street.
Sidewalks exist adjacent to this development.
Bicycle Facilities
The Fort Collins Bike Map shows that Riverside Avenue is a street with bike
lanes. These bicycle lanes are not striped. However, there is enough width in the right-
most through lane for bicycles to function separate from motor vehicles. McHugh Street
is designated as a bike route.
Transit Facilities
Currently, there is no Transfort service along Riverside Avenue in this area of
Fort Collins. The nearest Transfort route is Route 5, which operates along Lemay
Avenue.
DELICH Little Bears Day Care TIS, May 2012
ASSOCIATES Page 7
III. PROPOSED DEVELOPMENT
Little Bears is a proposed day care development to be licensed for 104 students.
Figure 4 shows the site plan of the Little Bears Day Care. The site plan shows the
proposed building will continue to access Riverside Avenue via a shared access with
the office building to the north. The short range analysis (Year 2017) includes
development of Little Bears Day Care and an appropriate increase in background traffic,
due to normal growth and other known developments in the area.
Trip Generation
Trip generation is important in considering the impact of a development such as this
upon the existing and proposed street system. A compilation of trip generation information
contained in Trip Generation, 8th Edition, ITE was used to estimate trips that would be
generated by the proposed/expected use at this site. Students is the variable used for trip
generation. Table 2 shows the expected trip generation on a daily and peak hour basis.
TABLE 2
Trip Generation
Code Use Size AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
220 Day Care 104
Students 4.48 465 0.42 44 0.38 39 0.39 40 0.43 45
Trip Distribution
Directional distribution of the generated trips was determined for Little Bears Day
Care. Future year data was obtained from the NFRRTP and other transportation impact
studies in the area. Figure 5 shows the trip distribution used for Little Bears Day Care.
The trip distribution was discussed with and agreed to by City staff.
Background Traffic Projections
Figure 6 shows the short range (2017) background peak hour traffic at the key
intersections. Background traffic projections for the short range future horizon were
obtained by reviewing the NFRRTP, reviewing transportation impact studies for other
developments, and reviewing historic count data for this area of Fort Collins. Traffic
volumes on the area arterial streets were increased at a rate of two percent per year. In
addition to this, the site generated traffic volumes from Phase 6 of the PVH Lemay
Campus Expansion were added to the traffic volumes. At the shared Site Access, the
existing traffic volumes are low for the land uses using this shared access. The building
DELICH Little Bears Day Care TIS, May 2012
ASSOCIATES Page 8
SCALE: 1"=50'
SITE PLAN Figure 4
DELICH
ASSOCIATES
Little Bears Day Care TIS, May 2012
Page 9
TRIP DISTRIBUTION Figure 5
DELICH
ASSOCIATES
Little Bears Day Care TIS, May 2012
Page 10
McHugh
Riverside
Coloradoan
McHugh
Elizabeth
20%
30%
50%
Site Access
AM/PM
SHORT RANGE (2017) BACKGROUND
PEAK HOUR TRAFFIC Figure 6
DELICH
ASSOCIATES
Little Bears Day Care TIS, May 2012
Page 11
553/534
3/1
494/575
2/0
0/2
1/2
25/34
0/0
80/117
0/4
0/2
0/2
3/0
463/541
29/36
1/1
531/497
128/76
McHugh
Riverside
Site Access
Coloradoan
DELICH Little Bears Day Care TIS, May 2012
ASSOCIATES Page 12
that is proposed to be the Little Bears Day Care is 7,559 square feet and has an existing
office use. The other building using the Site Access is approximately 3,500 square feet
and also has an existing office use. In order to be conservative, trip generation for the
3,500 square foot building was calculated using Code 710 – General Office from Trip
Generation, 8th Edition, ITE. The site generated traffic from this office building was
assigned to the Site Access.
Trip Assignment
Trip assignment is how the generated and distributed trips are expected to be
loaded on the street system. The assigned trips are the resultant of the trip distribution
process. The site generated trip assignment for Little Bears Day Care is shown in
Figure 7. The site generated traffic was combined with the background traffic to
determine the total forecasted traffic for the study area. Figure 8 shows the short range
(2017) total peak hour traffic at the key intersections.
Signal Warrants
As a matter of policy, traffic signals are not installed at any location unless warrants
are met according to the Manual on Uniform Traffic Control Devices. The
Riverside/McHugh-Coloradoan intersection will not likely meet peak hour volume signal
warrants in the future.
