Loading...
HomeMy WebLinkAboutRIDGEWOOD HILLS RESIDENCES 4TH FILING - MAJOR AMENDMENT - MJA130003 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT (3)PRELIMINARY DRAINAGE REPORT Ridgewood Hills Fourth Filing Multi-Family Residential Development Triangle Drive & Avondale Road Fort Collins, Colorado Prepared For: M. Timm Development, Inc. 233 E. Carrillo St., Suite 0 Santa Barbara, CA 93101 (805) 963-0358 Prepared By: .aI B CONSULTING OWEN GROUP, INC. 3715 Shallow Pond Drive, Fort Collins, CO 80528 Phone: 970-226-0264 Fax: 970-226-3760 April 2013 Proj . No.: 12-390 RIDGEWOOD HILLS FOURTH FILING MULTI-FAMILY RESIDENTIAL DEVELOPMENT PRELIMINARY DRAINAGE REPORT Table of Contents ENGINEER'S CERTIFICATION ........... ............................................................. ..................... 1 I. LOCATION AND DESCRIPTION OF PROPERTY AND PROPOSED DEVELOPMENT ...... 2 A. Location ........................................... .............................................. ................................... 2 B. Description of Property ....... .. .. .... ... ........... ........................................................................ 2 C. Description of Proposed Development ........................................ .... ................................. 2 II. DRAINAGE BASINS AND SUB-BASiNS ..... .. ....... .. ........ .. ............... .. ..... ... ..... ........................ 3 A Major Basin Description ...... .. ....... ............... ... .. .. ... .. .. ... .... ... ..... ... ..... .... ..... ............. ......... .. 3 B. Sub-Basin Description .. ... ........... .......... ................................... .. ... ..... ..... .... .. ........... ....... .. 3 III. DRAINAGE DESIGN CRITERIA.. ..... ...... .............................................. .... .................... ......... 4 A. Regulations ..................... ..... ... .. .. ..... ......... .................................... ...................... .. ............ 4 B. Development Criteria Reference and Constraints ............................................................ 4 C. Hydrologic Criteria ........... .. .. ......... .... ....................................... .... .... .................. ............... 4 D. Hydraulic Criteria ............. .. .. ...... .. .......................................... ... ....... ...... ........................... 5 E. Floodplain Impacts .......... .. ... ... ... ..... ... ..................................... ..... .... .... ............................. 6 F. Waiver I Variance from Criteria .... ............................................. ........................................ 6 IV. WETLAND PRESERVATION AND MITIGATION ......................................... .......................... 6 V. DRAINAGE FACILITY DESiGN.. .... .................... ................. ... ....... ......... .......... .... .. ... ... ..... .. ... 6 A. General Concept .................. .... .. ........ ... ....... ................... .. .. .... .. ....... ..... ... .. .. .. ... ..... ...... ..... 6 B. Specific Details ................ .. ... ... ........................................ .... .. ....... .. .. .............. .. ....... .. .... .. . 7 C. Erosion Control and Storm Water Considerations ................. ... .... .................. ............ ...... 9 VI. CONCLUSiONS......................... ........................................................................................... 10 A Compliance with Standards ... ... .. .... ............................................... ................................. 10 B. Drainage Concept ...................... .................................................... .. ... ............................ 10 VII . REFERENCES ................................. .............................................. ..... .... .. ...... ............ ......... 11 VIII. ATTACHMENTS IX. DRAWINGS RIDGEWOOD HILLS FOURTH FILING MULTI-FAMILY RESIDENTIAL DEVELOPMENT PRELIMINARY DRAINAGE REPORT ENGINEER'S CERTIFICATION I hereby certify that this Preliminary Drainage Report for the design of stormwater management facilities for the Ridgewood Hills Fourth Filing multi-family residential development was prepared by me, or under my direct supervision, in accordance with the provisions of the City of Fort Collins Storm Drainage Design Criteria and Construction Standards for the owners thereof. Larry C. Owen, P.E. mm,,~ i~ Registered Professional Engineer State of Colorado No. 29871 1 RIDGEWOOD HILLS FOURTH FILING MULTI-FAMILY RESIDENTIAL DEVELOPMENT PRELIMINARY DRAINAGE REPORT I. LOCATION AND DESCRIPTION OF PROPERTY AND PROPOSED DEVELOPMENT A. LOCATION The proposed development is located in the Southeast Quarter of Section 14, Township 6 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. The site is bounded on the west, south of Avondale Rd., by single-family residential lots fronting onto Triangle Dr. , on the north and west, north of Avondale Rd., by Triangle Dr., on the east by vacant land, and on the south by single-family residential lots fronting onto Peyton Dr. Adjacent land use to the south, west and north of the project site is single-family residential , and to the east of the site, the vacant land immediately adjacent to the site is designated for medium-density mixed-use neighborhood development, and beyond that for neighborhood commercial development. The site is entirely within the bounds of the City of Fort Collins. B. DESCRIPTION OF PROPERTY The site comprises a total area of 10.4 acres. The property is currently vacant, but has been used for agriculture in past. The current ground cover is a mix of native grasses. The site slopes generally from west to east, at surface gradients ranging between 3.5% and 15%. There is a gentle ridge, however, that bisects the site along an axis aligned roughly from northwest to southeast and generally corresponding to the alignment of Avondale Road, which effectively subdivides the site into two natural drainage basins, both ultimately draining to the east, but in the context of the site alone, one drains to the northeast and the other to the southeast. The native soils underlying the site are predominantly silty loams (Wiley loam - 65.6% of site area; Fort Collins loam - 27.7% of site area; and Satanta loam - 6.7% of site area). All of these soils fall within NRCS Hydrologic Soil Group B. A geotechnical engineering investigation