HomeMy WebLinkAboutTHE GROVE AT FORT COLLINS - FDP - FDP110015 - REPORTS - DRAINAGE REPORT (5)Final Drainage and Erosion Control Report for at Fort Collins, Colorado November 16, 2011 Prepared for: Campus Crest at Fort Collins, LLC 2100 Rexford Road, Suite 414 Charlotte, North Carolina 28211 Prepared by: 200 South College Avenue, Suite 100 Fort Collins, Colorado 80524 Phone: 970.221.4158 Fax: 970.221.4159 www.northernengineering.com Project Number: 502-001  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. November 16, 2011 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Final Drainage and Erosion Control Report THE GROVE at Fort Collins Dear Staff: Northern Engineering is pleased to submit this Final Drainage and Erosion Control Report for your review. This report accompanies the 11.16.11 Final Plan submittal for the proposed Grove at Fort Collins multi-family (student housing) development. Comments from the Staff Review Letter dated October 28, 2011 have been addressed. Written responses thereto can be found in the comprehensive response to comments letter on file with Current Planning. This report has been prepared in accordance to City of Fort Collins Storm Drainage Design Criteria and Construction Standards (SDDCCS), and serves to document the stormwater impacts associated with the proposed Grove at Fort Collins student housing project. We understand that review by the City is to assure general compliance with standardized criteria contained in the SDDCCS. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Aaron T. Cvar, PE Senior Engineer Nicholas W. Haws, PE Andrew G. Reese Project Manager Project Engineer Final Drainage and Erosion Control Report TABLE OF CONTENTS 1.0 Scope ............................................................................................................ 1 2.0 Design Criteria and References ......................................................................... 1 3.0 Site Location and Description ........................................................................... 1 4.0 Existing Condition ........................................................................................... 2 5.0 Irrigation Facilities ........................................................................................... 5 6.0 Floodplain Encroachment ................................................................................. 8 7.0 Wetlands ..................................................................................................... 10 8.0 Proposed Development .................................................................................. 12 9.0 Proposed Drainage Plan ................................................................................. 12 10.0 Outfall ......................................................................................................... 14 11.0 Stormwater Quantity Detention ....................................................................... 16 12.0 Stormwater Quality Mitigation ........................................................................ 16 13.0 Erosion and Sediment Control ........................................................................ 20 14.0 Conclusions .................................................................................................. 21 References ............................................................................................................. 22 APPENDICES: APPENDIX A – Rational Method Developed Runoff Calculations APPENDIX B – Water Quality Calculations APPENDIX C – Previous Drainage Memos and Correspondence APPENDIX D – Floodplain Information APPENDIX E – Street Capacity Calculations APPENDIX F – Inlet and Curb Cut Calculations APPENDIX G – Storm Line and Culvert Calculations APPENDIX H – Prorated Culvert and Prorated WQ Pond Sizing Calculations APPENDIX I – Erosion Control Cost Estimates and Riprap/Erosion Calculations APPENDIX J – Supplemental Subsurface Water Investigation (by Applegate Group) APPENDIX K – Geotechnical / Soils Information (by Earth Engineering Company) APPENDIX L – Wetlands / Environmental Information (by Cedar Creek Associates) MAP POCKET: DR1 – Drainage Exhibit FLOOD – Floodplain Exhibit Final Drainage and Erosion Control Report 1 1.0 Scope This Final Drainage and Erosion Control Report has been prepared for the proposed Grove at Fort Collins student housing community, and is intended to document the associated stormwater impacts. Major drainage items to be addressed are: Historic drainage patterns and quantities of flow Proposed overall drainage patterns and quantities of flow Confirmation of existing facilities’ ability to convey and detain peak runoff from developed site Proposed stormwater infrastructure design Proposed water quality design Confirmation that the proposed development will have no adverse drainage impacts 2.0 Design Criteria and References Drainage criteria outlined in the City of Fort Collins Storm Drainage Design Criteria and Construction Standards (SDDCCS) has been referenced in this study. The Rational Method has been used to estimate the peak discharge rates for the minor and major storm events. The minor and major rainfall events are considered to be the 2-yr and 100-yr storms, respectively. Runoff coefficients and rainfall values utilized in the Rational Method computations are consistent with the SDDCCS. The Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual, Volume III has been used for water quality design. Additionally, multiple previous studies and reports have been referenced in the preparation of this document (see page 20 for a full listing). 3.0 Site Location and Description The project site is located near the center of Section 23, Township 7 North, Range 69 West of the 6th Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. The site is bounded on the south by the Larimer Canal No. 2, on the west by Care Housing at Windtrail Park, on the east by Centre Avenue, and by the Sundering and Windtrail neighborhoods to the north. The Gardens on Spring Creek is located immediately northeast of the property (note, the street stub constructed due south of the Gardens on Spring Creek currently known as Rolland Moore Drive is expected to be re- named as Botanic Place once the new Rolland Moore Drive is constructed and accepted). The land is currently, and will continue to be, owned by the Colorado State University Research Foundation (CSURF). The developer of the Grove has entered into a long-term ground lease with CSURF. Existing ground cover is predominately a grass hayfield, with portions of non-native grassland along the northern and eastern boundaries. Abandoned local irrigation ditches and control structures exist along the southern property boundary, remnant of times when the land was an active hayfield. Jurisdictional wetlands exist along the northern property line. (Refer to the Ecological Characterization Study and Waters of the U.S. Delineation documents prepared by Cedar Creek Associates for additional information related to the wetlands). Final Drainage and Erosion Control Report 2 Existing Project Site According to the NRCS Soil Survey, the site consists of loams and clay loam, which fall into Hydrologic Soil Groups B and C. More site-specific exploration found an overburden layer of brown and reddish brown sandy lean clay soils. Numerous soils bores and monitoring wells have been drilled on the subject property, and subsurface exploration reports have been prepared by both Earth Engineering Company (EEC) and Applegate Group. Copies of said reports can be found in Appendices J and K of this document. 