Loading...
HomeMy WebLinkAboutCROWNE ON TIMBERLINE - PDP - PDP130009 - PLANS - UTILITY PLANS (27)SOFT PAN DETAIL N.T.S. POND BANK/ SOD-GRASS-LINED 12" SECTION OF SAND/TOPSOIL MIX (50 50) NATIVE SOIL NOTE: THE SOFT PANS SHALL BE 2' WIDE x 1' DEEP. SOFT PANS SHALL BE INSTALLED IN-LIEU-OF CONCRETE TRICKLE PANS TO MEET CITY OF FORT COLLINS STORMWATER QUALITY / BMP STANDARDS. PONDING FOR FIRST FLUSH CONDITIONS WILL PROVIDE FOR THE SOFT PANS FILLING UP, PRIOR TO SPILLING DOWNSTREAM IN THE SWALES/ STORM SEWER SYSTEMS. THE SOFT PANS WILL ALLOW FOR POLLUTANTS TO SETTLE OUT OF THE STORM FLOWS, WHILE ALSO ALLOWING INFILTRATION, PRIOR TO FLOWS BEING DIRECTED TO THE OUTLET STRUCTURE IN POND 100. SECTION C-C SECTION A-A SECTION B-B WELL SCREEN FLOW CONTROL PLATE GENERAL NOTES SECTION D-D A A ABBREVIATIONS LEGEND C C A A B B PLAN D D SHEET No: CROWNE ON TIMBERLINE FORT COLLINS, COLORADO PROJECT/ LOCATION: DRAWING: OF 20 CHECKED BY: DESIGNED BY: DRAWN BY: REV. # DESCRIPTION OF REVISION: DATE: REVISED BY: APPROVED BY: 1 2 3 4 5 6 7 PRELIMINARY NOT FOR CONSTRUCTION project no: 501-001 date: 05/15/13 UTILITY PLAN APPROVAL City of Fort Collins, Colorado FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2 BUSINESS DAYS IN ADVANCE CENTER OF COLORADO CALL UTILITY NOTIFICATION MEMBER UTILITIES. STORM SEWER AND DRAINAGE DETAILS C-020 20 SEE CHANNEL LAYOUT ON SHEET 2. 409 8" SECTION A-A INLET WITH DROP BOX~H>5' SECTION A-A REGULAR INLET TYPICAL PLAN VIEW 413 411 412 403 502 502 504 409 L=15' H > 5' D D L=10' 413 403 411 412 410 406 403 401 405 407 9"o.c. 403 503 502 601 2" CLR. 3" CLR. MIN. 0.5% Slope VARIABLE CONSTANT 5'-0" CONSTANT 32" 8" 12" 8" 18"TO STA.PT. L=10' TYPICAL AROUND 2" All 6"o.c x 6"o.c. 16'-8" L=15 H<5' 401 403 409 407 403 405 406 6"o.c x 6"o.c. 11'-8" L=5' L=10'or15'~H<5' L=5'~All H 8" 403 12" 6'-8" 11"o.c. 9"o.c. TYP. 6"o.c. x 6"o.c. 9"o.c. 3"clr. 3"clr. 2"clr. MANHOLE CUT OFF OR BEND BARS TO CLEAR MANHOLE. 3" CLR. 601 401 407 401 403 405 406 403 401 409 601 503 409 STA.PT. 18" TO REQUIRED WHEN L=10' OR MORE. ADDITIONAL MANHOLE RING AND COVER L=10'-0" 11'-4" INLET IN 10' 3 RODS 409 503 8" INLET IN 15' 5 RODS L=15'-0" 16'-4" * CURB AND GUTTER HERE. MEET SHAPE OF NORMAL BARRIER 409 CURB ENDS OF 8 [ BEAM 3" CLR. FACE OF 3", EACH END OF FLOW DIRECTION 30" 30" 30" 30" GUTTER TRANSITION 3' INLET PAY LENGTH 3' IN 5' INLET ONE 1 " DIA. ROD TO 18" 30" 601 GUTTER TRANSITION Face of Curb o.c.8" 36" 8" o.c. 5 " L=5'-0" 6'-4" B B A A PLACE ENTIRE ASSEMBLY BEFORE POURING CURB FACE ASSEMBLY 8" 3" 8" 6" 4" 8" 1 " 4" 1"LEG 3 THD. (TYPE 2-SEC. IIB) CURB FACE FLUSH WITH ( ) 2:1 3"x3"x " PLATE 2'-6"o.c. GALV. STEEL ROD 1 " DIA.. x 24" AND 1 " LOCK NUT 1 " PIPE SPACER 2:1 4:1 18" LONG NO.4 BAR 8 8.5 TRANSITION CURB CURB FACE BARRIER INLET CURB AND GUTTER FOR AS CURB AND GUTTER. MOUNTABLE TRANSITION SHALL BE PAID SHALL BE CONSTRUCTED. GUTTER, 5 FT. TRANSITION MOUNTABLE CURB AND INLET IS USED WITH WHEN