This memorandum constitutes a traffic impact study (TIS) for Affordable Roofing,
located at 217 W. Trilby Road in Fort Collins. The site location is shown in Figure 1.
Affordable Roofing is currently located on the site in a converted house that is
approximately 1100 square feet. There are also three other outbuildings on the site that
are approximately 920 square feet, 900 square feet, and 200 square feet. These
outbuildings will be razed with this proposal. However, the converted house will remain.
Scoping discussions with Ward Stanford, Fort Collins Traffic Engineer, were conducted. A
Base Assumptions Form and related information is provided in Appendix A.
A site plan is shown in Figure 2. Lot 1 is the existing converted house building.
Currently, there are two accesses to/from Trilby Road. With this proposal, these accesses
will be improved.
Trilby Road is an east-west street that is north of the site. Trilby Road is classified
as a two-lane arterial on the Fort Collins Master Street Plan. Currently, Trilby Road has a
two-lane cross section. Trilby Road is widened to its full width (curb/gutter on the south
side) adjacent to Ridgewood Hills to the west. Trilby Road is widened to its full width
(curb/gutter on the north side) adjacent to the Southgate Church to the east. There are no
other improvements in this segment of Trilby Road. It is posted at 35 mph. At the
Trilby/East Access and Trilby/West Access intersections, Trilby Road has all eastbound
and westbound movements combined into single lanes. At the Trilby/East Access and
Trilby/West Access intersections, there is stop sign control on site accesses.
Recent peak hour traffic counts at the Trilby/East Access and Trilby/West Access
intersections are shown in Figure 3. Raw traffic counts are provided in Appendix B. Traffic
counts at the key intersections were obtained in March 2013. Using the volumes shown in
Figure 3, the current peak hour operation at the key intersections is shown in Table 1.
Calculation forms for these analyses are provided in Appendix C. These intersections were
analyzed using the unsignalized intersection techniques from the 2010 Highway
DELICH Affordable Roofing TIS, March 2013
ASSOCIATES
Capacity Manual. A description of level of service for unsignalized intersections from the 2010
Highway Capacity Manual and a table showing the Fort Collins Motor Vehicle LOS Standards
(Intersections) are also provided in Appendix C. The Trilby/East Access and Trilby/West
Access intersections operate acceptably during the peak hours. The Affordable Roofing site
is in an area termed “other.” In areas termed “other,” acceptable operation at unsignalized
intersections during the peak hours is defined as level of service E or better for any
approach leg for an arterial/collector intersection or an arterial/local intersection. In such
areas, it is expected that there would be substantial delays to the minor street movements
during the peak hours. This is considered to be normal in urban areas.
Table 2 shows the calculated trip generation for the proposed Affordable Roofing
using Trip Generation, 9th Edition, ITE, as the reference document. The trip generation
resulted in 168 daily trip ends, 24 morning peak hour trip ends, and 24 afternoon peak hour
trip ends. It is important to note that the office use on Lot 1 already exists. Figure 4 shows
the trip distribution for the site generated traffic. Figure 5 shows the site generated peak
hour traffic assignment for the Affordable Roofing site.
Background traffic projections for the short range (2018) future were obtained by
factoring the recent peak hour counts by two percent per year plus the approved
Ridgewood Hills Apartments. Figure 6 shows the short range (2018) background peak
hour traffic on Trilby Road along the site frontage. Analysis of the existing intersections
with the short range background traffic is not relevant, since the proposal will replace the
current operation. The traffic volumes generated by the proposed Affordable Roofing were
added to the background traffic volumes to produce the total traffic volume forecasts for the
short range (2018) future. Figure 7 shows the short range (2018) total peak hour traffic at
the Trilby/East Access and Trilby/West Access intersections.
Table 3 shows the short range (2018) total morning and afternoon peak hour
operation at the Trilby/East Access and Trilby/West Access intersections. The key
intersections will operate at acceptable levels of service during the morning and afternoon
peak hours with existing control and geometry. Calculation forms for these analyses are
provided in Appendix D.
