HomeMy WebLinkAboutPATEROS CREEK - PDP - PDP130011 - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESPateros Creek Project Development Plan Page 1 of 8
STATEMENT OF PROPOSED PLANNING OBJECTIVES
Russell + Mills Studios | 13 March 2013
Pateros Creek Preliminary Development Plan
Statement of Proposed Planning Objectives
3.13.2013
Project Overview
This 17.34 acre parcel is within the Urban Estate Zone District. Redevelopment of the property is
proposed under the cluster plan standards for this district. The gross density is shown at 2.34
DU/AC under a previously approved stand alone modification request with a maximum gross
density of 2.4 DU/AC. The net density is shown at 5 DU/AC, meeting the standard for cluster
developments within the UE zone district. Redevelopment of the parcel includes residential single
family lots within the southwest portion of the site surrounding the proposed loop drive. A courtyard
community with small single family lots surrounding a community green and gardens comprise the
interior of the loop road. The project preserves 57.4% open space.
The interior loop road is shown with a 52’ ROW with detached walks and 30’ roadway per LUCASS
standards. Storm-water drainage will be directed to the east utilizing existing drainage patterns and
depressions for detention. Water quality will be provided with a constructed forebay wetland
approx. 5,700 in size, which will discharge into the existing pond at the southeast of the site.
Storm-water best practices such as bio-swales, etc. will be utilized to further enhance water
quality.
The project has been reviewed with Poudre Fire Authority where a second access point through a
16’ concrete access drive/trail at the southwest corner of the property was determined to provide
sufficient access.
The history of the site as Hart’s farm will be emphasized in the character of the overall
development, through interpretive efforts along trails, the proposed orchard and community
gardens.
1. CITY PLAN PRINCIPLES AND POLICIES ACHIEVED BY THE PROPOSED PLAN
ENV 4.3 – Improve Water Quality and Detention
Storm water facilities will be designed to maximize water quality in each component of the
development. Storm-water drainage will be directed to the east utilizing existing drainage patterns
and depressions for detention. Water quality will be provided with a constructed forebay wetland
approx. 5,700 in size that will discharge into the existing pond at the southeast of the site. Storm-
water best practices such as bio-swales, etc. will be utilized to further enhance water quality.
ENV 4.4 – Provide Neighborhood Natural Areas
Trails and connections will link the residential lots to a neighborhood natural area providing a
variety of amenities to the east and north.
LIV 4: Development will provide and pay its share of the cost of providing needed public facilities and services
concurrent with development.
All roads, access points, sidewalks and street trees/roadway landscaping within the project will be
paid for by the developer, including landscape treatments along Wood Street.
LIV 6.2 – Seek Compatibility with Neighborhoods
Pateros Creek Project Development Plan Page 2 of 8
STATEMENT OF PROPOSED PLANNING OBJECTIVES
Russell + Mills Studios | 13 March 2013
The proposed lot size, scale and housing character will be similar to what is found in adjacent Old
Town neighborhoods. Architectural character is envisioned as a bungalow style, compatible with
historic old town housing types.
LIV 10.1 – Design Safe, Functional, and Visually Appealing Streets
Well-lit streets with street trees and detached walks are included, with accessible ramps at each
corner.
LIV 10.2 – Incorporate Street Trees
Street trees will be included per standards at least 40’ O.C. along all public ROW’s.
LIV 10.4 – Incorporate Street Art
Historic farm implements will be developed into project themed art at the entry to the site.
LIV 11.2 – Incorporate Public Space
Public spaces include the central courtyard with lawn, arbor, café seating, herb gardens and xeric
edge planting to enclose and define the space. A community gathering area is envisioned in the
open space with a shelter and play area.
LIV 14.1 – Encourage Unique Landscape Features
Unique landscape features include entry bulb outs with xeric planting to facilitate parking and
reduce roadway scale, community gardens, pond and orchard with fruit bearing trees.