Operation Analysis
Operation analyses were performed at the Riverside/McHugh-Coloradoan Access
and Riverside/Site Access intersections. The operation analyses were conducted for the
short range analysis, reflecting a year 2017 condition.
Using the traffic volumes shown in Figure 6, the key intersections operate in the
short range (2017) background peak hour as indicated in Table 3. Calculation forms for
these analyses are provided in Appendix C. The key intersections operate acceptably
during the peak hours.
Table 4 shows the short range (2017) peak hour operation at the key
intersections with full development of the Little Bears Day Care. Calculation forms are
provided in Appendix D. The analysis indicated that the key intersections will operate at
acceptable levels of service during both the morning and afternoon peak hours.
Geometry
The short range (2017) geometry will remain as it exists today. No additional
auxiliary lanes are required.
AM/PM
SITE GENERATED
PEAK HOUR TRAFFIC Figure 7
DELICH
ASSOCIATES
Little Bears Day Care TIS, May 2012
Page 13
22/20
22/20
19/22
20/23
9/8
12/14
8/9
13/12
McHugh
Riverside
Site Access
Coloradoan
AM/PM
SHORT RANGE (2017) TOTAL
PEAK HOUR TRAFFIC Figure 8
DELICH
ASSOCIATES
Little Bears Day Care TIS, May 2012
Page 14
553/534
25/21
494/575
24/20
19/24
21/25
34/42
0/0
80/117
0/4
0/2
0/2
3/0
475/555
37/45
1/1
544/509
128/76
McHugh
Riverside
Site Access
Coloradoan
TABLE 3
Short Range (2017) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
EB LT/T/RT B C
WB LT/T/RT A C
NB LT A
DELICH Little Bears Day Care TIS, May 2012
ASSOCIATES Page 15
A
Riverside/McHugh-Coloradoan
(stop sign)
SB LT A A
Riverside/Site Access EB LT/RT B B
(stop sign) NB LT A A
TABLE 4
Short Range (2017) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
EB LT/T/RT C C
WB LT/T/RT A C
NB LT A A
Riverside/McHugh-Coloradoan
(stop sign)
SB LT A A
Riverside/Site Access EB LT/RT B B
(stop sign) NB LT A A
Pedestrian Level of Service
Appendix E shows a map of the area that is within 1320 feet of Little Bears Day
Care. The Little Bears Day Care site is located within an area termed as “other,” which
sets the level of service threshold at LOS C for all measured factors. There are five
destination areas within 1320 feet of the proposed Little Bears Day Care: 1) the
Coloradoan, 2) the residential neighborhood to the southeast, 3) PVH Lemay Campus,
4) the residential neighborhood to the west, and 5) the commercial uses along Lemay
Avenue. In most cases, sidewalks are completed within the pedestrian influence area.
Appendix E contains a Pedestrian LOS Worksheet.
Bicycle Level of Service
Appendix E contains a map of the bicycle influence area that is within 1320 feet
of Little Bears Day Care. Based upon Fort Collins bicycle LOS criteria, there is one
destination area within 1320 feet of Little Bears Day Care. This is 1) the commercial
uses along Lemay Avenue. A bicycle LOS worksheet is provided in Appendix E. The
bicycle level of service is acceptable.
Transit Level of Service
Currently, there is no Transfort service along Riverside Avenue in this area of
Fort Collins. The nearest Transfort route is Route 5, which operates along Lemay
Avenue. Lemay Avenue is within 0.25 miles of the Little Bears Day Care site. The Fort
Collins Transit System Map shows that Lemay Avenue will have high frequency (20
minute) transit service in the future. Transit future level of service will be acceptable.
DELICH Little Bears Day Care TIS, May 2012
ASSOCIATES Page 16
IV. CONCLUSIONS/RECOMMENDATIONS
This study assessed the impacts of the Little Bears Day Care development on the
short range (2017) street system in the vicinity of the proposed development. Little Bears
is a day care development located in the northwest quadrant of the Riverside/McHugh
intersection in Fort Collins, Colorado. As a result of this analysis, the following is
concluded:
• The development of Little Bears Day Care is feasible from a traffic engineering
standpoint. At full development, Little Bears Day Care will generate
approximately 465 daily trip ends, 83 morning peak hour trip ends, and 85
afternoon peak hour trip ends.
• Current operation at the key intersections is acceptable.
