Loading...
HomeMy WebLinkAboutPATEROS CREEK - PDP - PDP130011 - CORRESPONDENCE - (3)Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview April 26, 2013 Craig Russell Russell Mills Studios 141 S. College Ave. Ste. 104 Fort Collins, CO 80524 Comment Summary: Department: Current Planning Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com Topic: General 04/19/2013: In the Statement of Planning Objectives, please also address the Poudre River Corridor Overlay principles in City Plan. The Statement should also address the U-E Neighborhood standards. How does the project comport with the Northwest Subarea Plan as well? Also, I did not see the development schedule in the written statement; please provide. Comment Number: 1 Comment Originated: 04/19/2013 04/19/2013: Modification request - as per my discussion with the applicant, staff will need to see a revised modification justification that addresses the standards in Section 3.5.2(D)(2) of the Land Use code regarding front porches that encroach into the setback. Images/sketches that illustrate how the project would appear if the standard were met and how the project would appear as proposed shall also be provided. The plans will also need to illustrate where the driveways are to comply with this standard as well as with Section 3.5.2(E). Comment Number: 2 Comment Originated: 04/19/2013 04/19/2013: Open Space Area of 57.4% - can you clarify how you came to this number? The calculations on the site plan are unclear. Also where do you outline the purpose and acreage of each tract (per submittal requirements)? Comment Number: 3 Comment Originated: 04/19/2013 04/19/2013: Lineweights - I'm struggling to read some of the various lineweights on the plan. Can this be fixed? Comment Number: 4 Comment Originated: 04/19/2013 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Lindsay Ex, at 970-224-6143 or lex@fcgov.com. RE: Pateros Creek, PDP130011, Round Number 1 Department: Current Planning Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com Topic: General 04/19/2013: Building envelopes - some of the building footprints appear to extend beyond the envelopes - please correct or clarify. Dimensions also need to be added for all buildings, structures, and building envelopes with dimensions on at least two sides to the nearest platted property line (see submittal requirements and Section 3.5.2(D) of the Land Use Code). Comment Number: 5 Comment Originated: 04/19/2013 04/19/2013: Street trees - nice work on diversity and spacing - check with City Forester on use of Acer negundo as a street tree. There are a couple of locations where additional street trees need to be added, see redlines. Comment Number: 6 Comment Originated: 04/19/2013 04/19/2013: Landscape plan - please work on the lineweights on the existing trees, they are not legible here. Also will need the planting specifications for the wetland area (please use plugs for this area). Comment Number: 7 Comment Originated: 04/19/2013 04/19/2013: Trees -on the Plan (Sheet LP102), you indicate 0 Pinus flexilis trees, is that correct? The project meets the tree species diversity requirement (257 total trees, no one tree species >15%, Plains Cottonwood is most oft used tree and has 36). Also, which trees are upsized for the mitigation requirements? Please label on the plans. Comment Number: 8 Comment Originated: 04/19/2013 04/19/2013: Bike Parking -are you going to provide any bike parking in the common areas? It's not required, just recommended. Comment Number: 9 Comment Originated: 04/19/2013 04/19/2013: Site Lighting and Natural Areas - while a lighting plan is not required, please show street light locations to determine potential impacts onto the buffer zone area. Additional screening may be needed to minimize impacts. Comment Number: 10 Comment Originated: 04/19/2013 04/19/2013: Housing Types - the applicant has provided three distinct housing types via the elevations. Please add a note on the elevations that while the project must maintain three distinct house types, that minor material changes are allowed to be approved during the building permit process. You might also want to indicate that the elevations are provided for illustrative purposes only and are not to be used for building permit review. Comment Number: 11 Comment Originated: 04/19/2013 04/23/2013: As you are aware, staff is developing urban agriculture regulations. As the community garden would be accessory to this development, an urban agriculture license would not be required. However, please note the standards that do not allow for the spraying or application of