Loading...
HomeMy WebLinkAboutLEGACY AUTO - PDP - PDP120001 - REPORTS - DRAINAGE REPORTFINAL DRAINAGE AND EROSION CONTROL REPORT LEGACY AUTO FINAL DRAINAGE AND EROSION CONTROL REPORT LEGACY AUTO Prepared for: WG Architects P.O. Box 270788 Fort Collins, CO 80528 Prepared by: North Star Design 700 Automation Drive, Unit I Windsor, Colorado 80550 (970) 686-6939 March 20, 2013 Job Number 264-06 March 20 Wes Lam City of F 700 Woo Fort Coll RE: F Dear We I am ple Report fo Legacy A Drainage I appreci questions Prepared Patricia K Project E 0, 2013 marque Fort Collins S od Street lins, CO 805 Final Draina es, eased to sub for the Lega Auto was pr e Manual. iate your tim s. d by: Kroetch Engineer 700 Automa Windsor, CO Phone: 970- Fax: 970-68 Stormwater 522 age and Ero mit for you acy Auto pro repared in a me and consid ation Drive, Unit O 80550 -686-6939 86-1188 osion Contro ur review an oject. I cer accordance w deration in r t I ol Report fo nd approval, rtify that thi with the cri reviewing th or Legacy A this Final D iii TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................... iii 1. GENERAL LOCATION AND DESCRIPTION 1.1 Location ...................................................................................................................1 1.2 Description of Property ............................................................................................1 2. DRAINAGE BASINS AND SUB-BASINS 2.1 Major Basin Description ..........................................................................................2 2.2 Sub-Basin Description .............................................................................................2 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations ..............................................................................................................3 3.2 Development Criteria Reference and Constraints ....................................................3 3.3 Hydrologic Criteria ..................................................................................................4 3.4 Hydraulic Criteria ....................................................................................................4 4. DRAINAGE FACILITY DESIGN 4.1 General Concept .......................................................................................................4 4.2 Specific Flow Routing .............................................................................................4 4.3 Drainage Summary ..................................................................................................5 5. EROSION CONTROL 5.1 General Concept ......................................................................................................6 5.2 Specific Details ........................................................................................................6 6. CONCLUSIONS 6.1 Compliance with Standards ....................................................................................6 6.2 Drainage Concept .....................................................................................................7 7. REFERENCES ....................................................................................................................8 APPENDICES A Vicinity Map B Hydrologic Computations C Hydraulic Calculations D Water Quality and Detention Pond Calculations E Figures and Tables 1 1. GENERAL LOCATION AND DESCRIPTION 1.1. Location The Legacy Auto project is located in north Fort Collins. This site is located in a portion of the southeast quarter of Section 35, Township 8 North, Range 69 West of the 6th P.M., City Of Fort Collins, County Of Larimer, State Of Colorado. See the vicinity map located in Appendix A. This project is bounded on the north by the Larimer/Weld Canal (also known as Eaton Ditch), on the east by North College Avenue, on the south by an existing building, and on the west by an existing building. 