HomeMy WebLinkAboutFEEDER SUPPLY - PDP - PDP130012 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTPRELIMINARY DRAINAGE AND EROSION
CONTROL REPORT
FEEDER SUPPLY PROJECT
PRELIMINARY DRAINAGE AND EROSION
CONTROL REPORT
FEEDER SUPPLY PROJECT
Prepared for:
Jon Prouty
Lagunitas
Fort Collins, CO 80216
Prepared by:
North Star Design
700 Automation Drive, Unit I
Windsor, Colorado 80550
(970) 686-6939
April 9, 2013
Job Number 173-10
April 9, 2013
Glen Schlueter
City of Fort Collins Stormwater
700 Wood Street
Fort Collins, CO 80522
RE: Preliminary Drainage and Erosion Control Report for Feeder Supply Project
Dear Glen,
I am pleased to submit for your review and approval, this Preliminary Drainage & Erosion
Control Report for the Feeder Supply project. I certify that this report for the drainage design of
the Feeder supply was prepared in accordance with the criteria in the City of Fort Collins Storm
Drainage Manual.
I appreciate your time and consideration in reviewing this submittal. Please call if you have any
questions.
Prepared by:
Patricia Kroetch P.E.
Project Manager
700 Automation Drive, Unit I
Windsor, CO 80550
Phone: 970-686-6939
Fax: 970-686-1188
iii
TABLE OF CONTENTS
TABLE OF CONTENTS ............................................................................................................... iii
1. GENERAL LOCATION AND DESCRIPTION
1.1 Location ...................................................................................................................1
1.2 Description of Property ............................................................................................1
1.3 Major Basin Description ..........................................................................................2
1.4 Sub Basin Description .............................................................................................2
2. DRAINAGE DESIGN CRITERIA
2.1 Regulations ..............................................................................................................2
2.2 Development Criteria Reference and Constraints ...................................................2
2.3 Hydrologic Criteria ..................................................................................................3
2.4 Hydraulic Criteria ....................................................................................................3
3. DRAINAGE FACILITY DESIGN
3.1 General Concept ......................................................................................................3
3.2 Specific Flow Routing .............................................................................................3
3.3 Drainage Summary ..................................................................................................4
4. EROSION CONTROL
4.1 General Concept .....................................................................................................4
4.2 Specific Details ........................................................................................................4
5. CONCLUSIONS
6.1 Compliance with Standards ....................................................................................4
6.2 Drainage Concept ....................................................................................................4
6. REFERENCES ....................................................................................................................5
APPENDICES
A Vicinity Map
B Hydrologic Computations
1
1. GENERAL LOCATION AND DESCRIPTION
1.1. Location
The Feeder Supply redevelopment project, hereafter referred to as the Feeder Supply, is
located at 359 Linden. The proposed project is located on a portion of Blocks 6 & 7, City
of Fort Collins Old Town in the Northeast Quarter of Section 12, Township 7 North,
Range 69 West of the Sixth Principal Meridian, in the City of Fort Collins, Larimer
County, Colorado. See the location map in Appendix A.
This project is bounded on the northeast by Willow Street, on the southeast by Linden
Street, on the northwest by Schrader Oil Company, and on the southwest by existing
office and commercial development.
1.2. Description of Property
The project consists of approximately 1.4 acres of land. There is currently one original
historic building on site that has several additions which were added after the original
building and gravel drives and parking. There is no existing vegetation on site. The
original historic building will be preserved and the additions will be removed with this
project. The original building will be expanded and an additional residential and retail
building with parking on the main floor will be located northwest of the existing structure
that will remain. Willow Street will be widened with this project and internal drives and
parking will be paved with asphalt.
All elevations given in this report and in the construction plans are based on the 1929
NGVD unadjusted datum. See the grading sheet for specific elevations on the site and
elevation of the building at each entry point.
Stormwater from the Cache La Poudre Drainage Basin is ultimately routed to the Poudre
River in the existing streets and existing storm pipes in historic flow routes. Runoff from
this site will flow to a storm pipe that will be relocated with this project. This storm
system will convey the runoff to an existing inlet at the intersection of Willow and
Linden. From this point the runoff will be routed through a Baysaver water quality
structure and into a regional detention facility. Because of this, no on site detention is
being provided.
2
Currently water quality and detention measures have not been provided for the existing
development. With this project, it is proposed to construct approximately 22,000 sq.ft of
additional roof area, 16,600 sq. ft. of additional asphalt pavement and no additional
concrete walk. Since there additional impervious area being constructed, water quality
and detention would normally be required for the new impervious area. With this project
the City will allow the runoff from the site to enter the existing storm system without
detention because detention for this area is provided in a regional facility down stream.
Even though the runoff from the site is directed through a Bay saver water quality
structure, additional water quality enhancement is proposed for site in the form of water
quality enhancement (L.I.D.) swales.
1.3. Major Basin Description
This site is located in the Cache La Poudre Drainage Basin. The site is not located within
the FEMA designated 100 year floodplain or the City designated flood plain.