synthetic chemicals or pesticides in the community garden. A note should be added to the landscape plan to this effect. Comment Number: 12 Comment Originated: 04/23/2013 Department: Engineering Development Review Contact: Andrew Gingerich, 970-221-6603, agingerich@fcgov.com Topic: Construction Drawings Department: Engineering Development Review Contact: Andrew Gingerich, 970-221-6603, agingerich@fcgov.com Topic: Construction Drawings 04/21/2013: CS1 - The cross section of Wood Street appears to be shown "looking south", please revise to "look north". Addtionally please show all the dimensions for the Connector local on the cross section and feel free to add additional "existing" or "varies" comments to the cross section. Comment Number: 6 Comment Originated: 04/21/2013 04/21/2013: EC1 - Revise the existing conditions map to show actual existing conditions. Many of the trailers and buildings that are shown on this sheet have already been removed. Comment Number: 7 Comment Originated: 04/21/2013 04/21/2013: U1 - Fences and Decks are not permitted within the existing sanitary sewer easement in lots 14 - 21. Please coordinate with Water Wastewater and additional language may need to be added to the site plan, plat and development agreement. Comment Number: 8 Comment Originated: 04/21/2013 04/24/2013: U1 - The access in Tract A does not need to have driveway wings on it at Peregoy or Wood Street. Please have rollover curb in these areas to not invite vehicles to use this as an access. Comment Number: 10 Comment Originated: 04/24/2013 04/24/2013: U1 - Easement/Right of Way will be required from City of Fort Collins for end of sidewalk on the north side of Harts Farm where it ties to Wood Street. Please contact Helen Matson in real estate services for a letter of intent. Comment Number: 11 Comment Originated: 04/24/2013 04/24/2013: U1 - Garage door setbacks need to be a minimum of 20' to allow a vehice to park in the driveway and not encroach into right of way and sidewalk. Comment Number: 12 Comment Originated: 04/24/2013 04/24/2013: G1 - Please label the widths of the street neck downs. The minimum width at a neck down is 20'. Comment Number: 13 Comment Originated: 04/24/2013 04/24/2013: G1 - The street neck downs shall be designed to a minimum radius to allow for proper street maintenance and not impede the flow of runoff in the gutter. The minimum radius on the curves should be 15'. Comment Number: 14 Comment Originated: 04/24/2013 04/24/2013: G1 - The proposed storm sewer pipe at the south west end of Peregoy Way appears to have no cover at the crossing of the street. Storm sewer needs a minimum of 36 inches of clearance from top of asphalt to top of pipe. Comment Number: 15 Comment Originated: 04/24/2013 04/24/2013: R1 - All street sheets need to have horizontal design information added to them inlcuding radius and tangent. Comment Number: 16 Comment Originated: 04/24/2013 Department: Engineering Development Review Contact: Andrew Gingerich, 970-221-6603, agingerich@fcgov.com Topic: Construction Drawings 04/26/2013: Staff met to discuss Wood Street Cross section. In order to meet standards this project will need to build a 30' driveable surface as well as curb and gutter and sidewalk on both sides of the street. One option might be to construct curb and gutter with the flowline at the existing edge of asphalt (not back of existing concrete) and then build a 4.5 attached walk to avoid conflicts with the existing trees. From this flowline a 24' wide road section to the east with 8' of inset parking. The thought of the inset parking would be to eliminate on street parking from constraining this section of roadway. 04/24/2013: R1 - Include addtional design for Wood Street offsite from this projects frontage. Our standard is 500'. Staff is meeting to discuss Wood Street this thursday and will provide additional feedback regarding length of preliminary design required, minimum travel width required for this project, etc. Comment Number: 17 Comment Originated: 04/24/2013 04/24/2013: R1 - The design speed of a Connector Local is 30 mph. Please revise the length of the vertical curve on Wood Street to approx. 