Loading...
HomeMy WebLinkAboutPATEROS CREEK - PDP - PDP130011 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTMarch 13, 2013 PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT PATEROS CREEK Fort Collins, Colorado Prepared for: Bucking Horse, LLC 3702 Manhattan Ave., Suite 201 Fort Collins, CO 80526 Prepared by: 200 South College Avenue, Suite 10 Fort Collins, Colorado 80524 Phone: 970.221.4158 Fax: 970.221.4159 www.northernengineering.com Project Number: 687-001  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. March 13, 2013 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Preliminary Drainage and Erosion Control Report for PATEROS CREEK Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage and Erosion Control Report for your review. This report accompanies the Project Development Plan submittal for the proposed Pateros Creek development. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Aaron Cvar, PE Project Engineer Pateros Creek Preliminary Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION .................................................................... 1 A. Location ............................................................................................................................................. 1 B. Description of Property ..................................................................................................................... 2 C. Floodplain ......................................................................................................................................... 3 II. DRAINAGE BASINS AND SUB-BASINS ........................................................................ 4 A. Major Basin Description .................................................................................................................... 4 III. DRAINAGE DESIGN CRITERIA .................................................................................... 5 A. Regulations ........................................................................................................................................ 5 B. Four Step Process .............................................................................................................................. 5 C. Development Criteria Reference and Constraints ............................................................................ 6 D. Hydrological Criteria ......................................................................................................................... 6 E. Hydraulic Criteria .............................................................................................................................. 6 F. Floodplain Regulations Compliance .................................................................................................. 7 G. Modifications of Criteria ................................................................................................................... 7 IV. DRAINAGE FACILITY DESIGN ..................................................................................... 7 A. General Concept ............................................................................................................................... 7 B. Specific Details .................................................................................................................................. 8 V. CONCLUSIONS .......................................................................................................... 9 A. Compliance with Standards .............................................................................................................. 9 B. Drainage Concept .............................................................................................................................. 9 References ......................................................................................................................... 10 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations B.1 – Storm Sewers (reserved for future use) B.2 – Inlets (reserved for future use) APPENDIX C – Detention and Water Quality Design Computations APPENDIX D – Erosion Control Report APPENDIX E – Supplemental Information: FEMA FIRMette, LOMR-F Pateros Creek Preliminary Drainage Report LIST OF TABLES AND FIGURES: Figure 1 – Aerial Photograph .................................................................................................. 2 Figure 2– Proposed Site Plan .................................................................................................. 3 Figure 3 – Existing Floodplains ............................................................................................... 4 Table 1 – Water Quality Pond Summary .................................................................................. 