A TYPE R CURB FACE MOUNTABLE 5' TRANSITION AT THE SAME END OF THE INLET. AND OUTFLOW PIPE SHALL BE LOCATED NOTE: MANHOLE RING & COVER, STATION POINT TYPICAL END VIEW SECTION B-B INLET. ACCEPTANCE OF THE CONCRETE BEFORE SHALL BE PLUGGED WITH ROAD BASE. THE HOLE THREE INCHES BELOW ELEVATION OR A MINIMUM BE PLACED AT SUBGRADE HOLE FOR DRAINAGE SHALL A 2" DIAMETER TEMPORARY 8" WING FL. 12" o.c. 408 403 401 9" o.c. 11" o.c. 11" o.c. 9" o.c. 11"o.c. 9" o.c. 8" TYPICAL WALL 402 407 5 "o.c. 1 " R 2" R SLOPE=1"/FT. “ - FOR A 1'-0" PAN SLOPE 2" PER FT. 4" 6" 2'-0" 4'-4" 1 " SLOPE 2% TO GUTTER ,8"o.c. 501 409 5 "o.c. 2"clr. 503 601 H > 3'-- 6" REQ'D.FOR ALL INLET STEPS 16" MAX. 401 407 2" ALL AROUND 6" o.c. 6" o.c. 406 405 3" CLR. 3'-4" 11"o.c. SECTIONS C-C & D-D (DOTTED BARS ARE IN SECTION D-D) 412 403 501 413 3-411 413 502 409 1 2 3" CLR. 10" EMBEDMENT C C 403 CONCRETE. STATION POINT 2 1 4 1 1 2 4 1 ( 1 ) 4 4 1 1 4 2 1 4 1 8 3 1 4 C C D D 3" CLR. 1 2 FOR LENGTH GREATER THEN 5 FT. PROVIDE ACCESS AT BOTH ENDS. 1 2 4 1 601 601 409 CUT REINFORCEMENT BAR ACCORDINGLY. 601 601 601 403 601 407 405 406 409 403 401 H<5' * * Colorado Department of Transportation Standard Plan Revised Project Development Branch 4201 East Arkansas Avenue Phone: (303) 757-9083 Denver, Colorado 80222 Path: www.dot.state.co.us/DevelopProjects/DesignSupport/MStandards/ Drawing File Name: 6040120102.dwg Computer File Information FAX: (303) 757-9820 SD Acad Version: R14 Scale: NA Units: English Date: STANDARD PLAN NO. Issued By: Project Development Branch October 1, 2000 Sheet No. 1 of 2 CURB INLET TYPE R Comments: M-604-12 POND 100 OUTLET STRUCTURE 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30cm) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30cm) ACROSS THE WIDTH OF THE BLANKET. 3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM, STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. PLACE COSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A 4"-6" (10cm-15cm) OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10cm) APART AND 4" (10cm) ON CENTER TO SECURE BLANKETS. 5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. ADJACENT BALNKETS MUST BE OVERLAPPED APPROXIMATELY 2"-5" (5cm-12.5cm)(DEPENDING ON BLANKET SIZE) AND STAPLED. 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30' TO 40' (9M-12M) INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10cm) APART AND 4" (10cm) ON CENTER OVER ENTIRE WIFTH OF THE CHANNEL. 8. THE TERMINAL END OF BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. CRITICAL POINTS A) OVERLAPS AND SEAMS B) PROJECTED WATER LINE C) CHANNEL BOTTOM/SIDE SLOPE VERTICES NOTE: * HORIZONTAL STAPLE SPACING SHOULD BE ALTERED IF NECESSARY TO ALLOW STAPLES TO SECURE THE CRITICAL POINTS ALONG THE CHANNEL SURFACE. ** IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15cm) MAY BE NECESSARY TO PROPERLY ANCHOR THE BLANKETS. B C A 4 6 7 5 2 8 1 3 J.Gooch J.Gooch J.Gooch