October 31, 2012
Re: Rigden Farm 6th Filing Replat
Description of project: This is a request from Meritage Homes to replat a total of 67 lots in Rigden Farm
Filing 6. The replat includes eliminating the alley load tract and widening other lots. The site is zoned Low
Density Mixed Use Residential.
Please see the following summary of comments regarding the project request referrenced above. The
comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed
components of the project application. Modifications and additions to these comments may be made at the
time of formal review of this project. If you have any questions regarding these comments or the next steps in
the review process, you may contact the individual commenter or direct your questions through the Project
Planner, Seth Lorson, at 970-224-6189 or slorson@fcgov.com.
Comment Summary:
Contact: Gary Lopez, 970-416-2338, glopez@fcgov.com
Department: Zoning
Note that modification #28 of the project notes for Rigden Farm 6th filing will not apply to the those lots
where the alleys are eliminated. These and the lots where the lot width is increasing will remain with an 8'
min. rear setback.
1.
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
Department: Water-Wastewater Engineering
Existing water mains and sanitary sewers in this area are shown on the utility map provided to the
applicant.
1.
Detailed discussions will be needed to determine how the water mains and sanitary sewers will be
phased to provide a system with adequate reliability.
2.
3. Water mains and sanitary sewers must be installed on any streets that are to be paved.
All water and sewer services must be extended to all lots (both sides of street) on all streets being
paved.
4.
5. No sewer services have been installed on the existing 30-inch sewer that extends through the site.
The water conservation standards for landscape and irrigation will apply. Information on these
requirements can be found at: http://www.fcgov.com/standards
6.
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
Department: Water-Wastewater Engineering
Development fees and water rights will be due at building permit. There may be water and sewer repays
due for the water transmission and sewer trunk lines.
7.
Contact: Glen Schlueter, 970-224-6065, gschlueter@fcgov.com
Department: Stormwater Engineering
1. Portions of this project are in the Poudre 500-year Moderate Risk Floodplain, and must comply with
Chapter 10 of City Code. A Flood Risk Map is attached.
1.
2. Life, Safety and Emergency Response critical facilities are prohibited within the Poudre River 500-year
Floodplain.
2.
3. Residential development is allowed within the 500-year floodplain without any other Chapter 10
restrictions, however, elevation of structures in the 500-year floodplain is recommended.
3.
4. The Floodplain Administrator for the Poudre River Floodplain is Marsha Hilmes-Robinson;
970.224.6036, mhilmesrobinson@fcgov.com. Feel free to contact Marsha if you have any questions.
4.
5. A copy of the drainage system improvements that Stormwater thinks has been built was provided at
the Conceptual Review meeting. This should be representative of the system in place but there hasn't
been a certification of the system submitted which will need to be done prior to reaching the allotted
building permits allowed in the Development Agreement.
5.
6. It doesn't appear that the drainage system in general needs any major modifications. However
verification that the changes being proposed do not alter the approved plan is needed from the design
engineer. Any basin delineations will need to be noted and mitigation of the changes need to be
provided.
6.
7. There is a note on the plat that the floodplain easement will be vacated at a later date by separate
document. Please provide documentation that the easement has been vacated or it needs to be
vacated now.
7.
8. The detailed lot grading will need to be revised because the lot line locations will change with the
wider lots being proposed. The biggest issue is on the lots where the alley tract is to be eliminated.
That will completely change the drainage concept of the lots on either side of the alley. The alley was
serving as one continuous drainage outfall. With its elimination the lots will have to drain out to the
adjacent streets. A drainage easement along the back lot lines has to be in a separate tract owned and
maintained by the HOA and cannot be on private property. Also not more than three lots can drain to a
common swale between homes and an easement must be provided on both sides of downstream lots
for the upstream lots to drain beside them. The other option is to change the grading plan so that there
is a high point in the rear of the lots and they all drain to the streets in front of them (Type A grading).
8.
9. A SWMP will need to be submitted for approval by the state so please provide a copy of the permit
application and documents to the erosion control inspector to review. It should meet present City
requirements, however please contact the Erosion Control Inspector, Jesse Schlam at 224-6015 or
jschlam@fcgov.com to verify that.
9.
10. The city wide Stormwater development fee (PIF) is $6,390.00/acre ($0.1467/sq.ft.) for new
impervious area over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.ft.) review fee. No fee is
charged for existing impervious area. These fees are to be paid at the time each building permit is
10.