9 MAP POCKET: Historic Drainage Exhibit Proposed Drainage Exhibit Pateros Creek Preliminary Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map 2. The project site is located in the southwest quarter of Section 2, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. The project site is located on the south side of Wood Street, and just north City of Fort Collins Utilities Building. The Cache La Poudre River runs just to the north of the project site. 4. The project site lies within Old Town Master Basin (City of Fort Collins, July 2003). The site will outfall to the Cache La Poudre River. Due to the project site proximity to the river, no detention is required for onsite runoff. 5. Residential development exists to the south and west of the site. Pateros Creek Preliminary Drainage Report 2 B. Description of Property 1. The development area is roughly 9.3 net acres. Figure 1 – Aerial Photograph 2. The subject property now consists of vacant ground. In 2012 the site was cleared of a mobile home park that had existed for several decades on the property. The ground cover generally consists of native seeding. Existing ground slopes are mild (i.e., 1 - 3±%) through the interior of the property. General topography slopes from southwest to the northeast towards the Cache La Poudre River. 3. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey website: http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx, the site consists of Paoli fine sandy loam and Table Mountain Loam, which fall into Hydrologic Soil Group B; and Table Mountain Loam. More site-specific exploration found varying materials including sandy clay with occasional sand layers and sandy gravel. See the Geotechnical Engineering Report by Earth Engineering Consultants, Inc. for additional information. 4. The proposed project will create a residential development. Associated roadways, water and sewer lines will be constructed with the development. A water quality forebay will be constructed near the southeast corner of the site. The existing wet pond at the southeast corner of the site will be utilized for stacked detention. Pateros Creek Preliminary Drainage Report 3 Figure 2– Proposed Site Plan 5. There are no irrigation ditches or related facilities in the vicinity of the project site. 6. The proposed land use is residential. C. Floodplain 1. A portion of the subject property is encroached by the FEMA 100-year floodplain (Cache La Poudre River). Pateros Creek Preliminary Drainage Report 4 Figure 3 – Existing Floodplains 2. No offsite improvements are proposed with the project. 3. FEMA FIRM Panel Number 977 for Larimer County, dated June 17, 2008 is referenced in this study. A FIRMette of the area is provided in the appendix. A LOMR-F was completed March 22, 2012 (FEMA case no. 12-08-0323A). A copy of this LOMR-F is provided in the Appendix. 4. Base (100-year) flood elevations range from roughly 4973 at the east end of the site to 4977 at the west end of the site. These elevations are referenced to the City of Fort Collins NGVD 29. 5. The proposed structures are located outside of the 100-year floodplain; however some of the proposed residential structures lie within the 500-year floodplain. 6. The Cache La Poudre half-foot floodway is located outside of the development area. No fill is proposed within the floodway 7. Stabilization measures are currently being proposed along the bend in the Cache La Poudre River northwest of the project site. All stabilization design work is being conducted by the City of Fort Collins. 8. It is noted that the vertical datum utilized for site survey work is the City of Fort Collins Benchmark #10-00 (Elevation=4968.43, Ft. Collins Unadjusted NGVD 29). II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. The project The project site lies within Old Town Master Basin (City of Fort Collins, July 2003). The site will outfall to the Cache La Poudre River. Due to the project site proximity to the river, no detention is required for onsite runoff. Pateros Creek Preliminary Drainage Report 5 B. Sub-Basin Description 2. The subject property historically drains overland towards the Cache La Poudre River, which runs north of the site. A more detailed description of the project drainage patterns follows in Section IV.A.4., below. 