HomeMy WebLinkAboutMAX FLATS - PDP/FDP - FDP130008 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTDrainage Letter Date: April 24, 2013 Project: MAX Flats Project No. 860-001 Fort Collins, Colorado Attn: Mr. Wes Lamarque City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 Dear Wes: This letter serves to address the stormwater impacts of the MAX Flats mixed-use redevelopment located at 203 West Mulberry Street. The existing site includes a two-level concrete block building with a footprint of approximately 3050 square-feet. It is located along the western edge of the property and roughly centered north-to-south. The remainder of the site is almost entirely paved as a parking lot. Existing landscaping is minimal and generally limited to narrow strips of shrubs along the north and east edges of the property. The site currently surface drains from southwest to northeast along flat grades of less than one percent. Two existing off-site combination inlets are located at the southwest corner of Mulberry and Mason Streets, and along the south and west flowlines of each, respectively. These inlets collect existing developed site runoff and discharge it to the public storm sewer system. The proposed condition will generally preserve existing drainage patterns. The total impervious area of the existing site is approximately 28,588 square-feet. The proposed redevelopment will completely remove all existing above-grade structures and adjacent hardscape. The project will consist of four stories of residential units over a ground level containing a commercial/retail flex space and parking. The structures foundation system will consist of drilled concrete piers and grade beams. The first floor commercial/retail flex space (i.e., non- residential) foundation will be concrete slab-on-grade. The total impervious area of the proposed redevelopment is approximately 27,403 square-feet. Developed runoff from the interior region of the site and roof area will drain to an on-site storm drain system that will connect to the existing combination inlet in Mulberry Street. The proposed system will receive developed runoff from Inlet A3 (Neenah R-3403-F), which will be located within the covered concrete parking area, and Inlet A4, which will be located in the adjacent landscaping. The roof drains will connect to a subsurface system (i.e., 10" HDPE), which will connect to Inlet A3. The roof drain system is designed to convey flows from the 10-year storm event. The difference between the 100 and 10-year flows (1.95 cfs) was added to the concrete parking area surface runoff (i.e., 1.95 + 2.47 = 4.42 cfs) to size Inlet A3. Peripheral areas along the north and east property lines will sheet flow into the adjoining street sections. Refer to the attachments for developed runoff calculations, area inlet sizing and hydraulic grade line calculations. The project site is located in the Old Town Basin (Old Town Basin Master Drainage Plan, Anderson Consulting Engineers, Inc., July 15, 2003); therefore, on-site detention is not required so long as the increase in impervious area is less than 5,000 square-feet. The total impervious area will decrease with this development by approximately 1,185 square-feet (28,588 - 27,403). A detailed breakdown of the existing and proposed impervious areas is attached to this letter (see attached Exhibit 1). Although stormwater quantity detention is not required, stormwater quality mitigation will be addressed by both temporary and permanent Best Management Practices (BMPs). During construction, the contractor will follow appropriate and applicable City of Fort Collins (City) standards for erosion and sediment control. Post construction erosion control will be achieved by a fully established and stabilized site. The areas disturbed during construction will be permanently stabilized with hardscape (i.e., concrete), landscape or building structure. This portion of the Old Town Basin receives regional water quality treatment