Loading...
HomeMy WebLinkAboutASPEN HEIGHTS STUDENT HOUSING - FDP - FDP130010 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY (3)DELICH Aspen Heights TIS, March 2012 ASSOCIATES TABLE 1 Revised Current Peak Hour Operation Intersection Movement Level of Service AM PM EB LT C C EB RT C C EB APPROACH C C NB T A A NB RT A A NB APPROACH A A SB T/RT A A N. College/Hickory (signal) OVERALL A A WB LT C C WB RT C C WB APPROACH C C NB T/RT A A SB LT A A SB T A A SB APPROACH A A N. College/Conifer (signal) OVERALL A A APPENDIX A Subject: Aspen Heights From: Ward Stanford <WSTANFORD@fcgov.com> Date: 3/8/2012 10:01 PM To: Ted Shepard <TSHEPARD@fcgov.com>, Sheri Langenberger <SLangenberger@fcgov.com> CC: 'Joseph Delich' <joseph@delichassoc.com> I finally got my TIS comments into Accela. I think I have the plans at home and will give them a review for landscaping issues so I may still have comments but they will be finalized either Friday or Monday (at all day training in Denver Friday). The following are my TIS comments: 02/08/2012: The TIS analyzed the College and Conifer intersection with a north bound right turn lane. Unfortunately one does not currently exist at that location. It is being built with the current improvements so analyzing it in the short and long term is appropriate. Please revise the TIS appropriately. (ACTIVE) 03/08/2012: The City believes more than 10% of the trips generated by this project will pass thru the Linden and existing Vine intersection. Traffic Op's recreated the Linden/Vine and the College/Vine intersections and increased volumes significantly. The intersections didn't fail nor did individual movements fail or even suffer significantly. It is concluded that the two intersections can accommodate more traffic than analyzed without significant negative impacts. As such no revision to the TIS for that issue will be requested. (RESOLVED) Ward Stanford Traffic Systems Engineer City of Fort Collins Traffic Operations off: 970-221-6820 fax: 970-221-6282 Aspen Heights 1 of 1 3/21/2012 3:11 PM APPENDIX B HCM Signalized Intersection Capacity Analysis 1: Hickory & College Recent AM Joseph Synchro 6 Light Report Matthew J. Delich , P. E. Movement EBL EBR NBL NBT SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 Frt 1.00 0.85 1.00 1.00 0.99 Flt Protected 0.95 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1770 1583 1770 3539 3518 Flt Permitted 0.95 1.00 0.28 1.00 1.00 Satd. Flow (perm) 1770 1583 522 3539 3518 Volume (vph) 38 67 61 466 810 34 Peak-hour factor, PHF 0.85 0.85 0.90 0.90 0.86 0.86 Adj. Flow (vph) 45 79 68 518 942 40 RTOR Reduction (vph) 0 71 0020 Lane Group Flow (vph) 45 8 68 518 980 0 Turn Type Perm Perm Protected Phases 4 2 6 Permitted Phases 4 2 Actuated Green, G (s) 6.7 6.7 60.3 60.3 60.3 Effective Green, g (s) 8.2 8.2 63.8 63.8 63.8 Actuated g/C Ratio 0.10 0.10 0.80 0.80 0.80 Clearance Time (s) 5.5 5.5 7.5 7.5 7.5 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 181 162 416 2822 2806 v/s Ratio Prot c0.03 0.15 c0.28 v/s Ratio Perm 0.01 0.13 v/c Ratio 0.25 0.05 0.16 0.18 0.35 Uniform Delay, d1 33.1 32.4 1.9 1.9 2.3 Progression Factor 1.00 1.00 0.44 0.46 1.00 Incremental Delay, d2 0.7 0.1 0.8 0.1 0.3 Delay (s) 33.8 32.5 1.7 1.0 2.6 Level of Service C C A A A Approach Delay (s) 33.0 1.1 2.6 Approach LOS C A A Intersection Summary HCM Average Control Delay 4.3 HCM Level of Service A HCM Volume to Capacity ratio 0.34 Actuated Cycle Length (s) 80.0 Sum of lost time (s) 8.0 Intersection Capacity Utilization 40.2% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group HCM Signalized Intersection Capacity Analysis 1: Hickory & College Recent PM Joseph Synchro 6 Light Report Matthew J. Delich , P. E. Movement EBL EBR NBL NBT SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 Frt 1.00 0.85 1.00 1.00 0.99 Flt Protected 0.95 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1770 1583 1770 3539 3503 Flt Permitted 0.95 1.00 0.31 1.00 1.00 Satd. Flow (perm) 1770 1583 582 3539 3503 Volume (vph) 50 79 77 989 755 55 Peak-hour factor, PHF 0.77 0.77 0.90 0.90 0.93 0.93 Adj. Flow (vph) 65 103 86 1099 812 59 RTOR Reduction (vph) 0 89 0050 Lane Group Flow (vph) 65 14 86 1099 866 0 Turn Type Perm Perm Protected Phases 4 2 6 Permitted Phases 4 2 Actuated Green, G (s) 9.5 9.5 57.5 57.5 57.5 Effective Green, g (s) 11.0 11.0 61.0 61.0 61.0 Actuated g/C Ratio 0.14 0.14 0.76 0.76 0.76 Clearance Time (s) 5.5 5.5 7.5 7.5 7.5 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 243 218 444 2698 2671 v/s Ratio Prot c0.04 c0.31 0.25 v/s Ratio Perm 0.01 0.15 v/c Ratio 0.27 0.06 0.19 0.41 0.32 Uniform Delay, d1 30.9 30.0 2.6 3.3 3.0 Progression Factor 1.00 1.00 0.52 0.44 1.00 Incremental Delay, d2 0.6 0.1 0.9 0.4 0.3 Delay (s) 31.5 30.2 2.3 1.9 3.3 Level of Service C C A A A Approach Delay (s) 30.7 1.9 3.3 Approach LOS C A A Intersection Summary HCM Average Control Delay 4.6 HCM Level of Service A HCM Volume to Capacity ratio 0.39 Actuated Cycle Length (s) 80.0 Sum of lost time (s) 8.0 Intersection Capacity Utilization 40.2% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group HCM Signalized Intersection Capacity Analysis 2: Conifer & College Recent AM Joseph Synchro 6 Light Report Matthew J. Delich , P. E. Movement WBL WBR NBT NBR SBL SBT Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 0.97 1.00 0.95 1.00 0.95 Frt 1.00 0.85 0.98 1.00 1.00 Flt Protected 0.95 1.00 1.00 0.95 1.00 Satd. Flow (prot) 3433 1583 3451 1770 3539 Flt Permitted 0.95 1.00 1.00 0.41 1.00 Satd. Flow (perm) 3433 1583 3451 765 3539 Volume (vph) 106 30 493 98 29 84 Peak-hour factor, PHF 0.92 0.92 0.93 0.93 0.85 0.85 Adj. Flow (vph) 115 33 530 105 34 99 RTOR Reduction (vph) 0 30 13 0 0 0 Lane Group Flow (vph) 115 3 622 0 34 99 Turn Type Perm Perm Protected Phases 8 2 6 Permitted Phases 8 6 Actuated Green, G (s) 6.7 6.7 60.3 60.3 60.3 Effective Green, g (s) 8.2 8.2 63.8 63.8 63.8 Actuated g/C Ratio 0.10 0.10 0.80 0.80 0.80 Clearance Time (s) 5.5 5.5 7.5 7.5 7.5 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 352 162 2752 610 2822 v/s Ratio Prot c0.03 c0.18 0.03 v/s Ratio Perm 0.00 0.04 v/c Ratio 0.33 0.02 0.23 0.06 0.04 Uniform Delay, d1 33.3 32.3 2.0 1.7 1.7 Progression Factor 1.00 1.00 0.84 0.46 0.46 Incremental Delay, d2 0.5 0.1 0.2 0.2 0.0 Delay (s) 33.9 32.3 1.9 0.9 0.8 Level of Service C C A A A Approach Delay (s) 33.5 1.9 0.8 Approach LOS C A A Intersection Summary HCM Average Control Delay 6.8 HCM Level of Service A HCM Volume to Capacity ratio 0.24 Actuated Cycle Length (s) 80.0 Sum of lost time (s) 8.0 Intersection Capacity Utilization 33.4% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group HCM Signalized Intersection Capacity Analysis 2: Conifer & College Recent PM Joseph Synchro 6 Light Report Matthew J. Delich , P. E. Movement WBL WBR NBT NBR SBL SBT Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 0.97 1.00 0.95 1.00 0.95 Frt 1.00 0.85 0.99 1.00 1.00 Flt Protected 0.95 1.00 1.00 0.95 1.00 Satd. Flow (prot) 3433 1583 3492 1770 3539 Flt Permitted 0.95 1.00 1.00 0.22 1.00 Satd. Flow (perm) 3433 1583 3492 403 3539 Volume (vph) 182 77 978 95 35 796 Peak-hour factor, PHF 0.97 0.97 0.91 0.91 0.95 0.95 Adj. Flow (vph) 188 79 1075 104 37 838 RTOR Reduction (vph) 0 68 7000 Lane Group Flow (vph) 188 11 1172 0 37 838 Turn Type Perm Perm Protected Phases 8 2 6 Permitted Phases 8 6 Actuated Green, G (s) 9.5 9.5 57.5 57.5 57.5 Effective Green, g (s) 11.0 11.0 61.0 61.0 61.0 Actuated g/C Ratio 0.14 0.14 0.76 0.76 0.76 Clearance Time (s) 5.5 5.5 7.5 7.5 7.5 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 472 218 2663 307 2698 v/s Ratio Prot c0.05 c0.34 0.24 v/s Ratio Perm 0.01 0.09 v/c Ratio 0.40 0.05 0.44 0.12 0.31 Uniform Delay, d1 31.5 30.0 3.4 2.5 3.0 Progression Factor 1.00 1.00 1.16 0.43 0.39 Incremental Delay, d2 0.6 0.1 0.5 0.8 0.3 Delay (s) 32.0 30.1 4.4 1.8 1.4 Level of Service C C A A A Approach Delay (s) 31.4 4.4 1.4 Approach LOS C A A Intersection Summary HCM Average Control Delay 6.4 HCM Level of Service A HCM Volume to Capacity ratio 0.43 Actuated Cycle Length (s) 80.0 Sum of lost time (s) 8.0 Intersection Capacity Utilization 41.9% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group