3. Flows from the pond just to the south of the site historically drain through the project site. A 12-inch diameter pipe conveys flow from the offsite pond into the existing wet pond at the southeast corner of the site. A 24-inch pipe drains the existing wet pond into an offsite swale that runs northeast into the Cache La Poudre River. No modifications are proposed to the 24-inch outlet pipe. Therefore, flows will continue to pass through the existing onsite wet pond with the proposed development. III. DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with the proposed project. B. Four Step Process The overall stormwater management strategy employed with the proposed project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low Impact Development (LID) strategies including: Conserving existing amenities in the site including the existing vegetated areas. Providing vegetated open areas throughout the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Routing flows, to the extent feasible, through vegetated swales to increase time of concentration, promote infiltration and provide initial water quality. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, urban development of this intensity will still generate stormwater runoff that will require additional BMPs and water quality. The majority of stormwater runoff from the site will ultimately be routed to the southeast corner of the site, where it will be intercepted and treated in the main water quality forebay prior to entering the existing wet pond and then exiting the site. Step 3 – Stabilize Drainageways There are no major drainageways within the subject property. While this step may not seem applicable to proposed development, the project indirectly helps achieve stabilized drainageways nonetheless. By providing water quality where none previously existed, sediment with erosion potential is removed from the downstream drainageway systems and Cache La Poudre River. Furthermore, this project will pay one-time stormwater Pateros Creek Preliminary Drainage Report 6 development fees, as well as ongoing monthly stormwater utility fees, both of which help achieve City-wide drainageway stability. Step 4 – Implement Site Specific and Other Source Control BMPs. The proposed project will improve upon site specific source controls compared to historic conditions: Trash, waste products, etc. that were previously left exposed with the historic trailer park will no longer be allowed to exposure to runoff and transport to the adjacent Cache La Poudre River. The proposed development will eliminate these sources of potential pollution. C. Development Criteria Reference and Constraints The subject property is surrounded by currently developed properties. Thus, several constraints have been identified during the course of this analysis that will impact the proposed drainage system including: Existing elevations along the west and south property lines will be maintained. As previously mentioned, overall drainage patterns of the existing site will be maintained. Elevations of existing downstream facilities that the subject property will release to will be maintained. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the proposed development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. Three separate design storms have been utilized to address distinct drainage scenarios. A fourth design storm has also been computed for comparison purposes. The first design storm considered is the 80th percentile rain event, which has been employed to design the project’s water quality features. The second event analyzed is the “Minor,” or “Initial” Storm, which has a 2-year recurrence interval. The third event considered is the “Major Storm,” which has a 100-year recurrence interval. The fourth storm computed, for comparison purposes only, is the 10-year event. 4. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, the subject property maintains historic drainage patterns. 2. All drainage facilities proposed with the project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual. 3. As stated above, portions of the subject property is located in a FEMA regulatory floodplain. Pateros Creek Preliminary Drainage Report 7 4. The proposed project does not propose to modify any natural drainageways. F. Floodplain Regulations Compliance 1. As previously mentioned, all structures are located outside of the Cache La Poudre 100-year floodplain, and thus the structures are not subject to any floodplain regulations. However, extra care has been taken to ensure that neither existing nor proposed structures will suffer damage during the 100-year storm as a result of the proposed development. 2. Stabilization measures are currently being proposed along the bend in the Cache La Poudre River northwest of the project site. All stabilization design work is being conducted by the City of Fort Collins. 3. Critical facilities are prohibited within the 100-year and 500-year flood fringe. 4. A floodplain use permit must be obtained prior to any work to be done within the floodplain prior to construction. A no-rise certification must be completed for any work to be done within the floodway prior to construction. 