HomeMy WebLinkAboutBDR FOUR-PLEX, 621 S. MELDRUM ST. - FDP130002 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFebruary 20, 2013 FINAL DRAINAGE REPORT Big Deal Four Plex Fort Collins, Colorado Prepared for: Big Deal Real Estate Inc. 2519 Ridge Creek Road Fort Collins, Colorado 80528 Prepared by: 200 South College Avenue, Suite 10 Fort Collins, Colorado 80524 Phone: 970.221.4158 Fax: 970.221.4159 www.northernengineering.com Project Number: 876-001 3This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. February 20, 2013 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Final Drainage Report for Big Deal Four Plex Dear Staff: Northern Engineering is pleased to submit this Final Drainage Report for your review. Comments from the Big Deal Four Plex PDP Round Number 2 review letter dated 01.04.13 have been addressed. Written responses can be found in the comprehensive response to comments letter on file with Current Planning. This report has been prepared in accordance with the Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed Big Deal Four Plex multi-family student housing project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Herman H. Feissner, PE Project Engineer Big Deal Four Plex Final Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ......................................................... 1 II. DRAINAGE BASINS AND SUB-BASINS ............................................................. 5 III. DRAINAGE DESIGN CRITERIA ......................................................................... 6 IV. DRAINAGE FACILITY DESIGN .......................................................................... 8 V. CONCLUSIONS............................................................................................. 10 References ............................................................................................................. 11 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations B.1 – Storm Sewers B.2 – Street Flow (not applicable) B.3 – Inlets B.4 – Detention Facilities APPENDIX C – Water Quality Design Computations LIST OF TABLES AND FIGURES: MAP POCKET: EX1 – Existing Conditions Drainage Exhibit C4.00 – Drainage Exhibit NOTE: TABLE OF CONTENTS WILL BE UPDATED/CORRECTED WITH SUBSEQUENT REPORT ISSUANCES. Big Deal Four Plex Final Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map Figure 1 – Vicinity Map 2. Big Deal Four Plex (project site) is located in Section 14, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. More specifically, the project is located at 621 South Meldrum Street. 3. The project site is bordered to the north and south by existing single-family homes; to the east by Meldrum Street (100' Right-of-Way); and to the west by an existing alley (20' Right-of-Way). 4. There are no major drainageways within or adjacent to the site. 5. The existing Arthur Ditch bisects the east-west project axis. According to the ditch company President, Mark Taylor, the existing ditch has a capacity of 60 to 70 cfs. The ditch company generally runs flows of 50 - 55 cfs. The ditch receives existing stormwater flows from two storm inlets in the alley. The concrete ditch box is at grade (±5001.20) and visible across the project site. The structural integrity of the ditch has yet to verified by a registered professional engineer. At the time of writing, CTL Thompson was evaluating the existing concrete ditch box. Big Deal Four Plex Final Drainage Report 2 B. Description of Property 1. Big Deal Four Plex is comprised of ±0.22 acre. 2. The existing site improvements (See Figure 2 - Aerial Photograph) include: one single- family home which fronts to Meldrum Street, a detached garage and a small shed. Figure 2 – Aerial Photograph 3. The existing groundcover currently consists of several mature trees, grass, weeds and bare soil. 4. The existing conditions runoff from sub-basin EX1 (see Existing Conditions Drainage Exhibit) sheet flows from the west property line and the top of the Arthur Ditch across flat grades (e.g., <2.00%) to a local low-point. The excess surface runoff in sub-basin EX2 flows from the east edge of the Arthur Ditch toward Meldrum Street. 