• In the short range (2017) future, given development of Little Bears Day Care and
an increase in background traffic, the key intersections operate acceptably during
the peak hours.
• No additional auxiliary lanes are required at the Riverside/Site Access
intersection.
• Acceptable level of service is achieved for pedestrian, bicycle, and transit modes
based upon the measures in the multi-modal transportation guidelines.
DELICH Little Bears Day Care TIS, May 2012
ASSOCIATES Page 17
APPENDIX A
Riverside
Elizabeth
McHugh
Mulberry
Lemay
SCALE: 1"=500'
SITE LOCATION Figure 1
DELICH
ASSOCIATES
Little Bears Day Care TIS, April 2012
Page 3
SCALE: 1"=40'
SITE PLAN Figure 3
DELICH
ASSOCIATES
Little Bears Day Care TIS, April 2012
Page 7
TABLE 2
Trip Generation
Code Use Size AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
220 Day Care 104
Students 4.48 465 0.42 44 0.38 39 0.39 40 0.43 45
Larimer County Urban Area Street Standards
January 2, 2001
TRIP DISTRIBUTION Figure 2
DELICH
ASSOCIATES
Little Bears Day Care TIS, April 2012
Page 5
McHugh
Riverside
Coloradoan
McHugh
Elizabeth
20%
30%
50%
Site Access
AM/PM
SITE GENERATED
PEAK HOUR TRAFFIC Figure 2
DELICH
ASSOCIATES
Little Bears Day Care TIS, April 2012
Page 5
22/20
22/20
19/22
20/23
9/8
12/14
8/9
13/12
McHugh
Riverside
Site Access
Coloradoan
Riverside
Elizabeth
McHugh
Mulberry
Lemay
SCALE: 1"=500'
PEDESTRIAN INFLUENCE AREA
DELICH
ASSOCIATES
Little Bears Day Care TIS, April 2012
Riverside
Elizabeth
McHugh
Mulberry
Lemay
SCALE: 1"=500'
BICYCLE INFLUENCE AREA
DELICH
ASSOCIATES
Little Bears Day Care TIS, April 2012
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 4-3-12 Observer: Joe
Day: Tuesday Jurisdiction: Fort Collins
R = right turn Intersection: Riverside/Driveway
S = straight
L = left turn
Time Northbound: Riverside Southbound: Riverside Total Eastbound: Driveway Westbound: Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:15 1 77 78 57 0 57 135 0 0 0 0 0 135
7:30 1 123 124 84 1 85 209 1 0 1 0 1 210
7:45 1 129 130 113 2 115 245 0 1 1 0 1 246
8:00 2 127 129 119 0 119 248 0 1 1 0 1 249 0
8:15 0 118 118 125 0 125 243 0 0 0 0 0 243 1
8:30 0 114 114 67 1 68 182 0 0 0 0 0 182 0
7:30-8:30 4 497 0 501 0 441 3 444 945 1 0 2 3 0 0 0 0 3 948
PHF 0.96 0.89 0.75 n/a
4:15 1 67 68 87 0 87 155 0 1 1 0 1 156
4:30 1 118 119 108 1 109 228 2 1 3 0 3 231
4:45 2 116 118 111 0 111 229 0 0 0 0 0 229
5:00 1 130 131 154 0 154 285 0 0 0 0 0 285 0
5:15 0 111 111 146 0 146 257 0 0 0 0 0 257 1
5:30 0 96 96 97 0 97 193 0 0 0 0 0 193 0
4:30-5:30 4 475 0 479 0 519 1 520 999 2 0 1 3 0 0 0 0 3 1002
PHF 0.91 0.84 0.25 n/a
APPENDIX B
HCM Unsignalized Intersection Capacity Analysis 3: McHugh & Riverside
Recent AM
Michael Delich Synchro 6
Matthew J. Delich , P. E. 5/10/2012
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Sign Control Stop Stop Free Free
Grade 0% 0% 0% 0%
Volume (veh/h) 20 0 69 0 0 0 108 481 1 3 419 21
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.88 0.88 0.88 0.89 0.89 0.89
Hourly flow rate (vph) 24 0 81 0 0 0 123 547 1 3 471 24
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type Raised Raised
Median storage veh) 1 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 1008 1283 247 1116 1294 274 494 548
vC1, stage 1 conf vol 489 489 793 793
vC2, stage 2 conf vol 519 793 323 501
vCu, unblocked vol 1008 1283 247 1116 1294 274 494 548
tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1
tC, 2 stage (s) 6.5 5.5 6.5 5.5
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 92 100 89 100 100 100 88 100