1.2. Description of Property The proposed project site consists of approximately 3.06 acres of land. The project site consists of the existing Legacy Auto facility, associated drives, walks and landscaping. Access to the existing Legacy Auto parking lot is from North College Avenue. The property is currently used for commercial uses that include the sales and service of farm equipment. The proposed site is located on Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map number 08069C0977G with an effective date of June 17, 2008. FEMA does not have a defined floodplain within the project boundary, however there is a floodplain defined along the Larimer / Weld Canal, north of this property. A portion of the FEMA floodplain is shown on the FIRMette that is located in Appendix D of this report. The boundaries of this site are not located within the City of Fort Collins or FEMA designated floodplains. The majority of stormwater from the development of this site is routed to the southwest to the proposed onsite detention pond where water quality and detention is provided. There are no offsite flows entering the boundaries of this site. Existing onsite vegetation consists of native grasses and various landscaping. It is proposed to provide detention for Basins 2 and 3 and then pipe detained stormwater to the existing inlet located near the southeast corner of the site. Existing slopes onsite are 2 flat and range from approximately 0.0% to 2.0% and generally slopes to the southwest. Stormwater from this site is ultimately conveyed to the Poudre River. The site has been divided into 4 drainage basins to better define the area that will drain north to the Larimer/Weld Canal, to the detention pond and to the existing and proposed inlets located in the southeast corner of the site. Detention volume calculations are based on detaining the 100 year developed storm and releasing runoff into the existing storm sewer at the specified 0.2 cfs/acre runoff rate. The detention volume has been calculated using the FAA method as described in the City of Fort Collins Drainage Criteria manual. Due to site constrains detention can only be provided for Basins 2 and 3. Basin 1 will remain undeveloped and runoff will be allowed to sheet flow north to the Larimer/Weld Canal in historic flow routes. Basin 4 has been minimized to the greatest extent possible but because of existing grades (existing walk along College, existing driveway to the southeast) cannot be captured and conveyed to the proposed detention area and will be allowed to flow to the existing storm inlet located near the southeast corner of the site in historic flow routes. Water quality is required for this development, for Basin 1 water quality will be provided by the conveyance of runoff through the grass buffer to the Larimer/Weld Canal, for Basins 2 and 3 water quality will be provided by the use of a water quality extended detention, and due to site constraints the small asphalt area in Basin 4 will sheet flow to the existing inlet in historic flow routes. 2. DRAINAGE BASINS AND SUB-BASINS 2.1. Major Basin Description This site is located within the City of Fort Collins Dry Creek Basin which states that water quality and detention is required for all new developments. The detention pond has been designed to detain the 100 year developed storm event with a release rate equal to 0.20cfs/acre. The calculated detention pond release rate is 0.52 cfs. Historic drainage patterns have been maintained to the greatest extent possible and with the development of this site the overall drainage will be an improved. 