May 24, 2013
John Beggs
Russell + Mills Studios
141 S. College Ave., Suite 104
Fort Collins, CO 80525
Comment Summary:
Department: Current Planning
Contact: Courtney Levingston, 970-416-2283, clevingston@fcgov.com
Topic: General
05/22/2013: Please delineate where vehicles will be displayed and customer parking spaces.
Comment Number: 1 Comment Originated: 05/22/2013
05/24/2013: The required sidewalks will need to be formally depicted on the site plans and
provided via a second round of review. Staff is willing to meet on site to discuss the existing
conditions and proposed configurations, however we will need to see this on the plans before
we move forward to the Planning and Zoning Board hearing.
Comment Number: 2 Comment Originated: 05/24/2013
05/24/2013: Since this project is a combined PDP and Final Plan, all comments must be
resolved through formal rounds of review prior to proceeding to hearing.
Comment Number: 3 Comment Originated: 05/24/2013
Topic: Lighting Plan
05/21/2013: Staff is concerned with the sufficiency of the plans demonstrating that Section
3.2.4, Site Lighting, will be met with the proposal. The code requires the site to be brought up
to current lighting standards and there are questions if the existing canopy lighting meets
today's lighting standards.
Comment Number: 1 Comment Originated: 05/21/2013
Topic: Site Plan
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Courtney Levingston, at
970-416-2283 or clevingston@fcgov.com.
RE: Magnum Motors of Loveland (5900 S. College Ave.), FDP130016, Round Number 1
Page 1 of 6
Department: Current Planning
Contact: Courtney Levingston, 970-416-2283, clevingston@fcgov.com
Topic: Site Plan
05/22/2013: The site plan is difficult to read with the contours and engineering information
grayed on the plans. Please turn these layers off to clean up the site plan.
Comment Number: 1 Comment Originated: 05/22/2013
05/22/2013: The location of the bike parking is not optimal as it is in a low visibility back of the
building area and not near an main entrance. Safety could be a concern in this location.
Comment Number: 2 Comment Originated: 05/22/2013
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: General
05/22/2013: The construction of sidewalk along Saturn Drive abutting the property and tying into
the sidewalk network directly east should be provided with the proposal. The sidewalk would
ideally be a minimum 5 feet in width, detached a minimum 6 feet from the curb. The existing
trees along the Saturn Drive frontage may result in the need to explore other sidewalk
configurations along all or a portion of the property. ADA compliance for grade would need to
be ensured and additional right-of-way or access easement may be needed if the sidewalk
placement falls outside of existing right-of-way.
Comment Number: 1 Comment Originated: 05/22/2013
05/22/2013: Access ramps across the driveways for the sidewalk installation would be needed
and the sidewalk would need to carry through the driveways in accordance with LCUASS detail
707. The sidewalk would tie into the depressed curb with an access ramp at the Saturn Drive /
College Avenue intersection. The driveway approaches may need to be rebuilt in accordance
with LCUASS detail 707 to ensure ADA compliance across the driveways.
Comment Number: 2 Comment Originated: 05/22/2013
Page 2 of 6
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: General
05/22/2013: The comment was made at the conceptual that the property would need to be
obligated for the local street portion of College Avenue in the development agreement due to
the frontage of College Avenue not being in conformance with the long-term access control
plan for south College Avenue. Since the conceptual, the City has modified its approach to
addressing satisfying the local street obligation. The outstanding obligation for the local street
portion of College Avenue is no longer in this case viewed as to include pavement, curb and
gutter; the outstanding portion of local street would be for sidewalk only, reducing the amount of
local street obligation attributable to the property owner. That said, rather than looking for the
satisfaction of the local street obligation for sidewalk to be tied with future
development/redevelopment, the proposal would need to either build the sidewalk along
College Avenue, or provide for the local street portion of sidewalk at this time. If providing
funds in lieu of construction, the City has determined that for 2013, the established local street
portion of sidewalk is $35.00 per foot, which equates to $9,435.30 based on 269.58 feet of
College frontage. Under the scenario of payment in lieu of construction, payment would need to
be provided prior to final plan approval, or a development agreement would be needed tying
payment of this prior to issuance of a building permit. Otherwise, the sidewalk would need to
be designed and shown on the drawings (7 feet in width, detached) and would need to be
completed in conjunction with the required sidewalk along Saturn Drive, prior to issuance of a
certificate of occupancy.
Comment Number: 3 Comment Originated: 05/22/2013
05/22/2013: Information on the plans including grading and utility information isn't legible with
the lineweight used and needs to be updated for review.
Comment Number: 4 Comment Originated: 05/22/2013
05/22/2013: A 15 foot utility easement behind the College Avenue right-of-way along with a 9
foot utility easement behind Saturn Drive would need to be dedicated unless agreed to
otherwise by the utility providers.
Comment Number: 5 Comment Originated: 05/22/2013
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com
Topic: General
05/20/2013: No comments.