that was conducted at the site in 2004 characterized the subsurface soils as sandy, lean clays, extending to depths in excess of 15 feet, in most areas of the site. At one boring location in the northern portion of the site and at two locations in the southern portion of the site, weathered siltstone/claystone bedrock was encountered at depths of approximately 11 - 12 feet. No groundwater was encountered during initial boring or when the borings were reinspected several days later. Flood plain mapping for the vicinity of the development site indicates that no portion of the site lies within any mapped floodplain area. C. DESCRIPTION OF PROPOSED DEVELOPMENT The proposed development of the site will consist of multi-family residential buildings, including 146 dwelling units in 11 buildings (2-story and 3-story); 33 enclosed garages in 2 three buildings; a clubhouse, with adjoining pool I spa, sports court, tot lot and recreation area; paved access driveways, sidewalks, and outdoor parking areas; and landscaped open space. Buildings will cover approximately 19.8% of the site; paved drive aisles, sidewalks and vehicle parking areas will cover approximately 29.2% of the site; and landscaped open space will account for 51.0% of the site area. Access to the development will be via the eastward extension of Avondale Road from Triangle Drive. The layout of the proposed development is shown as the base of the Drainage Plan, which is included as an attachment to this report. Municipal infrastructure for supply of potable water and collection of sanitary sewage is available adjacent to the site in Triangle Drive, as well as at the end of Peyton Dr., south of the site. Appropriate utility mains will be extended throughout the site to serve the development. Electric power, natural gas, telephone and cablevision services are also available to serve the development. Stormwater runoff from the development will be directed via overland flow to appropriately sized and located storm drain inlets and drainage piping, and conveyed to one of two existing off-site detention basins; one located across Triangle Dr. from the north tip of the site, and the other located south of Peyton Dr., approximately 250 feet south of the site. II. DRAINAGE BASINS AND SUB-BASINS A. MAJOR BASIN DESCRIPTION The proposed development lies within the Fossil Creek Master Drainage Basin, as delineated in the City of Fort Collins Drainage Basin Master Plan (City of Fort Collins, June 2004). B. SUB-BASIN DESCRIPTION The site is located in Basins OS-4, 821 and 918, as well as a portion of Basin 917, as delineated in the Ridgewood Hills PUD, Filing 3, Final Drainage & Erosion Control Study (Nolte Associates, June 2000). The northern portion of the site (Tract B) drains to the east and is Basin OS-4. According to the Nolte report, development of Basin OS-4 was anticipated to include multi-family residential dwellings, and runoff was to be routed through one of the two Ridgewood Hills 3rd Filing detention basins (labeled as Detention Ponds #1 and #2). Both of the detention ponds were reported to have sufficient capacity to accommodate developed runoff from Tract B. The southern portion of the site (Tract A) consists of Basin 821 and a portion of Basin 917. Tributary flows include those from on-site areas, as well as the rear portions of the developed single-family lots along the east side of Triangle Dr., between Avondale Rd., and Peyton Dr., and the rear portions of the developed single-family lots along the north side of Peyton Dr., east of Triangle Dr. This basin also includes the front halves of the first 3 Yz lots on the east side of Triangle Dr., south of Avondale Rd., and the east half of Triangle Dr., abutting those lots. The total off-site area that is tributary to the southern drainage system is approximately 1.59 ac. 3 A portion of the site along the east perimeter slopes away sharply from the remainder of the site. Runoff from this area cannot reasonably be captured and directed to the detention basins. Thus, runoff will flow overland from this area onto the adjacent undeveloped land, as it does currently. There are no improvements proposed in this area of the site, aside from grading and landscaping, so the rate of runoff from this area will be essentially the same as it is for the historic, undeveloped condition. The total area of the undetained portion of the site is approximately 1.25 ac (0.90 ac. north of Avondale Rd., and 0.35 ac. south of Avondale Rd.). For purposes of analyzing the drainage regime for the proposed development, the project site and off-site tributary areas have been subdivided into 27 drainage sub-basins, reflective of the anticipated final topography of the site. These drainage sub-basins range in size from 0.04 acres to 1.87 acres. These on-site and off-site sub-basins comprise the drainage regime for the project and are accounted for in the stormwater management analysis and the design of stormwater management improvements for the project. While final grading of the development site will result in localized ridges and depressions, the overall direction of storm flow will continue to be generally consistent with the existing predevelopment drainage patterns of the site. III. DRAINAGE DESIGN CRITERIA A. REGULATIONS The proposed stormwater management improvements for the development of Ridgewood Hilts Fourth Filing are designed in accordance with the requirements of the City of Fort Collins Storm Drainage Design Criteria and Construction Standards (City of Fort Collins, May 1984, March 1991 and January 1997). The recently approved amendment to the Fort Collins Stormwater Criteria Manual, requiring the incorporation of Low-Impact Development (LID) principles and criteria, is also expected to apply to this development. The specific requirements of the LID amendment, as they may apply to this site, have not yet been determined and, thus, are not reflected in this Preliminary Drainage Report. Those requirements will be clarified through meetings and discussions with City staff, and will be incorporated, as necessary, into the final design of stormwater management improvements for the project. B. DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS The criteria used as the basis for analysis and design of stormwater management improvements for this site are those found in the references cited in the section immediately above. To the knowledge of the author, there are no other capital drainage improvements planned for this portion of the Fossil Creek Master Drainage Basin, aside from those referred to above, that would constrain or otherwise influence the design of the stormwater improvements for this site. C. HYDROLOGIC CRITERIA Stormwater runoff from the respective sub-basins of the Ridgewood Hills Fourth Filing site is analyzed for storms with 2-year and 1 ~O-year return frequencies. 