5. No floatable items are proposed within the floodway. Any floatable items within the floodway must be anchored to prevent flotation. G. Modifications of Criteria 1. The proposed development is not requesting any modifications to criteria at this time. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of the project drainage design are to maintain existing drainage patterns, and to ensure no adverse impacts to any adjacent properties. 2. The existing pond to the south of the site historically drains through the project site. Off-site drainage flows and patterns will be maintained and accounted for with the proposed development. 3. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 4. The drainage patterns anticipated for proposed drainage basins are described below. Basin 1 Basin 1 consists of backs of proposed residential lots. This basin will be allowed to sheet flow across a large natural vegetated buffer prior to entry into the Cache La Poudre River, just to the north of this basin. Due to reduction in area draining directly to the Cache La Poudre River, Historic 2-, 10-, and 100-year flows will be reduced. 2-yr Flow 10-yr Flow 100-yr Flow (cfs) (cfs) (cfs) Historic Cond. 1.01 1.72 4.53 Proposed Cond. 0.42 0.72 1.86 Pateros Creek Preliminary Drainage Report 8 Basin 2 Basin 2 consists of residential lots and proposed street/sidewalk. This basin will drain via street curb and gutter to a proposed storm sewer system and into the proposed water quality forebay to be located just west (upstream) of the existing wet pond. Basin 3 Basin 3 consists of residential lots and proposed street/sidewalk. This basin will drain via street curb and gutter to a proposed storm sewer system and into the proposed water quality forebay to be located just west (upstream) of the existing wet pond. Basin 4 Basin 4 consists of backs of residential lots and an open area behind lots. This basin will drain via swale and then via street curb and gutter to a proposed storm sewer system and into the proposed water quality forebay to be located just west (upstream) of the existing wet pond. Basin 5 Basin 5 consists of residential lots and proposed street/sidewalk. This basin will drain via street curb and gutter to a proposed storm sewer system and into the proposed water quality forebay to be located just west (upstream) of the existing wet pond. Basin 6 Basin 6 consists of residential lots and proposed street/sidewalk. This basin will drain via street curb and gutter to a proposed storm sewer system and into the proposed water quality forebay to be located just west (upstream) of the existing wet pond. Basin 7 Basin 7 consists of backs of residential lots. This basin will be allowed to sheet flow across a large natural vegetated buffer area. The length of this area is sufficient that we believe all storm runoff will infiltrate or be captured in localized depressions prior to entry into the Cache La Poudre River. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. B. Specific Details 1. Water quality treatment is being provided for the proposed development in the form of a water quality forebay as previously described. Further documentation of treatment volumes and removal rates of stormwater BMPs will be documented with the Final Drainage Report prepared during the City FCP process. Final design details, construction documentation, and Standard Operating Procedures (SOP) Manual shall be provided to the City of Fort Collins for review prior to Final Development Plan approval. A final copy of the approved SOP manual shall be provided to City and must be maintained on-site by the entity responsible for the facility maintenance. Annual reports must also be prepared and submitted to the City discussing the results of the maintenance program (i.e. inspection dates, inspection frequency, volume loss due to sedimentation, corrective actions taken, etc.). 2. Table 1, below, summarizes the water quality information for the proposed water quality pond. Pateros Creek Preliminary Drainage Report 9 Table 1 – Water Quality Pond Summary Water Quality Water Quality Pond Spillway Top of Pond Capture Volume WSEL Elevation Elevation (AC‐FT) (FT) (FT) (FT) 0.110 4971 +/‐ (prelim.) 4971.5 +/‐ (prelim.) 4972 +/‐ (prelim.) 3. Proper maintenance of the drainage facilities designed with the proposed development is a critical component of their ongoing performance and effectiveness. The water quality pond may be easily accessed by maintenance staff via the gentle slope provided to the bottom of the pond from the south side. 4. The drainage features associated with the proposed project are all private facilities, located on private property. 