cM capacity (veh/h) 301 256 753 226 239 724 1066 1018
Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3
Volume Total 105 0 123 364 183 3 314 181
Volume Left 24 0 123 00300
Volume Right 81 00010024
cSH 563 1700 1066 1700 1700 1018 1700 1700
Volume to Capacity 0.19 0.00 0.12 0.21 0.11 0.00 0.18 0.11
Queue Length 95th (ft) 17 0 10 00000
Control Delay (s) 12.9 0.0 8.8 0.0 0.0 8.5 0.0 0.0
Lane LOS B A A A
Approach Delay (s) 12.9 0.0 1.6 0.1
Approach LOS B A
Intersection Summary
Average Delay 1.9
Intersection Capacity Utilization 33.6% ICU Level of Service A
Analysis Period (min) 15
HCM Unsignalized Intersection Capacity Analysis 3: McHugh & Riverside
Recent PM
Michael Delich Synchro 6
Matthew J. Delich , P. E. 5/10/2012
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Sign Control Stop Stop Free Free
Grade 0% 0% 0% 0%
Volume (veh/h) 25 0 99 2 2 4 65 450 1 0 490 30
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.93 0.93 0.93 0.85 0.85 0.85
Hourly flow rate (vph) 29 0 116 2 2 5 70 484 1 0 576 35
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type Raised Raised
Median storage veh) 1 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 982 1219 306 1029 1236 242 612 485
vC1, stage 1 conf vol 594 594 624 624
vC2, stage 2 conf vol 388 625 405 612
vCu, unblocked vol 982 1219 306 1029 1236 242 612 485
tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1
tC, 2 stage (s) 6.5 5.5 6.5 5.5
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 91 100 83 99 99 99 93 100
cM capacity (veh/h) 315 288 690 257 268 758 963 1074
Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3
Volume Total 146 9 70 323 162 0 384 227
Volume Left 29 2 70 00000
Volume Right 116 50010035
cSH 556 390 963 1700 1700 1700 1700 1700
Volume to Capacity 0.26 0.02 0.07 0.19 0.10 0.00 0.23 0.13
Queue Length 95th (ft) 26 2600000
Control Delay (s) 13.8 14.5 9.0 0.0 0.0 0.0 0.0 0.0
Lane LOS B B A
Approach Delay (s) 13.8 14.5 1.1 0.0
Approach LOS B B
Intersection Summary
Average Delay 2.1
Intersection Capacity Utilization 37.5% ICU Level of Service A
Analysis Period (min) 15
HCM Unsignalized Intersection Capacity Analysis 6: Site Access & Riverside
Recent AM
Michael Delich Synchro 6
Matthew J. Delich , P. E. 5/10/2012
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Sign Control Stop Free Free
Grade 0% 0% 0%
Volume (veh/h) 1 2 4 497 441 3
Peak Hour Factor 0.85 0.85 0.96 0.96 0.89 0.89
Hourly flow rate (vph) 1 2 4 518 496 3
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type Raised
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 764 249 499
vC1, stage 1 conf vol 497
vC2, stage 2 conf vol 267
vCu, unblocked vol 764 249 499
tC, single (s) 6.8 6.9 4.1
tC, 2 stage (s) 5.8
tF (s) 3.5 3.3 2.2
p0 queue free % 100 100 100
cM capacity (veh/h) 447 750 1061
Direction, Lane # EB 1 NB 1 NB 2 NB 3 SB 1 SB 2
Volume Total 4 4 259 259 330 169
Volume Left 140000
Volume Right 200003
cSH 612 1061 1700 1700 1700 1700
Volume to Capacity 0.01 0.00 0.15 0.15 0.19 0.10
Queue Length 95th (ft) 000000
Control Delay (s) 10.9 8.4 0.0 0.0 0.0 0.0
Lane LOS B A
Approach Delay (s) 10.9 0.1 0.0
Approach LOS B
Intersection Summary
Average Delay 0.1
Intersection Capacity Utilization 23.7% ICU Level of Service A
Analysis Period (min) 15
HCM Unsignalized Intersection Capacity Analysis 6: Site Access & Riverside
Recent PM
Michael Delich Synchro 6
Matthew J. Delich , P. E. 5/10/2012
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Sign Control Stop Free Free
Grade 0% 0% 0%
Volume (veh/h) 2 1 4 475 519 1