4 Due to the relatively small aggregate area of the tributary drainage sub-basins (approximately 13.5 acres, including off-site tributary areas), the Rational Method was chosen for use in the design of the stormwater management improvements. The Rational Method provides that: Q =CIA, where: Q = Design flow in cubic feet per second (cfs) C = Coefficient of runoff for the area under consideration I = Rainfall intensity for the design storm duration (in/hr) A =Area of the drainage sub-basin under consideration (a c) Composite coefficients of runoff were calculated for the two design storm events, based on the applicable percent imperviousness of the respective surfaces (roof, pavement, landscaped areas, etc.) within the various sub-basins. Rainfall intensities were determined using information presented in the City of Fort Collins Storm Drainage Design Criteria and Construction Standards. For this Preliminary Drainage Report the adequacy of the two off-site detention basins is accepted, per the Nolte report. Tract B (the northern portion of the site) will, for the most part, drain to the northeast and into existing Detention Pond #1 and Tract A (the southern portion of the site), plus a small portion of Tract B, will drain to the southeast and into existing Detention Pond #2. Analyses that were conducted by Interwest Consulting Group for a previously proposed development of this same site included recommendations that some modifications be made to the flow control orifices in the outlet control structures for both existing detention ponds, and to the emergency overflow spillway in Detention Basin #2, in order to properly reflect the City's revised rainfall criteria and the specific runoff characteristics of the proposed development. Similar analyses will be conducted for the currently proposed development, as part of the final design process, and appropriate design revisions will be included in the final design submittal. The detention analyses will also reflect application of the newly adopted LID criteria, as necessary. The design worksheets included in the Attachments to this Preliminary Drainage Report present documentation of the hydrologic calculations for the on-site storm drainage systems. D. HYDRAULIC CRITERIA Within the development, a significant portion of the runoff will be conveyed on the surface, initially as sheet flow and subsequently as concentrated flow in shallow pans and gutters, as well as in grassed swales. In order to minimize surface accumulations of runoff, the assessment of required capacity and the sizing of the respective components of the drainage system are based on the anticipated runoff from the 100-year storm event. No detention is planned within any of the traffic circulation or parking areas, and it is the intent of the design that there be minimal, if any, accumulation of runoff in paved parking or travel areas. Inevitably, however, some accumulation will occur under extreme storm events, due to the constriction presented by inlet openings. In all cases, it is the intent of the design that the maximum depth of accumulation be less than one foot and that the duration of localized impoundment be short. 5 Where the site grading design in localized areas precludes continuous surface migration of runoff to the respective detention basins, appropriately sized inlets and storm drain piping are included to convey the accumulated runoff from these localized collection points to the detention basins. Inlet locations and sizing will be refined in the final design phase of the project. The calculation spreadsheets included in the Attachments to this Preliminary Drainage Report reflect this design approach. E. FLOODPLAIN IMPACTS As stated in Section I B (Description of Property) above, there are no mapped floodplains that impact this property. F. WAIVER I VARIANCE FROM CRITERIA There are currently no waivers or variances from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards requested in connection with the design of the stormwater management facilities for the Ridgewood Hills Fourth Filing development. IV. WETLAND PRESERVATION AND MITIGATION There are no wetlands within the boundaries of the site. V. DRAINAGE FACILITY DESIGN A. GENERAL CONCEPT In general , developed flows will follow the intent of the Ridgewood Hills PUD, Filing 3 drainage report, with all tributary flows updated to reflect 1997 Rainfall. As stated above, Tract B will, for the most part, drain to existing Detention Pond #1 and Tract A , plus a small portion of Tract B, will drain to existing Detention Pond #2. Water quality requirements will be addressed through implementation of LID principles, on-site, as well as within the detention basins. Off-site migration of runoff will be minimized to the extent practical. The design of the stormwater management systems for the Ridgewood Hills development is based on the premise that runoff generated within the site should be managed within the site, to the greatest extent practicable, such that there is no adverse impact to either the development or to adjacent or downstream properties, drainage facilities and waterways. The grading plan for the site has been designed to promote positive drainage away from all building envelopes, and to direct collectable runoff flow to the collection system and then to the detention basins. The design worksheets included in the attachments to this Preliminary Drainage Report present details of the hydrologic and hydraulic calculations pertinent to the design of the on­ site storm drainage system. A Preliminary Drainage Plan, showing the Concept Plan for development of the site and proposed developed drainage patterns is included in the map pocket following the attachments. 