Loading...
HomeMy WebLinkAboutASPEN HEIGHTS STUDENT HOUSING - FDP - FDP130010 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANS (27)REDWOOD STREET (NEW VINE-TBD) (NEW VINE-TBD) REDWOOD STREET 22 No. Revision/Issue Date 7711 WINDSONG DR, WINDSOR, CO 80550 deanne@TFGcolorado.com (970) 278-0240 PLANNERS / LANDSCAPE ARCHITECTS SHEET OF PROJECT: 155-101FC DATE: DRAWN BY: OCG SCALE: By: THIS DOCUMENT IS AN INSTRUMENT OF PROFESSIONAL SERVICE OF THE FREDERICKSON GROUP, LLC. THE FREDERICKSON GROUP SHALL, TO THE FULLEST EXTENT PERMITTED BY LAW, BE HELD HARMLESS AND RELEASED OF ANY DAMAGE,LIABILITY, OR COST ALLEGEDLY ARISING OUT OF UNAUTHORIZED MODIFICATION, CHANGE, OR REUSE OF THIS DOCUMENT BY OTHERS. 3715 Shallow Pond Drive Ft. Collins, CO 80528 Phone: (970) 226-0264 larrycowen@comcast.net 1"=40' 29 MAR 13 10 48 ASPEN HEIGHTS, FORT COLLINS EROSION CONTROL PLAN GRADING, DRAINAGE AND 1-800-922-1987 160' GRAPHIC SCALE 40' 0' 20' 40' 80' 1 INCH = 40 FEET KEYMAP NOT TO SCALE LEGEND 8 MATCHLINE -- (SEE SHEET 8) MATCHLINE -- (SEE SHEET 9) NOTE: FINISH FLOOR/TOF ELEVATIONS AND FINE GRADING WILL BE DETERMINED PRIOR TO FDP MYLAR. OUTLET CONTROL STRUCTURE OF INTERIM DETENTION BASIN INTERIM DETENTION BASIN DISCHARGE PIPE TEMPORARY CURB CUT AND SIDEWALK CHASE TEMPORARY ARMORED RUNDOWN TRICKLE PAN