4.0 Existing Condition 4.1 Historic Site Drainage The total area being subdivided is roughly 31.3 acres in size and currently consists of undeveloped pasture land. The site slopes generally from southwest to northeast at slopes ranging from 6% to 12% near the southern site boundary, and 1% to 5% heading further north. Runoff currently sheet flows to the north towards Spring Creek. The majority of flow is intercepted by a major drainageway designed with Windtrail P.U.D. This outfall channel was intentionally constructed as a wetland with the primary purpose of conveying developed flows from neighborhoods to the north and west along the backyards of Sundering Townhomes, as well as Windtrail Townhomes and Windtrail detached residences. Variances were granted with the Windtrail P.U.D. to intentionally create wet, flat, natural appearing drainage areas and man-made wetlands. This area is expected to hold water at times and have drainage back-ups by design. Final Drainage and Erosion Control Report 3 The ability for the Windtrail outfall swale to sufficiently convey stormwater is dependent upon adequate maintenance of the wetland drainage facilities. The outfall swale falls within a drainage easement, and according to the plans approved with Windtrail P.U.D., the homeowners association shall be responsible for maintenance of the drainageway. Said easement and corresponding maintenance obligations carries forward, regardless of future ownership changes or development plans on the property. The Grove at Fort Collins subdivision plat preserves the pertinent drainage easements of record to allow continued maintenance activities by the responsible parties. A portion of the site also drains towards the triple 24” RCP culverts installed with the Centre for Advanced Technology (CAT) 22nd Filing under the roadway stub near the service entrance drive to the Gardens on Spring Creek. The culverts were designed to accept a 100-yr off-site flow of 57.6 cfs from the CSURF (Grove) parcel to the south. Said culverts discharge into the Horticulture Center Outfall Channel. This outfall channel, constructed with CAT-22, will now serve as the outfall for all off the developed runoff from the Grove student housing community. 4.2 Groundwater The project site lies in a region containing rather shallow groundwater. The areas with the narrowest depth to water (DTW) tend to lie along the Windtrail P.U.D. Outfall Swale. Not only does this area along the northern subdivision boundary contain much of the shallowest groundwater, but it also appears to be the least influenced by seasonal changes due to fluctuating water levels in surrounding irrigation ditches. Portions of the neighborhoods to the north and northwest of the Grove currently battle shallow groundwater on a consistent basis. There are reports from residents of soggy crawlspaces and nearly constant sump pump discharges. However, such problems are rather sporadic. While one homeowner may have a routinely running basement sump pump, the neighbor next door or across the street may be completely dry and have a sump pump that has never kicked on. This appears to indicate that there are localized factors on a micro-level, in addition regional conditions, that influence the groundwater on properties in this area. The difficulties that Windtrail, Sundering, and other neighborhoods presently experience with shallow groundwater seemingly have very little to do with conditions of property to be platted as The Grove at Fort Collins. Rather, it is believed that groundwater along Spring Creek has much more to do with regional geologic and subsurface hydrologic parameters. While the subject property does have the ability to influence the local DTW, anything proposed within the Grove subdivision boundary would have nominal affects to the surrounding neighborhoods and area-wide groundwater levels. According to borings and other analysis performed by EEC, Applegate, and Miller Groundwater, the DTW not only varies seasonally, but also differs horizontally across the site. As previously mentioned, the areas with the shallowest groundwater tend to fall within the wetlands and floodplain adjacent to Windtrail P.U.D. Therefore, the proposed site development and buildings are placed to avoid the locations with the worst DTW. Additionally, underdrains will be installed to further protect the buildings and roadways from potentially shallow groundwater. Note 8 is included on the subdivision plat to explicitly prohibit basement construction for residential structures. Final Drainage and Erosion Control Report 4 Details of the underdrain system are included with the Final Utility Plans. The “subdivision-wide” underdrain system generally follows the public street network, and has been designed in accordance with Section 5.6 of the Larimer County Urban Area Street Standards (LCUASS). This underdrain system will outfall into the Grove’s water quality control structure, downstream of the orifice plate, thereby routing groundwater discharge into the CAT-22 outfall channel. The underdrain outfall elevation is roughly 4994.1-ft. The peak groundwater discharge from the Grove’s underdrain system is conservatively estimated to be on the order of 15 gpm, or roughly 0.03 cfs. Additional recommendations and design parameters can be found in the Supplemental Subsurface Water Investigation by Applegate Group (Appendix J). Not only does said report further expound on the technical details of the underdrains and DTW levels, but it also contains modeling results to approximate the affects of the proposed site grading and subsurface drainage system. Additionally, the groundwater modeling has taken the Larimer Canal No. 2 ditch realignment into consideration as well. It can be concluded that the proposed Grove development will have a negligible impact to the historic groundwater condition along Spring Creek. The groundwater levels will neither lower enough to adversely impact the existing wetlands nor raise enough to negatively affect surrounding homes. Furthermore, permanently installed monitoring wells will allow for ongoing groundwater measurements to assess any fluctuations in DTW. These monitoring wells and groundwater readings will also aid in tracking the subsurface hydrology along the existing wetland channel. A narrative describing Cedar Creek Associates’ proposed monitoring plan can be found in Appendix L. Please see Section 5.0, below, for groundwater related to the Larimer Canal No. 2. 4.3 Off-Site Drainage In addition to the on-site project area, six (6) off-site basins have also been delineated. Basins 0S1 – OS4 are south of the site boundary, and generally drain to the north. While the Larimer County Canal No. 2 runs west to east through these basins, it is assumed to be full for the purposes of stormwater analysis and drainage basin delineation. Basins OS5 and OS6 consist of the existing Rolland Moore Drive stub (to be re-named) that will drain through new facilities to be constructed with the Grove prior to reaching the Horticulture Center Outfall Channel. Historic flows for the off-site basins have been computed and are utilized, where appropriate, in the design of the Grove drainage improvements. All off-site flow patterns and quantities will continue in their historic manner with the proposed student housing development. No provisions have been made for the future development of any off-site basins outside the limits of the Grove subdivision plat. There are also historic flows that enter the site from off-site basins to the north and west of the project boundary. However, since these flows travel directly to and/or through the Windtrail P.U.D. outfall swale along the northern property line, no explicit computations are necessary. The limits of development and other improvements associated with the Grove project will not be affected by, nor have an effect on, the historic Windtrail drainageway. Not only will the existing drainage easements be preserved with this development, but the entirety of Outlot A will be