Peak Hour Factor 0.85 0.85 0.91 0.91 0.85 0.85
Hourly flow rate (vph) 2 1 4 522 611 1
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type Raised
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 881 306 612
vC1, stage 1 conf vol 611
vC2, stage 2 conf vol 270
vCu, unblocked vol 881 306 612
tC, single (s) 6.8 6.9 4.1
tC, 2 stage (s) 5.8
tF (s) 3.5 3.3 2.2
p0 queue free % 99 100 100
cM capacity (veh/h) 396 690 963
Direction, Lane # EB 1 NB 1 NB 2 NB 3 SB 1 SB 2
Volume Total 4 4 261 261 407 205
Volume Left 240000
Volume Right 100001
cSH 461 963 1700 1700 1700 1700
Volume to Capacity 0.01 0.00 0.15 0.15 0.24 0.12
Queue Length 95th (ft) 100000
Control Delay (s) 12.9 8.8 0.0 0.0 0.0 0.0
Lane LOS B A
Approach Delay (s) 12.9 0.1 0.0
Approach LOS B
Intersection Summary
Average Delay 0.1
Intersection Capacity Utilization 24.4% ICU Level of Service A
Analysis Period (min) 15
UNSIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 15
C > 15 and < 25
D > 25 and < 35
E > 35 and < 50
F > 50
Table 4-3
Fort Collins (City Limits)
Motor Vehicle LOS Standards (Intersections)
Land Use (from structure plan)
Other corridors within:
Intersection type Commercial
corridors
Mixed use
districts
Low density
mixed use
residential
All other
areas
Signalized intersections
(overall)
DE*DD
Any Leg EEDE
Any Movement EEDE
Stop sign control
(arterial/collector or local—
any approach leg)
N/A F** F** E
Stop sign control
(collector/local—any
approach leg)
N/A C C C
* mitigating measures required
** considered normal in an urban environment
APPENDIX C
HCM Unsignalized Intersection Capacity Analysis 3: McHugh & Riverside
Short Bkgrd AM
Michael Delich Synchro 6
Matthew J. Delich , P. E. 5/10/2012
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Sign Control Stop Stop Free Free
Grade 0% 0% 0% 0%
Volume (veh/h) 25 0 80 0 0 0 128 531 1 3 463 29
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.88 0.88 0.88 0.89 0.89 0.89
Hourly flow rate (vph) 29 0 94 0 0 0 145 603 1 3 520 33
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type Raised Raised
Median storage veh) 1 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 1136 1439 276 1256 1454 302 553 605
vC1, stage 1 conf vol 543 543 895 895
vC2, stage 2 conf vol 593 895 361 560
vCu, unblocked vol 1136 1439 276 1256 1454 302 553 605
tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1
tC, 2 stage (s) 6.5 5.5 6.5 5.5
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 89 100 87 100 100 100 86 100
cM capacity (veh/h) 260 221 721 186 201 694 1013 969
Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3
Volume Total 124 0 145 402 202 3 347 206
Volume Left 29 0 145 00300
Volume Right 94 00010033
cSH 507 1700 1013 1700 1700 969 1700 1700
Volume to Capacity 0.24 0.00 0.14 0.24 0.12 0.00 0.20 0.12
Queue Length 95th (ft) 24 0 13 00000
Control Delay (s) 14.4 0.0 9.1 0.0 0.0 8.7 0.0 0.0
Lane LOS B A A A
Approach Delay (s) 14.4 0.0 1.8 0.1
Approach LOS B A
Intersection Summary
Average Delay 2.2
Intersection Capacity Utilization 37.1% ICU Level of Service A
Analysis Period (min) 15
HCM Unsignalized Intersection Capacity Analysis 3: McHugh & Riverside
Short Bkgrd PM
Michael Delich Synchro 6
Matthew J. Delich , P. E. 5/10/2012
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Sign Control Stop Stop Free Free
Grade 0% 0% 0% 0%
Volume (veh/h) 34 0 117 2 2 4 76 497 1 0 541 36
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.93 0.93 0.93 0.85 0.85 0.85
Hourly flow rate (vph) 40 0 138 2 2 5 82 534 1 0 636 42
