Loading...
HomeMy WebLinkAboutZIEGLER - HARVEST PARK PDP - PDP120033 - SUBMITTAL DOCUMENTS - ROUND 2 -December 18, 2012 Ms. Sherry Albertson-Clark, Planner Current Planning City of Fort Collins P.O. Box 580 Fort Collins, CO 80525 RE: PDP120033 Ziegler- Harvest Park PDP- Type II ODP120004 Ziegler- Harvest Park Overall Development Plan First Submittal Dear Ms. Albertson-Clark, The Fort Collins- Loveland Water District and the South Fort Collins Sanitation District have reviewed the above mentioned project and submit the following comment. The water and sanitary sewer taps must be purchased and owned by the Home Owners Association. This note is to be included in the plat notes. A note has been added to the Plat Easements, on the District’s standard easement form, are required for all facilities that are not located in the public ROW. Easements will be dedicated using the District’s standard easement forms prior to recordation The District does not allow trees or extensive landscaping within the District's easement. ?? Reduced Pressure Principle Back-Flow-Prevention-Devices are required on the fire line riser. A note has been added to the Utility Plans There are reimbursements required for the existing water and sanitary facilities. The District will require payment of the reimbursements prior to connection to existing facilities. Understood The South Fort Collins Sanitation District will require the property to petition into the District. Understood The District will provide comments when the construction drawings are submitted for review. Please do not hesitate to contact me at 226-3104, ext. 104, if you have any questions or require additional information. Respectfully, Mr. Terry W. Farrill, P.E. District Engineer xc: Mr. Michael D. DiTullio, District Manager Steve Steinbicker 5150 Snead Drive, Fort Collins, CO 80525 Phone (970) 226-3104 Fax (970) 226-0186