LIV 14.2 – Promote Functional Landscape
All planting will be designed with native/adaptive plants, emphasizing xeric upland planting where
appropriate and including edible plants and fruit trees within the orchard, community gardens,
courtyard and courtyard edge planting areas.
LIV 14.3 – Design Low Maintenance Landscapes
Native and adaptive planting and a minimized turf area, reserved for functional/multi-use lawns will
allow a minimum of maintenance. Shrub beds will be maintained without excessive pruning or
‘snow-balling’ of shrubs.
LIV 16.1 – Survey, Identify, and Prioritize Historic Resources
All existing historic farm buildings have been surveyed in discussion with Historic Preservation.
Historic Preservation determined that none of the previous existing buildings met required levels of
historic integrity.
LIV 16.2 – Increase Awareness
The historic heritage and legacy as Hart’s Farm will become an integrated educational aspect of
the overall development, with the implementation of the orchard (an historic use) interpretive
materials and providing the community with an understanding of our agricultural heritage.
LIV 21.2 – Establish an Interconnected Street and Pedestrian Network
The street and pedestrian network will allow access to all proposed open-space features as well as
providing an interconnected trail system from the residential units to the open space and beyond to
the Poudre River Trail. A variety of open space connections to the trail system are provided within
the Detached Single Family Area.
LIV 22.4 – Orient Buildings to Public Streets or Spaces
All structures will orient to the roadways.
LIV 22.8 – Reduce the Visual Prominence of Garages and Driveways
Pateros Creek Project Development Plan Page 3 of 8
STATEMENT OF PROPOSED PLANNING OBJECTIVES
Russell + Mills Studios | 13 March 2013
All garages project will be recessed and setback from the primary building façade.
LIV 22.9 – Form Neighborhood Edges
Neighborhood edges are created through the transition of housing to open space provided and,
along Wood St. the provision of a landscape separation tract.
LIV 23.1 – Provide Neighborhood Parks and Outdoor Spaces
Neighborhood parks include the central courtyard with lawn, arbor, café seating, herb gardens and
xeric edge planting to enclose and define the space. A community gathering area is envisioned in
the open space with a shelter and play area.
LIV 23.2 – Integrate Natural Features
All existing stands of healthy trees and shrubs will be maintained through design efforts throughout
the project, including a number of large and significant Cottonwoods, Box elders and Ash trees.
The vision is to retain as much of the riparian forest as possible.
LIV 26.3 – Promote Compatibility of Uses
All adjacent land use is residential with some City Facilities to the west and south.
LIV 28.1 – Density
The gross density is shown at 2.34 DU/AC under a previously approved stand alone modification
request with a maximum gross density of 2.4 DU/AC. The net density is shown at 5 DU/AC,
meeting the standard for cluster developments within the UE zone district. The density achieved
with the cluster plan, together with preserving open space, meets the objectives of City Plan.
LIV 28.3 – Mix of Housing Types
A mix of larger, standard single family housing is provided with an alternative for cottage type,
courtyard facing residences.
LIV 28.4 –Neighborhood Center
Easy access to neighborhood center retail commercial amenities provided near downtown Fort
Collins is provided with the Poudre River Trail.
LIV 30.2 –Connect to Surrounding Neighborhoods
Roadway and pedestrian connections are proposed to connect to the existing neighborhood along
Wood Street and to Old Town via the Poudre River Trail.
LIV 30.3 – Improve Pedestrian and Bicycle Access
Trail access from the project to the Poudre River is provided throughout the site.
LIV 31.4 – Design for Pedestrian Activity
The trail network encourages pedestrian use within the open space and along detached walks
within the ROW.
SW 3.1 – Encourage Community Gardens and Markets
Community gardens are proposed within the open space and courtyard area, with the large
orchard providing an additional source of edible plants.
SW 3.3 – Encourage Private Community Gardens in Neighborhood Design
Edible plants will be provided within all common. Community gardens are proposed within the
open space and courtyard area, with the large orchard providing an additional source of edible
plants.