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type Raised Raised
Median storage veh) 1 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 1094 1357 339 1154 1377 268 679 535
vC1, stage 1 conf vol 658 658 698 698
vC2, stage 2 conf vol 437 699 456 679
vCu, unblocked vol 1094 1357 339 1154 1377 268 679 535
tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1
tC, 2 stage (s) 6.5 5.5 6.5 5.5
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 86 100 79 99 99 99 91 100
cM capacity (veh/h) 280 256 656 215 235 730 909 1029
Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3
Volume Total 178 9 82 356 179 0 424 255
Volume Left 40 2 82 00000
Volume Right 138 50010042
cSH 504 343 909 1700 1700 1700 1700 1700
Volume to Capacity 0.35 0.03 0.09 0.21 0.11 0.00 0.25 0.15
Queue Length 95th (ft) 39 2700000
Control Delay (s) 16.0 15.8 9.4 0.0 0.0 0.0 0.0 0.0
Lane LOS C C A
Approach Delay (s) 16.0 15.8 1.2 0.0
Approach LOS C C
Intersection Summary
Average Delay 2.5
Intersection Capacity Utilization 42.0% ICU Level of Service A
Analysis Period (min) 15
HCM Unsignalized Intersection Capacity Analysis 6: Site Access & Riverside
Short Bkgrd AM
Michael Delich Synchro 6
Matthew J. Delich , P. E. 5/10/2012
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Sign Control Stop Free Free
Grade 0% 0% 0%
Volume (veh/h) 0 1 3 553 494 2
Peak Hour Factor 0.85 0.85 0.96 0.96 0.89 0.89
Hourly flow rate (vph) 0 1 3 576 555 2
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type Raised
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 850 279 557
vC1, stage 1 conf vol 556
vC2, stage 2 conf vol 294
vCu, unblocked vol 850 279 557
tC, single (s) 6.8 6.9 4.1
tC, 2 stage (s) 5.8
tF (s) 3.5 3.3 2.2
p0 queue free % 100 100 100
cM capacity (veh/h) 413 719 1009
Direction, Lane # EB 1 NB 1 NB 2 NB 3 SB 1 SB 2
Volume Total 1 3 288 288 370 187
Volume Left 030000
Volume Right 100002
cSH 719 1009 1700 1700 1700 1700
Volume to Capacity 0.00 0.00 0.17 0.17 0.22 0.11
Queue Length 95th (ft) 000000
Control Delay (s) 10.0 8.6 0.0 0.0 0.0 0.0
Lane LOS B A
Approach Delay (s) 10.0 0.0 0.0
Approach LOS B
Intersection Summary
Average Delay 0.0
Intersection Capacity Utilization 25.3% ICU Level of Service A
Analysis Period (min) 15
HCM Unsignalized Intersection Capacity Analysis 6: Site Access & Riverside
Short Bkgrd PM
Michael Delich Synchro 6
Matthew J. Delich , P. E. 5/10/2012
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Sign Control Stop Free Free
Grade 0% 0% 0%
Volume (veh/h) 2 2 1 534 575 0
Peak Hour Factor 0.85 0.85 0.91 0.91 0.85 0.85
Hourly flow rate (vph) 2 2 1 587 676 0
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type Raised
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 972 338 676
vC1, stage 1 conf vol 676
vC2, stage 2 conf vol 296
vCu, unblocked vol 972 338 676
tC, single (s) 6.8 6.9 4.1
tC, 2 stage (s) 5.8
tF (s) 3.5 3.3 2.2
p0 queue free % 99 100 100
cM capacity (veh/h) 364 658 911
Direction, Lane # EB 1 NB 1 NB 2 NB 3 SB 1 SB 2
Volume Total 5 1 293 293 451 225
Volume Left 210000
Volume Right 200000
cSH 469 911 1700 1700 1700 1700
Volume to Capacity 0.01 0.00 0.17 0.17 0.27 0.13
Queue Length 95th (ft) 100000
Control Delay (s) 12.8 9.0 0.0 0.0 0.0 0.0
Lane LOS B A
Approach Delay (s) 12.8 0.0 0.0
Approach LOS B
Intersection Summary
Average Delay 0.1
Intersection Capacity Utilization 25.9% ICU Level of Service A
Analysis Period (min) 15
APPENDIX D
HCM Unsignalized Intersection Capacity Analysis 3: McHugh & Riverside
Short Total AM
Michael Delich Synchro 6
Matthew J. Delich , P. E. 5/10/2012