2.2. Sub-basin Description This site is divided into four drainage basins where the north portion sheet flows to the Larimer/Weld Canal and the majority of the remaining development is routed to the 3 southwest corner of the site to the proposed detention pond. Due to site constraints there is a small portion of the site in the southeast corner that will sheet flow to the existing inlet. See Section 4 of this report for specific details for each sub-basin. 3. DRAINAGE DESIGN CRITERIA 3.1. Regulations Drainage for this site has been designed to meet or exceed the “City of Fort Collins Storm Drainage Design Criteria Manual” specifications. Where applicable, the criteria established in the “Urban Storm Drainage Criteria Manual” (UDFCD), 2001 has been used. 3.2. Development Criteria Reference and Constraints Stormwater runoff from this site has been routed to conform to the requirements of the City for Fort Collins Stormwater Department. Detention is required for this site and is being provided for the majority of the development. Runoff for the remaining site is allowed to drain in historic flow routes. The grass buffer along the north property line will slow runoff and promote settling of the suspended solids prior to runoff being conveyed into the Larimer / Weld Canal. Due to site constraints, a variance is requested to allow the detention pond to have 0.45’ of freeboard from the calculated 100 year water surface elevation to the proposed top of berm instead of the 1.0’ that is typically required. The existing and proposed buildings are located a minimum of 1.5’ above the calculated 100 year water surface elevation and will therefore be protected from localized flooding in the event the pond reaches capacity. The detention pond has been designed to detain the 100 year developed storm event without overtopping. If the detention pond reaches capacity, then any additional stormwater will be routed the future public street along the southern property boundary and once fully constructed it is anticipated this additional runoff will be conveyed to Willox Court or College Avenue. The spillway for the pond shall be along the south embankment of the pond adjacent to the future public street. If the outlet structure becomes completely clogged the entire 100 year runoff overtops the sidewalk to the public street and runoff will flow in historic flow routes. 4 3.3. Hydrologic Criteria Runoff computations were prepared for the 2 year and 10 year minor storm events and 100 year major storm event utilizing the Rational Method. All hydrologic calculations associated with the basins are included in Appendix B of this report. Water quality has been provided by utilizing the extended detention method recommended in the “Urban Storm Drainage Criteria Manual”. See Appendix D for water quality calculations. 3.4. Hydraulic Criteria All hydraulic calculations within this report have been prepared in accordance with the City of Fort Collins Drainage Criteria, Urban Area Drainage Criteria Manual and are included in Appendix C. 4. DRAINAGE FACILITY DESIGN 4.1. General Concept Runoff from this site historically sheet flows to all 4 sides of the development. With the construction of these proposed improvements onsite stormwater will be allowed to flow in historic flow routes. The majority of the site drains to the southwest corner to the proposed detention pond. Detained stormwater will be released at 0.20 cfs/acre (0.49cfs) and conveyed in storm piping to the existing inlet located near the southeast corner of the development. Historic flow routes are maintained to the greatest extent possible. 