90' minimum to comply with the 30 mph design speed. Comment Number: 18 Comment Originated: 04/24/2013 Topic: General 04/24/2013: See Additional comments on the redlines. Comment Number: 19 Comment Originated: 04/24/2013 04/24/2013: Please verify with PFA that the surface being proposed in the Tract A emergency access is acceptable for their use. Comment Number: 20 Comment Originated: 04/24/2013 04/24/2013: Many of the lots being proposed are narrow and in some cases are less than 50 feet in width. Consideration should be taken to the layout of street trees, driveways, and utility services. These may need to be shown in specific details at Final Submittal. Comment Number: 21 Comment Originated: 04/24/2013 04/26/2013: Engineering has contacted City of Fort Collins Operation Services and will be meeting with them next week to discuss possible options for West side of Wood Street. Comment Number: 22 Comment Originated: 04/26/2013 Topic: Plat 04/26/2013: The Right of Way on Hart Farms Lane North on the north side should extend and intersect perpendicularly with the west property line. The road may continue to curve as proposed but the Right of way should be squared off to allow for a future T-intersection if the Livingston or Fort Collins properties redevelop. 04/21/2013: Right of Way will be required from the adjacent property owners to the west of the project. Letters of intent will be required from these property owners prior to public hearing. The property owners are Karin Livingston and City of Fort Collins. Comment Number: 1 Comment Originated: 04/21/2013 04/21/2013: Label all adjacent property owners on the plat. Comment Number: 2 Comment Originated: 04/21/2013 Department: Engineering Development Review Contact: Andrew Gingerich, 970-221-6603, agingerich@fcgov.com Topic: Plat 04/21/2013: Please add additional information, leaders, callouts, etc. to clarify the right of way and what is being dedicated at the southwest corner of the project along wood street. Comment Number: 3 Comment Originated: 04/21/2013 04/21/2013: Tract A will function as emergency access. Please verify with Poudre Fire Authority but it is my thought that this Tract should also have emergency access included or an overlapping emergency access easement. Comment Number: 4 Comment Originated: 04/21/2013 04/21/2013: See additional comments on the redlines. Comment Number: 5 Comment Originated: 04/21/2013 Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com Topic: General 04/23/2013: The project owes an additional $25 for the TDR PDP fee. This can be paid at time of final. Comment Number: 9 Comment Originated: 04/23/2013 Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com Topic: General 04/19/2013: Prior to hearing, we'll need to discuss further the wetland mitigation requirements for the small wetlands that range from 53-2587 sf. How will the City know if the forebay wetland mitigation is successful? Pre-construction hydrologic monitoring is necessary to establish the likelihood of the success of this area. What plantings are proposed? Comment Number: 1 Comment Originated: 04/19/2013 04/19/2013: Without being able to clearly see the existing trees on the landscape plan, it's difficult for me to assess whether 3.4.1(E)(1)(g) is being met by the project. Please update these lineweights and provide me with new drawings. Comment Number: 2 Comment Originated: 04/19/2013 Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com Topic: Landscape Plans 04/24/2013: Provide the required number of up-sized mitigation trees at the bottom of the table. That number of trees should be up-sized on the project or planned for off-site if necessary. Up sized trees should be to the tree size standard in LUC 3.2.1 F. Comment Number: 1 Comment Originated: 04/24/2013 04/24/2013: Provide the completed tree inventory table on LP100 that was developed in the field with City Forestry staff. Comment Number: 2 Comment Originated: 04/24/2013 Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com Topic: Landscape Plans 04/24/2013: Show all the trees proposed to be preserved on LP103 to see how they are sited on the landscape/site plan in reference to buildings, roads and proposed trees. Place the identification number by these existing trees to retain on LP 103 so they can be referenced to the table. Comment Number: 3 Comment Originated: 04/24/2013 04/24/2013: Label and delineate Zones A &B on sheet LP 101. Comment Number: 4 Comment Originated: 04/24/2013 04/24/2013: Provide a statement by a private certified arborist that the trees shown to be preserved (not zones A & B) have a likelihood of surviving construction (grade changes, locations by hardscape, locations by buildings etc.). Comment Number: 5 Comment Originated: 04/24/2013 04/24/2013: Provide a statement by a private certified arborist that the trees to retain have been reviewed for health and structure in terms of their suitability for retention. Incorporate this information as needed into the plans. Comment Number: 6 Comment Originated: 04/24/2013 04/24/2013: Please