5. The proposed outfall for the majority of the site is the existing wet pond at the southeast corner of the site. This wet pond has drains via an existing 24-inch pipe into a swale, which conveys flows northeast to the Cache La Poudre River. Stacked detention (detention over the permanent water surface elevation) within the existing wet pond is proposed in order to maintain capacity within the receiving offsite swale. Preliminary calculations provided in the appendix show a detention volume of 0.94 acre-feet with a peak 100-year release rate of 1.30 cfs. V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with the proposed project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with this project complies with the Old Town Master Basin (City of Fort Collins, July 2003). 3. The drainage plan and stormwater management measures proposed with the proposed development are compliant with all applicable State and Federal regulations governing stormwater discharge. 4. The proposed development is in compliance with Chapter 10 of City Code. B. Drainage Concept 1. The drainage design proposed with this project will effectively limit any potential damage associated with its stormwater runoff by providing detention and a water quality forebay. 2. The drainage concept for the proposed development is consistent with the Old Town Master Basin (City of Fort Collins, July 2003). Pateros Creek Preliminary Drainage Report 10 References 1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 2. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 3. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. 6. Preliminary Subsurface Exploration Report, 912 Wood Street, November 17, 2011, Earth Engineering Consultants, Inc. APPENDIX A HYDROLOGIC COMPUTATIONS CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: 687-001 Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: ATC Asphalt ……....……………...……….....…...……………….……………………………… 0.95 100% Date: Concrete …….......……………….….……….………………..….…………………………… 0.95 90% Gravel ……….…………………….….…………………………..…………………………… 0.50 40% Roofs …….…….………………..……………….……………………………………………. 0.95 90% Pavers…………………………...………………..…………………………………………… 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. H1 203425 4.67 0.000 0.000 0.436 0.776 3.458 0.17 0.17 0.21 15% H2 201247 4.62 0.000 0.000 0.415 0.000 4.205 0.09 0.09 0.11 8% HISTORIC COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 March 12, 2013 Overland Flow, Time of Concentration: Project: 687-001 Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc Rational Method Equation: Project: 687-001 Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: 1H14.6732 32 30 0.17 0.17 0.21 1.26 2.14 4.52 1.0 1.7 4.5 2H24.6245 45 44 0.09 0.09 0.11 0.99 1.69 3.51 0.4 0.7 1.7 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) HISTORIC RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) ATC March 12, 2013 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Q  C f  C i  A CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: 687-001 Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: ATC Asphalt ……....……………...……….....…...……………….……………………………… 0.95 100% Date: Concrete …….......……………….….……….………………..….…………………………… 0.95 90% Gravel ……….…………………….….…………………………..…………………………… 0.50 40% Roofs …….…….………………..……………….……………………………………………. 0.95 90% Pavers…………………………...………………..…………………………………………… 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. 1 51826 1.19 0.000 0.028 0.184 0.000 0.979 0.17 0.17 0.21 16% 2 68364 1.57 0.360 0.110 0.275 0.000 0.824 0.45 0.45 0.56 45% 3 41042 0.94 0.295 0.083 0.207 0.000 0.358 0.59 0.59 0.74 59% 4 61286 1.41 0.000 0.059 0.390 0.000 0.958 0.30 0.30 0.38 29% 5 36917 0.85 0.260 0.083 0.207 0.000 0.298 0.62 0.62 0.77 61% 6 111161 2.55 0.300 0.126 0.459 0.000 1.667 0.33 0.33 0.41 32% 7 33891 0.78 0.000 0.014 0.092 0.000 0.672 0.13 0.13 0.16 12% 2 - 6 318770 7.32 1.215 0.460 1.538 0.000 4.104 0.42 0.42 0.52 41% DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. Overland Flow, Time of Concentration: Project: 687-001 Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc Rational Method Equation: Project: 687-001 Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: 1 1 1.19 12 12 11 0.17 0.17 0.21 2.09 3.57 7.42 0.4 0.7 1.9 2 2 1.57 18 18 17 0.45 0.45 0.56 1.73 2.95 6.20 1.2 2.1 5.5 3 3 0.94 14 14 13 0.59 0.59 0.74 1.92 3.29 6.92 1.1 1.8 4.8 4 4 1.41 19 19 17 0.30 0.30 0.38 1.68 2.86 6.10 0.7 1.2 3.3 5 5 0.85 13 13 12 0.62 0.62 0.77 1.98 3.39 7.29 1.0 1.8 4.8 6 6 2.55 22 22 21 0.33 0.33 0.41 1.53 2.61 5.46 1.3 2.2 5.7 7 7 0.78 15 15 15 0.13 0.13 0.16 1.87 3.19 6.62 0.2 0.3 0.8 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) DEVELOPED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) ATC March 12, 2013 Q  C f  C i  A APPENDIX B HYDRAULIC COMPUTATIONS B.1 – Storm Sewers (reserved for future use) B.2 – Inlets (reserved