4.2. Specific Flow Routing A summary of the drainage patterns within each basin is provided in the following paragraphs. Basin 1 is located along the north portion of the site. This basin will remain undeveloped and will consist of native vegetation. This basin and existing landscaping is preserved for a wildlife corridor as required by the Colorado Department of Wildlife. Runoff from this basin sheet flows north to the Larimer/Weld Canal. Water quality for this basin will be provided by runoff flowing through the established vegetation prior to being conveyed to the canal. Basin 2 is located in the central portion the site. This basin includes roof area for the existing and proposed buildings, asphalt drives, sidewalks, gravel storage area and landscaping. Stormwater runoff will sheet flow to low points where runoff is intercepted 5 and conveyed to the detention pond. Water quality is provided for this basin by a sediment trap and a “Snout” inlet hood located within the detention pond outlet structure. Runoff is detained and routed in storm pipe to the existing inlet that is located near the southeast corner of the site. Basin 3 is located along the eastern property boundary and contains a portion of the existing and proposed buildings, asphalt drives, sidewalks, and landscaping. Runoff in this basin is routed to the south in the proposed curb and gutter where runoff is intercepted by a proposed inlet and conveyed west to the proposed detention pond. Water quality is provided for this basin by a sediment trap and a “Snout” inlet hood located within the detention pond outlet structure. Runoff is detained and routed in storm pipe to the existing inlet that is located near the southeast corner of the site. Basin 4 is located along the east edge of the site which includes the existing concrete sidewalk along College and the adjacent landscape area. The Basin is also located in the southeast corner of the site and includes a portion of the existing building, existing asphalt drive and sidewalk. This basin has been reduced in size to the greatest extent possible. Runoff from this basin sheet flows south to the existing inlet in historic flow routes. Due to site constraints water quality is not provided for this basin. 4.3. Drainage Summary Drainage for this site was designed to conform to the City of Fort Collins stormwater requirements. Water quality is provided for the majority of the site which includes basins 1, 2, and 3. Water quality is provided by routing runoff through either a grass buffer or through the detention pond and providing extended detention. Due to site constraints detention and water quality is not provided for basin 4 and allowed to flow in historic flow routes. Stormwater will be detained in the pond and released through the outlet structure to the existing storm system located along the west side of College Avenue. Drainage facilities located outside of the right-of-way will be maintained by the owners of the property. During construction the pond and outlet structure shall be visually inspected at a minimum of once a week for collected sediment and cleaned if the depth of sediment is greater than 4 inches. After construction and once vegetation is considered established, then the outlet structure shall be visually inspected once a month until a maintenance schedule can be created. The maximum allowable time between visual inspections shall be 6 months. 6 5. EROSION CONTROL 5.1. General Concept This site lies within the Moderate Rainfall and Wind Erodibility Zone per the City of Fort Collins. Potential also exists for tracking of mud onto existing streets which could then wash into existing storm systems. See the drainage and erosion control plan for location and measures taken to control the movement of sediment offsite to the public streets and existing storm sewer system. 