6 B. SPECIFIC DETAILS There are a number of collection and conveyance scenarios within the drainage regime associated with this development. The respective scenarios are described below. Runoff from all buildings and the immediately adjacent landscaped areas will migrate via overland flow to either an adjacent paved parking area and drive aisle or to an area inlet in a nearby landscaped collection area. Within Tract B, runoff from the buildings along the west side of this portion of the site adjacent to Triangle Drive will be, for the most part, directed to a series of connected area inlets and a piping network beneath the landscaped area between the buildings an the street. These sub-basins comprise an aggregate area of approximately 1.14 ac and generate a 100-yr flow of 7.56 cfs. Runoff from the adjacent drive aisle and parking area, including the west half of the garages, will flow overland to a low-point inlet at the north end of the drive aisle. This sub-basin comprises an area of 0.83 ac and generates a peak design runoff of 8.22 cfs. Runoff from the clubhouse and amenities area in the central region of Tract B, as well as from the adjacent drive aisles to the south and east, and the north half of the two residential buildings fronting onto Avondale Road will migrate via overland flow to the drive aisles and to a low-point inlet toward the north end of the east drive aisle. This SUb-basin comprises an area of 1.87 ac and will generate a peak design runoff of 15.79 cfs. The runoff accumulating at the inlet in the east drive aisle, along with that accumulating at the inlet at the north end of the west drive aisle, will be piped northward to the existing inlet in the east gutter of Triangle Drive, and from there to existing Detention Pond #1. At a point in this piped system just upstream of the existing Triangle Drive inlet, the accumulated runoff from the buildings and surrounding landscaping along the Triangle Drive frontage of Tract B will be coming led with the flows from the interior areas of the site. The total design flow entering the existing Triangle Drive inlet from the drainage systems serving Tract B is calculated to be 30.55 cfs. In addition to this collected runoff, there will be uncollected runoff from the landscaped area along the east perimeter of Tract B. That runoff is calculated to be 2.60 cfs, which will exit the site in a relatively uniform sheet flow across a property line measuring approximately 706 feet in length (0.037 cfs 1ft). Within Tract A, there will also be a blend of overland flow and piped flow, but the areas tributary to the piped collection system are more broadly integrated than those in Tract B. Runoff from the southern portions and surrounding landscaping of the Tract B buildings fronting onto Avondale Dr., as well as from a corner of the building and adjacent landscaping in the northwest corner of Tract A, and from the off-site single-family area draining to Triangle Drive and then to Avondale Road either migrates to the adjacent street gutter and flows to one of several street inlets, or is collected in a series of area inlets in the respective landscaped areas, from where it is piped to the storm main to be located within the Avondale Road right-of-way. The aggregate tributary area within this collection of sub­ basins is 2.12 ac, and the peak design runoff generated from this area amounts to 12.08 cfs. Runoff from the buildings, adjacent landscaped areas and paved drive aisle and parking area in the northeast quadrant of Tract A will be collected in area inlets and a parking lot inlet at the east end of the drive aisle, and piped to the storm main that will be an extension of the storm main serving the Avondale Road sub-basins. The aggregate area of these 7 northeast sub-basins is 0.68 acres, and the incremental peak design runoff from these sub­ basins is calculated to be 3.95 cfs. Runoff from the buildings, driveways, parking areas and landscaped space within the three interior sub-basins in Tract A, comprising the majority of the area tributary to this drainage system, will migrate via overland sheet flow and shallow gutter flow, to an inlet near the southeast corner of the site, from where it will be piped to the a connection point with the storm drain serving the Avondale Road sub-basins and those in the eastern region of the site, and from there to existing Detention Pond #2. The aggregate area of these three interior sub-basins is 3.22 acres and the peak design flow generated from these sub-basins is calculated to be 21.15 cfs. There is a drainage sub-basin along the southern perimeter of Tract A, which includes a landscaped buffer area along between this site and the adjacent single-family lots, the southern half of the most southwesterly building on this site, the southeast quarter of the most southeasterly building on this site, and the rear portions of the single-family lots. Runoff from this tributary area will migrate via overland sheet flow to a grassed swale running along the southern perimeter of the site, and eventually into an area inlet near the southeast corner of the site. Flows accumulated at the area inlet will be comingled with the runoff piped from the central region of Tract A and piped to the connection with the main north-south storm drain along the eastern perimeter of the site. The aggregate area of this southern perimeter drainage basin is 1.80 acres, and the incremental peak design runoff from this area is calculated to be 5.12 cfs. The drainage sub-basins, overland flow directions and the piped drainage systems serving the proposed development are shown on the drawings included with this report. The following table presents a summary of the tributary sub-basins and corresponding calculated hydrology for the proposed Ridgewood Hills Fourth Filing development. 