for future use) APPENDIX B.1 STORM SEWERS (reserved for future use) APPENDIX B.2 INLETS (reserved for future use) APPENDIX C DETENTION AND WATER QUALITY DESIGN COMPUTATIONS ATC Pond No : Exist. Wet Pond Overall 100-yr 0.52 Area (A)= 7.32 acres 41067 ft 3 Max Release Rate = 1.30 cfs 0.94 ac-ft Time Time 100-yr Intensity Q 100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Volume (mins) (secs) (in/hr) (cfs) (ft 3 ) (ft 3 ) (ft 3 ) 5 300 9.950 37.87 11362 390.0 10972.1 10 600 7.720 29.39 17631 780.0 16851.2 15 900 6.520 24.82 22336 1170.0 21166.0 20 1200 5.600 21.32 25579 1560.0 24019.0 25 1500 4.980 18.96 28434 1950.0 26483.8 30 1800 4.520 17.20 30969 2340.0 28628.9 35 2100 4.080 15.53 32613 2730.0 29883.2 40 2400 3.740 14.24 34166 3120.0 31046.2 45 2700 3.460 13.17 35559 3510.0 32049.4 50 3000 3.230 12.29 36884 3900.0 32984.0 55 3300 3.030 11.53 38060 4290.0 33770.2 60 3600 2.860 10.89 39191 4680.0 34510.7 65 3900 2.720 10.35 40378 5070.0 35308.3 70 4200 2.590 9.86 41406 5460.0 35946.0 75 4500 2.480 9.44 42479 5850.0 36629.4 80 4800 2.380 9.06 43484 6240.0 37244.3 85 5100 2.290 8.72 44455 6630.0 37824.9 90 5400 2.210 8.41 45426 7020.0 38405.6 95 5700 2.130 8.11 46214 7410.0 38803.5 100 6000 2.060 7.84 47047 7800.0 39247.1 105 6300 2.000 7.61 47961 8190.0 39770.6 110 6600 1.940 7.38 48737 8580.0 40157.1 115 6900 1.890 7.19 49639 8970.0 40669.3 120 7200 1.840 7.00 50427 9360.0 41067.2 Input Variables Results Calculations By: Design Point Design Storm Required Detention Volume Developed "C" = DETENTION POND CALCULATION; FAA METHOD Project Number : 687-001 Project Name : Pateros Creek Project Location : Fort Collins WATER QUALITY POND DESIGN CALCULATIONS Water Quality Pond Project: 687-001 By: ATC Date: 3/12/13 REQUIRED STORAGE & OUTLET WORKS: BASIN AREA = 7.320 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 41.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.4100 <-- CALCULATED WQCV (watershed inches) = 0.182 <-- CALCULATED from Figure EDB-2 WQCV (ac-ft) = 0.111 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 WQ Depth (ft) = ** <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = ** <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = ** <-- INPUT from Figure 5 n = ** <-- INPUT from Figure 5 t (in) = ** <-- INPUT from Figure 5 number of rows = ** <-- CALCULATED from WQ Depth and row spacing **To be completed at final design APPENDIX D EROSION CONTROL REPORT Pateros Creek Preliminary Erosion Control Report EROSION CONTROL REPORT A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on the Utility Plans. The Final Plans will contain a full-size Erosion Control sheet as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in the Development Agreement for the development. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, prior to any earth disturbance activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. APPENDIX E SUPPLEMENTAL INFORMATION: FEMA FIRMETTE, LOMR-F Date: Case No.: 12-08-0323A LOMR-F Federal Emergency Management Agency Washington, D.C. 20472 Page 1 of 2 March 22, 2012 COMMUNITY AND MAP PANEL INFORMATION LEGAL PROPERTY DESCRIPTION COMMUNITY AFFECTED MAP PANEL NUMBER: 08069C0977G DATE: 6/17/2008 FLOODING SOURCE: CACHE LA POUDRE RIVER LARIMER COUNTY, COLORADO (Unincorporated Areas) A portion of Section 2, Township 7 North, Range 69 West, 6th P.M., as described in the Special Warranty Deed recorded as Reception No. 20110057190, in the Office of the Recorder, Larimer County, Colorado. The portion of property is more particularly described by the following COMMUNITY NO.: 080101 metes and bounds: DATUM: NAD 83 APPROXIMATE LATITUDE & LONGITUDE OF PROPERTY: 40.600, -105.088 SOURCE OF LAT & LONG: GOOGLE EARTH PRO DETERMINATION DOCUMENT (REMOVAL) LETTER OF MAP REVISION BASED ON FILL DETERMINATION STREET FLOOD ZONE LOWEST LOT ELEVATION (NAVD 88) BLOCK/ SECTION LOT SUBDIVISION OUTCOME 1% ANNUAL CHANCE FLOOD ELEVATION (NAVD 88) LOWEST ADJACENT GRADE ELEVATION (NAVD 88) WHAT IS REMOVED FROM THE SFHA -- 4976.9 to 4978.2 feet 4976.8 to -- 4978.1 feet X (shaded) Portion of Property -- -- 912 Wood Street Special Flood Hazard Area (SFHA) - The SFHA is an area that would be inundated by the flood having a 1-percent chance of being equaled or exceeded in any given year (base flood). ADDITIONAL CONSIDERATIONS (Please refer to the appropriate section on Attachment 1 for the additional considerations listed below.) LEGAL PROPERTY DESCRIPTION Date: Case No.: 12-08-0323A LOMR-F Federal Emergency Management Agency Washington, D.C. 20472 Page 2 of 2 March 22, 2012 LETTER OF MAP REVISION BASED ON FILL DETERMINATION DOCUMENT (REMOVAL) ATTACHMENT 1 (ADDITIONAL CONSIDERATIONS) LEGAL PROPERTY DESCRIPTION (CONTINUED) COMMENCING at the southwest sixteenth corner of Section 