add to Landscape Note #14 that street tree planting shall be performed by a qualified landscape contractor. Comment Number: 7 Comment Originated: 04/24/2013 04/24/2013: The use of Bigtooth Maple at the SW corner of the entrance off Wood street will tend to cause site distance problem. Use a species that will have a higher canopy. Comment Number: 8 Comment Originated: 04/24/2013 04/24/2013: Provide percent of total for proposed new trees and check that it meets the minimum species diversity in LUC 3.2.1 D 3. Comment Number: 9 Comment Originated: 04/24/2013 04/24/2013: Street tree by lot 31 appears to be closer than 40 from the street light. A ornamental tree could be used at this location as long as it is 15 feet away from the street light. Comment Number: 10 Comment Originated: 04/24/2013 Department: Internal Services Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com Topic: General Department: Internal Services Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com Topic: General 04/18/2013: GIS has the following comments (contact Todd Reidenbach at 416.2483 or treidenbach@fcgov.com with any questions): 1. Hart Farms Ln and Peregoy Way have been added to the Larimer County Street. Inventory System as approved street names. 2. please also see the GIS redlines emailed on 4/18/2013 to Ralph and Craig. Comment Number: 1 Comment Originated: 04/18/2013 04/18/2013: From Helen Matson: The 30' sewer easement commitment (item 19 comment on the plat) - the City obtained an easement in 1986. I need to know if this is the same easement. Comment Number: 2 Comment Originated: 04/18/2013 04/18/2013: Jim Colburn, Neighborhood Services, and Russ Hovland, Building Services, have no comments. Comment Number: 3 Comment Originated: 04/18/2013 Department: Light And Power Contact: Doug Martine, 970-224-6152, dmartine@fcgov.com Topic: General 04/10/2013: Normal electric development charges plus costs to remove the existing electric facilities, will apply. Comment Number: 1 Comment Originated: 04/10/2013 04/10/2013: A landscape plan showing planned streetlights and preliminary locations of electric vaults was sent to Russel+Mills Studio on 4-10-13. Street tree locations must be adjusted to provide 40 feet minimum clearance between trees and lights (15 feet if the tree is an ornamental type). All trees must be a minimum of 3 feet from electric vaults. Comment Number: 2 Comment Originated: 04/10/2013 04/10/2013: After the plans are final, please send an AutoCad (version 2008) drawing of the site plan to Terry Cox at TCOX@FCGOV.COM. Comment Number: 3 Comment Originated: 04/10/2013 04/10/2013: The developer will need to coordinate electric service sizes and locations to each lot with Light & Power Engineering (970)221-6700. Comment Number: 4 Comment Originated: 04/10/2013 Department: Outside Agencies Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com Topic: General 04/18/2013: Comcast (Dennis Greenwalt at 970-484-7166) has the following comment: -Comcast Cable will need to have all utility easements labeled on the plat map not just noted on the cover sheet including the Tracks. Comcast would like to install facilities in a Joint Trench manner with other utilities which will need to be worked out with developer for cots of trench. Comcast will supply the materials and the labor to install it. Comment Number: 1 Comment Originated: 04/18/2013 Department: Outside Agencies Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com Topic: General 04/18/2013: Ed Holder (Poudre School District) has no comments. Comment Number: 2 Comment Originated: 04/18/2013 Department: Park Planning Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com Topic: General 04/18/2013: From Craig Foreman (cforeman@fcgov.com): -Plat should show a 20' public trail easement from the end of the Wood Street north to the Poudre Trail. -Parks would also prefer the easement to be greater than 10' for the trail near Lot 1. Comment Number: 1 Comment Originated: 04/18/2013 Department: PFA Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org Topic: General 04/23/2013: WATER SUPPLY Within the Urban Growth Area, hydrants are to provide 1,000 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter. The current hydrant placement creates a situation that exceeds the 800' separation maximum. Shifting the hydrant of Hart Farms Lane to the west will solve this problem within the development, however please keep in mind the distance to the closest hydrant on Wood Street shall be taken into account when determining the number of hydrants and placement within Pateros Creek. A third hydrant may be