8 DRAINAGE DATA SUMMARY TABLE SUB-BASIN DESIGN BASIN COMP. RUNOFF COEFF. CUMMDES.RUNOFF (cfs) 1.0. POINT AREA (ac) C2 C100 0 2 0100 North System N1 1 0.353 0.53 0.66 0.66 2.31 N2 2 0.276 0.52 0.66 1.18 4.11 N3 3 0.301 0.57 0.72 1.79 6.26 N4 4 0.211 0.50 0.62 2.08 7.56 N5 5 1.872 0.68 0.85 4.08 15.79 N6 6 0.830 0.80 1.00 2.35 8.22 7 6.08 23.69 8 7.87 30.55 OS-1 9 0.401 0.71 0.89 8.76 34.01 N7 0.900 0.25 0.31 0.73 2.60 N8 0.163 0.68 0.85 0.39 1.37 South System S1 10 0.560 0.58 0.73 1.00 3.73 S2 11 0.125 0.41 0.52 1.05 3.85 S3 12 0.235 0.46 0.57 0.38 1.34 13 1.35 4.93 S4 14 0.121 0.47 0.59 0.20 0.71 S5 15 0.125 0.46 0.57 0.20 0.71 S6 16 0.154 0.73 0.91 1.96 7.20 S7 17 0.155 0.41 0.51 0.22 0.78 S8 18 0.412 0.68 0.85 1.14 4.26 S9 19 0.112 0.74 0.92 0.29 1.03 20 3.09 11.40 S10 21 0.119 0.69 0.86 3.27 12.08 S11 22 0.201 0.62 0.77 0.44 1.55 23 3.56 13.15 S12 24 0.436 0.64 0.81 0.90 3.49 25 4.28 15.90 S13 26 0.041 0.61 0.76 0.08 0.31 27 4.30 16.03 S14 28 1.866 0.64 0.80 3.01 11.80 S15 29 1.153 0.77 0.96 5.09 20.03 S16 30 0.204 0.78 0.98 5.39 21.15 S17 31 0.810 0.32 0.41 0.94 2.84 S18 32 0.990 0.28 0.35 6.70 26.27 33 10.56 41 .62 S19 0.352 0.25 0.31 0.31 1.10 C. EROSION CONTOL AND STORM WATER QUALITY CONSIDERATIONS Permanent water quality enhancement will be provided through the design of on-site LID improvements, as necessary, as well as the outlet control structure components of the detention facilities, as addressed above. In addition, storm water quality and erosion control during construction will be addressed through the application of Best Management Practices (BMPs), as recommended in Volume III of the Urban Storm Drainage Criteria Manual (UDFCD, April 2008). 9 Throughout the course of construction and until such time as permanent drainage surfaces and/or vegetation are established throughout the development, appropriate measures will be implemented and maintained to minimize erosion and limit the transport and migration of sediment. Silt fencing will be installed along the downstream perimeters of the site (south and east), as well as around sub-sites or work areas within the site, as appropriate. Temporary drainage swales will be established throughout the site, as necessary, to collect and convey storm runoff from the work areas, and temporary sediment barriers will be installed at regular intervals along the lengths of these swales to slow the runoff flows and promote deposition of sediment and other suspended solids. The anticipated locations of the temporary swales, as well as details of erosion control Best Management Practices (BMP's) will be shown on the Erosion Control Plan, submitted as part of the Final Compliance drawing set. All runoff from the disturbed portions of the site will be intercepted and directed to one of the temporary sediment traps within the site, and discharge from these facilities will be controlled. Accumulated sediments will be periodically removed from these facilities and properly disposed of. Permanent landscaping will be installed within the developed area, as soon as practical, and temporary revegetation or mulching will be implemented if there are any areas disturbed by construction activities, but not scheduled for immediate implementation of development improvements. VI. CONCLUSIONS A. COMPLIANCE WITH STANDARDS The design of the storm water management improvements to serve the Ridgewood Hills Fourth Filing development is in compliance with the City of Fort Collins Storm Drainage Design Criteria and Construction Standards. The criteria and recommendations of the Urban Storm Drainage Criteria Manual are also reflected in the design of the drainage systems. B. DRAINAGE CONCEPT The proposed drainage improvements for the Ridgewood Hills Fourth Filing development will effectively protect the proposed development, as well as downstream properties, drainage facilities and natural waterways, from the potential impacts of storm runoff, resulting in no adverse impacts from the improvements proposed for this site. Development of the site, as proposed, should have a beneficial impact on water quality in downstream drainage facilities and drainage ways by reducing of delaying the initial discharge of runoff from the site such that sediments and other potential pollutants typically carried by this first flush are removed from the flow. 10 VII. REFERENCES "City of Fort Collins Storm Drainage Design Criteria and Construction Standards" City of Fort Collins, May 1984, March 1991 and January 1997 "Urban Storm Drainage Criteria Manual", Volumes 1 & 2, UDFCD, April 2008 "Urban Storm Drainage Criteria Manual", Volume 3, UDFCD, April 2008 11 ATTACHMENTS I r-- r ~-rt ' ! I I ,.. ~rl . ._- .-- . -- - +:- ­ .- ...- ... • ··i 1 I / , , l, 0 ~", , ' . ~ !l I / TRILBY ROAD . ;-', .;':. i . 1 ___Cl ; I 'J ! I .-,-­ ! . /. ' I' .! I ii' , . - -~- }I ~l' ! ! 1 . pr."""'i " I Cl~n $S.CT .., : f . -"".' '' '. l ! I ., :, j ' ­ , , u.i I' .~ . , "" .. ~ -~. - . fi' w C> !I .W ..J , I ...J il1/' o I () . ! -1 ;iJ , -----l­ I . CARPENTER RD . \I ,1 _- --- ...:-..:.-. - .. ---.--.--~. SITE PROJECT - - ~- - . .-. -- - . - _: ­ i _.' . I " VICINITY MAP Hydrologic Soil Group-------Larimer County Area, Colorado (Ridgewood Hills Fourth Filing) 40· 29' 7" 40· 2S' 54" 40· 29' 7" 40· 28' 54" Map Scale: 1:1,S80 W printed on Asize (S.S" x 11") sheet. __-==:::::II____-=====Meters A N o 15 W ~ 00 O!"""...~50:==1~01llll0---·211110"'0===~30~eel USDA Natural Resources Web Soil Survey 4/3/2013 = Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group-Larimer County Area, Colorado (Ridgewood Hills Fourth Filing) MAP LEGEND Area o of Interest Area (AOI) of Interest (AOI) Soils Soil Map Units Soil Ratings D A D ND D B D BID D C D CID D D Not rated or not available Political Features o Cities Water Features Streams and Canals Transportation +++ Rails -/V' Interstate US Routes Highways Major Roads .A../ Local Roads MAP INFORMATION Map Scale: 1: 1 ,880 if printed on A size (8.5" x 11 ") sheet. The soil surveys that comprise your AOI were mapped at 1 :24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for accurate map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: UTM Zone 13N NAD83 This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 7, May 1, 2009 Date(s) aerial images were photographed: 8/6/2005 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA ~iiiiji Natural Resources Web Soil Survey 4/3/2013 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group-larimer County Area, Colorado Ridgewood Hills Fourth Filing Hydrologic Soil Group Hydrologic Soil Group-- Summary by Map Unit - Larimer County Area, Colorado (C0644) Map unit symbol 37 Map unit name Rating Acres in AOI Percent of AOI Fort Collins loam, 5 to 9 percent slopes B 3.1 27.7% 96 Satanta loam, 3 to 5 percent slopes B 0.8 6.7% 118 Wiley silt loam, 1 to 3 percent slopes B 0.4 3.9% 119 Wiley silt loam, 3 to 5 percent slopes B 7.0 61.7% Totals for Area of Interest 11.3 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, S, C, and D) and three dual classes (NO, BID, and C/O). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group O. