HomeMy WebLinkAboutASPEN HEIGHTS STUDENT HOUSING - FDP - FDP130010 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANS (36)LUPINE DRIVE
STEAMBOAT STREET
COPPER MOUNTAIN STREET
(PRIVATE DRIVE)
STEAMBOAT STREET
(PRIVATE DRIVE)
MARY JANE WAY
(PRIVATE DRIVE)
ASPEN HEIGHTS WAY
(PRIVATE DRIVE)
CONIFER STREET
RED-
WOOD
STREET
REDWOOD
STREET
LUPINE
DRIVE
CONIFER
STREET
5a
16
12
13
14
No. Revision/Issue Date
7711 WINDSONG DR, WINDSOR, CO 80550
deanne@TFGcolorado.com (970) 278-0240
PLANNERS / LANDSCAPE ARCHITECTS
SHEET
OF
PROJECT:
155-101FC
DATE: DRAWN BY:
OCG
SCALE:
By:
THIS DOCUMENT IS AN INSTRUMENT OF PROFESSIONAL SERVICE OF THE FREDERICKSON GROUP, LLC. THE FREDERICKSON GROUP SHALL, TO THE FULLEST EXTENT PERMITTED BY LAW, BE HELD HARMLESS AND RELEASED
OF ANY DAMAGE,LIABILITY, OR COST ALLEGEDLY ARISING OUT OF UNAUTHORIZED MODIFICATION, CHANGE, OR REUSE OF THIS DOCUMENT BY OTHERS.
3715 Shallow Pond Drive
Ft. Collins, CO 80528
Phone: (970) 226-0264
larrycowen@comcast.net
1"=40'
29 MAR 13
7 48
ASPEN HEIGHTS, FORT COLLINS
EROSION CONTROL PLAN-NE
GRADING, DRAINAGE AND
1-800-922-1987
160'
GRAPHIC SCALE
40' 0' 20' 40' 80'
1 INCH = 40 FEET
KEYMAP
NOT TO SCALE
LEGEND
8
MATCHLINE -- (SEE SHEET 6)
MATCHLINE -- (SEE SHEET 9)
NOTE: FINISH FLOOR/TOF
ELEVATIONS AND FINE
GRADING WILL BE DETERMINED
PRIOR TO FDP MYLAR.