required if the distance to the closest hydrant on Wood Street exceeds 800'. Comment Number: 01 Comment Originated: 04/23/2013 04/23/2013: EAE All fire lanes shall be designated on the plat as an Emergency Access Easement. Fire lanes shall be visibly marked by signage and maintained unobstructed at all times. Both ends of the emergency access road identified as Tract A shall be signed at both east and west ends with permanent NO PARKING - FIRE LANE signs complying with IFC appendix D306.6. Roll over curbs accessing the fire lane are acceptable. Comment Number: 02 Comment Originated: 04/23/2013 04/23/2013: APPROVED GATES & BARRICADES ACROSS FIRE LANES The proposed, breakaway bollards will not be permitted. The PFA would prefer the installation of a gate at Wood Street which can be activated and opened from inside the cab of a fire apparatus. If this condition cannot be met, we will accept a gate that is secured with a Knox Padlock. The design and location of this gate needs to be reviewed and approved by the PFA prior to installation. Comment Number: 03 Comment Originated: 04/23/2013 Department: Stormwater Engineering Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com Topic: Erosion Control 04/16/2013: The site disturbs more than 10,000 sq-ft and in a sensitive area, therefore Erosion and Sediment Control Materials need to be submitted for FDP. The erosion control requirements are in the Stormwater Design Criteria Under the Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials Submitted do not meet requirements. Please submit; Erosion Control Plan, Erosion Control Report, and an Escrow / Security Calculation. If you need clarification concerning this section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com Comment Number: 1 Comment Originated: 04/16/2013 Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com Topic: Floodplain 04/23/2013: 1. Please include the floodplain and floodway boundary for both the Poudre River and West Vine on the necessary drawings including – Plat, site plan, grading plan, drainage plan. The Poudre River Floodway and West Vine flood fringe are missing. 2. The benchmark should be on the plat. 3. Site Plan – Please identify and show a detail for the fence that will be used in the floodway areas. The fence must be break-away. 4. Grading and Drainage Plan – please include cross-section and BFE lines. Please identify the datum shown for the cross-section and BFE elevations and the conversion (NGVD 1929 + 3.0 ft = 1988 NAVD). A separate floodplain plan may be used if the grading and drainage plan becomes too busy with all the required information. 5. Please provide more detail regarding grading in the floodway, vegetation, etc. Please provide a detail how the paths are to be constructed (i.e. excavated and paths at or below existing grade. There can be no fill placed in the floodway. A no-rise certification will be required for all work in the floodway. 6. The lots in the West Vine Floodway cannot be constructed at this time. Please include a note that these can only be developed if and when the West Vine floodway is removed. 7. Please designate which lots are in the area where the LOMR-Fill was approved. 8. Please include a table with the following information for the LOMR-Fill lots: BFE, Regulatory flood protection elevation (BFE + 2.0 ft.), minimum lowest floor elevation, minimum HVAC and electrical elevations. Include a note on the plans which homes must be elevated to the regulatory flood protection elevation. For 100% plans, please also include the actual design elevations for each structure. 9. Include a drawing detail for the type of foundation showing lowest floor elevation, HVAC elevation and electrical relative to the BFE. Basements are not allowed below the regulatory flood protection elevation. Structures on crawl spaces must meet the requirements of Section 10-40 of City Code. If garages are not going to be elevated to the regulatory flood protection elevation, they must meet the venting requirements of Section 10-39 of City Code. 10. For the LOMR-Fill lots, please include a note on the plans that a floodplain use permit will be required prior to issuance of the building permit and a FEMA elevation certificate must be submitted and approved prior to issuance of the Certificate of Occupancy. Comment Number: 2 Comment Originated: 04/23/2013 Department: Stormwater Engineering Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com Topic: Floodplain 04/23/2013: 11. Please include a note on the plans that a floodplain use permit is required for any site work in the floodplain or floodway including fences, paths, trellises, benches, bike racks, gardens, etc. 12. Drainage report – Please see development review checklist for items to be included in the drainage report including discussion of both the Poudre River and West Vine floodplain and floodway; the lots in the West Vine floodway that cannot be built on at this time; structures in the LOMR-Fill area and the requirements for elevation of the lowest floor, HVAC and electrical; type of foundation for the LOMR-Fill lots, floodplain permit and CO requirements; breakaway fence details; and, no-rise certification requirements in the floodway. 