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (NO, BID, or C/O), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group 0 are assigned to dual classes. USDA Natural Resources Web Soil Survey 4/3/2013 =-iiiiii Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group-Larimer County Area, Colorado Ridgewood Hills Fourth Filing Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey =-jjjj= Conservation Service National Cooperative Soil Survey Page 4 of 4 4/3/2013 RIDGEWOOD HILLS APARTMENTS DRAINAGE BASIN COMPONENT AREA DATA 3/29/13 Basin 1.0. Total Area Pavement Buildings Landscaped North System (s.f.) (ae) (s.f. ) (ae) (s.f. ) (ae) (s·U (ae) N1 15,358 0.353 0 0.000 6 058 0.139 9,300 0.213 N2 12037 0.276 a 0.000 4,723 0.108 7314 0.168 N3 13 116 0.301 0 0.000 6,058 0.139 7058 0.162 N4 9,185 0.211 0 0.000 3,248 0.075 5,937 0.136 N5 81,554 1.872 42,000 0.964 7875 0.181 31679 0.727 N6 36,142 0.830 24,914 0.572 3,293 0.076 7,935 0.182 N7 39187 0.900 0 0.000 0 0.000 39,187 0.900 N8 7,103 0.163 4,331 0.099 0 0.000 2,772 0.064 OS-1 17473 0.401 11603 0.266 0 0.000 5870 0.135 North System Subtotal 231155 5.307 82848 1.902 31255 0.718 117052 2.687 South System S1 24413 0.560 9554 0.219 2,000 0.046 12,859 0.295 S2 5,428 0.125 0 0.000 1,269 0.029 4159 0.095 S3 10,225 0.235 0 0.000 3,029 0.070 7196 0.165 S4 5,270 0.121 0 0.000 1,683 0.039 3,587 0.082 S5 5,443 0.125 0 0.000 1 599 0.037 3,844 0.088 S6 6,714 0.154 4,556 0.105 0 0.000 2,158 0.050. S7 6,757 0.155 0 0.000 1 509 0.035 5,248 0.120 S8 17,943 0.412 10972 0.252 0 0.000 6,971 0.160 S9 4,872 0.112 3394 0.078 0 0.000 1478 0.034 S10 5191 0.119 3226 0.074 0 0.000 1,965 0.045, S11 8,767 0.201 0 0.000 4611 0.106 4,156 0.095 S12 18,992 0.436 7457 0.171 3245 0.074 8290 0.190 S13 1,804 0.041 0 0.000 931 0.021 873 0.020 S14 81287 1.866 29061 0.667 16184 0.372 36042 0.827 S15 50,233 1.153 28576 0.656 8392 0.193 13,265 0.305 S16 8,874 0.204 4,865 0.112 1 881 0.043 2128 0.049 S17 35304 0.810 0 0.000 3764 0.086 31 ,540 0.724 S18 43,113 0.990 0 0.000 1 878 0.043 41,235 0.947 S19 15348 0.352 0 0.000 0 0.000 15348 0.352 South System Subtotal 355978 8.172 101 661 2.334 51975 1.193 202342 4.645 Tributary Area Total 587,133 13.479 184,509 4.236 83,230 1.911 319,394 7.332 RIDGEWOOD HILLS APARTMENTS RUNOFF COEFFICIENTS & PERCENT IMPERVIOUSNESS Rational Method Runoff Coefficients & % Imperviousness Runoff Coeff % Imprerv. Roof 0.95 90 Pavement 0.95 100 Landscaped 0.25 0 Basin 1.0. Total Basin Bldg Footprint Pavement Landscaped Composite Composite Area Area Area Area Runoff Coeff. % Imperv. (ac) (ac) (ac) (ac) North &ystem N1 0.353 0.139 0.000 0.213 0.53 35.50 N2 0.276 0.108 0.000 0.168 0.52 35.31 N3 0.301 0.139 0.000 0.162 0.57 41.57 N4 0.211 0.075 0.000 0.136 0.50 31.83 N5 1.872 0.181 0.964 0.727 0.68 60.19 N6 0.830 0.076 0.572 0.182 0.80 77.13 N7 0.900 0.000 0.000 0.900 0.25 0.00 N8 0.163 0.000 0.099 0.064 0.68 60.97 OS-1 0.401 0.000 0.266 0.135 0.71 66.41 South System S1 0.560 0.046 0.219 0.295 0.58 46.51 S2 0.125 0.029 0.000 0.095 0.41 21.04 S3 0.235 0.070 0.000 0.165 0.46 26.66 S4 0.121 0.039 0.000 0.082 0.47 28.74 S5 0.125 0.037 0.000 0.088 0.46 26.44 S6 0.154 0.000 0.105 0.050 0.73 67.86 S7 0.155 0.035 0.000 0.120 0.41 20.10 S8 0.412 0.000 0.252 0.160 0.68 61.15 S9 0.112 0.000 0.078 0.034 0.74 69.66 S10 0.119 0.000 0.074 0.045 0.69 62.15 S11 0.201 0.106 0.000 0.095 0.62 47.34 S12 0.436 0.074 0.171 0.190 0.64 54.64 S13 0.041 0.021 0.000 0.020 0.61 46.45 S14 1.866 0.372 0.667 0.827 0.64 53.67 S15 1.153 0.193 0.656 0.305 0.77 71.92 S16 0.204 0.043 0.112 0.049 0.78 73.90 S17 0.810 0.086 0.000 0.724 0.32 9.60 S18 0.990 0.043 0.000 0.947 0.28 3.92 S19 0.352 0.000 0.000 0.352 0.25 0.00 North System Total 4.905 0.718 1.636 2.552 0.59 46.51 South System Total 8.172 1.193 2.334 4.645 0.55 41 .70 Tributary Area Tot. 13.078 1.911 3.969 7.198 0.56 43.50 RIDGEWOOD HILLS APARTMENTS Prepared by: ~ TImes of Concentration 2-yr Storm Event Date: 3/29/13 Frequency Adjustment Factor: 1.00 Sub-Basin Data Initial 1Overland TIme Basin I Area Runoff Coeff LenQth Slope TI 1.0. I (ac) (It) (%) (min) North System N1 0.353 0.53 35 6.0% 3.51 N2 0.276 0.52 35 10.0% 2.98 N3 0.301 0.57 35 15.0% 2.38 N4 0.211 0.50 30 100% 2.89 N5 1.872 0.68 95 6.0% 4.26 N6 0.830 0.80 20 5.0% 1.49 N7 0.900 0.25 83 11.0% 6.56 N8 0.163 0.68 42 5.0% 3.02 OS-1 0.401 0.71 54 2.0% 4.21 South System S1 0.560 0.58 75 2.0% 6.68 S2 0.125 0.41 57 2.0% 7.71 S3 0.235 0.46 45 15.0% 3.30 S4 0.121 0.47 24 2.0% 4.57 S5 0.125 0.46 23 2.0% 460 S6 0.154 0.73 30 2.0% 306 S7 0.155 0.41 25 5.0% 3.81 S8 0.412 0.68 35 2.0% 3.71 S9 0.112 0.74 20 2.5% 2.24 S10 0.119 0.69 33 3.0% 3.10 S11 0.201 0.62 22 2.0% 3.36 S12 0.436 0.64 63 2.0% 5.38 S13 0.041 0.61 50 1.0% 6.46 S14 1.866 0.64 156 1.0% 10.75 S15 1.153 0.77 28 2.0% 2.64 S16 0.204 0.78 40 1.0% 3.76 S17 0.810 032 28 25.0% 2.65 S18 0.990 0.28 18 20.0% 2.42 S19 0.352 0.25 78 20.0% 5.22 Total 13.48 Channel Travel TIme Length Slope Velocity (ft) (%) (fps) 200 Pipe Flow 200 Pipe Flow 220 Pipe Flow 120 Pipe Flow 460 2.65% 3.20 515 4.47% 4.20 368 Pipe Flow 135 2.20% 2.90 596 3.36% 3.60 81 1.23% 1.60 375 2.40% 3.00 165 Pipe Flow 167 2.40% 3.00 35 Pipe Flow 64 Pipe Flow 80 Pipe Flow 400 2.25% 2.90 RIDGEWOOD HILLS APARTMENTS Prepared by: ~ Times of Concentration 100-yr Storm Event Date: 3!29/13 Frequency Adjustment Factor: 1.25 Sub-Basin Data Initial! Overland Time Basin Area Runoff Coeff LenQlh Slope Ti 1.0. ae ft % min North System N1 0.353 0.53 35 6.0% 2.71 N2 0.276 0.52 35 10.0% 2.30 N3 0.301 0.57 35 15.0% 1.74 N4 0.211 0.50 30 10.0% 2.29 N5 1.872 0.68 95 6.0% 2.55 N6 0.830 0.80 20 5.0% 0.51 N7 0.900 0.25 83 11 .0% 6.08 N8 0.163 0.68 42 5.0% 1.81 OS-1 0.401 0.71 54 2.0% 2.26 South System S1 0.560 0.58 75 2.0% 4.81 S2 0.125 0.41 57 2.0% 6.55 83 0.235 0.46 45 15.0% 2.71 84 0.121 0.47 24 2.0% 3.70 S5 0.125 0.46 23 2.0% 3.78 86 0.154 0.73 30 2.0% 1.58 87 0.155 0.41 25 5.0% 3.25 S8 0.412 0.68 35 2.0% 2.22 89 0.112 0.74 20 2.5% 1.10 810 0.119 0.69 33 3.0% 1.82 811 0.201 0.62 22 2.0% 2.28 812 0.436 0.64 63 2.0% 3.48 813 0.041 0.61 50 1.0% 4.44 814 1.866 0.64 156 1.0% 7.02 815 1.153 0.77 28 2.0% 1.13 816 0.204 078 40 1.0% 1.45 817 0.810 0.32 85 10.0% 5.60 818 0.990 0.28 18 20.0% 2.21 S19 0.352 0.25 78 20.0% 4.84 Total 13.48 - L­ "----­ '------­ - Channel Travel Time LenQlh Slope Velocity ft %) (fps) 200 Pipe Flow 200 Pipe Flow 220 Pipe Flow 120 Pipe Flow 460 2.65% 3.20 515 4.47% 4.20 368 Pipe Flow 135 2.20% 2.90 596 3.36% 3.60 81 1.23% 1.60 375 2.40% 3.00 165 Pipe Flow 167 2.40% 3.00 35 Pipe Flow 64 Pipe Flow 80 Pipe Flow Figure 3·1 City of Fort Collins, Colorado Rainfallintensity-Duration-Frequency Curve City of Fort Collins Precipitation Frequency Analysis, 1999 (Regional Analysis) 11,00 10,00 · : · ·~:;; tc-· , ,'.