The traffic volumes at the two site accesses do not meet the volume thresholds
requiring either right-turn or left-turn auxiliary lanes. However, since Trilby Road is
classified as an arterial street, Figure 8-1 in the “Larimer County Urban Area Street
Standards” indicates that left-turn lanes are required at all intersections and all-movement
accesses on arterial roadways, except where roundabouts are required. Therefore, a
center left-turn lane will be required on Trilby Road, unless the City chooses to delay this
until other improvements are made in this segment of Trilby Road.
According to the site plan, sidewalks will be built along the property frontage on
Trilby Road. There is currently sidewalk along the south side of Trilby Road (Ridgewood
Hills) and along the north side of Trilby Road (Southgate Church). Other properties have
no sidewalks along Trilby Road. It is doubtful that this land use will generate any
pedestrian or bicycle trips. That being said, the Affordable Roofing site is in an area within
which the City requires pedestrian and bicycle level of service evaluations. Appendix E
shows a map of the area that is within 1320 feet of Affordable Roofing. The Affordable
Roofing site is located within an area termed as “Transit Corridor,” which sets the level of
service threshold at LOS C for all measured categories except for directness and security,
which is LOS B. It is noted that the transit service on South College Avenue is the “FLEX
Route” between Fort Collins and Loveland. It is not the more frequent service of the other
routes within the Transfort system. There are three destination areas within 1320 feet of
the proposed Affordable Roofing site: 1) the residential neighborhood to the southwest of
the site, 2) the residential neighborhood to the northwest of the site, and 3) the commercial
land uses near the US287/Trilby intersection. Appendix E contains a Pedestrian LOS
Worksheet. Acceptable LOS is achieved in every category except for continuity. Sidewalks
in the area are sporadic. It is expected that sidewalks will be installed along other
properties, by these properties, in the future.
Based upon Fort Collins bicycle LOS criteria, there are no bicycle destinations within
1320 feet of the site. This site connects directly to bike lanes on Trilby Road, which
achieves level of service A.
Currently, this area is served by the Transfort Flex Route on College Avenue. It is
expected that transit level of service will be acceptable.
It is concluded that, with development of Affordable Roofing, the future level of
service at the Trilby/East Access and Trilby/West Access intersections will be acceptable.
The level of service for bicycle and transit modes will be acceptable. Sidewalk will be
installed along the site frontage of Trilby Road. According to the “Larimer County Urban
Area Street Standards,” arterial streets (Trilby Road) should have a left-turn lane.
DELICH Affordable Roofing TIS, March 2013
ASSOCIATES
B. N. R.R.
Trilby
US287 (College)
Avondale
SCALE: 1"=1000'
SITE LOCATION Figure 1
DELICH
ASSOCIATES
Affordable Roofing TIS, March 2013
SCALE: 1"=60'
SITE PLAN Figure 2
DELICH
ASSOCIATES
Affordable Roofing TIS, March 2013
LOT 3
0.5199 Ac.
22,645.47 s.f.
BUILDING
4,500 s.f. total
2,800 s.f. office
1,800 s.f. main
1,000 s.f. mezz
1,700 s.f. garage
FF Elev.=5046.2
LOT 2
0.3230 Ac.
14,070.20 s.f.
BUILDING
4,500 s.f. total
2,800 s.f. office
1,800 s.f. main
1,000 s.f. mezz
1,700 s.f. garage
FF Elev.=5046.2
LOT 4
1.2150 Ac.
52,924.91 s.f.
BUILDING
6,000 s.f. total
4,600 s.f. office
2,800 s.f. main
1,800 s.f. mezz
3,200 s.f. garage
FF Elev.=5056.2
West Access
East Access
LOT 1
0.3439 Ac.
14,978.24 s.f.