Pateros Creek Project Development Plan Page 4 of 8
STATEMENT OF PROPOSED PLANNING OBJECTIVES
Russell + Mills Studios | 13 March 2013
T 8.2 – Design for Active Living
The trail access within the open space and to the Poudre River Trail promotes an active lifestyle.
2. DESCRIPTION OF PROPOSED OPEN SPACE, WETLANDS, NATURAL HABITATS AND
FEATURES, LANDSCAPING, CIRCULATION, TRANSITION AREAS, AND ASSOCIATED
BUFFERING ON SITE AND IN THE GENERAL VICINITY OF THE PROJECT.
The plan is designed to preserve as many significant trees as possible and enhance open space to
the east of the residential lots, where habitat quality is most intact as a riparian forest. The
enhanced open space includes an orchard, community gardens, gathering area, enhanced pond,
and trail connections to the Poudre River Trail at two points, one on the north side of the property
and one on the eastern edge. 57.4% of the total project area is proposed as open space.
Open space enhancements will include removal of non-native species, primarily Russian Olive
trees and select understory shrubs that prevent visibility and prohibit a safe environment. Spot
seeding of disturbed areas with native vegetation and removal of debris will improve the overall
condition as well. The goal is to maximize contiguous open space and cultivate a Riparian Forest
environment that contributes to the overall ecological health of the Poudre River Corridor.
Some small existing wetlands near the south property line, primarily occupied by Canary Reed
Grass, an invasive species, will likely be removed, as well as one small wetland within the utility
access tract at the southeast of the lot area. These wetlands will be mitigated with the proposed
water quality forebay wetland east of the existing pond. Other wetlands including fringes of the
existing pond will be preserved.
An interconnected open - space trail system is proposed connecting the outer lots to the interior
courtyard with two open space access points at the east and southeast edge of the lots. The open
space area provides interior access loops to the orchard, community gardens, pond, community
gathering area and play area. One access point to the Poudre River Trail is provided at the north
end of the open space and another is located at the northwest edge of the property, providing
Poudre River Trail access at the end of Wood Street, as a neighborhood connection. The trails are
envisioned as crusher fines surface and will weave in and out of existing stands of trees.
3. PROPOSED OWNERSHIP AND MAINTENANCE OF PUBLIC AND PRIVATE OPEN SPACE
AREAS
In general, the property owner or tenant shall perform all maintenance on private residential lots. In
addition, the property owner, or tenant shall maintain all sidewalks and landscaped parkways
within the ROW, according to the width of the property.
The HOA shall perform all maintenance on all common areas, parks, trails, community gardens,
etc. storm water infrastructure, and any other non-private amenity and or feature.
The City of For Collins shall only be responsible for typical ROW maintenance of infrastructure and
snow removal within the roadway.
Storm water infrastructure
Landscape maintenance and trash removal within storm water infrastructure including detention
ponds, swales, culverts, inlets, etc. shall be the responsibility of the HOA. This maintenance shall
include all required mowing, weeding cleanout, removal of trash and debris and other typical
maintenance required in order to ensure storm water infrastructure and features function according
to their designed intent.
Pateros Creek Project Development Plan Page 5 of 8
STATEMENT OF PROPOSED PLANNING OBJECTIVES
Russell + Mills Studios | 13 March 2013
Landscape
All landscape maintenance within areas other than private residential lots and the area of parkway
and ROW adjacent to private residential lots shall be the responsibility of and performed by the
HOA.
Snow Removal
The property owner or tenant shall perform Snow removal on private lots and sidewalks adjacent
to private lots. The HOA shall perform Snow removal within all common areas, trails, private drives
and parks.
Trash
All trash removal on private lots or within the sidewalk/parkway areas adjacent to private lots shall
be performed by property owner or tenant. The HOA shall perform trash removal within common
areas, parks, trails, and other non-private lots.
4. ESTIMATE OF NUMBER OF EMPLOYEES FOR BUSINESS, COMMERCIAL, AND
INDUSTRIAL USES.