13. Due to the bank erosion that occurred during the flooding of April 1999, this property is at risk of severe bank erosion. The McMurray Natural Area work and the bank stabilization of the south bank of the river will help reduce this risk. Complete funding and schedule for the bank stabilization work have not yet been identified. Design is not yet complete. Because this risk has not been mapped and thus is not subject to the floodplain regulations in Chapter 10 of City Code, any development is done at the owners risk. The owner is strongly encouraged to provide additional mitigation to protect the development from erosion and overland flooding and/or wait until the bank repairs are complete. 14. FEMA has officially kicked off remapping of the Poudre River. This will be a multi-year project. Property owners near the river need to be aware that the floodplain may be remapped and may change on their property. Furthermore, the Biggert-Waters Flood Insurance Reform Act of 2012 is removing subsidized flood insurance rates. Complete details regarding implementation by FEMA are unknown at this time. However, what we do know is that future structures that are mapped in the floodplain will not be eligible to receive grandfathered or subsidized rates. Therefore, if a structure is built with a basement and then gets mapped in the floodplain, they will be paying actuarial rates which are significantly higher when the basement is 8-10 feet below the 100-year flood elevation. Therefore, we are encouraging you to consider if you want to have basements on these structures and encourage you to elevate the structures as much as possible. We are providing you this information to help you plan for possible future change in the floodplain mapping and already adopted changes in flood insurance. 15. Please see redlines on the plans and the 50% development review checklist. Please contact Marsha Hilmes-Robinson for any questions on floodplain regulation requirements. Comment Number: 3 Comment Originated: 04/23/2013 Topic: General 04/24/2013: Please describe how the flows from the off-site basins pass through the property and show the of-site basins on the drainage plan. Comment Number: 4 Comment Originated: 04/24/2013 04/24/2013: Please describe in more detail the water quality mitigation techniques proposed for this project and describe how the site is meeting the LID requirements. Comment Number: 5 Comment Originated: 04/24/2013 Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Building Elevations 04/22/2013: No comments. Comment Number: 1 Comment Originated: 04/22/2013 Topic: Construction Drawings 04/22/2013: The sheet numbering for the existing conditions sheet does not match the index on sheet CS1. Comment Number: 2 Comment Originated: 04/22/2013 04/22/2013: Please change all references to the street "Hart Farms Lane" to match the Subdivision Plat, which shows the name as "Hart Farm Lane". Comment Number: 3 Comment Originated: 04/22/2013 04/22/2013: Please correct the mispelled words in the index on sheet CS1. Comment Number: 4 Comment Originated: 04/22/2013 04/22/2013: The title for sheet DR1 does not match the index on sheet CS1. Comment Number: 5 Comment Originated: 04/22/2013 04/23/2013: Please correct the elevation for benchmark 38-97 on sheet CS2. Comment Number: 6 Comment Originated: 04/23/2013 04/23/2013: Please mask all text that is in hatching on sheet EX1(EC1). Comment Number: 7 Comment Originated: 04/23/2013 Topic: Landscape Plans 04/23/2013: There are text over text issues on sheet LP001. Comment Number: 8 Comment Originated: 04/23/2013 04/23/2013: The text on sheet LP100 is a little hard to read. Please sharpen it up. Comment Number: 9 Comment Originated: 04/23/2013 04/23/2013: All of the tree numbering on sheet LP101 is covered up by the tree symbols. Please adjust the text, so it can be read. Comment Number: 10 Comment Originated: 04/23/2013 04/23/2013: Please change all references to the street "Hart Farms Lane" to match the Subdivision