BUILDING
1,105 s.f. total
FF Elev.=+5047.3
AM/PM
RECENT PEAK HOUR TRAFFIC Figure 3
DELICH
ASSOCIATES
Affordable Roofing TIS, March 2013
313/722
3/2
702/569
0/1
0/1
3/2
316/724
4/2
704/570
1/1
0/0
1/3
Trilby
East Access
West Access
TABLE 1
Current Peak Hour Operation
Intersection Movement Level of Service
AM PM
Trilby/East Access NB LT/RT B B
(stop sign) WB LT/T A A
Trilby/West Access NB LT/RT B C
(stop sign) WB LT/T A A
DELICH Affordable Roofing TIS, March 2013
ASSOCIATES
TABLE 2
Trip Generation
Code Use Size AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
Lot 1
710 Office 1.105 KSF 11.03 12 1.37 2 0.19 0 0.25 0 1.24 2
Lot 2
710 Office 2.8 KSF 11.03 30 1.37 4 0.19 0 0.25 1 1.24 3
110 Garage 1.7 KSF 6.97 12 0.81 2 0.11 0 0.12 0 0.85 2
Lot 3
710 Office 2.8 KSF 11.03 30 1.37 4 0.19 0 0.25 1 1.24 3
110 Garage 1.7 KSF 6.97 12 0.81 2 0.11 0 0.12 0 0.85 2
Lot 5
710 Office 4.6 KSF 11.03 50 1.37 6 0.19 1 0.25 1 1.24 6
110 Garage 3.2 KSF 6.97 22 0.81 3 0.11 0 0.12 0 0.85 3
Total Trip Generation 168 23 1 3 21
DELICH Affordable Roofing TIS, March 2013
ASSOCIATES
TRIP DISTRIBUTION Figure 4
DELICH
ASSOCIATES
Affordable Roofing TIS, March 2013
Trilby
30% 70%
LOT 3
0.5199 Ac.
22,645.47 s.f.
BUILDING
4,500 s.f. total
2,800 s.f. office
1,800 s.f. main
1,000 s.f. mezz
1,700 s.f. garage
FF Elev.=5046.2
LOT 2
0.3230 Ac.
14,070.20 s.f.
BUILDING
4,500 s.f. total
2,800 s.f. office
1,800 s.f. main
1,000 s.f. mezz
1,700 s.f. garage
FF Elev.=5046.2
LOT 4
1.2150 Ac.
52,924.91 s.f.
BUILDING
6,000 s.f. total
4,600 s.f. office
2,800 s.f. main
1,800 s.f. mezz
3,200 s.f. garage
FF Elev.=5056.2
West Access
East Access
LOT 1
0.3439 Ac.
14,978.24 s.f.
BUILDING
1,105 s.f. total
FF Elev.=+5047.3
AM/PM
SITE GENERATED
PEAK HOUR TRAFFIC Figure 5
DELICH
ASSOCIATES
Affordable Roofing TIS, March 2013
0/4
6/1
4/1
3/0
0/3
1/6
6/1
10/1
1/6
4/1
0/4
0/8
Trilby
East Access
West Access
AM/PM
SHORT RANGE (2018) BACKGROUND
PEAK HOUR TRAFFIC Figure 6
DELICH
ASSOCIATES
Affordable Roofing TIS, March 2013
346/799
Trilby
East Access
West Access
783/632
AM/PM
SHORT RANGE (2018) TOTAL
PEAK HOUR TRAFFIC Figure 7
DELICH
ASSOCIATES
Affordable Roofing TIS, March 2013
346/803
6/1
787/633
3/0
0/3
1/6
352/800
10/1
784/638
4/1
0/4
0/8
Trilby
East Access
West Access
TABLE 3
Short Range (2018) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Trilby/East Access NB LT/RT A C
(stop sign) WB LT/T A A
Trilby/West Access NB LT/RT C C
(stop sign) WB LT/T A A
DELICH Affordable Roofing TIS, March 2013
ASSOCIATES
APPENDIX A
APPENDIX B
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 3-7-13 Observer: Sue
Day: Thursday Jurisdiction: Fort Collins
R = right turn Intersection: Trilby/Affordable Roofing East Access
S = straight
L = left turn
Time Northbound: East Access Southbound: Total Eastbound: Trilby Westbound: Trilby Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 0 0 0 0 0 207 0 207 1 63 64 271 271
7:45 0 0 0 0 0 206 1 207 1 94 95 302 302
8:00 0 0 0 0 0 166 0 166 1 81 82 248 248
8:15 0 1 1 0 1 125 0 125 1 78 79 204 205
7:30-8:30 0 0 1 1 0 0 0 0 1 0 704 1 705 4 316 0 320 1025 1026