~ ' -;l ' '. .' r' ': '"~ I. I . .~ I : :; ':~~ ~~·~~~:...-" .,...;;.}/::,;, :..,;,.~~ : ':~.;}t ; ~' ;;;' :; -_ }~-j:i fJ;:" ·; ~~;if:4;~! 9.00 .•.• j ·' · :~:~T: ' ':::'::ET ' ~: /~ . .~ " ", ' ",. ; : ~~ ., ..,. .: . ; '. •'.-,--' ~.!.."..; . ;.:... .. ;,. . " ~ ' -.' ~. " "'1 --;, ..~ : ' : 7,00 '- ~ ;. , -- .~r.l.t: c: ., .- ~,.:.-.~ " ·~": '~ :.,:~. . _:~.·_~~: ~t. ": ;, ,_{r~ } ,'~-~ : :;- ~}-; ). ~. i ':4", ',-:'.". ."~., ~ . i , .._.._ :. .. :.. ,'.:. :~ ';':' '.•." .,.~~ ..:,. "7-•. • • '- . ~~~~ -';~,: . ; .. ~ r -~~~~:;; .- .'",":..' :TO" ',.' ..:<',,-..._> . j 1-- ·-- 25-year ~ ' - ' ~ " . : : .~ r :'~..; .," :_ '':- or ; 0,:. .~ : :.' , ! 1- I >. · ·.l ' t l ' , .. ' • ' ; , : .•• ' .. . . ;' : ., - ~O-ye"r ~ - _ ".0•• , ~ II) 5.00 ~ .:~!:~'. ~: :... '. ~~'~ . -. - " + . : ; ,- - - 5-year t: 1- --- 2~y~_a~ ._ .<..ll . I •• , ' ,• t: 4.00 ....;.. .. : ~ : ;i,:~ : ~ ; ,~:,:<~~ ;~;:,,{ , =+ ;; n'> .! ,.. ~ •.... ..•.....•- ~ ~ -. . ,.;. ," ,; '" 3.00 : :'..:; . : , . ; . , : ;:,:;: ~~ , .: -:::::: . :;: . : : ; ~ t'. ~:~')c~: 2.00 .\..,:..Z':... . ' :'7'~;" ;r ~.; ~ . :. ' :' ;..!. :. >~: ~~ '1 1.00 0.00 o 20 40 60 80 100 120 Duration (minutes) City of Fort Collins Rainfall Intensity-Duration-Frequency Table for using the Rational Method (5 minutes - 30 minutes) Figure 3-1a - Duration : 10-year 2-year 100- I (minutes) Intensity Intensity Intensity yen (in/hr) (in/hr) (in/hr 5.00 2.85 4.87 9.95 I 2.67 4.56 i I 6.00 I 9.31 , I - 7.00 2.52 4 .31 8.80 8.00 2.40 4.10 8 .38 .- -. 9.00 2.30 I 3.93 8.03 10.00 2.21 3.78 I 7.72 , 11.00 2.13 3.63 ! 7.42 I i 12.00 2.05 I 3.50 7.16 13.00 1.98 i 3.39 I 6 .92 14.00 1.92 3.29 6.71 15.00 1.87 3.19 6.52 I 16.00 1.81 3.08 6.30 i I 17.00 1.75 2.99 6.10 ! 18.00 1.70 2.90 5.92 ! 19.00 1.65 2.82 I 5.75 -20.00 i 1.61 2.74 5.60 , ! ! 21 .00 ; 1.56 2.57 5.46 22.00 1.53 2.61 5.32 23.00 1.49 2.55 5.20 24.00 1.46 2.49 f 5.09 1__- 25.00 1.43 2.44 t 4.98 --1; 26.00 1.40 i 2 .39 4.87 27.00 1.37 2.34 4.78 28 .00 1.34 2.29 I 4.69 i 29.00 1.32 ! 2.25 ! 4.60 30.00 ; ; 1.30 2.21 4.52 DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF z- W o Q. .J CI) 1 I I II ! iI I ;fj IlL:I II I. I j I I i It I II: I i ..J:/ 1 I .2.3 I 4tiil/If i/if ~J 11!!Ij'! l ' !i i 12 I 3 5 10 20 t---~-;- - "'t~ tiFI(i~~E I~l RO~~' ~11 PER SECOND Estimate of Average Overland Flow Velocity for Use With the Rational Formula 06/2001 RO-13 Urban Drainage and Flood Control District I ,. I .. I I I RIDGEWOOD HILLS APARTMENTS ON·SITE STORM DRAINAGE SYSTEM DESIGN (Rational Method Procedure) 2·YR STORM EVENT Prepared by: ~ Date: 3/29/13 Direct Runoff Basin Des! n Sub-Basin Runoff lime of C'A Rainfall Des igrJ I. D. Point Area Coe ffi c Concenl1 Intensit R.un off ac min ac mtho els North System Nl 1 0.353 0.53 3.5 0.19 2.85 0.66 N2 2 0.276 0.52 3.0 0.14 2.85 0.52 N3 3 0.301 0.57 2.4 0.17 2.85 0.61 N4 4 0.211 0.50 2.9 0.10 2.85 0.37 N5 5 1.872 0.68 6.7 1.27 2.57 4.08 N6 6 0.830 0.80 3.5 0.66 2.85 2.35 7 8 OS-l 9 0.401 0.71 7.0 0.29 2.52 0.90 N7 0.900 0.25 6.6 0.22 2.58 0.73 N8 0.163 0.68 3.8 0.11 2.85 0.39 South System Sl 10 0.560 0.58 7.5 0.33 2.46 1.00 S2 11 0.125 0.41 9.8 0.05 2.23 0.14 53 12 0.235 0.46 3.3 0.11 2.85 0.38 13 S4 14 0.121 0.47 5.5 0.06 2.76 0.20 55 15 0.125 0.46 4.6 0.06 2.85 0.20 S6 16 0.154 0.73 3.1 0.11 2.85 0.40 S7 17 0.155 0.41 3.8 0.06 2.85 0.22 58 18 0.412 0.68 6.0 0.28 2.67 0.93 S9 19 0.112 0.74 3.0 0.08 2.85 0.29 20 S10 21 0.119 0.69 3.9 0.08 2.85 0.29 S11 22 0.201 0.62 4.8 0.12 2.85 0.44 23 S12 24 0.436 0.64 6.8 0.28 2.55 0.90 25 513 26 0.041 0.61 6.5 0.03 2.60 0.08 27 S14 28 1.866 0.64 12.5 1.19 2.02 3.01 S15 29 1.153 0.77 4.2 0.88 2.85 3.14 S16 30 0.204 0.78 4.7 0.16 2.85 0.57 S17 31 0.810 0.32 4.4 0.26 2.85 0.94 S18 32 0.990 0.28 6.0 0.28 2.67 0.93 33 S19 0.352 0.25 5.2 0.09 2.81 0.31 ~--'--­ - '----­ - Cummulatlve Runoff Chann el ' Gutter Flow Total Time Cumm . Rainfall Cumm. Channel Flow of Cone. C'A Intensity Run off Slope Depth min ac 101M cfs % ft 3.5 0.19 2.85 0.66 4.4 0.33 2.85 1.18 4.7 0.50 2.85 1.79 5.6 0.61 2.74 2.08 6.7 1.27 2.57 4.08 3.5 0.66 2.85 2.35 7.0 1.93 2.52 6.08 7.3 2.54 2.48 7.87 RIDGEWOOD HILLS APARTMENTS ON-SITE STORM DRAINAGE SYSTEM DESIGN (Rational Method Procedure) 100-YR STORM EVENT Prepared by: ~ Date: ~ Direct Runoff Basin Desigfl Sub-Basin Runoff Time ot C'A Rainfall 1.0. Point Area Coeffic Concentr. Jntensttv ao min ae mlhr) North System Nl 1 0.353 0.53 2.7 0.19 9.95 N2 2 0.276 0.52 2.3 0.14 9.95 N3 3 0.301 0.57 1.7 0.17 9.95 N4 4 0.211 0.50 2.3 0.1 0 9.95 N5 5 1.872 0.68 4.9 1.27 9.95 N6 6 0.830 0.80 2.6 0.66 9.95 7 8 OS-l 9 0.401 0.71 5.0 0.29 9.95 N7 0.900 0.25 6.1 0.22 9.26 N8 0.163 0.68 2.6 0.11 9.95 South System Sl 10 0.560 0.58 5.7 0.33 9.16 S2 11 0.125 0.41 8.6 0.05 8.17 53 12 0.235 0.46 2.7 0.11 9.95 13 S4 14 0.1 21 0.47 4.6 0.06 9.95 55 15 0.125 0.46 3.8 0.06 9.95 56 16 0.154 0.73 1.6 0.11 9.95 S7 17 0.155 0.41 3.3 0.06 9.95 58 18 0.412 0.68 4.5 0.28 9.95 59 19 0.112 0.74 1.9 0.08 9.95 20 510 21 0.119 0.69 2.6 0.08 9.95 511 22 0.201 0.62 3.8 0.12 9.95 23 S12 24 0.436 0.64 4.8 0.28 9.95 25 S13 26 0.041 0.61 4.4 0.03 9.95 27 514 28 1.866 0.64 9.4 1.19 7.91 S15 29 1.153 0.77 2.7 0.88 9.95 S16 30 0.204 0.78 2.4 0.1 6 9.95 517 31 0.810 0.32 7.4 0.26 8.63 S18 32 0.990 0.28 5.7 0.28 9.50 33 519 0.352 0.25 4.8 0.09 9.95 De sian Runoff cfs 2.31 1.80 2.15 1.30 15.79 8.22 3.57 2.60 1.37 3.73 DRAINAGE DATA SUMMARY TABLE SUB-BASIN DESIGN BASIN COMP. RUNOFF COEFF. CUMM.DES.RUNOFF (cfs) I.D. POINT AREA (ae) C? Cwo Q? Qmo North S"'y"stem N1 1 0.353 0.53 0.66 0.66 2.31 N2 2 0.276 0.52 0.66 1.18 4.11 N3 3 0.301 0.57 0.72 1.79 6.26 N4 4 0.211 0.50 0.62 2.08 7.56 N5 5 1.872 0.68 0.85 4.08 15.79 N6 6 0.830 0.80 1.00 2.35 8.22 7 6.08 23.69 8 7.87 30.55 OS-1 9 0.401 0.71 0.89 8.76 34.01 N7 0.900 0.25 0.31 0.73 2.60 N8 0.163 0.68 0.85 0.39 1.37 South S'l.stem S1 10 0.560 0.58 0.73 1.00 3.73 S2 11 0.125 0.41 0.52 1.05 3.85 S3 12 0.235 0.46 0.57 0.38 1.34 13 1.35 4.93 S4 14 0.121 0.47 0.59 0.20 0.71 S5 15 0.125 0.46 0.57 0.20 0.71 S6 16 0.154 0.73 0.91 1.96 7.20 S7 17 0.155 0.41 0.51 0.22 0.78 S8 18 0.412 0.68 0.85 1.14 4.26 S9 19 0.112 0.74 0.92 0.29 1.03 20 3.09 11.40 S10 21 0.119 0.69 0.86 3.27 12.08 S11 22 0.201 0.62 0.77 0.44 1.55 23 3.56 13.15 S12 24 0.436 0.64 0.81 0.90 3.49 25 4.28 15.90 S13 26 0.041 0.61 0.76 0.08 0.31 27 4.30 16.03 S14 28 1.866 0.64 0.80 3.01 11 .80 S15 29 1.153 0.77 0.96 5.09 20.03 S16 30 0.204 0.78 0.98 5.39 21.15 S17 31 0.810 0.32 0.41 0.94 2.84 S18 32 0.990 0.28 0.35 6.70 26.27 33 10.56 41.62 S19 0.352 0.25 0.31 0.31 1.10 DRAWINGS 0.53 1.34 0.71 0.71 1.39 0.78 3.47 1.03 1.02 1.55 3.49 0.31 11.80 10.97 1.98 2.84 3.30 1.10 Cummulative Runoff Channell Gutter Flow Total Time Cumm. Ra infall Cumm. Channel Flow of Conc. C'A [ntenm Runoff Slope De th min se inlhrl cfs % ft 2.7 0.19 9.9 5 2.31 3.3 0.33 9.95 4.11 3.6 0.50 9.95 6.26 4.4 0.61 9.95 7.56 4.9 1.27 9.95 15.79 2.6 0.66 . 