HomeMy WebLinkAboutCROWNE ON TIMBERLINE - PDP - PDP130009 - PLANS - UTILITY PLANSFOR THE MARKING OF UNDERGROUND
BEFORE YOU DIG, GRADE, OR EXCAVATE
CALL 2 BUSINESS DAYS IN ADVANCE
CENTER OF COLORADO
CALL UTILITY NOTIFICATION
MEMBER UTILITIES.
PLANNER/LANDSCAPE
ARCHITECT:
Vignette Studios
P.O. Box 1889
Fort Collins, CO 80522
Contact: Terence Hoaglund
(970) 472-9125
ARCHITECT:
Pucciano & English, Inc.
3084 Mercer University Drive, Suite 110
Atlanta, GA 30341
Contact: David English
(770) 457-0623
FORT COLLINS LOVELAND
WATER DISTRICT/ SOUTH FORT
COLLINS SANITATION DISTRICT:
Contact: Terry Farrill
(970) 226-3104
POUDRE FIRE AUTHORITY
Contact: Ron Gonzales
(970) 219-5316
XCEL ENERGY - GAS & ELECTRIC
Contact: Terry Stencel
(970) 225-7848
CENTURY LINK
Contact: Bob Rulli
(970) 490-7503
COMCAST
Contact: Don Kapperman
(970) 567-0245
UTILITY PLAN APPROVAL
City of Fort Collins, Colorado
OWNER:
Crowne Partners, Inc.
505 North 20th Street, Suite 1015
Birmingham, AL 35203
Contact: Alan Levow (404) 266-8900
Lewis Shubin (205) 328-3120
TRAFFIC ENGINEER:
Delich Associates
2272 Glen Haven Drive
Loveland, CO 80538
Contact: Matt Delich
(970) 669-2061
GEOTECHNICAL ENGINEER:
Terracon, Inc.
1901 Sharp Point Drive, Suite C
Fort Collins, CO 80525
Contact: Eric Bernhardt
(970) 484-0359
UTILITY PLANS FOR
CROWNE ON TIMBERLINE
Fort Collins, Colorado
MAY 15, 2013
VICINITY MAP
ASPEN
Project Contacts:
Utility Entity Contacts:
Refer to the Preliminary Geotechnical Engineering Report, Johnston Annexation, 6111 South
Timberline Road, Fort Collins, Colorado, dated December 6, 2012, Terracon Project No.
20125039, by Terracon, Inc., for site excavation and grading, and paving recommendations.
A TRACT OF LAND LOCATED IN THE SOUTHEAST QUARTER OF SECTION 7, TOWNSHIP 6 NORTH, RANGE 68 WEST OF THE 6TH
PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
C-001 COVER SHEET
C-002 GENERAL CONSTRUCTION NOTES AND MASTER LEGEND
C-003 DEMOLITION PLAN
C-004 HORIZONTAL CONTROL & SIGNAGE & STRIPING PLAN
C-005 STREET TYPICAL SECTIONS
C-006 EROSION CONTROL PLAN
C-007 EROSION CONTROL NOTES AND DETAILS
C-008 GRADING PLAN (WEST)
C-009 GRADING PLAN (EAST)
C-010 DRAINAGE BASIN EXHIBIT
C-011 OVERALL UTILITY PLAN
C-012 RED WILLOW DRIVE CENTERLINE PLAN & PROFILE
C-013 ROSEN DRIVE CENTERLINE PLAN & PROFILE
C-014 ROSEN DRIVE CENTERLINE PLAN & PROFILE
C-015 TIMBERLINE ROAD FLOWLINE PLAN & PROFILE
C-016 TIMBERLINE ROAD FLOWLINE PLAN & PROFILE
C-017 SITE & STREET DETAILS
C-018 WATER & SANITARY SEWER DETAILS
C-019 SANITARY SEWER & STORM SEWER DETAILS
C-020 STORM SEWER & DRAINAGE DETAILS
PLAT (1-2) (ATTACHED, BY OTHERS: FOR REFERENCE ONLY)
DRAWING/ SHEET INDEX
SHEET TITLE
SHEET
NO.
CITY OF FORT COLLINS LIGHT
AND POWER
Contact: Doug Martine
(970) 224-6152
CITY OF FORT COLLINS
STORMWATER
Contact: Glen Schleuter
(970) 221-6700
SHEET No:
CROWNE ON TIMBERLINE
FORT COLLINS, COLORADO
PROJECT/ LOCATION:
DRAWING:
OF 20
CHECKED BY:
DESIGNED BY:
DRAWN BY:
REV. # DESCRIPTION OF REVISION: DATE: REVISED BY: APPROVED BY:
1
2
3
4
5
6
7
PRELIMINARY
NOT FOR CONSTRUCTION
project no: 501-001
date: 05/15/13
COVER SHEET
C-001
J.Gooch
J.Gooch
D.Wood
1
CIVIL ENGINEER:
Aspen Engineering
19 Old Town Square, Suite 238
Fort Collins, CO 80524
Contact: John Gooch
(970) 420-5345
All changes, addendums, additions, deletions and
modifications to these drawings must be approved,
in writing, by the Fort Collins-Loveland
Water District and the South Fort Collins Sanitation District.
Mr. Terry Farrill, P.E., District Engineer Date
Mr. Michael D. DiTullio, Manager Date
FORT COLLINS - LOVELAND
WATER DISTRICT
SOUTH FORT COLLINS
SANITATION DISTRICT
SITE
LOCATION