2; thence N82º46'17"E, 742.17 feet to the POINT OF BEGINNING; thence S72º29'58"E, 11.00 feet; thence S61º00'36"E, 56.26 feet; thence S45º51'29"E, 28.00 feet; thence S11º34'53"E, 12.83 feet; thence S33º46'31"E, 57.28 feet; thence S19º36'59"E, 10.57 feet; thence S41º14'18"W, 13.40 feet; thence S53º25'50"W, 5.22 feet; thence S23º39'30"W, 3.62 feet; thence S06º29'07"E, 16.57 feet; thence S01º58'10"W, 5.67 feet; thence S31º19'01"E, 15.75 feet; thence S73º17'41"E, 25.80 feet; thence S50º36'37"E, 4.30 feet; thence S18º08'58"E, 18.35 feet; thence S04º38'57"W, 8.51 feet; thence S26º03'53"E, 74.26 feet; thence S12º18'35"E, 42.71 feet; thence S01º04'35"E, 20.34 feet; thence S19º40'18"E, 54.06 feet; thence S34º19'30"E, 20.20 feet; thence S37º32'20"E, 22.09 feet; thence S89º55'53"W, 194.56 feet; thence N21º43'47"W, 171.33 feet; thence N33º07'30"W, 110.80 feet; thence N27º04'37"E, 191.50 feet to the POINT OF BEGINNING. FILL RECOMMENDATION (This Additional Consideration applies to the preceding 1 Property.) The minimum NFIP criteria for removal of the subject area based on fill have been met for this request and the community in which the property is located has certified that the area and any subsequent structure(s) built on the filled area are reasonably safe from flooding. FEMA’s Technical Bulletin 10-01 provides guidance for the construction of buildings on land elevated above the base flood elevation through the placement of fill. A copy of Technical Bulletin 10-01 can be obtained by calling the FEMA Map Assistance Center toll free at (877) 336-2627 (877-FEMA MAP) or from our web site at http://www.fema.gov/mit/tb1001.pdf. Although the minimum NFIP standards no longer apply to this area, some communities may have floodplain management regulations that are more restrictive and may continue to enforce some or all of their requirements in areas outside the Special Flood Hazard Area. PORTIONS OF THE PROPERTY REMAIN IN THE SFHA (This Additional Consideration applies to the preceding 1 Property.) Portions of this property, but not the subject of the Determination/Comment document, may remain in the Special Flood Hazard Area. Therefore, any future construction or substantial improvement on the property remains subject to Federal, State/Commonwealth, and local regulations for floodplain management. This attachment provides additional information regarding this request. If you have any questions about this attachment, please contact the FEMA Map Assistance Center toll free at (877) 336-2627 (877-FEMA MAP) or by letter addressed to the Federal Emergency Management Agency, LOMC Clearinghouse, 7390 Coca Cola Drive, Ste 204, Hanover, MD 21076. Luis Rodriguez, P.E., Chief Engineering Management Branch Federal Insurance and Mitigation Administration River District Block One Mixed Use Preliminary Erosion Control Report MAP POCKET DRAINAGE EXHIBITS WOOD STREET (ROW VARIES) �����: ����� ������� �/������ � 802 ���� ��. ���� �������, �� 80521 �����: ���� �� ���� ������� �� ��� 580 ���� �������, �� 80522 H1 4.67 �� H2 4.62 �� 4980 4981 4982 4983 4984 4979 4978 4978 4975 4975 4976 4977 4975 4972 4975 4971 4972 4973 4974 4976 4971 4970 4969 4970 4971 4971 4970 4970 4971 4970 4971 4972 4971 4973 4971 4972 4968 4970 4969 4971 4972 4973 4974 4973 A 4980 4981 4982 4983 4984 4979 4978 4978 4975 4975 4976 4977 4975 4972 4975 4971 4972 4973 4974 4976 4971 4970 4969 4970 4971 4971 4970 4970 4971 4970 4971 4972 4971 4973 4971 4972 4968 4970 4969 4971 4972 4973 4974 4973 4973 4974 4975 4974 4975 4980 4976 4977 4978 4979 4980 4977 4978 4979 4981 4980 4976 4977 4978 4979 4980 4978 4979 4981 4982 4983 4985 4984 4970 4970 4969 4971 4972 4972 7 6 3 5 4 2 7 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S S S S S W WV W W W SS E E T T T E E G G G T T T T T T W WV C C E WW D TR D LP D D W WW D C FH LP E C LP C S S S S W X �����: ����� ������� �/������ � 802 ���� ��. ���� �������, �� 80521 �����: ���� �� ���� ������� �� ��� 580 ���� �������, �� 80522 �����: ����� �. ���������� 930 �. ������� ��. ���� �������, �� 80521 �����: ���� �� ���� ������� 300 ������� ��� ���� �������, �� 80521 4 1.41 �� 3 0.94 �� 2 1.57 �� 5 0.85 �� 6 2.55 �� 1 1.19 �� 7 0.78 �� WOOD STREET (ROW VARIES) PEREGOY WAY HART FARMS LANE N�. R��������: B�: D���: REVIEWED BY: N. H��� DESIGNED BY: DRAWN BY: SCALE: DATE: MARCH 13, 2013 PROJECT: 687-001 S���� O� 9 S����� PATEROS CREEK T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 03/13/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO K��� ����'������. C��� ������ ��� ���. R DR1 DRAINAGE PLAN A. R���� N. W������� 1"=60' NORTH ( IN FEET ) 1 ���� = ��. 