dedicated as a drainage easement with The Grove at Fort Collins subdivision plat. Therefore, the ability for the Windtrail and Sundering HOAs to fulfill their current channel maintenance obligations will not be impeded by this project. Final Drainage and Erosion Control Report 5 4.4 Major Drainage Basin The site lies entirely within the Spring Creek Major Drainage Basin. More specifically, the Grove resides within Basin 130 of the Spring Creek Master Drainage Plan. Two regional stormwater studies have recently been conducted within the major drainage basin. The first is an analysis that primarily deals with the conveyance and detention for the areas that drain to the Burlington Northern Railroad (BNRR) pond south of the Fort Collins Hilton. Development boundaries and percentage of impervious areas for the proposed Grove student housing community have been shared with the parties involved in the study and modeling update. Please refer to the “Alternative Analysis for the Design of the Mason Street Outfall” report by Ayres Associates dated November 2010 for additional information. The second regional stormwater effort currently underway is a proposed Physical Map Revision (PMR) to the Spring Creek floodplain. This includes updates to both the MODSWMM hydrology as well as the HEC-RAS hydraulic modeling. Pertinent drainage parameters have been shared between City Staff, their consultants, and the Grove engineers. As a result, it is neither appropriate nor required that the Applicant for the Grove conduct any further modeling. The practical and preferred approach is to ensure consistent data and enable a more thorough and accurate effort by those already conducting larger-scale studies. The Grove student housing development remains consistent with the governing master drainage studies. 5.0 Irrigation Facilities All existing on-site irrigation facilities are assumed to be abandoned, and will be removed within the limits of work. The Larimer County Canal No. 2 roughly parallels the southern property boundary. The ditch is elevated in this area and has relatively steep banks. The proposed Grove subdivision boundary lies approximately 20’ – 40’ north of the existing top of ditch. Alternatively, the boundary line is intended to follow the toe of slope along the elevated portion of the Larimer Canal No. 2. Another consideration regarding the ditch that runs along the southern property line is the potential for seepage. It is a known fact that the Larimer Canal No. 2 seeps in the area near Care Housing at Windtrail Park. The horizontal separation of the Grove property boundary, as well as the additional buffer provided by Outlot B, offers a certain level of protection for the buildings and roadways. Additionally, The Grove at Fort Collins will install an underdrain system to safeguard the structural integrity of the foundations and subgrade. The potential for the Larimer Canal No. 2 to overtop in major rainfall events is no different than any other irrigation ditch elsewhere in Fort Collins, and is not a consideration or concern in selecting this site for development. Neither the subdivision boundary nor the limits of development for the proposed Grove student housing community impact existing ditch company rights-of-way, easements, integrity, or ability to access and maintain ditch company facilities. Nonetheless, the Larimer County Canal No. 2 Irrigating Company has been notified of the proposed project and copies of the applicable development plan documents have been provided for their review. Additionally, the final construction plans for the Grove will be routed to the ditch company for their approval and signature to confirm that there are no adverse impacts to their facilities. Final Drainage and Erosion Control Report 6 The proposed Grove Project Development Plan has been discussed with Ditch Company representatives on multiple occasions since this project was first envisioned. Concerns of seepage, slope stability, large tree intrusion, access, and maintenance have been the main topics of conversation to date. The Ditch Company has issued multiple letters on the matter. Copies of said correspondence can be found in Appendix C. In order to address the concerns related to potential seepage and slope stability, additional testing and analysis has been performed by Applegate Group, Miller Groundwater and Earth Engineering Company (EEC) to further resolve these issues. The supplementary data has afforded a more accurate understanding of how much of an effect, if any, the May to July irrigation flows in the Larimer No. 2 canal have on downhill groundwater and slope stability. Brief memos further describing the additional testing efforts can be found in Appendix J (Applegate) and Appendix K (EEC). Development adjacent to the canal must be done with great care. The fact that the student housing buildings will not have basements or crawlspaces is one significant advantage. Cuts will not be allowed below the ditch while the canal is running. Slope stability measures and retaining wall construction shall follow the strict recommendations of EEC. Slopes previously proposed at 2:1 or 3:1 in proximity to the ditch have been revised such that all design slopes are 4:1 or less. Additionally, a free-draining mechanically stabilized earth (MSE) retaining wall with modular concrete block facing will be constructed behind Buildings 3, 4, and 5. As alluded to above, CSURF, the Ditch Company, and Campus Crest have entered into a three-party agreement to realign the Larimer No. 2 Canal further south on land also owned by CSURF. The Fort Collins Planning and Zoning Board added a condition of approval to the Grove at Fort Collins PDP requiring the canal to be realigned prior to issuance of the first certificate of occupancy. As such, the final groundwater modeling and underdrain design take the ditch realignment into account. The ditch relocation will help achieve numerous objectives benefitting multiple parties. First of all, the newly cut and compacted clay-lined channel section will have significantly less seepage than the existing ditch. Obviously the Ditch Company and its shareholders will benefit from the decreased seepage. Additionally, downhill land owners will have increased peace-of-mind and future construction north of the canal will be safer and more cost effective as a result. The proposed ditch realignment will offer additional horizontal separation from the active canal and The Grove at Fort Collins development plan. This again is an improvement for the Ditch Company, not only to gain distance, but to get away from the steep slope that currently exists downhill of the present alignment. Concerns of slope stability effectively go away from their perspective. The canal is currently lined with numerous large cottonwood trees, many of which protrude into the ditch embankment and are nearing the end of their maximum lifetime. These trees pose major concerns to the Ditch Company in terms of water loss, as well as safety and liability. In fact, the Superintendent for the Larimer Canal No. 2 has gone on record to say that if the ditch remains in its present alignment, that he will have to remove multiple significant trees along the channel. Final Drainage and Erosion Control Report 7 The trees in question offer substantial habitat value to the wildlife corridor, as well as contributing to the aesthetic landscape of the area. Realigning the ditch will allow the existing trees to remain as-is. The intent is to restore the abandoned channel section to a more natural condition; therefore, a reclamation plan has been prepared to specify the planting of additional trees, shrubs, and native grasses. The new canal route will provide an additional wildlife corridor, essentially creating a refuge in the middle. The end result will offer