PHF 0.25 n/a 0.85 0.84
4:30 0 0 0 0 0 136 0 136 1 173 174 310 310
4:45 0 1 1 0 1 151 1 152 1 191 192 344 345
5:00 0 1 1 0 1 135 0 135 0 179 179 314 315
5:15 0 1 1 0 1 148 0 148 0 181 181 329 330
4:30-5:30 0 0 3 3 0 0 0 0 3 0 570 1 571 2 724 0 726 1297 1300
PHF 0.75 n/a 0.94 0.95
DELICH ASSOCIATES
2272 GLEN HAVEN DRIVE
LOVELAND, CO 80538
Phone: (970) 669-2061
TABULAR SUMMARY OF VEHICLE COUNTS
Date: 3-7-13 Observer: Sue
Day: Thursday Jurisdiction: Fort Collins
R = right turn Intersection: Trilby/Affordable Roofing West Access
S = straight
L = left turn
Time Northbound: West Acces Southbound: Total Eastbound: Trilby Westbound: Trilby Total Total
Begins L S R Total L S R Total north/south L S R Total L S R Total east/west All
7:30 0 0 0 0 0 207 0 207 0 63 63 270 270
7:45 0 0 0 0 0 207 0 207 2 92 94 301 301
8:00 0 3 3 0 3 163 0 163 1 80 81 244 247
8:15 0 0 0 0 0 125 0 125 0 78 78 203 203
7:30-8:30 0 0 3 3 0 0 0 0 3 0 702 0 702 3 313 0 316 1018 1021
PHF 0.25 n/a 0.85 0.84
4:30 0 0 0 0 0 136 0 136 1 172 173 309 309
4:45 0 1 1 0 1 151 1 152 1 190 191 343 344
5:00 1 1 2 0 2 134 0 134 0 179 179 313 315
5:15 0 0 0 0 0 148 0 148 0 181 181 329 329
4:30-5:30 1 0 2 3 0 0 0 0 3 0 569 1 570 2 722 0 724 1294 1297
PHF 0.38 n/a 0.94 0.95
APPENDIX C
HCM 2010 TWSC Recent AM
5: East Access & Trilby Road 3/18/2013
Affordable Roofing 3/18/2013 Synchro 8 Light Report
Delich Associates recent am.syn
Intersection
Intersection Delay, s/veh 0
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 704 1 4 316 0 1
Conflicting Peds, #/hr 0000 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized None None None None None None
Storage Length 0 0 0 0
Median Width 0 0 12
Grade, % 0% 0% 0%
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85
Heavy Vehicles, % 2222 2 2
Mvmt Flow 828 1 5 372 0 1
Number of Lanes 1001 1 0
Major/Minor Major 1 Major 2
Conflicting Flow All 0 0 829 0 1210 829
Stage 1 ---- 829 -
Stage 2 ---- 381 -
Follow-up Headway - - 2.218 - 3.518 3.318
Pot Capacity-1 Maneuver - - 803 - 202 370
Stage 1 ---- 429 -
Stage 2 ---- 691 -
Time blocked-Platoon, % - - 0 - 0 0
Mov Capacity-1 Maneuver - - 803 - 200 370
Mov Capacity-2 Maneuver ---- 200 -
Stage 1 ---- 429 -
Stage 2 ---- 685 -
Approach EB WB NB
HCM Control Delay, s 0 0.1 14.8
HCM LOS - - B
Minor Lane / Major Mvmt NBLn1 EBT EBR WBL WBT
Cap, veh/h 370 - - 803 -
HCM Control Delay, s 14.8 - - 9.51 0
HCM Lane V/C Ratio 0.00 - - 0.01 -
HCM Lane LOS B - - A A
HCM 95th-tile Q, veh 0.0 - - 0.0 -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
HCM 2010 TWSC Recent PM
5: East Access & Trilby Road 3/18/2013
Affordable Roofing 3/18/2013 Synchro 8 Light Report
Delich Associates recent pm.syn
Intersection
Intersection Delay, s/veh 0
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 570 1 2 724 0 3
Conflicting Peds, #/hr 0000 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized None None None None None None
Storage Length 0 0 0 0
Median Width 0 0 12
Grade, % 0% 0% 0%
Peak Hour Factor 0.85 0.85 0.94 0.94 0.95 0.95
Heavy Vehicles, % 2222 2 2
Mvmt Flow 671 1 2 770 0 3
Number of Lanes 1001 1 0