Comment Number: 1 Comment Originated: 05/20/2013
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
05/21/2013: All existing trees are inventoried as to species, size and condition and shown to
be preserved. No tree removal will occur on this project.
Comment Number: 1 Comment Originated: 05/21/2013
Page 3 of 6
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
05/21/2013: New trees are shown on the east side of the project where there are existing trees.
These proposed trees include 4 Southwest White Pine and 3 Honeylocust. It appears that the
existing trees in this area are of a quantity and size that they would limit the successful planting
of the 7 proposed trees for this area. Please clarify that there is adequate space to add these 7
trees where existing trees are shown.
Comment Number: 2 Comment Originated: 05/21/2013
05/21/2013: Show the actual locations of all existing trees on Sheet LP102 so they can be
displayed as part of the landscape design.
Comment Number: 3 Comment Originated: 05/21/2013
05/21/2013: Evaluate adding two canopy shade trees to function as street trees at the NW part
of the site in the landscape area along the front of the project just to the south of Saturn.
Comment Number: 4 Comment Originated: 05/21/2013
05/21/2013: Where is the location of the bioswale? Will it impact any of the existing trees.
Comment Number: 5 Comment Originated: 05/21/2013
05/21/2013: Please identify with a landscape note the type of mulch that will be used on the
project.
Comment Number: 6 Comment Originated: 05/21/2013
Department: Light And Power
Contact: Doug Martine, 970-224-6152, dmartine@fcgov.com
Topic: General
05/09/2013: If any changes to the electric system is required, please coordinate with Light &
Power Engineering at (970)221-6700.
Comment Number: 1 Comment Originated: 05/09/2013
Department: Outside Agencies
Contact: Bob Rulli, ,
Topic: General
Page 4 of 6
Department: Outside Agencies
Contact: Bob Rulli, ,
Topic: General
05/21/2013: The existing building at 5900 S. College Ave. has a 25 pair entrance cable (in
property owner 2" entrance conduit) and an inside terminal. It is fed from cable to the northeast
on Saturn Drive. The inside terminal and cable does not appear to be impacted by the plan and
should be sufficient for any telecom needs for the project. However, any changes (relocations,
modifications, ect.) to the existing cable and terminal are billable in advance to Magnum
Motors. The CTL process is time consuming and must be coordinated in advance with
Engineering and billing, prior to working beign done. The General Contractor and oener need
to contact CTL engineering in advance, for site meet, proposal and billing to be sent to Denver
for processing before a construction job will be released.
The feed pedestal on Saturn Dr. also does not appear to conflict with any planned uses,
however if landscping or street modifications require it to be relocated, the above billing
process is also in affect.
-Bob Rulli, 970-490-7503
Comment Number: 1 Comment Originated: 05/21/2013
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
05/22/2013: Please provide as-built survey information for the existing detention pond and
design the water quality extended detention using actual pond volumes.
Comment Number: 2 Comment Originated: 05/22/2013
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
05/16/2013: The photos on sheet LS102 are with the wrong titles. Please swap the titles or
photos. For example, the north elevation photo is titled as the south elevation. See redlines.
Comment Number: 1 Comment Originated: 05/16/2013
Topic: Landscape Plans
05/16/2013: Please rotate all text so that it is plan readable. See redlines.
Comment Number: 2 Comment Originated: 05/16/2013
05/16/2013: There are line over text issues on sheets LP101 & LP102. See redlines.
Comment Number: 3 Comment Originated: 05/16/2013
05/16/2013: There are text over text issues on sheet LP101. See redlines.
Comment Number: 4 Comment Originated: 05/16/2013
05/16/2013: Please darken up all of the lighter background text & linework on all sheets.
Comment Number: 5 Comment Originated: 05/16/2013
Page 5 of 6
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Landscape Plans
05/16/2013: Please show the complete Subdivision Plat name for Lot 3 to the south.
Comment Number: 6 Comment Originated: 05/16/2013
Topic: Site Plan
05/16/2013: Please rotate all text so that it is plan readable. See redlines.
Comment Number: 7 Comment Originated: 05/16/2013
05/16/2013: Please add the legal description of the property that this project is located on to
sheet LS001.
Comment Number: 8 Comment Originated: 05/16/2013
05/16/2013: There are line over text issues on sheets LS101 & LP102. See redlines.
Comment Number: 10 Comment Originated: 05/16/2013
05/16/2013: Please darken up all of the lighter background text & linework on all sheets.
Comment Number: 11 Comment Originated: 05/16/2013
05/16/2013: Please show the complete Subdivision Plat name for Lot 2 to the east and Lot 3 to
the south.
Comment Number: 12 Comment Originated: 05/16/2013
Department: Traffic Operation
Contact: Ward Stanford, 970-221-6820, wstanford@fcgov.com
Topic: General
05/21/2013: TIS was waived for the project as he previous use generated as much or more
traffic than the new proposed use.
Comment Number: 1 Comment Originated: 05/21/2013
05/21/2013: No additional comments.
Comment Number: 2 Comment Originated: 05/21/2013
Page 6 of 6