a substantially improved natural habitat from what would occur to the wildlife corridor if the Ditch Company were to remove the large trees and keep the single channel where it is. The 04.04.11 memo from Senior Wildlife Biologist, T. Michael Phelan, further describes the benefits of realigning the ditch from a habitat perspective. As of the date of this report, the contact information of record for the Larimer County Canal No. 2 Irrigating Company is as follows: John Moen - Superintendent 970.482.3309 (970.218.0726 – mobile) John Strachan - President 970.223.5231 Brent Bartlett - Attorney 970.407.9000 ext.217 Final Drainage and Erosion Control Report 8 6.0 Floodplain Encroachment The majority of Outlot A falls within the Spring Creek floodplain. Both 100-yr floodway (dark blue) and flood fringe zones (cyan) run along the northern property line. There is no erosion buffer zone associated with Spring Creek. Spring Creek is a regulatory FEMA floodplain. A copy of FIRM Panel 0987F with an effective date of 12.19.06 can be found in Appendix D. Please note, a Physical Map Revision (PMR) is currently being reviewed by FEMA for the Spring Creek floodplain. The placement of fill and the construction of new residential dwellings (including mixed-use development) is allowed in the Spring Creek 100-yr flood fringe. The City of Fort Collins has prepared a Quick Guide for all floodplain regulations other than the Poudre River. This document helps to clearly depict and explain the code allowance to fill in the flood fringe. A copy of this Quick Guide is included in Appendix D for reference. No floodplain modeling is required as part of this proposed development, as it will result in no change to the FEMA regulatory mapped flood hazard zones. However, a City of Fort Collins Floodplain Use Permit, along with ancillary support documents, will be required for each structure (Buildings 10 and 11) and each site construction element (stormwater swale and pond, paths, parking lots, streets, utilities, etc.) in the floodplain. Furthermore, FEMA Elevation Certificates shall be completed and approved before the Certificates of Occupancy are issued for Building 10 and Building 11. Final Drainage and Erosion Control Report 9 A portion of the 100-yr flood fringe encroaches slightly into Tract A, Lot 1, Block 1 and Lot 1, Block 2. No structures are proposed within the floodplain on either Tract A or Lot 1, Block 1. The only structures proposed within the (12.19.06) 100-yr floodplain are portions of Building 10 and Building 11, located on Lot 1, Block 2. Both buildings are multi-family residential structures with identical floor plans. There will be no basements or crawl spaces associated with any structure within the Grove student housing community. All building foundations will be slab-on-grade with thickened perimeter footings (see schematic detail on Floodplain Exhibit). All construction within the floodplain shall be in compliance with Chapter 10 of the City of Fort Collins Municipal Code. Specifically, the Lowest Floor and all HVAC equipment shall be elevated above the Regulatory Flood Protection Elevation. Buildings 10 and 11 are explicitly prohibited from being converted to critical facilities, as defined by Chapter 10 of the City Code. The controlling Base Flood Elevation (BFE) for Building 10 is 5004.31 feet (NAVD 88), and for Building 11 is 5002.81 feet (NAVD 88). Since the City of Fort Collins (and thus, the proposed Grove student housing development) is on the “original” NGVD 1929 (unadjusted) vertical datum, 3.0 feet was subtracted to convert the BFE’s to the project datum. Therefore, the resulting BFE affecting Building 10 is 5001.31, feet NGVD 29 (unadjusted), and Building 11 is 4999.81 feet, NGVD 29 (unadjusted). The Regulatory Flood Protection Elevation is eighteen (18) inches above the Spring Creek BFE. The consequent Regulatory Flood Protection Elevation for Building 10 is 5002.81 feet, NGVD 29 (unadjusted) or 5005.81 feet, NAVD 88 and the Regulatory Flood Protection Elevation for Building 11 is 5001.31 feet, NGVD 29 (unadjusted) or 5004.31 feet, NAVD 88. Regulatory Flood Protection Elevations Final Drainage and Erosion Control Report 10 7.0 Wetlands As previously mentioned, an Army Corps of Engineers (ACOE) jurisdictional wetland currently exists along the northern property line. The wetland roughly follows the floodplain passing through Outlot A. A descriptive project history, including more than twenty (20) site plan alternatives, has been prepared by Ripley Design, Inc. to document the extensive effort that has been taken to create a plan that meets the City’s codes and objectives, while minimizing the impact to the existing wetlands. The proposed Grove at Fort Collins development plan preserves 100% of the existing on- site ACOE jurisdictional wetlands. ACOE Wetland Delineation Map An existing clay tile underdrain is shown on the Windtrail P.U.D. Outfall Swale drawings, which roughly parallels the existing wetlands. Another underdrain line appears to have been installed parallel to the southern boundary of Sundering Townhomes as part of the Care Housing detention pond outfall. Since there will be no disturbance within the main wetland channel, it is not anticipated that the aforementioned drain tiles will be affected by the Grove. A very small (0.015-acre) pocket of non-jurisdictional wetlands exists near the northern corner of Building 11. Although this loss could be argued as nominal and inconsequential, the Applicant will be mitigating this area nonetheless through substantial buffer habitat enhancements, additional planting, and structural diversity augmentation within Outlot A. Final Drainage and Erosion Control Report 11 Since this project will not be disturbing any jurisdictional wetlands, no 404 permit or other specific approval is necessary from the Army Corps of Engineers. However, the Applicant still intends to inform the ACOE of the proposed development plan and measures taken to protect the wetlands. Additionally, the Grove will conduct a monitoring program for a minimum of three (3) years after construction. The monitoring plan will include visual observations and recording of wetland vegetation, soils, and groundwater levels. Pre-construction monitoring has already begun as of April 2011 to establish baseline data. A copy of the proposed monitoring plan, as well as results to date, can be found in Appendix L. Results of the ongoing monitoring program will be provided to the City of Fort Collins Natural Resources Department. Obviously it is desired to have no adverse changes to the existing wetlands as a result of the development. However, the monitoring plan will ensure that objective data is available for accurate evaluation. Should there be any issues of concern, the Grove and the City will work together to make certain that the development adheres to its intent and promise to have no negative impacts to the existing wetlands. As previously mentioned, the existing wetlands were created (man-made) with the Windtrail P.U.D. subdivision, and receive substantial surface water runoff from surrounding neighborhoods and upstream development. This is considered to be a significant source of irrigation to the existing wetlands. Since the delivery of such surface water is not impacted by the Grove, it is doubtful that there will be a material reduction in wetland vegetation as a result of this development. Final Drainage and Erosion Control Report 12 8.0 Proposed Development The proposed development will include construction of a 12-building, 218-unit student housing apartment community, including a clubhouse, pool, and other outdoor amenities capable of supporting 612 residents. Additionally, Rolland Moore Drive will be extended from its current terminus east of Shields Street towards a new intersection