HomeMy WebLinkAboutASPEN HEIGHTS STUDENT HOUSING - FDP - FDP130010 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANS (27)REDWOOD STREET
(NEW VINE-TBD)
(NEW VINE-TBD)
REDWOOD STREET
22
No. Revision/Issue Date
7711 WINDSONG DR, WINDSOR, CO 80550
deanne@TFGcolorado.com (970) 278-0240
PLANNERS / LANDSCAPE ARCHITECTS
SHEET
OF
PROJECT:
155-101FC
DATE: DRAWN BY:
OCG
SCALE:
By:
THIS DOCUMENT IS AN INSTRUMENT OF PROFESSIONAL SERVICE OF THE FREDERICKSON GROUP, LLC. THE FREDERICKSON GROUP SHALL, TO THE FULLEST EXTENT PERMITTED BY LAW, BE HELD HARMLESS AND RELEASED
OF ANY DAMAGE,LIABILITY, OR COST ALLEGEDLY ARISING OUT OF UNAUTHORIZED MODIFICATION, CHANGE, OR REUSE OF THIS DOCUMENT BY OTHERS.
3715 Shallow Pond Drive
Ft. Collins, CO 80528
Phone: (970) 226-0264
larrycowen@comcast.net
1"=40'
29 MAR 13
10 48
ASPEN HEIGHTS, FORT COLLINS
EROSION CONTROL PLAN
GRADING, DRAINAGE AND
1-800-922-1987
160'
GRAPHIC SCALE
40' 0' 20' 40' 80'
1 INCH = 40 FEET
KEYMAP
NOT TO SCALE
LEGEND
8
MATCHLINE -- (SEE SHEET 8)
MATCHLINE -- (SEE SHEET 9)
NOTE: FINISH FLOOR/TOF
ELEVATIONS AND FINE
GRADING WILL BE DETERMINED
PRIOR TO FDP MYLAR.
OUTLET CONTROL
STRUCTURE OF
INTERIM
DETENTION
BASIN
INTERIM
DETENTION BASIN
DISCHARGE PIPE
TEMPORARY CURB CUT
AND SIDEWALK CHASE
TEMPORARY
ARMORED
RUNDOWN
TRICKLE
PAN