5. A soils report (Soilogic Project # 12-1094) was completed by Soilogic, Inc. on November 28, 2012. The report contains the results of a complete geotechnical subsurface exploration as well as pertinent geotechnical recommendations. According to the summary of findings presented in the aforementioned report, "Approximately 3 inches of vegetation and topsoil or wood chips was encountered at the surface at the boring locations. The vegetative soil/wood chip layer was underlain by brown/rusty brown/beige lean clay with varying amounts of sand, which varied to clayey sand with depth in boring B-1. The lean clay/clayey sand varied from medium stiff to stiff in terms of consistency or loose to medium dense in terms of relative density and generally showed low swell potential at current moisture and density conditions. The lean clay/clayey sand extended to the full depth of exploration, approximately 15 feet below present site grade." The boring logs show that USCS soil group CL is predominant on-site. These soils are inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clays and lean clays. Project Site Big Deal Four Plex Final Drainage Report 3 6. There are no major drainageways within or adjacent to the project site. 7. The proposed Big Deal Four Plex project will include a single multi-family building with four units and a plan area of approximately 2570 sq. ft. The completed structure will be two stories. Other proposed improvements include: a new asphalt parking area and updated landscaping. 8. The existing Arthur Ditch cuts diagonally across the project site. This general alignment persists to the north and south of the project site (See Figure 3 – Existing Drainage and Irrigation Infrastructure). Figure 3 – Existing Drainage and Irrigation Infrastructure 9. The proposed land use is residential, multi-family dwellings. This is a permitted use in the Neighborhood Community - Buffer District (NCB). Project Site Big Deal Four Plex Final Drainage Report 4 C. Floodplain 1. The subject property is not located in a FEMA regulatory or City of Fort Collins designated floodplain. In particular, the project site is not located within a FEMA designated 100-year floodplain per Map Number 08069C0979H (Effective date: May 2, 2012). Figure 4 – FEMA Firmette (Map Number 08069C0979H) Project Site Big Deal Four Plex Final Drainage Report 5 II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. Big Deal Four Plex is located within the City of Fort Collins Old Town major drainage basin. This basin is located in north-central Fort Collins and has a drainage area of approximately 2,120 acres, including approximately 400 acres of the Colorado State University campus. The Old Town major drainage basin generally drains from west to east. It receives some runoff from the Canal Importation Basin directly west of Old Town. Most of the runoff from the Old Town major drainage basin drains into the Poudre River. Street flooding is a common occurrence in Old Town. Several capital projects such as the Howes Street, Locust Street and Oak Street Outfall projects have addressed the problem and improved drainage in the area. 2. As previously mentioned, the Arthur Ditch cuts diagonally across the project site. This irrigation conveyance has not been directly influenced by stormwater flows from the project site. However, with this design, we propose releasing attenuated developed runoff into this existing conveyance as described below. B. Sub-Basin Description 1. The existing site is defined with two sub-basins: EX1 and EX2. Sub-basin EX-1 is situated between the west property line and the west edge of the Arthur Ditch. This sub-basin drains to an existing low point with no defined outfall. Excess runoff could fill this low-lying area and spill into sub-basin EX2. Sub-basin EX2 is situated between the east edge of the Arthur Ditch and the east property line. The existing runoff in sub-basin EX2 sheet flows from the west to east and into Meldrum Street. 