HomeMy WebLinkAboutCROWNE ON TIMBERLINE - PDP - PDP130009 - PLANS - UTILITY PLANS (28)SHEET No:
CROWNE ON TIMBERLINE
FORT COLLINS, COLORADO
PROJECT/ LOCATION:
DRAWING:
OF 20
CHECKED BY:
DESIGNED BY:
DRAWN BY:
REV. # DESCRIPTION OF REVISION: DATE: REVISED BY: APPROVED BY:
1
2
3
4
5
6
7
PRELIMINARY
NOT FOR CONSTRUCTION
project no: 501-001
date: 05/15/13
WATER AND SANITARY SEWER DETAILS
J.Gooch
J.Gooch
J.Gooch
C-018
18
All changes, addendums, additions, deletions and
modifications to these drawings must be approved,
in writing, by the Fort Collins-Loveland
Water District and the South Fort Collins Sanitation District.
Mr. Terry Farrill, P.E., District Engineer Date
Mr. Michael D. DiTullio, Manager Date
FORT COLLINS - LOVELAND
WATER DISTRICT
SOUTH FORT COLLINS
SANITATION DISTRICT