N/A.
5. DESCRIPTION OF RATIONALE BEHIND THE ASSUMPTIONS AND CHOICES MADE BY
THE APPLICANT.
The overall project layout is based on views and access to open space including the Poudre River
Floodplain and interior courtyard in the center of the cottage homes.
6. EVIDENCE OF COMPLETION FOR APPLICABLE CRITERIA.
Annexation of the project has been completed and filed with the City as well as an approval of the
stand alone modification for an increase in overall density.
7. NARRATIVE DESCRIPTION OF HOW CONFLICTS BETWEEN LAND USES OR
DISTURBANCES TO WETLANDS, NATURAL HABITATS AND FEATURES AND OR WILDLIFE
ARE BEING AVOIDED TO THE MAXIMUM EXTENT FEASIBLE OR ARE MITIGATED.
The primary land use conflict is between the residential use and Poudre River Corridor, where a
total of 57.4% open space within the project is intended to mitigate the use as well as an average
buffer width of approx. 350’ from the bank-full discharge line established with City Staff.
Some small existing wetlands near the south property line, primarily occupied by Canary Reed
Grass, an invasive species, will likely be removed, as well as one small wetland within the utility
access tract at the southeast of the lot area. These wetlands will be mitigated with the proposed
water quality forebay wetland east of the existing pond. Other wetlands including fringes of the
existing pond will be preserved.
Privacy will be achieved through building orientation, landscape buffers and creating a park-like
setting for the buildings.
A landscape tract along Wood Street will provide mitigation between the neighborhood and
residences/City Services use on the west side of Wood St.
8. WRITTEN NARRATIVE ADDRESSING EACH CONCERN/ISSUE RAISED AT THE
NEIGHBORHOOD MEETING(S), IF A MEETING HAS BEEN HELD.
In general, the project received a positive response at the neighborhood meeting. Specific
issues/concerns include the following:
Pateros Creek Project Development Plan Page 6 of 8
STATEMENT OF PROPOSED PLANNING OBJECTIVES
Russell + Mills Studios | 13 March 2013
Issue: Several attendees commented that people would still use these areas if you don’t fence it.
The applicants indicated they are wrestling with a solution to this issue but are considering
signage.
Resolution: A boundary fence similar to those used by City Natural areas is provided along the
edge of the property.
Issue: I foresee a conflict between building R1 and my stables.
Resolution: A landscape buffer consisting of dense smaller street trees and existing trees has
been provided at the western edge.
Issue: Pateros Creek may propose to drain unhealthy storm water into the Poudre River, which
may negatively impact stream flows, water quality, and aquatic wildlife.
Resolution: All storm water will be required to meet the standards in Section 3.4.3 of the Land
Use Code and the Municipal Code requirements for storm water treatment. The project’s proximity
to the Poudre River means the project does not have to detain to the 100-year event. Several
methods, including the site’s existing topography, are employed for water quality treatment. Never
has it been remotely proposed that this development would drain unhealthy storm water into the
Poudre River. A forebay wetland is proposed to further enhance water quality.
Issue: I’m not thrilled with the proposed main entrance to the project; can the access be swapped
out with the Poudre Fire Authority access?
Resolution: The current locations of the access points are a requirement from PFA
Issue: Pateros Creek proposes to encroach over and into the Poudre River landscape buffer zone.
Resolution: Only a decision maker can establish the buffer zone. There are two ways to meet the
buffer zone standard – either quantitatively (through the 300’ standard) or qualitatively (though the
nine performance standards outlined in Section 3.4.1(E) of the Land Use Code. We believe we are
at a minimum of 280’ across the site. A main objective of both the code and the project design is
to protect the areas of highest quality habitat. The plan has a minimum buffer width of 200’ in the
area of lowest quality habitat, and a maximum buffer width of over 600’ in the area of the highest
quality habitat. The average buffer width for the entire project is over 350’. This is without getting
into detail on the aforementioned performance standards, or the additional restoration and
enhancement efforts that the 6 additional dwelling units would afford.