2. The Arthur Ditch does not currently receive stormwater flows from the subject site. 3. The project site does not receive any notable runoff from off-site properties. Big Deal Four Plex Final Drainage Report 6 III. DRAINAGE DESIGN CRITERIA A. The overall stormwater management strategy employed with Big Deal Four Plex utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices. The first consideration taken in trying to reduce the stormwater impacts of this development is the site selection itself. By choosing an already developed site with public storm sewer currently in place, the burden is significantly less than developing a vacant parcel absent of any infrastructure. Big Deal Four Plex aims to reduce runoff peaks, volumes and pollutant loads from frequently occurring storm events such as the water quality (80th percentile) and the 2- year storm event by implementing Low Impact Development (LID) strategies. Wherever practical, runoff will be routed across landscaped areas or through grass- or cobble-lined swales. This LID practice reduces the overall amount of impervious area, while Minimizing Directly Connected Impervious Areas (MDCIA) at the same time. The combined LID/MDCIA techniques will be implemented, where practical, throughout the development, thereby slowing runoff and increasing opportunities for infiltration. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release.The efforts taken in Step 1 will help to minimize excess runoff from frequently occurring storm events; however, urban development of this intensity will still have stormwater runoff leaving the site. The primary water quality will occur in an Extended Detention Basin (EDB) along the northwest property line (sub-basin A1). Water Quality in sub-basin B will occur in the Udall Natural Area. Step 3 – Stabilize Drainageways. As stated in Section I.B.6, above, there are no major drainageways in or near the subject site. Step 4 – Implement Site Specific and Other Source Control BMPs. This step typically applies to industrial and commercial developments. B. Development Criteria Reference and Constraints 1. The subject property is not part of an Overall Development Plan drainage study or similar “development/project” drainage master plan. 2. There are no known drainage studies for any adjacent properties that will have an affect on Big Deal Four Plex. 3. The site plan will be constrained on two sides by existing single-family development; an alleyway; and Meldrum Street. The drainage outfall for sub-basin A1 is an existing area inlet that ties into the existing 12” RCP storm sewer in the alleyway. The proposed design releases at the calculated existing Q2 for sub-basin EX1 (i.e., 0.072cfs). C. Hydrological Criteria Big Deal Four Plex Final Drainage Report 7 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the Big Deal Four Plex development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. The Rational Formula-based Federal Aviation Administration (FAA) procedure has been utilized for detention storage calculations. 4. Two separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2-year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. D. Hydraulic Criteria 1. The drainage facilities proposed with the Big Deal Four Plex project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual. 2. As stated in Section I.C.1, above, the subject property is not located in a FEMA regulatory or a City of Fort Collins designated floodplain. F. Floodplain Regulations Compliance 1. As previously mentioned, this project is not subject to any floodplain regulations. G. Modifications of Criteria 1. The design contained herein changes the direction that existing conditions stormwater runoff travels. We are proposing to release attenuated developed runoff (Qout=0.072cfs) into the existing storm drain system in the alley. This inlet discharges to the Arthur Ditch. The concept was discussed with and approved by Mark Taylor on November 13, 2012. Considering the proposed release rate and the existing ditch flows, he felt that it was okay to release into the existing infrastructure and, ultimately, the Arthur Ditch. Big Deal Four Plex Final Drainage Report 8 IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objective of the Big Deal Four Plex drainage design is, to the maximum extent practicable, maintain existing drainage patterns, while not adversely impacting adjacent properties. 2. No notable off-site runoff flows directly through the project site. 3. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 4. The project site has been divided into three drainage areas, designated as sub-basins A1, B1, B2, B3, C1 and C2. The drainage patterns anticipated for each basin are further described below. Sub-Basin A1 Sub-basin A1 encompasses nearly one-half of the total project site area. It is comprised of landscaping, concrete walks and asphalt parking. A large part of the parking area in this basin will comprise the on-site detention pond (Pond A). D.P. A1 is situated at the proposed outfall. A short section of pipe will connect to an existing area inlet in the alleyway. This basin releases at a rate of 0.072 cfs during the 100- year storm event. Sub-Basins B1 through B3 Sub-basins B1 through B3 encompass the eastern portion of the project site. These sub-basins are comprised of roof area, concrete walks and landscaping. The downspouts on the north and south sides of the proposed structure will direct developed runoff from the roof to finished grade or into a 6" PVC storm drain system. Surface stormwater flows will collect in swales that run parallel to the north and south property lines. These swales will drain into the existing curbline in Meldrum Street. During the 2-year and 100-year storm events, the proposed condition will increase (no) runoff into Meldrum Street by ±0.10 cfs and ±0.40cfs, respectively. Overall, the project site will increase flows by ±0.11 cfs during the 2-year storm event and ±0.22 cfs during the 100-year storm event. Sub-Basins C1 through C2 Sub-basins C1 and C2 are located along the south and north property lines, respectively. Each basin is comprised of landscaped area. These sub-basins drain to the respective neighboring properties. In both cases, the developed runoff is negligible. A full-size copy of the Drainage Exhibit (sheet C4.00) can be found in the Map Pocket at the end of this report. B. Specific Details 1. The proposed development will add ±0.072 acre of impervious area. This includes the entire site and not just the increase in sub-basin A1. Big Deal Four Plex Final Drainage Report 9 2. The required storage volume was estimated with the FAA method. To estimate the required storage volume, we calculated the existing 2-year release rate (0.072 cfs) for sub-basin EX1. Refer to Appendix B.4 for the calculation. 3. Water quality is provided for sub-basin A1 in an Extended Detention Basin (EDB). The calculated Water Quality Capture Volume (WQCV), 105 cu. ft., can be provided with less than one foot of depth because of the proposed detention pond configuration (i.e., long and narrow) and grading. The WQCV depth was set to one foot. At this depth we provide 238 cu. ft . of storage. This volume was added to the required 100-year storage volume, 649 cu. ft, to reach the total required volume, 887 cu. ft. 4. The 100-year water surface elevation is 5001.39. An emergency spillway is provided at the entrance to the parking lot. Water will begin spilling from the parking area at elevation 5001.51. 5. Sub-basins B1 through B3 drain, without attenuation, into Meldrum Street. Water quality for these basins is provided in the Udall Natural Area. 6. The drainage features associated with Big Deal Four Plex project are private facilities and located on private property. 7. There are no additional facilities or upgrades needed off-site in order to accommodate the developed runoff from Big Deal Four Plex. Big Deal Four Plex Final Drainage Report 10 V. CONCLUSIONS A. Compliance with Standards 1. The design elements comply without variation except as noted above with respect to the request to release attenuated developed runoff into the Arthurs Ditch. 2. The drainage design proposed with Big Deal Four Plex complies with the City of Fort Collins Master Drainage Plan for the Old Town Basin. 3. There are no regulatory floodplains associated with the Big Deal Four Plex development. 4. The drainage plan and stormwater management plan measures proposed with the Big Deal Four Plex student housing project are compliant with all applicable State and Federal regulations governing stormwater discharge. B. Drainage Concept 1. The drainage design proposed with this project will effectively limit potential damage associated with its stormwater runoff. The Big Deal Four Plex will detain for the sub- basin A1 developed condition and release at 0.072 cfs during the 100-year storm. 