Plat, which shows the name as "Hart Farm Lane". Comment Number: 11 Comment Originated: 04/23/2013 04/23/2013: The symbols (black dots) shown on sheets LP101, LP103, LP401 & LP402 that appear to be property corners, are not at the corners in a few places. These really are not necessary, and can be removed. Comment Number: 12 Comment Originated: 04/23/2013 04/23/2013: There are line over text issues on sheet LP103, LP401 & LP402. Comment Number: 13 Comment Originated: 04/23/2013 Topic: Plat Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Plat 04/23/2013: Please provide the current monument records for the public land corners shown for control. Comment Number: 14 Comment Originated: 04/23/2013 04/23/2013: Does the title commitment need to be updated? Comment Number: 15 Comment Originated: 04/23/2013 04/23/2013: There are 2 Basis Of Bearings statements on sheet 1. Please remove one of them, and make sure it matches the control shown on sheet 2. Comment Number: 16 Comment Originated: 04/23/2013 04/23/2013: There are typos in note #5 on sheet 1. Comment Number: 17 Comment Originated: 04/23/2013 04/23/2013: Please add the missing reception number in the Statement Of Ownership And Subdivision. Comment Number: 18 Comment Originated: 04/23/2013 04/23/2013: Please add a legal description that matches the metes & bounds boundary shown on sheet 2, referencing the current vesting deed if you wish ("being the same tract of land described in the deed recorded at..."). Comment Number: 19 Comment Originated: 04/23/2013 04/23/2013: Are there any lienholders? If so please add the Lienholders signature block. Comment Number: 20 Comment Originated: 04/23/2013 04/23/2013: Please label the site and adjust the city limits line on the vicinity map. Comment Number: 21 Comment Originated: 04/23/2013 04/23/2013: Please correct the sheet numbering on both sheets. Comment Number: 22 Comment Originated: 04/23/2013 04/23/2013: The boundary as shown on sheet 2, does not close by 23.6'. Comment Number: 23 Comment Originated: 04/23/2013 04/23/2013: There are missing bearings and distances along the outer boundary. Comment Number: 24 Comment Originated: 04/23/2013 04/23/2013: There are line over text issues on sheet 2. Comment Number: 25 Comment Originated: 04/23/2013 04/23/2013: There are text over text issues on sheet 2. Comment Number: 26 Comment Originated: 04/23/2013 04/23/2013: Please rotate all text to read from the bottom or right hand side of sheet 2. Comment Number: 27 Comment Originated: 04/23/2013 04/23/2013: Is there offsite right of way needed along the west end of the property? Comment Number: 28 Comment Originated: 04/23/2013 04/23/2013: Show adjoining properties and plat information/unplatted information. Comment Number: 29 Comment Originated: 04/23/2013 Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Plat 04/23/2013: Please label all easements with widths and the type. Comment Number: 30 Comment Originated: 04/23/2013 04/23/2013: Please label all street right of way widths. See redlines. Comment Number: 31 Comment Originated: 04/23/2013 04/23/2013: Please add reference to Note #6 with all Tracts on sheet 2. See redlines. Comment Number: 32 Comment Originated: 04/23/2013 04/24/2013: Please change the easement lines to a different linetype than the lot lines. Comment Number: 33 Comment Originated: 04/24/2013 04/24/2013: Please remove "commitment item 19" from the 30' sewer easement along the south side of the property, and add the book & page or reception number. See redlines. Comment Number: 34 Comment Originated: 04/24/2013 04/24/2013: What are the two lines shown along the south end of lots 18-21? Comment Number: 35 Comment Originated: 04/24/2013 04/24/2013: Please move all of the distances up off of the the south boundary line. Comment Number: 36 Comment Originated: 04/24/2013 04/24/2013: Please label all lot lines and right of way lines with bearings, distances and/or curve data. See redlines. Comment Number: 37 Comment Originated: 04/24/2013 04/24/2013: Please add a legend showing found & set pins and easement information. Comment Number: 38 Comment Originated: 04/24/2013 Topic: Site Plan 04/24/2013: Please capitalize the "ls402" in the index on sheet LS001. Comment Number: 39 Comment Originated: 04/24/2013 04/24/2013: Please change all references to the street "Hart Farms Lane" to match the Subdivision Plat, which shows the name as "Hart Farm Lane". Comment Number: 40 Comment Originated: 04/24/2013 04/24/2013: The symbols (black dots) shown on sheets LS101, LS102, LS401 & LS402 that appear to be property corners, are not at the corners