Major/Minor Major 1 Major 2
Conflicting Flow All 0 0 672 0 1445 671
Stage 1 ---- 671 -
Stage 2 ---- 774 -
Follow-up Headway - - 2.218 - 3.518 3.318
Pot Capacity-1 Maneuver - - 919 - 145 456
Stage 1 ---- 508 -
Stage 2 ---- 455 -
Time blocked-Platoon, % - - 0 - 0 0
Mov Capacity-1 Maneuver - - 919 - 144 456
Mov Capacity-2 Maneuver ---- 144 -
Stage 1 ---- 508 -
Stage 2 ---- 453 -
Approach EB WB NB
HCM Control Delay, s 0 0 13
HCM LOS - - B
Minor Lane / Major Mvmt NBLn1 EBT EBR WBL WBT
Cap, veh/h 456 - - 919 -
HCM Control Delay, s 13 - - 8.926 0
HCM Lane V/C Ratio 0.01 - - 0.00 -
HCM Lane LOS B - - A A
HCM 95th-tile Q, veh 0.0 - - 0.0 -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
HCM 2010 TWSC Recent AM
3: West Access & Trilby Road 3/18/2013
Affordable Roofing 3/18/2013 Synchro 8 Light Report
Delich Associates recent am.syn
Intersection
Intersection Delay, s/veh 0.1
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 702 0 3 313 0 3
Conflicting Peds, #/hr 0000 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized None None None None None None
Storage Length 0 0 0 0
Median Width 0 0 12
Grade, % 0% 0% 0%
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85
Heavy Vehicles, % 2222 2 2
Mvmt Flow 826 0 4 368 0 4
Number of Lanes 1001 1 0
Major/Minor Major 1 Major 2
Conflicting Flow All 0 0 826 0 1201 826
Stage 1 ---- 826 -
Stage 2 ---- 375 -
Follow-up Headway - - 2.218 - 3.518 3.318
Pot Capacity-1 Maneuver - - 805 - 204 372
Stage 1 ---- 430 -
Stage 2 ---- 695 -
Time blocked-Platoon, % - - 0 - 0 0
Mov Capacity-1 Maneuver - - 805 - 203 372
Mov Capacity-2 Maneuver ---- 203 -
Stage 1 ---- 430 -
Stage 2 ---- 691 -
Approach EB WB NB
HCM Control Delay, s 0 0.1 14.8
HCM LOS - - B
Minor Lane / Major Mvmt NBLn1 EBT EBR WBL WBT
Cap, veh/h 372 - - 805 -
HCM Control Delay, s 14.8 - - 9.492 0
HCM Lane V/C Ratio 0.01 - - 0.00 -
HCM Lane LOS B - - A A
HCM 95th-tile Q, veh 0.0 - - 0.0 -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
HCM 2010 TWSC Recent PM
3: West Access & Trilby Road 3/18/2013
Affordable Roofing 3/18/2013 Synchro 8 Light Report
Delich Associates recent pm.syn
Intersection
Intersection Delay, s/veh 0
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 569 1 2 722 1 2
Conflicting Peds, #/hr 0000 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized None None None None None None
Storage Length 0 0 0 0
Median Width 0 0 12
Grade, % 0% 0% 0%
Peak Hour Factor 0.85 0.85 0.94 0.94 0.95 0.95
Heavy Vehicles, % 2222 2 2
Mvmt Flow 669 1 2 768 1 2
Number of Lanes 1001 1 0
Major/Minor Major 1 Major 2
Conflicting Flow All 0 0 671 0 1442 670
Stage 1 ---- 670 -
Stage 2 ---- 772 -
Follow-up Headway - - 2.218 - 3.518 3.318
Pot Capacity-1 Maneuver - - 919 - 146 457
Stage 1 ---- 509 -
Stage 2 ---- 456 -
Time blocked-Platoon, % - - 0 - 0 0
Mov Capacity-1 Maneuver - - 919 - 145 457
Mov Capacity-2 Maneuver ---- 145 -
Stage 1 ---- 509 -
Stage 2 ---- 454 -
Approach EB WB NB
HCM Control Delay, s 0 0 18.7
HCM LOS - - C
Minor Lane / Major Mvmt NBLn1 EBT EBR WBL WBT
Cap, veh/h 266 - - 919 -
HCM Control Delay, s 18.7 - - 8.926 0