at Centre Avenue across from the southern entrance to the Natural Resources Research Center. Two new streets, Native Plant Way and Perennial Lane, along with supporting earthwork, utility infrastructure, and stormwater improvements are also a part of the proposed Grove development. Site Plan 9.0 Proposed Drainage Plan 9.1 Drainage Basins The developed site has been broken into six (6) major drainage basins. The major basins have been further divided, where appropriate, into fifteen (15) total sub-basins. Basins A – D generally consist of the areas currently being developed as The Grove at Fort Collins student housing community, whereas Basin X is reserved for the future development of CSURF’s Tract A, and Basin CH is a small area at the west end of Rolland Moore Drive near the Care Housing subdivision. Basin A consists of public roadways, private parking lots and drive aisles, as well as buildings and landscape areas. Sub-basin A4 is comprised of Building 1 and the adjacent Lot 1, Block 1 parking area. This sub-basin drains into Storm Line 1, which travels east in Outlot A and north/northeast through sub-basins A3 and A2 into Swale 1. This swale then conveys flow east in Outlot A toward the water quality pond located in sub-basin A1. Final Drainage and Erosion Control Report 13 It should be noted that a small portion of Swale 1, as well as a small portion of the slope grading in Outlot A north of Rolland Moore Drive, have side slopes of 3:1. These areas are located within the natural habitats buffer, and will be restored with native plantings. As such, they will not be manicured turf maintained by riding mowers. These slopes will be privately maintained in a manner that respects the buffer, and the Applicant acknowledges the presence of 3:1 slopes. These slopes are designed to prevent encroachment into the floodway and wetlands, described in Sections 6.0 and 7.0, respectively. This is the exclusive reason for exceeding 4:1 side slopes. Basin B is comprised of public roadway, private parking lots and drive aisles, as well as buildings and landscape areas. Sub-basins B1 and B2 drain to sump inlets in Rolland Moore Drive located west of Buildings 5 and 7. An RCP storm drain will convey runoff from the inlets into Storm Line 1, which ultimately discharges into the main water quality pond near the west end of the Rolland Moore Drive (to be renamed) street stub. Basin C consists of roadway, parking lot and drive aisles, as well as buildings, amenities and landscape areas. Sub-basins C1 and C2 drain to sump inlets in Native Plant Way located east of Building 10. Sub-basin C3 drains to a sump inlet south of Buildings 10 and 11. Sub-basin C4 drains to a sump inlet in the private parking lot south of Building 9, which discharges into Swale 1 via Storm Line 2. Storm Line 3 will convey runoff from sub-basins C1-C3 into Swale 1. All of Basin C ultimately passes through Swale 1 prior to reaching the main water quality pond northeast of Building 11. Basin D is predominantly composed of public roadway along with portions of the clubhouse, Building 11, and adjacent landscaping. This basin drains to sump inlets located immediately south of the west end of the Rolland Moore Drive (to be renamed) street stub. Storm Line 4 will convey runoff from the inlets directly into the water quality pond on the west side of Perennial Lane. Basin X is currently comprised of undeveloped grassland owned by CSURF (Tract A). However, Basin X is subject to future development in accordance with the ODP of record (E zoning district). While the development of this parcel is not a part of The Grove at Fort Collins student housing project, certain assumptions have been made in the drainage computations contained within this report. A 90% impervious value has been assumed for Basin X. This basin drains north towards the intersection of Perennial Lane and the Rolland Moore Drive (to be renamed) street stub. Flared- end-sections will convey flows through Storm Line 4 under Perennial Lane into the Grove’s water quality pond. Both the storm line and water quality pond have been “up-sized” to accommodate the fully developed future flows from Basin X. (See Appendix H for documentation of the proportionate size increase necessary to allow Tract A to develop without any on-site detention or water quality.) Basin CH is comprised of the public right-of-way of Rolland Moore Drive (RMD), as well as the adjacent vegetated area that sheet flows into the roadway. This basin represents a very small area at the western-most end of RMD. Runoff from Basin CH drains west to existing sump inlets installed with Care Housing at Windtrail Park. While this area leaves the Grove subdivision boundary “undetained,” runoff does receive quantity and quality mitigation through the existing drainage system. The Care Housing design assumed a small off-site area would drain from the east to the existing sump inlets. The area corresponds to the high point in Rolland Moore Drive roughly 50’± east of the current end of pavement. The Grove roadway plan (thus, corresponding tributary area) matches the design assumptions made with the Care Housing project; therefore, no further analysis or improvements are necessary for the runoff from Basin CH. Likewise, Basin CH has been excluded from the on-site “developed” stormwater computations since this area drains to a different outfall. Final Drainage and Erosion Control Report 14 9.2 Developed Drainage Concept The Windtrail P.U.D. Outfall Swale currently drains a good portion of the site. The downstream end of this swale is located immediately east of 602 Gilgalad Way, which is also the limiting ‘pinch point’ of the outfall channel. The swale has a 100-yr design flow of approximately 130.7 cfs, with a maximum allowable capacity of 139.8 cfs. The swale was “over-sized” specifically to accommodate future developed flow from the land currently being platted as the Grove (then known as the CSURF/McCoy Land Swap). Therefore, previous Windtrail P.U.D. drainage designs would appear to provide sufficient capacity to drain a substantial portion of the Grove development. However, current homeowners in the neighborhoods north of Outlot A have expressed noted concerns with both surface and subsurface waters. Some of the issues regarding the backup of stormwater could be a result of the original design intent to achieve flat areas, subtle ponding, and created wetlands. Others could be a result of insufficient channel maintenance, over-irrigation, and sump pump discharge. Regardless of the factors currently causing water troubles for the Sundering and Windtrail neighborhoods, it is the strong desire and intent of the Applicant of the Grove to not exacerbate these problems in any way. Rather than sending developed runoff towards the Windtrail P.U.D. Outfall Swale, as it was originally intended, the Grove will design and install a completely separate outfall. Additionally, groundwater flows intercepted by the underdrain system will also be discharged away from existing homes in an effort to further ensure there are no adverse affects from the Grove development. A much better outfall for this project is the Horticulture Center Outfall Channel, which was constructed with the CAT-22 Gardens on Spring Creek improvements. 