Loading...
HomeMy WebLinkAboutBUCKINGHAM PLACE, 2ND FILING - PDP/FDP - FDP120019 - REPORTS - DRAINAGE REPORT (5)ENGINEERING Opinion of Probable Cost Cash in Leiu Items For: Buckingham Place Second Filing Date: 5/4/2013 ITEM 1: Cash in lieu for Frontage Improvements Estimated Item Units Unit Cost Quantity Cost Local Street Construction LF $204.00 125.5 $25,602 Item 1 Total $25,602 ITEM 2: Cash in Leiu to Construct the New Coy Ditch Estimated Item Units Unit Cost Quantity Cost 30" CMP LF $45.00 126 $5,670 APEX 30" CMP LF $45.00 126 $5,670 Regrading at property line LS $500.00 1 $500 Subtotal $6,170 Surveying and Construction Management Survey LS $400.00 1 $400 Construction Management @ 5% LS $300.00 1 $300 Mobilization @ 5% LS $300.00 1 $300 Subtotal $1,000 Subtotal $7,170 Contingency (15%) $1,076 Item 2 Total $8,246