HCM Lane V/C Ratio 0.01 - - 0.00 -
HCM Lane LOS C - - A A
HCM 95th-tile Q, veh 0.0 - - 0.0 -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
APPENDIX D
HCM 2010 TWSC Short Total AM
5: East Access & Trilby Road 3/18/2013
Affordable Roofing 3/18/2013 Synchro 8 Light Report
Delich Associates st am.syn
Intersection
Intersection Delay, s/veh 0.1
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 784 4 10 352 0 0
Conflicting Peds, #/hr 0000 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized None None None None None None
Storage Length 0 0 0 0
Median Width 0 0 12
Grade, % 0% 0% 0%
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85
Heavy Vehicles, % 2222 2 2
Mvmt Flow 922 5 12 414 0 0
Number of Lanes 1001 1 0
Major/Minor Major 1 Major 2
Conflicting Flow All 0 0 927 0 1363 925
Stage 1 ---- 925 -
Stage 2 ---- 438 -
Follow-up Headway - - 2.218 - 3.518 3.318
Pot Capacity-1 Maneuver - - 737 - 163 326
Stage 1 ---- 386 -
Stage 2 ---- 651 -
Time blocked-Platoon, % - - 0 - 0 0
Mov Capacity-1 Maneuver - - 737 - 160 326
Mov Capacity-2 Maneuver ---- 160 -
Stage 1 ---- 386 -
Stage 2 ---- 637 -
Approach EB WB NB
HCM Control Delay, s 0 0.3 0
HCM LOS - - A
Minor Lane / Major Mvmt NBLn1 EBT EBR WBL WBT
Cap, veh/h 0 - - 737 -
HCM Control Delay, s 0 - - 9.964 0
HCM Lane V/C Ratio - - - 0.02 -
HCM Lane LOS A - - A A
HCM 95th-tile Q, veh - - - 0.0 -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
HCM 2010 TWSC Short Total PM
5: East Access & Trilby Road 3/18/2013
Affordable Roofing 3/18/2013 Synchro 8 Light Report
Delich Associates st pm.syn
Intersection
Intersection Delay, s/veh 0.2
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 638 1 1 800 4 8
Conflicting Peds, #/hr 0000 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized None None None None None None
Storage Length 0 0 0 0
Median Width 0 0 12
Grade, % 0% 0% 0%
Peak Hour Factor 0.85 0.85 0.94 0.94 0.95 0.95
Heavy Vehicles, % 2222 2 2
Mvmt Flow 751 1 1 851 4 8
Number of Lanes 1001 1 0
Major/Minor Major 1 Major 2
Conflicting Flow All 0 0 752 0 1604 751
Stage 1 ---- 751 -
Stage 2 ---- 853 -
Follow-up Headway - - 2.218 - 3.518 3.318
Pot Capacity-1 Maneuver - - 858 - 116 411
Stage 1 ---- 466 -
Stage 2 ---- 418 -
Time blocked-Platoon, % - - 0 - 0 0
Mov Capacity-1 Maneuver - - 858 - 116 411
Mov Capacity-2 Maneuver ---- 116 -
Stage 1 ---- 466 -
Stage 2 ---- 417 -
Approach EB WB NB
HCM Control Delay, s 0 0 22.2
HCM LOS - - C
Minor Lane / Major Mvmt NBLn1 EBT EBR WBL WBT
Cap, veh/h 222 - - 858 -
HCM Control Delay, s 22.2 - - 9.201 0
HCM Lane V/C Ratio 0.06 - - 0.00 -
HCM Lane LOS C - - A A
HCM 95th-tile Q, veh 0.2 - - 0.0 -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
HCM 2010 TWSC Short Total AM
3: West Access & Trilby Road 3/18/2013
Affordable Roofing 3/18/2013 Synchro 8 Light Report
Delich Associates st am.syn
Intersection
Intersection Delay, s/veh 0.1
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 787 3 6 346 0 1
Conflicting Peds, #/hr 0000 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized None None None None None None
Storage Length 0 0 0 0