10.0 Outfall The CAT-22 Horticulture Center Outfall Channel currently flows behind the Gardens on Spring Creek. A concrete trail separates this outfall channel from the Windtrail P.U.D. outfall swale. The CAT-22 channel conveys flow from the current terminus of the Rolland Moore Drive stub (to be renamed) north towards Spring Creek. Dual 1.5’ x 6’ box culverts allow stormwater to pass under the Sherwood Lateral prior to reaching Spring Creek. The outfall channel was originally designed to convey 57.6 cfs from The Grove at Fort Collins project area in the 100-yr event. The 100-yr peak flow expected at this design point from the proposed student housing and future CSURF development is roughly 92.9 cfs. However, that does not necessarily imply that the outfall channel is insufficient to accommodate the developed runoff from the Grove. A simplified analysis of both the channel section itself, as well as the box culverts, estimated a 100-yr capacity in excess of 132 cfs. These cursory computations were calculated both with and without an assumed 34 cfs groundwater baseflow (extremely conservative). In all scenarios, the outfall could easily accept the fully developed 100-yr peak discharge from the Grove without overtopping. However, the Horticulture Center Outfall Channel cannot be fully evaluated with such simple analyses, as this channel is heavily influenced by the tailwater conditions in Spring Creek. Such correlation was witnessed as recently as this past fall of 2010 when there had been a build-up of debris immediately downstream of the outfall channel. The backwater effects caused the box culverts under the Sherwood Lateral to be nearly submerged. Fortunately, the City Stormwater Utility has since cleared the blockage in Spring Creek to provide unobstructed drainage. Nevertheless, this occurrence does prove the close correlation between the CAT-22 outfall channel and the water level in Spring Creek. Final Drainage and Erosion Control Report 15 This relationship was first documented by Anderson Consulting Engineers (ACE) in their 2002 “Hydraulic Analysis of the Horticulture Center Outfall Channel.” A HEC-RAS model was developed for the outfall channel, and 100-yr stormwater elevations were computed at both the peak time in Spring Creek as well as the peak of the local basin tributary to the storm drain feeding the outfall channel. The 2002 ACE report was based upon older Spring Creek drainage models. Northern Engineering has since obtained the most current modeling data from the City of Fort Collins, and has re-run the analysis on the Horticulture Center Outfall Channel. Additionally, the 2002 ACE report had assumed a time of concentration of 37 minutes for the CSURF basin upstream of the triple culverts. The new results reflect the latest modeling data as well as an actual time of concentration for the Grove of 26 minutes. The channel proves to have sufficient capacity to accept the 100-yr peak discharge of 92.9 cfs from The Grove at Fort Collins. Additional information on this analysis can be found in Appendix C. Even if one were to consider a catastrophic, worst-case scenario, such as the culverts being clogged or a rainfall event exceeding the 100-yr design storm, the emergency spill path would be to the east/northeast. Such an emergency overflow would likely occur via shallow overland flow traveling across City-owned property towards Spring Creek. It is practically impossible for any water from the Horticulture Center Outfall Channel to ever reach the neighboring homes in Windtrail under any circumstance. This is all the more reason to utilize the Horticulture Center Outfall Channel rather than the Windtrail P.U.D. outfall swale for the Grove’s developed runoff. It also should be noted that it is accepted design practice for culverts to be submerged at depths one-and-a-half-times their height during major rain events. Not only is the CAT-22 channel an appropriate stormwater outfall, but it currently serves to relieve groundwater in the area as well. In fact, a perennial baseflow can be observed trickling in the bottom of this channel even in the dead of winter. The underdrain system to be installed with the Grove will also outfall directly into this channel rather than routing through the Windtrail wetland drainage. The underdrain outfall will connect into the outlet structure of the water quality pond, downstream of the orifice plate. The underdrain outfall will also have an invert elevation higher than the triple culverts draining the outlet structure. These measures will help minimize the potential for stormwater to backup into the underdrain system. While routine rain events are unlikely to cause backwater in the underdrains, the potential does exist for major storms to backup into a portion of the outfall line. However, the underdrain outfall within Outlot A is solid PVC. The invert elevation crossing the right-of-way of Native Plant Way is roughly 4995.7-ft, whereas the 100-yr tailwater elevation at the outfall is approximately 4994.9-ft. The WQCV WSEL is around 4997.7-ft; however, the WQCV and the underdrain outfall are hydraulically disconnected. An inline backflow preventer could be installed on the underdrain outfall line just upstream of the outlet structure should there be remaining backwater concerns. The peak discharge of the underdrain outfall is expected to only be around 1.53 cfs (15 gpm, or 0.03 cfs, from groundwater and 1.5 cfs from the rain gardens), and has a negligible impact on the outfall channel (see Appendix J for further details on the underdrain system). Nonetheless, the floor of the concrete outlet structure will be sloped to prohibit groundwater discharge from trickling to the south and saturating the area in front of the water quality plate. Final Drainage and Erosion Control Report 16 11.0 Stormwater Quantity Detention The effective Spring Creek Master Drainage Plan assumes a set area and impervious value for Basin 130. As such, stormwater quantity detention is not required if development patterns are at or below the assumed basin parameters. The actual impervious value for the developed area within the Grove subdivision boundary (including future CSURF development of Tract A) is just over 62%. Therefore, it is prudent to run the applicable modeling to ensure that on-site detention is not required and that downstream conveyance is sufficient. Fortunately, such additional analysis has been conducted to be absolutely certain that the proposed Grove development will not have any adverse drainage impacts to downstream properties. Further examination was given to Basin 130 in the City’s MODSWMM for the Spring Creek Master Drainage Plan. Ayres Associates recently completed a large-scale study and analysis of the stormwater system in this portion of the Spring Creek basin. The November 2010 “Alternative Analysis for the Design of the Mason Street Outfall” assumed a developed area of 24 acres with a percent impervious value of 90% associated with the proposed Grove project. These parameters were modeled with the larger Spring Creek Master Plan, and the output resulted in no rise in water surface elevation to Pond 303 (aka, BNRR Pond). Therefore, it is further proven that the proposed Grove student housing development and future CSURF development of Tract A can free release without any on-site quantity detention. In fact, the Grove’s actual developed area and percent impervious values are closer to 23 acres and 59%, respectively, so there should be more than enough capacity in the downstream regional pond. 12.0 Stormwater Quality Mitigation 12.1 Water Quality Pond Regardless of whether or not on-site quantity detention is required, mitigation to address the stormwater quality of developed runoff is necessary. Water quality treatment for the Grove student housing community will primarily be achieved in the water quality pond located at the east/southeast corner of Outlot A. This pond will be designed as a standard dry extended detention basin (EDB), per City of Fort Collins guidelines. The water quality capture volume (WQCV) will help remove sediment and other pollutants from developed runoff. Criteria for a 40-hour drain time treating the 80th percentile runoff event, as outlined in the Urban Storm Drainage Criteria Manual, Volume 3 – Best Management Practices (BMPs) by the Urban Drainage and Flood Control District