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Sign Control Stop Stop Free Free
Grade 0% 0% 0% 0%
Volume (veh/h) 34 0 80 0 0 0 128 544 1 3 475 37
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.88 0.88 0.88 0.89 0.89 0.89
Hourly flow rate (vph) 40 0 94 0 0 0 145 618 1 3 534 42
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type Raised Raised
Median storage veh) 1 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 1161 1471 288 1277 1492 310 575 619
vC1, stage 1 conf vol 561 561 910 910
vC2, stage 2 conf vol 600 910 368 582
vCu, unblocked vol 1161 1471 288 1277 1492 310 575 619
tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1
tC, 2 stage (s) 6.5 5.5 6.5 5.5
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 84 100 87 100 100 100 85 100
cM capacity (veh/h) 254 215 709 181 195 686 994 957
Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3
Volume Total 134 0 145 412 207 3 356 219
Volume Left 40 0 145 00300
Volume Right 94 00010042
cSH 462 1700 994 1700 1700 957 1700 1700
Volume to Capacity 0.29 0.00 0.15 0.24 0.12 0.00 0.21 0.13
Queue Length 95th (ft) 30 0 13 00000
Control Delay (s) 15.9 0.0 9.2 0.0 0.0 8.8 0.0 0.0
Lane LOS C A A A
Approach Delay (s) 15.9 0.0 1.8 0.1
Approach LOS C A
Intersection Summary
Average Delay 2.4
Intersection Capacity Utilization 38.2% ICU Level of Service A
Analysis Period (min) 15
HCM Unsignalized Intersection Capacity Analysis 3: McHugh & Riverside
Short Total PM
Michael Delich Synchro 6
Matthew J. Delich , P. E. 5/10/2012
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Sign Control Stop Stop Free Free
Grade 0% 0% 0% 0%
Volume (veh/h) 42 0 117 2 2 4 76 509 1 0 555 45
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.93 0.93 0.93 0.85 0.85 0.85
Hourly flow rate (vph) 49 0 138 2 2 5 82 547 1 0 653 53
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type Raised Raised
Median storage veh) 1 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 1122 1391 353 1175 1417 274 706 548
vC1, stage 1 conf vol 679 679 711 711
vC2, stage 2 conf vol 443 712 464 706
vCu, unblocked vol 1122 1391 353 1175 1417 274 706 548
tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1
tC, 2 stage (s) 6.5 5.5 6.5 5.5
tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2
p0 queue free % 82 100 79 99 99 99 91 100
cM capacity (veh/h) 272 250 643 209 227 723 888 1017
Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3
Volume Total 187 9 82 365 184 0 435 271
Volume Left 49 2 82 00000
Volume Right 138 50010053
cSH 473 335 888 1700 1700 1700 1700 1700
Volume to Capacity 0.40 0.03 0.09 0.21 0.11 0.00 0.26 0.16
Queue Length 95th (ft) 47 2800000
Control Delay (s) 17.5 16.1 9.5 0.0 0.0 0.0 0.0 0.0
Lane LOS C C A
Approach Delay (s) 17.5 16.1 1.2 0.0
Approach LOS C C
Intersection Summary
Average Delay 2.7
Intersection Capacity Utilization 44.0% ICU Level of Service A
Analysis Period (min) 15
HCM Unsignalized Intersection Capacity Analysis 6: Site Access & Riverside
Short Total AM
Michael Delich Synchro 6
Matthew J. Delich , P. E. 5/10/2012
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Sign Control Stop Free Free
Grade 0% 0% 0%
Volume (veh/h) 19 21 25 553 494 24
Peak Hour Factor 0.85 0.85 0.96 0.96 0.89 0.89
Hourly flow rate (vph) 22 25 26 576 555 27
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type Raised
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 909 291 582
vC1, stage 1 conf vol 569
vC2, stage 2 conf vol 340
vCu, unblocked vol 909 291 582
tC, single (s) 6.8 6.9 4.1