1.4. Sub-basin Description
The majority of the site will be collected in an onsite L.I.D. and storm system and
conveyed to the existing inlet located at the intersection of Willow and Linden. A small
portion of the entry drives will directly enter the adjacent streets and flow in the streets to
the same storm system. See Section 4 of this report for specific details.
2. DRAINAGE DESIGN CRITERIA
2.1. Regulations
Drainage for this site has been designed to meet or exceed the “City of Fort Collins
Stormwater Criteria Manual” specifications, the City of Fort Collins Cache la Poudre
Basin Master Plan and the update to Chapter 26 of the City Code. Where applicable, the
criteria established in the “Urban Storm Drainage Criteria Manual” (UDFCD), 2001 has
been used.
2.2. Development Criteria Reference and Constraints
Stormwater runoff from this site has been routed to conform to the requirements of the
City Stormwater Department. Detention would normally be required for this site but
because the runoff will enter the storm system and be conveyed to a regional facility,
3
detention will not be provided.
Water quality facilities are required for the improvements and are being provided by an
existing off site Bay Saver water quality structure and proposed water quality swales on
the site.
2.3. Hydrologic Criteria
Runoff computations were prepared for the 2 year and 10 year minor and 100 year major
storm frequency utilizing the Rational Method. All hydrologic calculations associated
with the basins are included in Appendix B of this report.
2.4. Hydraulic Criteria
Necessary hydraulic calculations will be provided with the final drainage report for this
site and will be prepared in accordance with the City of Fort Collins Drainage Criteria
and the Urban Area Drainage Criteria Manual.
3. DRAINAGE FACILITY DESIGN
3.1. General Concept
All of the runoff from this site historically sheet flows to the adjacent streets and is
intercepted by the existing inlets located in Willow and Linden Streets. With the
construction of these proposed improvements, onsite stormwater will be collected in an
onsite storm and L.I. D. system and conveyed to the existing storm system in Willow
Street.
3.2. Specific Flow Routing
A summary of the drainage patterns within each basin is provided in the following
paragraphs.
Basin 1 encompasses the entire site. This basin includes a majority of the asphalt drives
on site and all of the buildings (existing and proposed) on site. Improvements proposed
in the right of way for Willow or existing improvements along Linden are not included in
this basin. Runoff from this basin will sheet flow to a proposed 4’ concrete pan on site
and into proposed L.I.D. swales. Roof runoff will be collected in an onsite storm system
and piped to the relocated storm system in Willow. Water quality is provided for this
4
basin by the L.I.D. swales and a downstream Bay Saver structure.
3.3. Drainage Summary
Drainage for this site was designed to conform to the City of Fort Collins stormwater and
water quality requirements. Water quality is provided for a majority of the site utilizing
water quality swales. Water quality for the site is also provided by routing runoff
through a Bay Saver sediment trap downstream.
4. EROSION CONTROL
4.1. General Concept
This site lies within the Moderate Rainfall and Wind Erodibility Zone per the City of Fort
Collins. Potential also exists for tracking of mud onto existing streets which could then
wash into existing storm systems. See drainage and erosion control plan for proposed
measures to control the movement of sediment off site to the public streets and existing
storm sewer system.
4.2. Specific Details
Specific details regarding erosion control will be provided with the final drainage and
erosion control report for this site.
5. CONCLUSIONS
5.1. Compliance with Standards
All computations that have been completed within this report will be in compliance with
the City of Fort Collins Erosion Control Reference Manual for Construction Sites and the
City of Fort Collins Stormwater Criteria Manual.
5.2. Drainage Concept
The proposed drainage concepts presented in this report, in the final drainage report and
on the construction plans, will adequately provide for stormwater quality treatment for
the proposed improvements. Conveyance elements have been designed to convey
required flows to the proposed water quality swales and the existing regional detention
facility and ultimately to the Cache la Poudre River.
5
If, at the time of construction, groundwater is encountered, a Colorado Department of
Health Construction Dewatering Permit will be required.
6
6. REFERENCES
1. City of Fort Collins, “Storm Drainage Criteria Manual”, (SDCM), dated March
1999.
2. Urban Drainage and Flood Control District, “Urban Storm Drainage Criteria
Manual”, Volumes 1 and 2, dated June 2001, and Volume 3 dated September
2001.
A
APPENDIX A
VICINITY MAP
B
APPENDIX B
HYDROLOGIC COMPUTATIONS
North Star Design, Inc.
700 Automation Drive, Unit I
Windsor, CO 80550
LOCATION: Feeder Supply
PROJECT NO: 173-09
COMPUTATIONS BY: PPK
DATE: 4/9/2013
Recommended % Impervious from Urban Storm Drainage Criteria Manual
%
Impervious
Roofs: 90%
Streets and Parking (Asphalt) 100%
Concrete Drives and Walks 90%
Packed Gravel: 40%
Landscaped Areas (Clayey soil, 0-1% slopes): 0%
SUBBASIN TOTAL TOTAL ROOF ASPHALT CONCRETE GRAVEL LANDSCAPE % RUNOFF RUNOFF RUNOFF RUNOFF
ID AREA AREA AREA AREA AREA AREA AREA Impervious COEFF. COEFF. COEFF. COEFF.