has been used to design the WQCV. The required water quality volume is approximately 0.53 ac-ft, and over 0.81 ac-ft is provided. The primary reason the extra volume (depth) is designed in the pond is to provide additional head to allow the developed 100-yr flow to fully pass through the outlet structure. Technically speaking, the EDB will fully satisfy the minimum water quality requirements for the Grove development. However, this project is going above and beyond the minimum requirements. Nearly every drop of developed runoff will pass over or through some sort of vegetated surface prior to leaving the project boundary. Swale 1 is intended to function as an infiltration swale, thereby offering additional water quality enhancement upstream of the water quality pond. Additionally, the CAT-22 outfall channel itself is designed as a water quality grassed swale. Therefore, there will be multiple BMPs in series between the developed runoff from the Grove and the receiving waters of Spring Creek. Final Drainage and Erosion Control Report 17 Rain Garden Precedence Photographs Photos courtesy of www.portlandonline.com 12.2 Rain Gardens One more water quality concept worth noting is the pursuit of rain garden planters within the curb extensions of Rolland Moore Drive. These roadside planters will serve to treat the stormwater from the public right-of-way. Gutter flows will be routed through the curb extension areas to create ecological rain gardens. An area-wide underdrain system will already be employed, and the same drains will extend under the rain garden areas for subsurface drainage relief. Engineering details of the rain gardens, including a specification for the bioretention sand media (BSM) can be found on Sheet D10 of the Utility Plans. Additional landscaping details, including planting, cobbles, and other surface treatments, can be found on the Landscape Plans by Ripley Design, Inc. Implementing these curb extension rain garden planters will have multiple benefits, the most obvious of which is the water quality treatment. However, there will also be the opportunity for the rain gardens to serve as a pilot project and case study for the region. Unfortunately, current Fort Collins street standards do not allow for such low-impact stormwater strategies; thus, a formal variance request has been from the Engineering Department to allow them within the public right- of-way. The City of Fort Collins Engineering/Streets Department had initially expressed concerns regarding the long-term viability, and potential replacement, of such facilities. Admittedly, the ongoing operation and maintenance of the curb extension areas are unknown at this time since there is little data or precedence in our region for such facilities. Fortunately, subsequent meetings have helped to expose and formulate remedies to the major concerns. The concepts depicted above were discussed at two Utility Coordination Meetings (04.14.10 and 01.20.11), and received no objections from the providers. A design charrette was also held on 10.26.10 to specifically address the pavement management concerns, opportunities, and constraints. A subsequent design meeting was held on 11.03.11 with multiple City Staff Departments to further discuss the design details of the already agreed to rain gardens. Additionally, the City of Fort Collins Stormwater Utility will be providing the necessary assurance for the rain gardens. As a thought-partner in these concepts, City Stormwater Staff has agreed to help champion these efforts and truly create 21st Century Utilities. The curb extension planters fall very much inline with the current trends in Green Streets and sustainable infrastructure. In fact, such techniques coincide perfectly with the recent Plan Fort Collins objectives to innovate, sustain, and connect. Rolland Moore Drive has the potential to become a showcase example of a multi- functioning street. Furthermore, the Urban Water Center at Colorado State University has expressed Final Drainage and Erosion Control Report 18 interest in another partnership project with the City of Fort Collins to install sampling stations and monitor the above-described rain gardens. Exhibit 1, above, illustrates the rain garden concept to be implemented with The Grove at Fort Collins. Stormwater runoff from the curb and gutter of Rolland Moore Drive will enter the rain gardens through 2’ wide curb openings with 2” depressed gutter sections. Cemented cobble forebays will be installed at the entrances to all rain gardens. While these forebays do take away a small amount of area from the infiltration zone, their benefit of collecting large trash, debris, and sediment far outweighs the reduced permeability. The forebays will provide much easier long-term maintenance, and will extend the life of the infiltration swale and adjoining bioretention sand media. Small weep drains will be installed in the cemented forebays to allow them to complete drain free of standing water. Downstream of the forebays, flow will enter the infiltration zone. A cobble swale will define the low flow path down the center of rain gardens. The flowline of the infiltration swale is aligned with the underdrain system, which extends under each rain garden. The underdrains from the rain gardens connect into the same outfall described in Section 4.2, above. To the side and elevated slightly above the infiltration swale is the vegetated zone. The plantings in this zone will be situated above the bioretention sand media. Non-floatable gravel mulch will be utilized, and drip irrigation will be installed for initial establishment and to ensure the long-range viability of the vegetation. Where pedestrian ramps cross the infiltration swales, sidewalk chases with decorative grates will be installed. The downstream end of each rain garden will have an overflow control weir integrated with the vertical curb and gutter. The overflow weir section consists of a 2’ wide opening with 4:1 side slopes. This will enable the rain gardens to pond to a maximum downstream depth of 4” above the adjacent street elevation prior to overtopping into the curb and gutter of Rolland Moore Drive. This shallow ponding depth is expected to allow full infiltration of the frequent storm events, while major storm events can safely spill in a controlled manner and reach the downstream storm inlets. Final Drainage and Erosion Control Report 19 The perimeters of the rain gardens will be lined with cobbles. The cobbles will be partially embedded into the underlying soil such that their tops are roughly flush with the adjacent curb heads and sidewalks. The cobble edge treatment will be situated on a 2’ wide section of compacted subgrade to provide stability to the concrete curb/gutter and sidewalk on either side. The compacted subgrade section then slopes down at 1.3:1 to the bottom of the underdrain section, helping to provide additional stability and drainage protection. One primary topic of discussion at the 11.03.11 rain garden meeting was the retrofit design alternative. The issue of concern regarded what would happen to the curb extension areas in the event that the infiltration component were to be abandoned. The two major considerations are what happens to the landscaping and what happens to the flows in the curb and gutter of Rolland Moore Drive. Exhibit 2, below, depicts the retrofit option. The ‘corrective plan’ is really quite simple. From the surface, the curb extensions will look nearly identical. The cobbles would be moved aside of the infiltration zone while the underlying sand is replaced with base material capable of supporting a concrete trickle pan. A concrete channel would then be installed, and some or all of the previous cobbles would be cemented into the channel, very similar to the forebay. This essentially puts a concrete lining under the swale section, and removes the low-flow infiltration component. The overflow weirs at the downstream end of each rain garden would be cut-out to provide a 2’ curb opening. The curb extensions would then become ‘pass- through’ landscape areas, and both frequent and major storm events would reach the downstream inlets in Rolland Moore Drive. Final Drainage and Erosion Control Report 20 13.0 Erosion and Sediment Control An Erosion and Sediment Control Plan (along with associated details) is included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan will address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the UDFCD and the City of Fort Collins Erosion Control Reference Manual for Construction Sites will be utilized. Expected measures include: silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways, and inlet protection at existing and proposed storm inlets and culverts. Special care and attention shall be given to the wetland drainageway in Outlot A. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, and job site restrooms shall also be provided by the Contractor. Final Drainage and Erosion Control Report 21 14.0 Conclusions This Final Drainage and Erosion Control Report has taken into consideration the comments and concerns raised with the previous development plan proposed for the subject property. The new analysis and updated Site Plan mitigate most, if not all, of the previous concerns. In addition to comments raised by City of Fort Collins Stormwater Staff, the Applicant also acknowledges receipt of Memorandums from the Windtrail and Sundering Townhomes Homeowners Associations dated 10.15.10 and 04.25.11, respectively; as well as concerns expressed by Mr. Terence H. Podmore, Ph.D. to the Ditch Company (Gene Fischer) on 01.27.11 and to the Fort Collins City Council on 04.19.11. All relevant engineering concerns voiced in said citizen comments have been diligently addressed. The proposed Grove at Fort Collins student housing development conforms to all governing drainage criteria and regulations. The proposed stormwater system will adequately treat the developed runoff for water quality before leaving the site. Regional conveyance and attenuation of peak discharge is provided off-site, and can safely accommodate full development of the subdivision. No adverse stormwater impacts are expected as a result of this project. The Grove will have a completely separate drainage system from Windtrail P.U.D.; thereby ensuring adjacent homeowners will not be affected by the Grove’s developed runoff. The proposed development complies with Chapter 10 of the City of Fort Collins Municipal Code – “Flood Prevention and Protection.” Final drainage improvements have been designed in accordance with applicable City of Fort Collins and UDFCD criteria. Extensive site analysis and alternative plan investigations have been conducted over the course of 2+ years. The resulting development plan best accommodates the multiple environmental and stormwater constraints of the site, while providing a great asset to the community. The Grove at Fort Collins will offer students a place to live that is close to campus and the Mason Corridor BRT, thereby lessening the vehicular impacts to local roadways and the environment. It also helps to consolidate students into an appropriate location (per vested ODPs, Master Plans, and compliant with City zoning and Land Use Code), and may relieve the stress on overburdened rental houses in single-family residential neighborhoods throughout the City. From a progressive stormwater management perspective, the rain gardens proposed along Rolland Moore Drive offer another opportunity to achieve the City’s vision for a 21st Century Utility. This collaborative effort is a true occasion to innovate, sustain, and connect. The Grove aligns with Plan Fort Collins objectives, moves towards multi-functioning (green) streets, helps create sustainable infrastructure, and promotes a high performing community. Final Drainage and Erosion Control Report 22 References 1. Addendum to the Final Drainage Report for the Windtrail P.U.D., Townhomes Site, March 1, 1995, Lidstone & Anderson, Inc. (LA Project No. COTST18.8). 2. Alternative Analysis for the Design of the Mason Street Outfall, November 2010, Ayres Associates. 3. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 4. Ecological Characterization Study Report (ESCR) Update for The Grove 11/29/10 Concept Plan, November 30, 2010, Cedar Creek Associates. 5. Erosion Control Reference Manual for Construction Sites, January 1991, City of Fort Collins. 6. Flood Insurance Rate Map (FIRM) Panel 0987F, Effective Date December 19, 2006, Federal Emergency Management Agency (FEMA). 7. Fort Collins Municipal Code (Chapter 10 – Flood Prevention and Protection), 1987, Colorado Code Publishing Company, Fort Collins, Colorado. 8. Hydraulic Analysis of the Horticulture Center Outfall Channel, September 4, 2002, Anderson Consulting Engineers, Inc. 9. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007 10. Monitor Well Installation and Slope Stability Assessment Status, September 7, 2010, Earth Engineering Company (EEC Project No. 09-01-032). 11. Project Development Drainage and Erosion Control Report, Center for Advanced Technologies 22nd Filing “Community Horticultural Center,” January 2003, EDAW Inc. (Job No. 7F082.20). 12. Revised Subsurface Exploration Report, The Grove at Fort Collins, Fort Collins, Colorado, December 7, 2010, Earth Engineering Company, Inc.(EEC Project No. 09-01-032). 13. Slope Stability Assessment, The Grove at Fort Collins, Fort Collins, Colorado, October 7, 2010, Earth Engineering Company, Inc., EEC Project No. 09-01-032). 14. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 15. Storm Drainage Design Criteria and Construction Standards, City of Fort Collins, Colorado, Updated April 1999. 16. Supplemental Subsurface Water Investigation – The Grove at Fort Collins, December 8, 2010, Applegate Group (AG File No. 10-132). 17. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Updated June 2001. APPENDIX A RATIONAL METHOD DEVELOPED RUNOFF CALCULATIONS APPENDIX B WATER QUALITY CALCULATIONS APPENDIX C PREVIOUS DRAINAGE MEMOS AND CORRESPONDENCE C.1 – Horticulture Center Outfall Channel Modeling C.1.a – Narrative C.1.b – MODSWMM: Spring Creek 100-yr PMR C.1.c – HEC-RAS: Truncated Spring Creek C.1.d – HEC-RAS: Horticulture Center Channel C.2 – Simplified Horticulture Center Outfall Analysis C.3 – BNRR Pond Capacity Confirmation C.4 – Ditch Company Letters APPENDIX C.1 HORTICULTURE CENTER OUTFALL CHANNEL MODELING C.1.a – Narrative C.1.b – MODSWMM: Spring Creek 100-yr PMR C.1.c – HEC-RAS: Truncated Spring Creek C.1.d – HEC-RAS: Horticulture Center Channel APPENDIX C.1.a HORTICULTURE CENTER OUTFALL CHANNEL MODELING Narrative APPENDIX C.1.b HORTICULTURE CENTER OUTFALL CHANNEL MODELING MODSWMM: Spring Creek 100-yr PMR APPENDIX C.1.c HORTICULTURE CENTER OUTFALL CHANNEL MODELING HEC-RAS: Truncated Spring Creek APPENDIX C.1.d HORTICULTURE CENTER OUTFALL CHANNEL MODELING HEC-RAS: Horticulture Center Channel APPENDIX C.2 SIMPLIFIED HORTICULTURE CENTER OUTFALL ANALYSIS APPENDIX C.3 BNRR POND CAPACITY CONFIRMATION APPENDIX C.4 DITCH COMPANY LETTERS APPENDIX D FLOODPLAIN INFORMATION APPENDIX E STREET CAPACITY CALCULATIONS APPENDIX F INLET AND CURB CUT CALCULATIONS APPENDIX G STORM LINE AND CULVERT CALCULATIONS APPENDIX H PRORATED CULVERT AND PRORATED WQ POND SIZING CALCULATIONS APPENDIX I EROSION CONTROL COST ESTIMATE AND RIPRAP/EROSION CALCULATIONS APPENDIX J SUPPLEMENTAL SUBSURFACE WATER INVESTIGATION (BY APPLEGATE GROUP) APPENDIX K GEOTECHNICAL / SOILS INFORMATION (BY EARTH ENGINEERING COMPANY) APPENDIX L WETLANDS / ENVIRONMENTAL INFORMATION (BY CEDAR CREEK ASSOCIATES) MAP POCKET DR1 – DRAINAGE EXHIBIT FLOOD – FLOODPLAIN EXHIBIT