2. The proposed Big Deal Four Plex development will not impact the Master Drainage Plan recommendations for the Old Town Basin. Big Deal Four Plex Final Drainage Report 11 References 1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 2. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 3. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 4. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. Big Deal Four Plex Preliminary Erosion Control Report APPENDIX A HYDROLOGIC COMPUTATIONS Big Deal Four Plex Project: Big Deal Four Plex Project Site Area 9513 Calculations By: EX1 3794 Date: EX2 5719 A1 4292 B1 1043 B2 1523 B3 1818 C1 447 C2 391 Basin Area, sq. ft. Surface Description % Impervious Area, sq. ft. Notes EX1 253 Roofs 90% 227 EX1 42 Roofs 90% 38 EX1 479 Concrete (e.g., walks & parking) 90% 431 Arthur Ditch Impervious Area 696 % Impervious 18% EX2 840 Roofs 90% 756 EX2 479 Concrete (e.g., walks & parking) 90% 431 Arthur Ditch EX2 26 Concrete (e.g., walks & parking) 90% 24 EX2 185 Roofs 90% 166 EX2 148 Pavers (e.g., flagstone or wood deck) 22% 32 Impervious Area 1410 % Impervious 25% Total Impervious Area 2106 % Impervious 22% Basin Area, sq. ft. Surface Description % Impervious Area, sq. ft. Notes A1 1817 Asphalt 100% 1817 A1 541 Concrete (e.g., walks & parking) 90% 487 A1 305 Roofs 90% 275 A1 298 Pavers (e.g., flagstone or wood deck) 22% 66 SUMMARY OF EXISTING AND PROPOSED IMPERVIOUS AREA H. Feissner February 14, 2013 EXISTING CONDITION PROPOSED CONDITION Areas, sq. ft. 2/14/2013 3:29 PM A1 298 Pavers (e.g., flagstone or wood deck) 22% 66 Impervious Area 2644 % Impervious 62% B1 179 Concrete (e.g., walks & parking) 90% 161 B1 373 Roofs 90% 336 Impervious Area 497 % Impervious 48% B2 332 Concrete (e.g., walks & parking) 90% 299 B2 946 Roofs 90% 851 Impervious Area 1150 % Impervious 76% B3 131 Concrete (e.g., walks & parking) 90% 118 B3 914 Roofs 90% 823 Impervious Area 941 % Impervious 52% C1 21 Concrete (e.g., walks & parking) 90% 19 Impervious Area 19 % Impervious 4% Total Impervious Area 5250 % Impervious 55% Area, sq. ft. Area, acre Total Impervious Area Increase 3144 0.072 Big Deal Four Plex CHARACTER OF SURFACE1: Runoff Coefficient Percentage Impervious Project: Big Deal Four Plex Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: H. Feissner Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 100% . Date: Concrete …….......……………….….……….………………..….…………………………………………………….0.95 90% . Gravel ……….…………………….….…………………………..……………………………………………………… 0.50 40% Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90% Pavers …………………………...………………..……………………………………………………………………… 0.40 22% Lawns and Landscaping Sandy Soil Flat <2% ……………………………………………………………………………………………………………… 0.10 0% Average 2% to 7% ………………………………………………………………………………………………….0.15 0% . Steep >7% …………………………………………………………………………………………………………… 0.20 0% Clayey Soil Flat <2% ……………………………………………………………………………………………………………… 0.20 0% Average 2% to 7% ………………………………………………………………………………………………….0.25 0% . Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year Cf = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Basin ID Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Gravel (ac) Area of Roofs (ac) Area of Pavers (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite Big Deal Four Plex Overland Flow, Time of Concentration: Project: Big Deal Four Plex Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Big Deal Four Plex Rational Method Equation: Project: Big Deal Four Plex Calculations By: Date: Rainfall Intensity: Existing Conditons EX1 EX1 0.09 8.75 8.75 8.11 0.35 0.35 0.44 2.35 4.02 8.38 0.072 0.12 0.32 EX2 EX2 0.13 13.97 13.97 12.95 0.41 0.41 0.51 1.95 3.34 7.04 0.10 0.18 0.47 Proposed Condition A1 A1 0.10 5.00 5.00 5.00 0.69 0.69 0.87 2.85 4.87 9.95 0.20 0.33 0.85 Q 100 release=0.072 cfs B1 B1 0.02 5.00 5.00 5.00 0.62 0.62 0.78 2.85 4.87 9.95 0.04 0.07 0.18 Sized Nyloplast 12" Standard Grate for 2x Q 100 B2 B2 0.03 5.00 5.00 5.00 0.84 0.84 1.00 2.85 4.87 9.95 0.08 0.14 0.35 N/A B2 (Roof Area) 0.02 5.00 5.00 5.00 0.95 0.95 1.00 2.85 4.87 9.95 0.06 0.10 0.22 Q 100 flow in 6" ADS = 0.18 + 0.22 = 0.40 cfs B3 B3 0.04 5.00 5.00 5.00 0.65 