9.95 8.22 5.2 1.93 9.82 23.69 5.5 2.54 9.63 30.55 5.5 2.82 9.63 34.01 2.60 1.37 37.98 5.7 0.33 9.16 3.73 8.6 0.38 8.17 3.85 2.7 0.1 1 9.95 1.34 8.7 0.48 8.14 4.93 4.6 0.06 9.95 0.7 1 3.8 0.06 9.95 0.71 8.8 0.71 8.10 7.20 3.3 0.06 9.95 0.78 4.5 0.34 9.95 4.26 1.9 0.08 9.95 1.03 9.0 1.14 8.03 11.40 9.3 1.22 7.94 12.08 3.8 0.12 9.95 1.55 9.6 1.34 7.84 13.15 4.8 0.28 9.95 3.49 9.6 1.62 7.84 15.90 4.4 0.03 9.95 0.31 9.8 1.65 7.78 16.03 9.4 1.19 7.91 11 .80 3.09% 0.36 10.0 2.08 7.72 20.03 1.22% 0.48 10.5 2.24 7.57 21.15 7.4 0.26 8.63 2.84 3.45% 0.61 10.5 2.78 7.57 26.27 10.5 4.40 7.57 41 .62 4.8 0.09 9.95 1.10 42.72 Pioe Flow Travel Time DeslQn Pi e Pice Pice Lena th Velocity Time Flow Slop~ Size Cmci\y_ cfs % ,n cfs ft :105) min 2.31 1.80 12 4.79 222 5.98 0.62 4.11 4.44 12 7.52 135 9.77 0.23 6.26 3.20 12 6.39 388 8.14 0.79 7.56 4.50 12 7.57 103 9.65 0.18 15.79 2.30 18 15.92 164 9.01 0.30 8.22 0.70 18 8.78 14 5.67 0.04 23.69 1.10 24 23.70 102 7.54 0.23 30.55 2.50 24 35.73 17 12.85 0.02 34.01 1.57 30 28.32 80 36.07 0.04 This runoff exits the site undetained, as is the current condition. This runoff exits the Site undetained, as is the current condition . Total Design Runoff from the North Drainage System 3.73 8.70 12 10.53 23 9.00 0.04 3.85 2.15 18 15.40 41 7.23 0.09 1.34 1.14 12 3.81 166 4.42 0.63 4.93 2.15 18 15.40 30 7.67 0.07 0.71 1.47 12 4.33 101 4.85 0.35 0.71 0.54 12 2.62 60 3.97 0.25 7.20 2.00 18 14.85 126 8.32 0.25 0.78 4.18 12 7.30 126 6.14 0.34 4.26 1.71 18 13.73 41 6.76 0.10 1.03 4.17 18 21.44 12 6.31 0.03 11.40 2.00 18 14.85 151 9.16 0.27 12.08 1.76 18 13.93 142 8.91 0.27 1.55 28.92 8 6.51 30 15.29 0.03 13.15 1.76 18 13.93 30 8.99 0.06 3.49 2.69 18 17.22 19 7.60 0.04 15.90 6.98 18 27.74 179 16.17 0.18 0.31 25.00 8 6.05 8 9.19 0.01 16.03 7.80 18 29.32 8 16.76 0.01 236 6.53 0.60 130 5.18 0.42 21.15 14.20 18 39.57 70 22.84 0.05 566 3.85 2.45 26.27 1.40 24 26.74 30 15.44 0.03 41 .62 1.04 30 41.81 74 8.52 0.14 This runoff exits the site undetained, as is the current condition. Total Design Runoff from the South Drainage System 7.3 2.82 2.48 8.76 0.73 0.39 9.88 7.5 0.33 2.46 1.00 9.8 0.38 2.23 1.05 3.3 0.11 2.85 0.38 9.9 0.48 2.22 1.35 5.5 0.06 2.76 0.20 4.6 0.06 2.85 0.20 10.0 0.71 2.21 1.96 3.8 0.06 2.85 0.22 6.0 0.34 2.67 1.14 3.0 0.08 2.85 0.29 10.4 1.1 4 2.18 3.09 10.8 1.22 2.15 3.27 4.8 0.12 2.85 0.44 11.1 1.34 2.12 3.56 6.8 0.28 2.55 0.90 11 .2 1.62 2.11 4.28 6.5 0.03 2.60 0.08 11 .5 1.65 2.09 4.30 12.5 1.19 2.02 3.01 3.09% 0.24 13.3 2.08 1.96 5.09 1.22% 0.32 13.9 2.24 1.93 5.39 4.4 0.26 2.85 0.94 3.45% 0.40 13.9 2.78 1.93 6.70 14.0 4.40 1.92 10.56 5.2 0.09 2.81 0.31 - 10.87 - L­_ Pi e Flow TravelTime De sigrl Pipe Pllil Pi e Len.q1h Velocity TIme Flow Slope Size Capacity cfs % 10 cfs ft :!ps min 0.66 1.80 12 4.79 222 4.33 0.85 1.18 4.44 12 7.52 135 6.90 0.33 1.79 3.20 12 6.39 388 7.00 0.92 2.08 4.50 12 7.57 103 8.20 0.21 4 .08 2.30 18 15.92 164 7.57 0.36 2.35 0.70 18 8.78 14 4.18 0.06 6.08 1.10 24 23.70 102 6.26 0.27 7.87 2.50 24 35.73 17 8.98 0.03 8.76 1.57 30 28.32 80 31 .74 0.04 This runoff exits the site undetained. as is the current condition. This runoff exits the site undetained. as is the current condition. Total Design Runoff from the North Drainage System 1.00 8.70 12 10.53 23 9.00 0.04 1.05 2.15 18 15.40 41 4.97 0.14 0.38 1.14 12 3.81 166 3.11 0.89 1.35 2.15 18 15.40 30 5.31 0.09 0.20 1.47 12 4.33 101 2.76 0.61 0.20 0.54 12 2.62 60 3.97 0.25 1.96 2.00 18 14.85 126 5.88 0.36 0.22 4.18 12 7.30 126 4.18 0.50 1.14 1.71 18 13.73 41 4.74 0.14 0.29 4.17 18 21.44 12 3.03 0.07 3.09 2.00 18 14.85 151 6.64 0.38 3.27 1.76 18 13.93 142 6.46 0.37 0.44 28 .92 8 6.51 30 10.63 0.05 3.56 1.76 18 13.93 30 6.62 0.08 0.90 2.69 18 17.22 19 5.17 0.06 4.28 6.98 18 27.74 179 11.46 0.26 0.08 25.00 8 6.05 8 4.33 0.03 4.30 7.80 18 29.32 8 11 .95 0.01 236 4.90 0.80 130 3.77 0.57 5.39 14.20 18 39.57 70 15.90 0.07 566 2.93 3.22 6.70 1.40 24 26.74 30 12.56 0.04 10.56 1.04 30 41.81 74 7.15 0.17 This runoff exits the site undetained . as is the current condition. ~lpesign Runoff from_the South_ Drainag~System I 400 2.25% 2.90 120 1.70% 2.60 137 2.19% 2.80 150 1.33% 1.70 140 0.70% 1.70 0 0.00% 1.00 291 1.03% 2.00 306 2.55% 3.30 103 2.00% 1.80 215 1.86% 2.00 573 3.49% 2.70 0 0.00% 0.00 TI (min) 2.40 2.04 0.78 2.76 0.84 2.08 0.93 2.30 0.77 0.82 1.47 1.37 0.00 2.43 1.55 0.95 1.79 3.54 Tc Check Final Tc Remarks CompTc Tot. LenQth Tc =(Ll180)+10 (min) (ft) (min) (min) 2.71 235 11.3 2.7 2.30 235 11.3 2.3 1.74 255 11.4 1.7 2.29 150 10.8 2.3 4.94 555 13.1 4.9 2.56 535 13.0 2.6 6.08 451 12.5 6.1 2.59 177 11.0 2.6 502 650 13.6 5.0 5.65 156 10.9 5.7 8.63 432 12.4 8.6 I 2.71 210 11.2 2.7 I 4.63 191 11.1 4.6 3.78 58 10.3 3.8 1.58 94 10.5 1.6 I 3.25 105 10.6 3.3 4.52 435 12.4 4.5 1.87 140 10.8 1.9 I 2.64 170 10.9 2.6 , 3.75 172 11.0 3.8 4.85 203 11.1 4.8 4.44 50 10.3 4.4 I 9.44 447 12.5 9.4 268 334 11.9 2.7 2.40 143 10.8 2.4 7.39 300 11.7 7.4 , 5.75 591 13.3 5.7 4.84 78 10.4 4.8 I 120 1.70% 2.60 137 2.19% 2.80 150 1.33% 1.70 140 0.70% 1.70 0 0.00% 1.00 291 1.03% 2.00 306 2.55% 3.30 103 2.00% 1.80 215 1.86% 2.00 573 3.49% 2.70 0 0.00% 0.00 Tt (min) 2.40 2.04 0.78 2.76 0.84 208 0.93 2.30 0.77 0.82 1.47 1.37 0.00 2.43 1.55 0.95 1.79 3.54 Tc Check Final Tc Remarks CompTe Tot. LenQth Tc =(U180)+10 (min) (It) (min) (min) 3.51 235 113 3.5 2.98 235 11.3 3.0 2.38 255 11.4 2.4 2.89 150 10.8 2.9 6.65 555 13.1 6.7 3.54 535 13.0 3.5 6.56 451 12.5 6.6 3.79 177 11.0 3.8 6.97 650 13.6 7.0 7.53 156 10.9 7.5 9.79 432 12.4 9.8 3.30 210 11.2 3.3 5.49 191 11.1 5.5 4.60 58 10.3 4.6 3.06 94 10.5 3.1 3.81 105 10.6 3.8 6.01 435 12.4 6.0 3.01 140 10.8 3.0 3.92 170 10.9 3.9 4.83 172 11.0 4.8 6.75 203 11.1 6.8 6.46 50 10.3 6.5 13.18 447 12.5 12.5 4.18 334 11.9 4.2 4.71 143 10.8 4.7 4.44 243 11.4 4.4 5.96 591 13.3 6.0 5.22 78 10.4 5.2