Contact: Glen Schlueter, 970-224-6065, gschlueter@fcgov.com
Department: Stormwater Engineering
issued. Information on fees can be found on the City's web site at
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-fees or
contact Jean Pakech at 221- 6375 for questions on fees. There is also an erosion control escrow
required before the Development Construction permit is issued. The amount of the escrow is
determined by the design engineer, and is based on the site disturbance area or a minimum amount in
accordance with the Fort Collins Stormwater Design Criteria.
11. The design of this site must conform to the drainage basin design of the Foothills Basin Master
Drainage Plan as well the City's Design Criteria and Construction standards.
11.
Contact: Craig Foreman, 970-221-6618, cforeman@fcgov.com
Department: Park Planning
1. 1. 8/17/2012: No comments
Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com
Department: Environmental Planning
1. No comments.
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Department: Engineering Development Review
Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit.
Please contact Matt Baker at 224-6108 if you have any questions.
1.
The City's Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional
information on these fees, please see: http://www.fcgov.com/engineering/dev-review.php
2.
Under the assumption that lacking public infrastructure is intended to be constructed abutting and
adjacent to the proposal, any damaged curb, gutter and sidewalk existing prior to construction, as well
as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this
project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense prior
to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of
Occupancy.
3.
Please contact the City's Traffic Engineer, Joe Olson (224-6062) to schedule a scoping meeting and
determine if a traffic study update is needed for this project. In addition, please contact Transportation
Planning for their requirements as well.
4.
Any public improvements must be designed and built in accordance with the Larimer County Urban Area
Street Standards (LCUASS). They are available online at:
http://www.larimer.org/engineering/GMARdStds/UrbanSt.htm
5.
City Transportation staff discussed the proposal and specific to lots 226-231, which front William Neal
Parkway, staff is not in support of converting these lots to front loaded due to concerns with direct access
6.
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Department: Engineering Development Review
to William Neal Parkway as a collector street in conjunction with the close proximity of these lots to the
Ziegler intersection. These lots will need to remain rear-loaded.
The proposal is dependant on the surrounding adjacent infrastructure not already built in Rigden Farm 6th
Filing to be built prior to any building permit issuance for the lots in the proposed replat.
7.
This project is responsible for dedicating any right-of-way and easements that are necessary for this
project.
8.
9. Construction plans and/or revisions to existing approved construction plans will be required.
A Development Agreement and/or an amendment to the existing Development Agreement for Rigden
Farm 6th Filing is required and will be recorded once the project is finalized with recordation costs paid
for by the applicant.
10.
11. A Development Construction Permit (DCP) will need to be obtained prior to starting any work on the site.
Contact: Rob Irish, 970-224-6167, rirish@fcgov.com
Department: Electric Engineering
Existing electric facilities are stubbed into the site. Any modification or relocation to the existing electric
facilities will be at the owners expense.
1.
2. Electric Capacity fees and Building Site charges will apply.
Contact: Seth Lorson, 970-224-6189, slorson@fcgov.com
Current Planning
This replatting will requires that the project comply with the LMN zoning specifically the section referencing
mix of housing types (4.5(D)(2).
1.
The proposed replatting is required to be in compliance with the approved PDP and ODP for density, mix
of housing types, and garage standards.
2.
The proposed development project is subject to a Type 1 review and public hearing, the decision maker
for Type 1 hearings is an Administrative Hearing Officer. The applicant for this development request is
not required to hold a neighborhood meeting for a Type 1 hearing, but if you would like to have one to
notify your neighbors of the proposal, please let me know and I can help you in setting a date, time and
location for a meeting. Neighborhood Meetings are a great way to get public feedback and avoid
potential hiccups that may occur later in the review process.
3.
Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color
coded flowchart with comprehensive, easy to read information on each step in the process. This guide
includes links to just about every resource you need during development review.
4.
This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code
(LUC), including Article 3 General Development Standards. The entire LUC is available for your review on
the web at http://www.colocode.com/ftcollins/landuse/begin.htm.
5.
If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard
Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of
the LUC for more information on criteria to apply for a Modification of Standard.
6.
Please see the Submittal Requirements and Checklist at:
http://www.fcgov.com/developmentreview/applications.php.
7.
The request will be subject to the Development Review Fee Schedule that is available in the Community
Development and Neighborhood Services office. The fees are due at the time of submittal of the required
documents for the appropriate development review process by City staff and affected outside reviewing
agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal.
8.
When you are ready to submit your formal plans, please make an appointment with Community
Development and Neighborhood Services at (970)221-6750.