0.65 0.82 2.85 4.87 9.95 0.08 0.13 0.34 C1 C1 0.01 5.00 5.00 5.00 0.28 0.28 0.35 2.85 4.87 9.95 0.008 0.014 0.036 C2 C2 0.01 5.00 5.00 5.00 0.25 0.25 0.31 2.85 4.87 9.95 0.006 0.011 0.028 Intensity, i2 (in/hr) Intensity, i10 (in/hr) Intensity, i100 (in/hr) Notes RUNOFF COMPUTATIONS H. Feissner February 14, 2013 Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 Design Point Basin(s) Area, A (acres) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Flow, Q2 (cfs) Flow, Q10 (cfs) Flow, Q100 (cfs) C2 C 10 C100 Q C f C i A 2/14/2013 4:03 PM Big Deal Four Plex Preliminary Erosion Control Report APPENDIX B HYDRAULIC COMPUTATIONS B.1 – Storm Sewers B.2 – Street Flow (not applicable) B.3 – Inlets B.4 – Detention Facilities Big Deal Four Plex Preliminary Erosion Control Report APPENDIX B.1 STORM SEWERS Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Thursday, Feb 14 2013 <Name> Circular Diameter (ft) = 0.50 Invert Elev (ft) = 5000.00 Slope (%) = 0.50 N-Value = 0.012 Calculations Compute by: Known Q Known Q (cfs) = 0.40 Highlighted Depth (ft) = 0.39 Q (cfs) = 0.400 Area (sqft) = 0.16 Velocity (ft/s) = 2.43 Wetted Perim (ft) = 1.09 Crit Depth, Yc (ft) = 0.33 Top Width (ft) = 0.41 EGL (ft) = 0.48 0 1 Elev (ft) Section 4999.75 5000.00 5000.25 5000.50 5000.75 5001.00 Reach (ft) Big Deal Four Plex Preliminary Erosion Control Report APPENDIX B.2 STREET FLOW (not applicable) Big Deal Four Plex Preliminary Erosion Control Report APPENDIX B.3 INLETS 3130 Verona Avenue • Buford, Georgia 30518 • (866) 888-8479 / (770) 932-2443 • Fax: (770) 932-2490 Nyloplast Grate Inlet Capacity Charts • March 20010 Nyloplast 12" Standard Grate Inlet Capacity Chart 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 0.55 0.60 0.65 0.70 0.75 0.80 0.85 0.90 0.95 1.00 1.05 1.10 Head (ft) Capacity (cfs) Orifice Flow Weir Flow Big Deal Four Plex Preliminary Erosion Control Report APPENDIX B.4 DETENTION FACILITIES Big Deal Four Plex 876-001 Detention Pond Calculation | FAA Method Project Number: 876-001 Fort Collins, Colorado H. Feissner Date: 2/15/2013 Project Number: Project Location: Calculations By: H. Feissner Date: 2/15/2013 Pond No.: Pond A Calculations By: A1 Input Variables Results Design Point A1 100-yr 0.87 WQCV 238 ft3 Design Point Design Storm Required Detention Volume Developed "C" = 0.87 WQCV 238 ft3 Area (A)= 0.10 acres Quantity Detention 649 ft3 Developed "C" = Area (A)= 0.10 acres Quantity Detention 649 ft Max Release Rate = 0.072 cfs Total Volume 887 ft3 Total Volume 0.020 ac-ft Ft.Collins Inflow Storage Time Time Ft.Collins 100-yr Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Intensity Volume Volume (Release) Volume Volume (mins) (secs) (in/hr) (cfs) (ft3) ft ) (ft3) ft ) (ft3) ft ) 5 300 9.95 0.9 260 22 238 10 600 7.72 0.7 403 43 360 15 900 6.52 0.6 511 65 446 20 1200 5.60 0.5 585 86 498 25 1500 4.98 0.4 650 108 542 30 1800 4.52 0.4 708 130 578 35 2100 4.08 0.4 745 151 594 40 2400 3.74 0.3 781 173 608 45 2700 3.46 0.3 813 194 618 50 3000 3.23 0.3 843 216 627 55 3300 3.03 0.3 870 238 632 60 3600 2.86 0.2 896 259 637 65 3900 2.72 0.2 923 281 642 70 4200 2.59 0.2 946 302 644 75 4500 2.48 0.2 971 324 647 80 4800 2.38 0.2 994 346 648 85 5100 2.29 0.2 1016 367 649 90 5400 2.21 0.2 1038 389 649 95 5700 2.13 0.2 1056 410 646 Big Deal Four Plex 876-001 Stage - Storage Calculation Project Number: 876-001 Fort Collins, Colorado H. Feissner Date: 2/15/2013 Project Number: Project Location: Calculations By: H. Feissner Date: 2/15/2013 Pond No.: Pond A Calculations By: Design Point A Required Volume Water Surface Elevation (WSE) A WQCV 238 ft3 5000.00 ft. Design Point Design Storm Require Volume= 238 ft 5000.00 ft. Design Storm 100-yr Required Volume= 887 ft3 5001.39 ft. Require Volume= Required Volume= 887 ft 5001.39 ft. Contour Contour Incremental Area Cumulative Volume Incremental Volume Contour Cummulative Elevation (Y- values) Contour Area Depth Incremental Area Avg. End Cumulative Volume Avg. End Incremental Volume Conic Cummulative Volume Conic (X- values) values) ft3 ft. ft3 ft3 ft3 ft3 4,999.00 27 0.00 0 0 0 0 4,999.20 184 0.20 21 21 19 19 4,999.40 284 0.20 47 68 46 65 4,999.60 287 0.20 57 125 57 122 4,999.80 290 0.20 58 183 58 180 5,000.00 293 0.20 58 241 58 238 5,000.20 