tC, 2 stage (s) 5.8
tF (s) 3.5 3.3 2.2
p0 queue free % 94 96 97
cM capacity (veh/h) 390 706 988
Direction, Lane # EB 1 NB 1 NB 2 NB 3 SB 1 SB 2
Volume Total 47 26 288 288 370 212
Volume Left 22 26 0000
Volume Right 25 000027
cSH 509 988 1700 1700 1700 1700
Volume to Capacity 0.09 0.03 0.17 0.17 0.22 0.12
Queue Length 95th (ft) 820000
Control Delay (s) 12.8 8.7 0.0 0.0 0.0 0.0
Lane LOS B A
Approach Delay (s) 12.8 0.4 0.0
Approach LOS B
Intersection Summary
Average Delay 0.7
Intersection Capacity Utilization 30.8% ICU Level of Service A
Analysis Period (min) 15
HCM Unsignalized Intersection Capacity Analysis 6: Site Access & Riverside
Short Total PM
Michael Delich Synchro 6
Matthew J. Delich , P. E. 5/10/2012
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Sign Control Stop Free Free
Grade 0% 0% 0%
Volume (veh/h) 24 25 21 534 575 20
Peak Hour Factor 0.85 0.85 0.91 0.91 0.85 0.85
Hourly flow rate (vph) 28 29 23 587 676 24
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type Raised
Median storage veh) 1
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume 1028 350 700
vC1, stage 1 conf vol 688
vC2, stage 2 conf vol 340
vCu, unblocked vol 1028 350 700
tC, single (s) 6.8 6.9 4.1
tC, 2 stage (s) 5.8
tF (s) 3.5 3.3 2.2
p0 queue free % 92 95 97
cM capacity (veh/h) 346 646 893
Direction, Lane # EB 1 NB 1 NB 2 NB 3 SB 1 SB 2
Volume Total 58 23 293 293 451 249
Volume Left 28 23 0000
Volume Right 29 000024
cSH 453 893 1700 1700 1700 1700
Volume to Capacity 0.13 0.03 0.17 0.17 0.27 0.15
Queue Length 95th (ft) 11 20000
Control Delay (s) 14.1 9.1 0.0 0.0 0.0 0.0
Lane LOS B A
Approach Delay (s) 14.1 0.3 0.0
Approach LOS B
Intersection Summary
Average Delay 0.7
Intersection Capacity Utilization 27.5% ICU Level of Service A
Analysis Period (min) 15
APPENDIX E
Riverside
Elizabeth
McHugh
Mulberry
Lemay
SCALE: 1"=500'
PEDESTRIAN INFLUENCE AREA
DELICH
ASSOCIATES
Little Bears Day Care TIS, April 2012
Pedestrian LOS Worksheet
Project Location Classification: Other
Level of Service (minimum based on project location classification)
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Directness Continuity Street
Crossings
Visual
Interest &
Amenities
Security
Minimum C C C C C
1 Actual B C C C C
Coloradoan Commercial
Proposed B C C C C
Minimum C C C C C
2 Actual B C B C B
Neighborhood to the SE Residential
Proposed B C B C B
Minimum C C C C C
3 Actual B C B B B
PVH Lemay Campus Commercial
Proposed B C B B B
Minimum C C C C C
4 Actual C C C C C
Neighborhood to the
west Residential
Proposed C C C C C
Minimum C C C C C
5 Actual C C C C C
Commercial uses along
Lemay Avenue Commercial
Proposed C C C C C
Minimum
6 Actual
Proposed
Minimum
7 Actual
Proposed
Minimum
8 Actual
Proposed
Minimum
9 Actual
Proposed
Minimum
10 Actual
Proposed
Riverside
Elizabeth
McHugh
Mulberry
Lemay
SCALE: 1"=500'
BICYCLE INFLUENCE AREA
DELICH
ASSOCIATES
Little Bears Day Care TIS, April 2012
Bicycle LOS Worksheet
Level of Service – Connectivity
Minimum Actual Proposed
Base Connectivity: C B B
Specific connections to priority sites:
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
1
Commercial uses along
Lemay Avenue Commercial C B B
2
3
4
!
"
#$ $%%&
’
$
()*!!"
+,-.-/
(0 1,2(0 /1-3,234)3’-)553,
)-,4)33.-,326%417
38 -)+12 3.-,32 1)+12 3.-,32 )(5 (,)+12 %417 9,)+12 -3.:(0 )(5 )(5
#73, )(5 )(5 -)6,1) )(5 )(5 (,)6:,) 55
" "
" " " "
"* *
*
* "
""*
" "* "*
" "
" " "
"
"
"
" " "
"
! " *" " *"
" ** "
""
’ ; ; ;
6(
*"
" "
"*
* "
"
** "
"""
* "
" "*
* *" *
" "
"*
* " "
"
*
*! * " " *
"
"
*
* "
""
’ ; ;* ;* ;