5.2. Specific Details To limit the amount of silt leaving the site, several erosion control measures shall be implemented during construction. All inlets (existing and proposed) shall be protected with gravel filters or wattles. Wattles will be placed in the existing curb and gutter and other areas where deemed appropriate and silt fence shall be installed along the property boundaries. The detention pond will act as a sediment trap during construction. All construction traffic shall access this site by way of a vehicle tracking pad. The vehicle tracking pad shall be located wherever construction traffic access the public roads. If mud is tracked on public roads then it shall be removed from the street on a daily basis. During demolition and site construction, all disturbed areas are to be kept in a roughened condition and watered to reduce wind erosion. If the area remains bare for longer than 30 days and is not being worked on, temporary vegetation is required and shall be planted to help reduce the potential for soil movement. The detention pond and outlet structure shall be used to collect sediment during construction and prior to final seeding of the detention pond, collected sediment shall be removed and the pond shall be graded to final design elevations. 6. CONCLUSIONS 6.1. Compliance with Standards All computations completed within this report are in compliance with the City of Fort Collins Drainage and Erosion Control Reference Manuals. 7 6.2. Drainage Concept The proposed drainage concepts presented in this report, and on the construction plans, adequately provide for stormwater quality treatment for the proposed improvements. Conveyance elements have been designed to convey required flows to the proposed detention pond and for minimal maintenance. If, at the time of construction, groundwater is encountered, a Colorado Department of Health Construction Dewatering Permit will be required. 8 7. REFERENCES 1. City of Fort Collins, “Storm Drainage Criteria Manual”, (SDCM), dated March 1999. 2. Urban Drainage and Flood Control District, “Urban Storm Drainage Criteria Manual”, Volumes 1 and 2, dated June 2001, and Volume 3 dated September 2001. 3. City of Fort Collins Floodplain maps found on the City of Fort Collins web site. Supplied by the City of Fort Collins, printed on October 19, 2009 A APPENDIX A VICINITY MAP B APPENDIX B HYDROLOGIC COMPUTATIONS North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: Legacy Auto PROJECT NO: 264-06 COMPUTATIONS BY: TDS DATE: 3/20/2013 Recommended % Impervious from Urban Storm Drainage Criteria Manual % Impervious Roofs: 90% Streets and Parking (Asphalt) 100% Concrete Drives and Walks 90% Packed Gravel: 40% Landscaped Areas (Clayey soil, 0-1% slopes): 0% SUBBASIN TOTAL TOTAL ROOF ASPHALT CONCRETE GRAVEL LANDSCAPE % RUNOFF RUNOFF RUNOFF RUNOFF ID AREA AREA AREA AREA AREA AREA AREA Impervious COEFF. COEFF. COEFF. COEFF. (ac.) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (sq.ft) C2 C5 C10 C100 historic site 3.06 133,162 2,500 12,978 350 20393 96,941 18% 0.16 0.25 0.34 0.55 1 0.21 9,342 0 0 0 0 9,342 0% 0.04 0.15 0.25 0.50 2 2.00 86,955 8,960 23,649 6,968 20350 27,028 53% 0.36 0.41 0.47 0.61 3 0.59 25,840 3,140 13,640 3,210 0 5,850 75% 0.54 0.57 0.61 0.71 4 0.18 7,780 0 2,111 3,915 0 1,754 72% 0.51 0.55 0.59 0.69 2+3 2.59 112,795 12,100 37,289 10,178 20,350 32,878 58% 0.39 0.44 0.50 0.63 RUNOFF COEFFICIENTS & % IMPERVIOUS Flow_legacy.xls Cval North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: Legacy Auto PROJECT NO: 264-06 COMPUTATIONS BY: TDS DATE: 3/20/2013 SUB-BASIN DATA INITIAL / OVERLAND TIME TRAVEL TIME / GUTTER OR CHANNEL FLOW tc CHECK FINAL REMARKS (ti)(tt) (URBANIZED BASIN) tc DESIGN SUBBASIN Area C5 Length Slope ti Length Slope Chan. Cv Vel. tt tc = Total L tc=(l/180)+10 POINT ID (ac) (ft) (ft/ft) (min) (ft) (ft/ft) Type (ft/s) (min) ti + tt (ft) (min) (min) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) historic site historic site 3.06 0.25 200 0.020 17.5 550 0.015 D 10 1.2 7.5 