Loading...
HomeMy WebLinkAboutCROWNE ON TIMBERLINE - PDP - PDP130009 - PLANS - UTILITY PLANSFOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES. PLANNER/LANDSCAPE ARCHITECT: Vignette Studios P.O. Box 1889 Fort Collins, CO 80522 Contact: Terence Hoaglund (970) 472-9125 ARCHITECT: Pucciano & English, Inc. 3084 Mercer University Drive, Suite 110 Atlanta, GA 30341 Contact: David English (770) 457-0623 FORT COLLINS LOVELAND WATER DISTRICT/ SOUTH FORT COLLINS SANITATION DISTRICT: Contact: Terry Farrill (970) 226-3104 POUDRE FIRE AUTHORITY Contact: Ron Gonzales (970) 219-5316 XCEL ENERGY - GAS & ELECTRIC Contact: Terry Stencel (970) 225-7848 CENTURY LINK Contact: Bob Rulli (970) 490-7503 COMCAST Contact: Don Kapperman (970) 567-0245 UTILITY PLAN APPROVAL City of Fort Collins, Colorado OWNER: Crowne Partners, Inc. 505 North 20th Street, Suite 1015 Birmingham, AL 35203 Contact: Alan Levow (404) 266-8900 Lewis Shubin (205) 328-3120 TRAFFIC ENGINEER: Delich Associates 2272 Glen Haven Drive Loveland, CO 80538 Contact: Matt Delich (970) 669-2061 GEOTECHNICAL ENGINEER: Terracon, Inc. 1901 Sharp Point Drive, Suite C Fort Collins, CO 80525 Contact: Eric Bernhardt (970) 484-0359 UTILITY PLANS FOR CROWNE ON TIMBERLINE Fort Collins, Colorado MAY 15, 2013 VICINITY MAP ASPEN Project Contacts: Utility Entity Contacts: Refer to the Preliminary Geotechnical Engineering Report, Johnston Annexation, 6111 South Timberline Road, Fort Collins, Colorado, dated December 6, 2012, Terracon Project No. 20125039, by Terracon, Inc., for site excavation and grading, and paving recommendations. A TRACT OF LAND LOCATED IN THE SOUTHEAST QUARTER OF SECTION 7, TOWNSHIP 6 NORTH, RANGE 68 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO C-001 COVER SHEET C-002 GENERAL CONSTRUCTION NOTES AND MASTER LEGEND C-003 DEMOLITION PLAN C-004 HORIZONTAL CONTROL & SIGNAGE & STRIPING PLAN C-005 STREET TYPICAL SECTIONS C-006 EROSION CONTROL PLAN C-007 EROSION CONTROL NOTES AND DETAILS C-008 GRADING PLAN (WEST) C-009 GRADING PLAN (EAST) C-010 DRAINAGE BASIN EXHIBIT C-011 OVERALL UTILITY PLAN C-012 RED WILLOW DRIVE CENTERLINE PLAN & PROFILE C-013 ROSEN DRIVE CENTERLINE PLAN & PROFILE C-014 ROSEN DRIVE CENTERLINE PLAN & PROFILE C-015 TIMBERLINE ROAD FLOWLINE PLAN & PROFILE C-016 TIMBERLINE ROAD FLOWLINE PLAN & PROFILE C-017 SITE & STREET DETAILS C-018 WATER & SANITARY SEWER DETAILS C-019 SANITARY SEWER & STORM SEWER DETAILS C-020 STORM SEWER & DRAINAGE DETAILS PLAT (1-2) (ATTACHED, BY OTHERS: FOR REFERENCE ONLY) DRAWING/ SHEET INDEX SHEET TITLE SHEET NO. CITY OF FORT COLLINS LIGHT AND POWER Contact: Doug Martine (970) 224-6152 CITY OF FORT COLLINS STORMWATER Contact: Glen Schleuter (970) 221-6700 SHEET No: CROWNE ON TIMBERLINE FORT COLLINS, COLORADO PROJECT/ LOCATION: DRAWING: OF 20 CHECKED BY: DESIGNED BY: DRAWN BY: REV. # DESCRIPTION OF REVISION: DATE: REVISED BY: APPROVED BY: 1 2 3 4 5 6 7 PRELIMINARY NOT FOR CONSTRUCTION project no: 501-001 date: 05/15/13 COVER SHEET C-001 J.Gooch J.Gooch D.Wood 1 CIVIL ENGINEER: Aspen Engineering 19 Old Town Square, Suite 238 Fort Collins, CO 80524 Contact: John Gooch (970) 420-5345 All changes, addendums, additions, deletions and modifications to these drawings must be approved, in writing, by the Fort Collins-Loveland Water District and the South Fort Collins Sanitation District. Mr. Terry Farrill, P.E., District Engineer Date Mr. Michael D. DiTullio, Manager Date FORT COLLINS - LOVELAND WATER DISTRICT SOUTH FORT COLLINS SANITATION DISTRICT SITE LOCATION