296 0.20 59 300 59 297 5,000.40 300 0.20 60 360 60 357 5,000.60 304 0.20 60 420 60 417 5,000.80 317 0.20 62 482 62 479 5,001.00 418 0.20 73 555 73 553 5,001.20 796 0.20 121 677 119 672 5,001.40 1473 0.20 227 904 224 895 5,002.00 5,001.50 5,001.00 Contour Elevation 5,000.50 Contour Elevation Big Deal Four Plex Developed Condition Orifice Plate Sizing Calculations 100-Year Developed Condition Attenuated to 2-Year Historic Rate Design Point Sub-Basin A1 Orifice Calculation: Qo = CA(2gH) 0.5 Tailwater Elevation 5000.03 100-year WSEL 5001.39 Invert Out 4998.93 Allowable Release Rate 0.072 cfs H 1.30 ft C 0.65 g 32.2 ft/s Qo 0.072 cfs Diameter 0.1242 ft A 0.01 ft 2 A 1.74 in 2 Diameter of Orifice: 1 1/2 in 2/20/2013 12:01 PM Big Deal Four Plex Preliminary Erosion Control Report APPENDIX C WATER QUALITY DESIGN COMPUTATIONS Sheet 1 of 4 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 62.0 % B) Tributary Area's Imperviousness Ratio (i = Ia / 100 ) i = 0.620 C) Contributing Watershed Area Area = 0.100 ac D) For Watersheds Outside of the Denver Region, Depth of Average d6 = in Runoff Producing Storm E) Design Concept (Select EURV when also designing for flood control) F) Design Volume (1.2 WQCV) Based on 40-hour Drain Time VDESIGN = 0.0024 ac-ft (VDESIGN = (1.0 * (0.91 * i 3 - 1.19 * i 2 + 0.78 * i) / 12 * Area * 1.2) G) For Watersheds Outside of the Denver Region, VDESIGN OTHER = ac-ft Water Quality Capture Volume (WQCV) Design Volume (VWQCV OTHER = (d 6*(VDESIGN /0.43)) H) User Input of Water Quality Capture Volume (WQCV) Design Volume VDESIGN USER = ac-ft (Only if a different WQCV Design Volume is desired) I) Predominant Watershed NRCS Soil Group J) Excess Urban Runoff Volume (EURV) Design Volume For HSG A: EURVA = (0.1878i - 0.0104)*Area EURV = ac-f t For HSG B: EURVB = (0.1178i - 0.0042)*Area For HSG C/D: EURVC/D = (0.1043i - 0.0031)*Area Design Procedure Form: Extended Detention Basin (EDB) Big Deal Four Plex Northern Engineering February 20, 2013 Fort Collins, Colorado | Pond A H. Feissner Choose One Excess Urban Runoff Volume (EURV) Choose One A B C / D Water Quality Capture Volume (WQCV) 2. Basin Shape: Length to Width Ratio L : W = 7.5 : 1 (A basin length to width ratio of at least 2:1 will improve TSS reduction.) 3. Basin Side Slopes A) Basin Maximum Side Slopes Z = 0.00 ft / ft (Horizontal distance per unit vertical, 4:1 or flatter preferred) 4. Inlet A) Describe means of providing energy dissipation at concentrated inflow locations: 876-001_UD-BMP_v3.02, EDB 2/20/2013, 10:32 AM Sheet 2 of 4 Designer: Company: Date: Project: Location: 5. Forebay A) Minimum Forebay Volume VFMIN = 0.000 ac-ft A FOREBAY MAY NOT BE (VFMIN = 0% of the WQCV) NECESSARY FOR THIS SIZE SITE B) Actual Forebay Volume VF = ac-ft C) Forebay Depth DF = in (DF = 12 inch maximum) D) Forebay Discharge i) Undetained 100-year Peak Discharge Q100 = cfs ii) Forebay Discharge Design Flow QF = cfs (QF = 0.02 * Q 100) E) Forebay Discharge Design F) Discharge Pipe Size (minimum 8-inches) Calculated DP = in G) Rectangular Notch Width Calculated WN = in PROVIDE A CONSISTENT LONGITUDINAL 6. Trickle Channel SLOPE FROM FOREBAY TO MICROPOOL WITH NO MEANDERING. RIPRAP AND A) Type of Trickle Channel SOIL RIPRAP LINED CHANNELS ARE NOT RECOMMENDED. MINIMUM DEPTH OF 1.5 FEET F) Slope of Trickle Channel S = 0.0100 ft / ft H. Feissner (flow too small for berm w/ pipe) Fort Collins, Colorado | Pond A Big Deal Four Plex February 20, 2013 Northern Engineering Design Procedure Form: Extended Detention Basin (EDB) Choose One Wall with Rect. Notch Berm With Pipe Choose One Concrete Soft Bottom Wall with V-Notch Weir 7. Micropool and Outlet Structure A) Depth of Micropool (2.5-feet minimum) DM = ft B) Surface Area of Micropool (10 ft 2 minimum) A M = sq ft C) Outlet Type D) Depth of Design Volume (EURV or 1.2 WQCV) Based on the Design H = 1.00 feet Concept Chosen Under 1.E. E) Volume to Drain Over Prescribed Time WQCV = 0.0020 ac-ft F) Drain Time TD = 3 hours DRAIN TIME < 40 HOURS Sheet 3 of 4 Designer: Company: Date: Project: Location: 8. Initial Surcharge Volume A) Depth of Initial Surcharge Volume DIS = in (Minimum recommended depth is 4 inches) B) Minimum Initial Surcharge Volume VIS = cu ft (Minimum volume of 