Issue: Can you explain the need for a modification of standard regarding density?
Resolution: We are exceeding the open space requirement and the development meets the net
density standard. Prior to this redevelopment, there were 45 mobile homes present and 49 lots for
mobile homes. With the additional density, more restoration and amenities can be provided and
there can be a fund established for long-term maintenance. We, the applicants, feel we can meet
more City Plan objectives with the modification of standard.
Issue: Pateros Creek filled in the floodplain on the property using standards that don’t meet City
Code.
Answer: This comment has been discussed quite a bit throughout the annexation process. It has
been determined by staff that the floodplain requirements, outlined in Chapter 10 of the Municipal
Code, do not apply until the time of annexation. There are portions of the property that are still in
the floodplain and will be subject to Chapter 10 requirements upon annexation. The portion of the
previous flood fringe that was filled under County and FEMA oversight fully satisfied all applicable
local, state, and federal regulations. Nothing about the act of fill placement itself would be any
different or “more safe” had the property been within City limits at the time.
Pateros Creek Project Development Plan Page 7 of 8
STATEMENT OF PROPOSED PLANNING OBJECTIVES
Russell + Mills Studios | 13 March 2013
Issue: Ecological Characterization Study provided is not adequate.
Answer: A revised ECS has been provided to City Staff.
Issue: Can you confirm there will be no storm water runoff from this project going toward Wood
Street?
Answer: The site’s natural drainage pattern is east, northeast. Some minor flow will occur on
Wood Street, but the site is designed to drain east.
9. NAME OF THE PROJECT AS WELL AS ANY PREVIOUS NAME THE PROJECT MAY HAVE
HAD DURING CONCEPTUAL REVIEW.
This project shall be titled Pateros Creek Project Development Plan.
The project has previously been titled the 912 Wood Street for Conceptual Review.
MODIFICATION REQUEST
The applicant requests a modification from the setback standard of 15’ from ROW to building. This
typically includes porches with columns, which are provided per the design guidelines for the
project.
It is requested that this standard be modified to a setback of 9’ to allow for porches to
extend beyond the building face, which will meet the required 16’ setback. This will allow
for a 6’ porch extension, beyond the building face.
This modification is requested for the interior courtyard lots (24-40) and for lots (14-20) at the south
edge of the project.
This modification is not detrimental to the public good in that:
The cluster development standards encourage a more compact development, which encourages
preservation and creation of open space. The plan exceeds the UE standard of 50% by 7%. This
setback modification allows the creation of a more substantial and effective interior courtyard for
the interior ‘courtyard community’, acting as a central amenity for the overall project.
The modification also helps ensure maintains high quality habitat, open space and promotes a
sense of community through its spatial structure and open space amenities.
The preferred plan is equal to or better than a comparable plan which meets the setback
standard by providing a usable interior courtyard rather than a narrower, less functional open
space.
The proposed plan advances the Land Use Code and exceeds it in many cases, supporting Plan
Fort Collins principles such as the following:
Compact Development Pattern
The proposed plan creates a compact development form that achieves greater than 50% open
space.
Interconnected System of Open Lands
Pateros Creek Project Development Plan Page 8 of 8
STATEMENT OF PROPOSED PLANNING OBJECTIVES
Russell + Mills Studios | 13 March 2013
Open space within the property is connected to the Poudre River Trail via a system of proposed
trail connections. The courtyard achieved by this modification is connected to the overall trail
system.
Community Gardens
The project will provide two community gardens for residents. One garden will serve the entire
community and will be located within the open space, strategically placed in a lower quality habitat
area. A second garden will be provided within the courtyard community, which is allowed for by the
requested modification.
Edible Plants
The project will contain an orchard and a variety of edible plants that provide an additional food
source for the community.
Community Gathering Areas
The modification allows the project to create an effective central courtyard in the courtyard
community.