(ac.) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (sq.ft) C2 C5 C10 C100
historic basin 1.14 49,853 5,233 0 1,760 18673 24,187 28% 0.21 0.29 0.37 0.56
Basin 1 1.14 49,853 27,575 16,626 1,536 0 4,116 86% 0.67 0.69 0.72 0.79
RUNOFF COEFFICIENTS & % IMPERVIOUS
Flow.xls Cval
North Star Design, Inc.
700 Automation Drive, Unit I
Windsor, CO 80550
LOCATION: Feeder Supply
PROJECT NO: 173-09
COMPUTATIONS BY: PPK
DATE: 4/9/2013
SUB-BASIN DATA INITIAL / OVERLAND TIME TRAVEL TIME / GUTTER OR CHANNEL FLOW tc CHECK FINAL REMARKS
(ti)(tt) (URBANIZED BASIN) tc
DESIGN SUBBASIN Area C5 Length Slope ti Length Slope Chan. Cv Vel. tt tc = Total L tc=(l/180)+10
POINT ID (ac) (ft) (ft/ft) (min) (ft) (ft/ft) Type (ft/s) (min) ti + tt (ft) (min) (min)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
historic basin historic basin 1.14 0.29 35 0.010 8.7 305 0.005 D 10 0.7 7.2 15.9 340 11.9 11.9
Basin 1 Basin 1 1.14 0.69 26 0.030 2.6 205 0.005 F 20 1.4 2.4 5.1 231 11.3 5.1
EQUATIONS: Channel Type Cv
tc = t
i + tt
A 2.5
B 5.0
ti = [0.395 (1.1 - C
5 ) L
0.5
] / S
1/3
C 7.0
D 10.0
tt = L/V V = C
v*S
0.5
E 15.0
F 20.0
final tc = minimum of t
i + tt
and urbanized basin check
minimum tc = 5 minutes
TIME OF CONCENTRATION
Paved
Grassed Waterway
Bare Ground
Short Pasture/ Lawn
Tillage / Field
Heavy Meadow
Flow.xls TOC5
North Star Design, Inc.
700 Automation Drive, Unit I
Windsor, CO 80550
LOCATION: Feeder Supply
PROJECT NO: 173-09
COMPUTATIONS BY: PPK
DATE: 4/9/2013
DIRECT RUNOFF TOTAL Inlet Capacity REMARKS
DESIGN SUBBASIN A C2 tc iQ2 Q2 Total
POINT ID
(ac) (min) (in/hr) (cfs) (cfs) (cfs)
historic basin historic basin 1.14 0.21 11.9 2.08 0.5 0.5
Basin 1 Basin 1 1.14 0.67 5.1 2.84 2.2 2.2
Q = C i A
Q = peak discharge (cfs)
C = runoff coefficient
i = rainfall intensity (in/hr) from IDF curve
A = drainage area (acres)
RATIONAL METHOD PEAK RUNOFF
(2-YEAR)
Flow.xls Q2
North Star Design, Inc.
700 Automation Drive, Unit I
Windsor, CO 80550
LOCATION: Feeder Supply
PROJECT NO: 173-09
COMPUTATIONS BY: PPK
DATE: 4/9/2013
DIRECT RUNOFF TOTAL Inlet Capacity REMARKS
DESIGN SUBBASIN A C10 tc iQ10 Q10 Total
POINT ID
(ac) (min) (in/hr) (cfs) (cfs) (cfs)
historic basin historic basin 1.14 0.37 11.9 3.56 1.5 1.5
Basin 1 Basin 1 1.14 0.72 5.1 4.85 4.0 4.0
Q = C i A
Q = peak discharge (cfs)
C = runoff coefficient
i = rainfall intensity (in/hr) from IDF curve
A = drainage area (acres)
RATIONAL METHOD PEAK RUNOFF
(10-YEAR)
Flow.xls Q10
North Star Design, Inc.
700 Automation Drive, Unit I
Windsor, CO 80550
LOCATION: Feeder Supply
PROJECT NO: 173-09
COMPUTATIONS BY: PPK
DATE: 4/9/2013
DIRECT RUNOFF TOTAL Inlet Capacity REMARKS
DESIGN SUBBASIN A C100 t
c iQ100
Q100 Total
POINT ID
(ac) (min) (in/hr) (cfs) (cfs) (cfs)
historic basin historic basin 1.14 0.56 11.9 7.26 4.7 4.7
Basin 1 Basin 1 1.14 0.79 5.1 9.91 9.0 9.0 to LID swales
Q = C i A
Q = peak discharge (cfs)
C = runoff coefficient
i = rainfall intensity (in/hr) from IDF curve
A = drainage area (acres)
RATIONAL METHOD PEAK RUNOFF
(100-YEAR)
Flow.xls Q100