in the Udall Natural Area; therefore, permanent on-site water quality mitigation is not required. This project is located in the Old Town Basin and impacted by the associated City-designated 100- year floodway/floodplain. In particular, approximately twenty-seven feet of the north portion of the project site is located in Zone AE of the City-designated 100-year floodplain. The remaining south portion of the project site is located in Zone AO of the City-designated 100-year floodfringe. A Floodplain Use Permit (FUP), which will be submitted at the time of building permit application, shall be obtained prior to commencing with any construction within the floodplain. The improvements within the floodfringe of the City-designated floodplain consist of the non-residential use portion of a mixed-use structure with the residential use on a floor completely above the Regulatory Flood Protection Elevation (RFPE). Refer to the table below for a summary of pertinent elevations. Elevation Designation NGVD 29 (Unadjusted) BFE 4993.70 RFPE 4995.20 Minimum Floodproofing Elevation 4995.20 Lowest Floor Elevation 4992.60 HVAC Elevation 5052.60 The non-residential (i.e., commercial/retail flex space) portion of the mixed-use redevelopment shall comply with requirements for floodproofing in lieu of elevating the structure. Additional details for the flood doors and elevator entrance(s) will be provided on a Floodproofing Plan with the next submittal. The floodproofing information (per City Floodproofing Guidelines) will be included with the utility plan set and completed prior to plan approval. It is important to note that the floodway of the City-designated floodplain currently follows the midpoint of the existing sidewalk along the project's Mulberry Street frontage. The proposed improvements within the floodway of the City-designated floodplain consist of non-structural development (i.e., driveway and streetscape modifications). A No-Rise Certification is required for all work within the floodway. Further details and supporting documentation for the No-Rise Certification shall accompany the FUP application. The proposed grading concept closely matches existing elevations and drainage patterns, and only varies in an effort to improve the existing condition. On-site detention is proven to be unnecessary. On-site stormwater quality is not required as runoff is treated in the Udall Natural Area water treatment facility. The project is designed in accordance to the governing floodplain regulations contained within Chapter 10 of the City Code, and the Floodplain Use Permit and necessary certifications shall ensure that construction remains compliant with Chapter 10. Therefore, it is my professional opinion that the MAX Flats mixed-use redevelopment satisfies all applicable stormwater criteria. Please do not hesitate to contact me if you have questions or require additional information. Sincerely, Herman H. Feissner, PE enc. MAX Flats CHARACTER OF SURFACE1: Runoff Coefficient Percentage Impervious Project: MAX Flats Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: H. Feissner Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 100% . Date: April 24, 2013 Concrete …….......……………….….……….………………..….…………………………………………………….0.95 100% . Gravel (packed) ……….…………………….….…………………………..………………………………………….0.50 40% . Roofs …….…….………………..……………….……………………………………………………………………… 0.95 100% Pavers…………………………...………………..……………………………………………………………………… 0.40 22% Lawns and Landscaping Sandy Soil Flat <2% ……………………………………………………………………………………………………………… 0.10 0% Average 2% to 7% ………………………………………………………………………………………………….0.15 0% . Steep >7% …………………………………………………………………………………………………………… 0.20 0% Clayey Soil Flat <2% ……………………………………………………………………………………………………………… 0.20 0% Average 2% to 7% ………………………………………………………………………………………………….0.25 0% . Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year C f = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Basin ID Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Gravel (ac) Area of Roofs (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. Existing Conditions 0.70 0.57 0.02 0.00 0.07 Clayey | Average 2% to 7% 0.04 0.91 0.91 1.00 94% Proposed Conditions 0.70 0.00 0.26 0.00 0.37 Clayey | Average 2% to 7% 0.07 0.88 0.88 1.00 90% Roof Area 0.37 0.00 0.00 0.00 0.37 Clayey | Average 2% to 7% 0.00 0.95 0.95 1.00 100% MAX Flats Overland Flow, Time of Concentration: Project: MAX Flats Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf =1.00) C*Cf (10-yr Cf =1.00) C*Cf (100-yr Cf =1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) MAX Flats Rational Method Equation: Project: MAX Flats Calculations By: Date: Rainfall Intensity: Proposed Conditions 0.70 5.0 5.0 5.0 0.88 0.88 1.00 2.85 4.87 9.95 1.76 3.00 6.97 Roof Area 0.37 5.0 5.0 5.0 0.95 0.95 1.00 2.85 4.87 9.95 0.99 1.70 3.65 Concrete Parking Area 0.25 5.0 5.0 5.0 0.83 0.83 1.00 2.85 4.87 9.95 0.59 1.01 2.47 Intensity, i2 (in/hr) 100-yr Tc (min) Intensity, i10 (in/hr) PROPOSED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) H. Feissner Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 April 24, 2013 C10 Area, A (acres) Q C f C i A 4/24/2013 10:02 AM D:\Projects\860-001\Drainage\Hydrology\860-001_Rational_Calcs\Runoff MAX Flats Area Inlet Capacity Calculations Grate: Neenah R-3402-E Number of Grates: 1 Length: 24 in 2.000 ft Width: 24 in 2.000 ft Open Area: 302.40 sq in 2.1 sq ft Weir Perimeter, P 96.00 in 8.00 ft Open Area, A 302.40 sq in 2.10 sq ft Clogging Factor, c 50% Stage Interval, ¨d 0.050 ft Weir Calculation: Orifice Calculation: Qi = C wPd 1.5 Qi = C oAg (2gd) 0.5 Cw 3.00 C o 0.61 cP 4.00 ft CoA g 1.05 ft 2 Water Depth, d Elevation Qw-INLET Q o-INLET Inflow ft ft cfs cfs cfs 0.00 4992.25 0.00 0.00 0.00 **Proposed top of grate elevation 0.05 4992.30 0.13 1.15 0.13 0.10 4992.35 0.38 1.63 0.38 0.15 4992.40 0.70 1.99 0.70 ĺQ2 =0.59 cfs 0.20 4992.45 1.07 2.30 1.07 ĺQ10 =1.01 cfs 0.25 4992.50 1.50 2.57 1.50 0.30 4992.55 1.97 2.82 1.97 0.35 4992.60 2.48 3.04 2.48 0.40 4992.65 3.04 3.25 3.04 0.45 4992.70 3.62 3.45 3.45 0.50 4992.75 4.24 3.63 3.63 0.55 4992.80 4.89 3.81 3.81 0.60 4992.85 5.58 3.98 3.98 0.65 4992.90 6.29 4.14 4.14 0.70 4992.95 7.03 4.30 4.30 0.75 4993.00 7.79 4.45 4.45 0.80 4993.05 8.59 4.60 4.60 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 0.55 0.60 0.65 0.70 0.75 0.80 Inlet Capacity, cfs Depth of Flow, Feet Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Wednesday, Apr 24 2013 Roof Drain | 10 inch Diameter HDPE Circular Diameter (ft) = 0.83 Invert Elev (ft) = 5280.00 Slope (%) = 0.50 N-Value = 0.012 Calculations Compute by: Known Q Known Q (cfs) = 1.70 Highlighted Depth (ft) = 0.70 Q (cfs) = 1.700 Area (sqft) = 0.49 Velocity (ft/s) = 3.49 Wetted Perim (ft) = 1.93 Crit Depth, Yc (ft) = 0.59 Top Width (ft) = 0.60 EGL (ft) = 0.89 0 1 Elev (ft) Section 5279.75 5280.00 5280.25 5280.50 5280.75 5281.00 Reach (ft) Qw-INLET Qo-INLET Inflow 4/23/201310:28 AM Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Proposed Conditions No 0.95 0.95 1.00 239 0.81% 4.6 4.6 3.1 0 0.00% N/A N/A 0 0.00% N/A N/A 5.0 5.0 5.0 Roof Area No 0.95 0.95 1.00 0 0.00% N/A N/A N/A 0 0.00% N/A N/A 0 0.00% N/A N/A 5.0 5.0 5.0 Concrete Parking Area No 0.95 0.95 1.00 0 0.00% N/A N/A N/A 0 0.00% N/A N/A 0 0.00% N/A N/A 5.0 5.0 5.0 * Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins. PROPOSED TIME OF CONCENTRATION COMPUTATIONS H. Feissner April 24, 2013 Design Point Basin Overland Flow Gutter Flow Swale Flow Time of Concentration (Equation RO-4) 3 1 1 . 87 1 . 1 * S Ti C Cf L  4/24/2013 10:02 AM D:\Projects\860-001\Drainage\Hydrology\860-001_Rational_Calcs\Tc Concrete Parking Area 0.25 0.00 0.21 0.00 0.00 Clayey | Average 2% to 7% 0.04 0.83 0.83 1.00 83% 1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis COMPARISON OF COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Composite Runoff Coefficient with Adjustment 4/24/2013 10:01 AM D:\Projects\860-001\Drainage\Hydrology\860-001_Rational_Calcs\Composite Runoff Coeff