60 0 60 F��� 60 120 180 LEGEND: 4953 PROPOSED CONTOUR 93 PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED PROPERTY BOUNDARY CURB & GUTTER PROPOSED INLET A DESIGN POINT FLOW ARROW DRAINAGE BASIN LABEL BASIN DESIGNATION BASIN AREA (AC) DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 1 1 B2 1.45 �� FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION C��� E������� D��� D��� D��� D��� D��� S��������� U������ P���� & R��������� T������ E������� D��� APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: W���� & W��������� U������ C��� �� F��� C������, C������� UTILITY PLAN APPROVAL E������������ P������ NOTES: 1.SEE SECTION 3.4.1(E) OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE "NATURAL HABITATS BUFFER ZONE." REFER TO PLANNING DOCUMENTS BY RUSSELL + MILLS STUDIOS, FOR ADDITIONAL INFORMATION. 4973 4974 4975 4974 4975 4980 4976 4977 4978 4979 4980 4977 4978 4979 4981 4980 4976 4977 4978 4979 4980 4978 4979 4981 4982 4983 4985 4984 4970 4970 4969 4971 4972 4972 7.9' 6.1' X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S S S S S W WV W W W SS E E T T T E E G G G T T T T T T W WV C C E D D C FH LP E C S S X H1 H2 N�. R��������: B�: D���: REVIEWED BY: N. H��� DESIGNED BY: DRAWN BY: SCALE: DATE: MARCH 3, 2013 PROJECT: 687-001 S���� O� 9 S����� PATEROS CREEK T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 03/13/13 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO K��� ����'������. C��� ������ ��� ���. R C��� E������� D��� D��� D��� D��� D��� S��������� U������ P���� & R��������� T������ E������� D��� APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: W���� & W��������� U������ C��� �� F��� C������, C������� UTILITY PLAN APPROVAL H1 HISTORIC DRAINAGE PLAN A. R���� N. W������� 1"=60' NORTH ( IN FEET ) 1 ���� = ��. 60 0 60 F��� 60 120 180 FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION LEGEND: 4953 PROPOSED CONTOUR 93 PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED PROPERTY BOUNDARY CURB & GUTTER PROPOSED INLET A DESIGN POINT FLOW ARROW DRAINAGE BASIN LABEL BASIN DESIGNATION BASIN AREA (AC) DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 1 1 B2 1.45 �� FILL RECOMMENDATION PORTIONS REMAIN IN THE SFHA This document provides the Federal Emergency Management Agency's determination regarding a request for a Letter of Map Revision based on Fill for the property described above. Using the information submitted and the effective National Flood Insurance Program (NFIP) map, we have determined that the described portion(s) of the property(ies) is/are not located in the SFHA, an area inundated by the flood having a 1-percent chance of being equaled or exceeded in any given year (base flood). This document revises the effective NFIP map to remove the subject property from the SFHA located on the effective NFIP map; therefore, the Federal mandatory flood insurance requirement does not apply. However, the lender has the option to continue the flood insurance requirement to protect its financial risk on the loan. A Preferred Risk Policy (PRP) is available for buildings located outside the SFHA. Information about the PRP and how one can apply is enclosed. This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If you have any questions about this document, please contact the FEMA Map Assistance Center toll free at (877) 336-2627 (877-FEMA MAP) or by letter addressed to the Federal Emergency Management Agency, LOMC Clearinghouse, 7390 Coca Cola Drive, Ste 204, Hanover, MD 21076. Luis Rodriguez, P.E., Chief Engineering Management Branch Federal Insurance and Mitigation Administration C:\NE\687-001-Pateros Creek\Drainage\Detention\DetentionVolume_FAA Method 3/12/2013 (min) 10-yr Tc (min) 100-yr Tc (min) 11No0.17 0.17 0.21 70 2.00% 11.6 11.6 11.0 0 0.00% N/A N/A 0 N/A N/A N/A 12 12 11 22No0.45 0.45 0.56 45 2.00% 6.5 6.5 5.3 979 0.50% 1.41 11.5 0 N/A N/A N/A 18 18 17 33No0.59 0.59 0.74 43 2.00% 5.0 5.0 3.5 804 0.50% 1.41 9.5 0 N/A N/A N/A 14 14 13 44No0.30 0.30 0.38 170 2.00% 15.4 15.4 14.0 0 0.00% N/A N/A 317 1.00% 1.50 3.5 19 19 17 55No0.62 0.62 0.77 47 2.00% 4.9 4.9 3.4 709 0.50% 1.41 8.4 0 N/A N/A N/A 13 13 12 66No0.33 0.33 0.41 125 2.00% 12.8 12.8 11.4 816 0.50% 1.41 9.6 0 N/A N/A N/A 22 22 21 77No0.13 0.13 0.16 98 2.00% 14.3 14.3 13.8 85 0.50% 1.41 1.0 0 N/A N/A N/A 15 15 15 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Gutter Flow Swale Flow Design Point Basin Overland Flow ATC March 12, 2013 Time of Concentration (Equation RO-4)   3 1 1 . 87 1 . 1 * S Ti C Cf L   10-year Cf = 1.00 March 12, 2013 (min) 10-yr Tc (min) 100-yr Tc (min) 11No0.17 0.17 0.21 483 1.70% 32.0 32.0 30.5 0 0.00% N/A N/A 0 N/A N/A N/A 32 32 30 22Yes0.09 0.09 0.11 500 1.10% 41.1 41.1 40.2 0 0.00% N/A N/A 425 1.30% 1.71 4.1 45 45 44 HISTORIC TIME OF CONCENTRATION COMPUTATIONS Gutter Flow Swale Flow Design Point Basin Overland Flow ATC March 12, 2013 Time of Concentration (Equation RO-4)   3 1 1 . 87 1 . 1 * S Ti C Cf L  