in a few places. These really are not necessary, and can be removed. Comment Number: 41 Comment Originated: 04/24/2013 04/24/2013: There are line over text issues on sheet LS101, LS102, LS401 & LS402. Comment Number: 42 Comment Originated: 04/24/2013 Department: Traffic Operation Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com Topic: General Department: Traffic Operation Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com Topic: General 04/25/2013: The design for the north end of Wood Street needs to be discussed internally. The geometric layout does conform to City standards. It may or may not be acceptable. More once the City has discussed the area internally. Comment Number: 3 Comment Originated: 04/25/2013 Topic: Traffic Impact Study 04/24/2013: Traffic Op's questions the number of trips shown in the final paragraph on page 13. Please explain or revise the discussion in this paragraph. Comment Number: 1 Comment Originated: 04/24/2013 04/24/2013: TIS is accepted once the page 13 paragraph discussion is worked out. Comment Number: 2 Comment Originated: 04/24/2013 Department: Water-Wastewater Engineering Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com Topic: Construction Drawings 04/23/2013: Concerns have been raised regarding the existing 27" sewer in the rear years of Lots 14 through 21. There is little space between the houses as shown and the easement. This could preclude the construction of decks on the back of these houses. Please review the possibility of re-routing this sewer to provide more flexibility for these lots. Comment Number: 1 Comment Originated: 04/23/2013 04/23/2013: The easement shown for the existing 27" sewer appears to be shown differently on the plat and the construction drawings. Please coordinate the two documents. Comment Number: 2 Comment Originated: 04/23/2013 04/23/2013: Are the pavers shown in Tracts C and D which lead to the existing MH's on the 27" sewer capable of withstanding a 40 ton loading from maintenance vehicles? Comment Number: 3 Comment Originated: 04/23/2013 04/23/2013: Extend the storm drain adjacent to Lot 13 east beyond the pavers extending to the existing MH on the 27" sewer. Comment Number: 5 Comment Originated: 04/23/2013 04/23/2013: See redlined utility plans for other comments. Comment Number: 7 Comment Originated: 04/23/2013 Topic: Landscape Plans 04/23/2013: There are many existing trees within 10 feet of the existing 27" sanitary sewer. Is it possible to prevent additional trees from being planted through HOA regulations, covenants, etc.? Comment Number: 4 Comment Originated: 04/23/2013 Topic: Site Plan 04/23/2013: Sheet LS501 has a detail for breakaway bollards. Where are these being proposed? Comment Number: 6 Comment Originated: 04/23/2013 Department: Zoning Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com Topic: General 04/11/2013: On the site plan notes, please include a note that cites the Modification already approved. Comment Number: 1 Comment Originated: 04/11/2013 04/11/2013: How has the open space been permanently preserved? Please include a note on the site plan with these details. Comment Number: 2 Comment Originated: 04/11/2013 04/11/2013: If Farm animals are not intended to be allowed in this cluster development please include a note on the site plan indicating this. If farm animals are desired then the plans need to identify the areas were they are allowed and how the area is mitigated and buffered from surroundings. Comment Number: 3 Comment Originated: 04/11/2013 04/11/2013: On the site plan sheet LS102 note number 15. Please delete the wording that says "or property line." The code is specific it is from the back of sidewalk only. Also in the site plan notes number 18 leaves me asking the question will this development be built in phases? Comment Number: 4 Comment Originated: 04/11/2013 04/11/2013: A level of deviation should be indicated on the site plan in regards to the building footprints. Comment Number: 5 Comment Originated: 04/11/2013 04/11/2013: The elevations of the single family structures to be recorded with the PDP/FP should include a note concerning the allowable level of deviation. Comment Number: 6 Comment Originated: 04/11/2013 04/24/2013: Need to revise Modification request for the porches to encroach in the front setback. Comment Number: 7 Comment Originated: 04/24/2013 04/24/2013: The enlarge sheets for the site and landscape might not be necessary The note for the trees to be planted at time of building permit is not clear who will plant trees that fall on lot lines. Comment Number: 8 Comment Originated: 04/24/2013