Median Width 0 0 12
Grade, % 0% 0% 0%
Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85
Heavy Vehicles, % 2222 2 2
Mvmt Flow 926 4 7 407 0 1
Number of Lanes 1001 1 0
Major/Minor Major 1 Major 2
Conflicting Flow All 0 0 929 0 1349 928
Stage 1 ---- 928 -
Stage 2 ---- 421 -
Follow-up Headway - - 2.218 - 3.518 3.318
Pot Capacity-1 Maneuver - - 736 - 166 325
Stage 1 ---- 385 -
Stage 2 ---- 662 -
Time blocked-Platoon, % - - 0 - 0 0
Mov Capacity-1 Maneuver - - 736 - 164 325
Mov Capacity-2 Maneuver ---- 164 -
Stage 1 ---- 385 -
Stage 2 ---- 654 -
Approach EB WB NB
HCM Control Delay, s 0 0.2 16.1
HCM LOS - - C
Minor Lane / Major Mvmt NBLn1 EBT EBR WBL WBT
Cap, veh/h 325 - - 736 -
HCM Control Delay, s 16.1 - - 9.939 0
HCM Lane V/C Ratio 0.00 - - 0.01 -
HCM Lane LOS C - - A A
HCM 95th-tile Q, veh 0.0 - - 0.0 -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
HCM 2010 TWSC Short Total PM
3: West Access & Trilby Road 3/18/2013
Affordable Roofing 3/18/2013 Synchro 8 Light Report
Delich Associates st pm.syn
Intersection
Intersection Delay, s/veh 0.1
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 633 0 1 803 3 6
Conflicting Peds, #/hr 0000 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized None None None None None None
Storage Length 0 0 0 0
Median Width 0 0 12
Grade, % 0% 0% 0%
Peak Hour Factor 0.85 0.85 0.94 0.94 0.95 0.95
Heavy Vehicles, % 2222 2 2
Mvmt Flow 745 0 1 854 3 6
Number of Lanes 1001 1 0
Major/Minor Major 1 Major 2
Conflicting Flow All 0 0 745 0 1601 745
Stage 1 ---- 745 -
Stage 2 ---- 856 -
Follow-up Headway - - 2.218 - 3.518 3.318
Pot Capacity-1 Maneuver - - 863 - 117 414
Stage 1 ---- 469 -
Stage 2 ---- 416 -
Time blocked-Platoon, % - - 0 - 0 0
Mov Capacity-1 Maneuver - - 863 - 117 414
Mov Capacity-2 Maneuver ---- 117 -
Stage 1 ---- 469 -
Stage 2 ---- 415 -
Approach EB WB NB
HCM Control Delay, s 0 0 21.8
HCM LOS - - C
Minor Lane / Major Mvmt NBLn1 EBT EBR WBL WBT
Cap, veh/h 224 - - 863 -
HCM Control Delay, s 21.8 - - 9.177 0
HCM Lane V/C Ratio 0.04 - - 0.00 -
HCM Lane LOS C - - A A
HCM 95th-tile Q, veh 0.1 - - 0.0 -
Notes
~ : Volume Exceeds Capacity; $ : Delay Exceeds 300 Seconds; Error : Computation Not Defined
APPENDIX E
B. N. R.R.
Trilby
US287 (College)
Avondale
SCALE: 1"=1000'
PEDESTRIAN INFLUENCE AREA
DELICH
ASSOCIATES
Affordable Roofing TIS, March 2013
Pedestrian LOS Worksheet
Project Location Classification: Transit Corridor
Level of Service (minimum based on project location classification)
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Directness Continuity Street
Crossings
Visual
Interest &
Amenities
Security
Minimum B C C C B
1 Actual A D A C B
Neighborhood to the
southwest Residential
Proposed A D A C B
Minimum B C C C B
2 Actual A E C C B
Neighborhood to the
northwest Residential
Proposed A E C C B
Minimum B C C C B
3 Actual A D C C B
Commercial uses near
US287/Trilby Commercial
Proposed A D C C B
Minimum
4 Actual
Proposed
Minimum
5 Actual
Proposed
Minimum
6 Actual
Proposed
Minimum
7 Actual
Proposed
Minimum
8 Actual
Proposed
Minimum
9 Actual
Proposed
Minimum
10 Actual
Proposed