25.0 750 14.2 14.2 1 1 0.21 0.15 50 0.050 7.2 50 0.020 D 10 1.4 0.6 7.8 100 10.6 7.8 2 2 2.00 0.41 80 0.050 6.6 550 0.005 F 20 1.4 6.5 13.1 630 13.5 13.1 3 3 0.59 0.57 30 0.020 4.2 350 0.020 F 20 2.8 2.1 6.2 380 12.1 6.2 4 4 0.18 0.55 10 0.020 2.5 130 0.050 F 20 4.5 0.5 3.0 140 10.8 5.0 EQUATIONS: Channel Type Cv tc = t i + tt A 2.5 B 5.0 ti = [0.395 (1.1 - C 5 ) L 0.5 ] / S 1/3 C 7.0 D 10.0 tt = L/V V = C v*S 0.5 E 15.0 F 20.0 final tc = minimum of t i + tt and urbanized basin check minimum tc = 5 minutes TIME OF CONCENTRATION Paved Grassed Waterway Bare Ground Short Pasture/ Lawn Tillage / Field Heavy Meadow Flow_legacy.xls TOC5 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: Legacy Auto PROJECT NO: 264-06 COMPUTATIONS BY: TDS DATE: 3/20/2013 DIRECT RUNOFF TOTAL Inlet Capacity REMARKS DESIGN SUBBASIN A C2 tc iQ2 Q2 Total POINT ID (ac) (min) (in/hr) (cfs) (cfs) (cfs) historic site historic site 3.06 0.16 14.2 2.44 1.2 1.2 1 1 0.21 0.04 7.8 3.08 0.0 0.0 2 2 2.00 0.36 13.1 2.52 1.8 1.8 3 3 0.59 0.54 6.2 3.32 1.1 1.1 4 4 0.18 0.51 5.0 3.50 0.3 0.3 Q = C i A Q = peak discharge (cfs) C = runoff coefficient i = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) RATIONAL METHOD PEAK RUNOFF (2-YEAR) Flow_legacy.xls Q2 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: Legacy Auto PROJECT NO: 264-06 COMPUTATIONS BY: TDS DATE: 3/20/2013 DIRECT RUNOFF TOTAL Inlet Capacity REMARKS DESIGN SUBBASIN A C10 tc iQ10 Q10 Total POINT ID (ac) (min) (in/hr) (cfs) (cfs) (cfs) historic site historic site 3.06 0.34 14.2 4.00 4.1 4.1 1 1 0.21 0.25 7.8 5.54 0.3 0.3 2 2 2.00 0.47 13.1 4.13 3.9 3.9 3 3 0.59 0.61 6.2 6.28 2.3 2.3 4 4 0.18 0.59 5.0 6.85 0.7 0.7 Q = C i A Q = peak discharge (cfs) C = runoff coefficient i = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) RATIONAL METHOD PEAK RUNOFF (10-YEAR) Flow_legacy.xls Q10 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 LOCATION: Legacy Auto PROJECT NO: 264-06 COMPUTATIONS BY: TDS DATE: 3/20/2013 DIRECT RUNOFF TOTAL Inlet Capacity REMARKS DESIGN SUBBASIN A C100 t c iQ100 Q100 Total POINT ID (ac) (min) (in/hr) (cfs) (cfs) (cfs) historic site historic site 3.06 0.55 14.2 6.41 10.7 10.7 1 1 0.21 0.50 7.8 8.13 0.9 0.9 2 2 2.00 0.61 13.1 6.62 8.1 8.1 3 3 0.59 0.71 6.2 8.80 3.7 3.7 4 4 0.18 0.69 5.0 9.30 1.1 1.1 Q = C i A Q = peak discharge (cfs) C = runoff coefficient i = rainfall intensity (in/hr) from IDF curve A = drainage area (acres) RATIONAL METHOD PEAK RUNOFF (100-YEAR) Flow_legacy.xls Q100 C APPENDIX C HYDRAULIC CALCULATIONS D APPENDIX D DETENTION POND CALCULATIONS Northstar Design, Inc 700 Automation Drive, Unit I Windsor CO, 80550 (970) 686-6939 LOCATION: Legacy Auto ITEM: Pond 1 COMPUTATIONS BY: TDS SUBMITTED BY: North Star Design, Inc DATE: 3/20/2013 From Urban Storm Drainage Criteria Manual, June 2001 (Referenced figures are attached in Appendix D) Use 40-hour brim-full volume drain time for extended detention basin Water Quality Capture Volume = WQCV = (required storage/12)*(tributary drainage area) MAJOR Trib. % Imperv. Req. Storage WQCV DWQ req. vol req. area/row BASIN area (in. of runoff) WQCV *1.2 (in 2 /row) (ac) from Fig. SQ-2 (ac-ft) (ft) (ac-ft) from Fig. EDB-3 Pond 1 2.59 58.00 0.230 0.050 1.55 0.059 0.22 Required Storage = 1 * ( 0.91 * I^3 - 1.19 * I^2 + 0.78 * I ) WQ outlet sizing for NORTH pond From Figure 5, for 9/16 in. hole diameter Area of hole = 0.24 in2 # of columns = 1 Area provided/row = 0.24 in2 Area Required/row = 0.22 in2 Use 1 column of 9/16" diam holes WATER QUALITY POND OUTLET SIZING DetPond.xls WQCV 1 MINIMUM DETENTION VOLUME REQUIRED FAA METHOD LOCATION: Legacy Auto PROJECT NO: Pond 1 COMPUTATIONS BY: TDS SUBMITTED BY: North Star Design, Inc DATE: 3/20/2013 Equations: A trib. To pond = 2.59 acre QD = CiA C100 = 0.63 Vi = T*CiA = T*QD Developed C*A = 1.63 acre Vo =m*QPO*(60*T) QPO = 0.52 cfs (0.2 cfs/acr S = Vi - Vo tc = 18 min Rainfall intensity from Larimer County Area 1 IDF Curve Storm Rainfall QD Vol. In Outflow Vol. Out Storage Storage Duration, T Intensity, i (cfs) Vi Adjustment Vo SS (min) (in/hr) (ft3) Factor, m (ft3) (ft3) (ac-ft) 5 9.95 16.2 4871 1.00 155 4715 0.108 10 7.72 12.6 7558 1.00 311 7247 0.166 20 5.60 9.1 10965 0.95 591 10375 0.238 30 4.52 7.4 13276 0.80 746 12530 0.288 40 3.74 6.1 14646 0.73 901 13745 0.316 50 3.23 5.3 15811 0.68 1057 14754 0.339 60 2.86 4.7 16800 0.65 1212 15588 0.358 70 2.62 4.3 17955 0.63 1368 16588 0.381 80 2.38 3.9 18641 0.61 1523 17118 0.393 90 2.22 3.6 19561 0.60 1678 17882 0.411 100 2.05 3.3 20070 0.59 1834 18236 0.419 110 1.93 3.1 20785 0.58 1989 18795 0.431 120 1.80 2.9 21147 0.58 2145 19002 0.436 130 1.60 2.6 20364 0.57 2300 18064 0.415 140 1.40 2.3 19189 0.56 2455 16733 0.384 150 1.20 2.0 17622 0.56 2611 15012 0.345 160 1.15 1.9 18014 0.56 2766 15248 0.350 170 1.10 1.8 18308 0.55 2922 15386 0.353 180 1.05 1.7 18503 0.55 3077 15427 0.354 Required Storage Volume: 19002 ft3 0.436 acre-ft Northstar Design, Inc 700 Automation Drive, Unit I Windsor CO, 80550 (970) 686-6939 Proposed Detention Pond - Stage/Storage LOCATION: Legacy Auto PROJECT NO: Pond 1 COMPUTATIONS BY: TDS SUBMITTED BY: North Star Design DATE: 3/20/2013 V = 1/3 d ( A + B + sqrt(A*B)) where V = volume between contours, ft3 d = depth between contours, ft A = surface area of contour Pond 1 Required Water Quality = 0.059 acre-feet REQ. 100 YR DETENTION VOL. = 0.436 acre-feet Total Volume Required = 0.496 acre-feet Surface Incremental Total Stage Area Storage Storage (ft) (ft2) (ac-ft) (ac-ft) 4981 4981.50 0 4982.00 8807 0.034 0.034 4982.12 9524 0.025 0.059 <-- WQ VOL 4983.00 14781 0.268 0.302 4983.55 15958 0.195 0.496 <-- 100 yr HWEL (TOTAL) 4984.00 16914 0.169 0.665 DetPond.xls Stage-Storage 1 100yr ORIFICE PLATE SIZING Detention Pond Outlet Sizing (100 yr event) LOCATION: Legacy Auto PROJECT NO: 215-04 COMPUTATIONS BY: ROB SUBMITTED BY: North Star Design, Inc. DATE: 3/20/2013 Submerged Orifice Outlet: release rate is described by the orifice equation, Qo = C oAo sqrt( 2g(h-Eo)) where Qo = orifice outflow (cfs) Co = orifice discharge coefficient g = gravitational acceleration = 32.2 ft/s Ao = effective area of the orifice (ft 2 ) Eo = greater of geometric center elevation of the orifice or d/s HGL (ft) h = water surface elevation (ft) Qo = 0.52 cfs outlet pipe dia = D = 12.0 in Invert elev. = 4981.50 ft Eo = 4981.65 ft h = 4983.55 ft - 100 yr WSEL Co = 0.7 solve for effective area of orifice using the orifice equation Ao = 0.067 ft 2 = 9.6 in 2 orifice dia. = d = 3.50 in Check orifice discharge coefficient using Figure 5-21 (Hydraulic Engineering ) d / D = 0.29 kinematic viscosity, u = 1.22E-05 ft 2 /s Reynolds no. = Red = 4Q/(pdu) = 1.85E+05 Co = (K in figure) = 0.70 check Use d = 3.50 in A o = 0.067 ft 2 = 9.62 in 2 Q max = 0.52 cfs DetPond.xls Legacy Auto Emergency Overflow Spillway Sizing LOCATION: Legacy Auto PROJECT NO: 215-04 COMPUTATIONS BY: ROB SUBMITTED BY: North Star Design, Inc. DATE: 3/20/2013 Equation for flow over weir Q = CLH3/2 where C = weir coefficient = 3.1 H = overflow height L = length of the weir Spillways will be designed with flow depth, H = 0.5 ft Size the spillway assuming that the pond outlet is completely clogged. North Detention & Water Quality Pond Q (100) = 10.00 cfs Spill elev = 4983.55 ft 100 yr WSEL = 4983.55 ft Min top of berm elev.= 4984.00 ft Act. Top of berm elev.= 4984.00 Wil Weir length th required: i d L = 10.76 ft Use L = 11.0 ft v = 1.33 ft/s DetPond.xls E APPENDIX E FIGURES AND TABLES is report for iteria in the his submittal Auto Drainage & r the draina City of Fo . Please cal Erosion Co age design o ort Collins S ll if you have ontrol of the Storm e any