0.3% of the WQCV) C) Initial Surcharge Provided Above Micropool Vs= cu ft 9. Trash Rack A) Type of Water Quality Orifice Used B) Water Quality Screen Open Area: At = 38.5*(e -0.095D )*Aot At = 12 square inches C) For 2", or Smaller, Circular Opening (See Fact Sheet T-12): i) Width of Water Quality Screen and Concrete Opening (Wopening) W opening = inches ii) Height of Water Quality Screen (HTR) H TR = inches iii) Type of Screen, Describe if "Other" D) For 2" High Rectangular Opening: i) Width of Rectangular Opening (Worifice) W = inches Northern Engineering H. Feissner Design Procedure Form: Extended Detention Basin (EDB) February 20, 2013 Big Deal Four Plex Fort Collins, Colorado | Pond A Choose One Circular (up to 2" diameter) Rectangular (2" high) Choose One S.S. Well Screen with 60% Open Area* Other (Describe): i) Width of Rectangular Opening (Worifice) W = inches ii) Width of Water Quality Screen Opening (Wopening) W opening = ft iii) Height of Water Quality Screen (HTR) H TR = ft iv) Type of Screen, Describe if "Other" v) Cross-bar Spacing inches vi) Minimum Bearing Bar Size Choose One Aluminum Amico-Klemp SR Series (or equal) Other (Describe): 876-001_UD-BMP_v3.02, EDB 2/20/2013, 10:32 AM Sheet 4 of 4 Designer: Company: Date: Project: Location: 10. Overflow Embankment A) Describe embankment protection for 100-year and greater overtopping: B) Slope of Overflow Embankment ZE = ft / ft (Horizontal distance per unit vertical, 4:1 or flatter preferred) 11. Vegetation 12. Access A) Describe Sediment Removal Procedures Notes: Fort Collins, Colorado | Pond A Design Procedure Form: Extended Detention Basin (EDB) February 20, 2013 Northern Engineering H. Feissner Big Deal Four Plex Choose One Irrigated Not Irrigated 876-001_UD-BMP_v3.02, EDB 2/20/2013, 10:32 AM Big Deal Four Plex Preliminary Erosion Control Report APPENDIX D OPERATIONS AND MAINTENANCE GUIDELINES FOR EXTENDED DETENTION BASINS (EDBS) Big Deal Four Plex Preliminary Erosion Control Report MAP POCKET C4.00 – DRAINAGE EXHIBIT (Min TD for WQCV= 40 hours; Max T D for EURV= 72 hours) G) Recommended Maximum Outlet Area per Row, (Ao) A o = 0.12 square inches H) Orifice Dimensions: i) Circular Orifice Diameter or Dorifice = 3 / 8 inches ii) Width of 2" High Rectangular Orifice Worifice = inches I) Number of Columns nc = 1 number J) Actual Design Outlet Area per Row (Ao) A o = 0.11 square inches K) Number of Rows (nr) nr = 3 number L) Total Outlet Area (Aot) A ot = 0.3 square inches M) Depth of WQCV (HWQCV) H WQCV = feet (Estimate using actual stage-area-volume relationship and VWQCV) N) Ensure Minimum 40 Hour Drain Time for WQCV TD WQCV = hours Choose One Orifice Plate Other (Describe): 876-001_UD-BMP_v3.02, EDB 2/20/2013, 10:32 AM 5,000.00 Contour Elevation 5,000.00 Contour Elevation 4,999.50 4,999.00 0 200 400 600 800 1000 Cummulative Volume, cu. ft. 2/15/20134:26 PM D:\Projects\876-001\Drainage\Detention\876-001__Detention Pond\Stage_Storage 100 6000 2.06 0.2 1075 432 643 105 6300 2.00 0.2 1096 454 643 110 6600 1.94 0.2 1114 475 639 115 6900 1.89 0.2 1135 497 638 120 7200 1.84 0.2 1153 518 634 2/15/2013 4:25 PM D:\Projects\876-001\Drainage\Detention\876-001__Detention Pond\FAA_CoFC idf Tc (min) 10-yr Tc (min) 100-yr Tc (min) Existing Conditons EX1 EX1 No 0.25 0.25 0.31 34 1.20% 8.8 8.8 8.1 0 0.00% N/A N/A 0 0.00% N/A N/A 8.75 8.75 8.11 EX2 EX2 No 0.25 0.25 0.31 94 1.35% 14.0 14.0 12.9 0 0.00% N/A N/A 0 0.00% N/A N/A 13.97 13.97 12.95 Proposed Condition A1 A1 No 0.95 0.95 1.00 45 2.00% 1.5 1.5 1.0 0 0.00% N/A N/A 12 1.00% 1.50 0.1 5.00 5.00 5.00 B1 B1 No 0.25 0.25 0.31 0 0.00% N/A N/A N/A 0 0.00% N/A N/A 0 0.00% N/A N/A 5.00 5.00 5.00 B2 B2 No 0.25 0.25 0.31 0 0.00% N/A N/A N/A 0 0.00% N/A N/A 0 0.00% N/A N/A 5.00 5.00 5.00 N/A B2 (Roof Area) No 0.95 0.95 1.00 0 0.00% N/A N/A N/A 0 0.00% N/A N/A 0 0.00% N/A N/A 5.00 5.00 5.00 B3 B3 No 0.25 0.25 0.31 0 0.00% N/A N/A N/A 0 0.00% N/A N/A 0 0.00% N/A N/A 5.00 5.00 5.00 C1 C1 No 0.25 0.25 0.31 0 0.00% N/A N/A N/A 0 0.00% N/A N/A 0 0.00% N/A N/A 5.00 5.00 5.00 C2 C2 No 0.25 0.25 0.31 0 0.00% N/A N/A N/A 0 0.00% N/A N/A 0 0.00% N/A N/A 5.00 5.00 5.00 TIME OF CONCENTRATION COMPUTATIONS Gutter Flow Swale Flow Design Point Basin Overland Flow H. Feissner February 14, 2013 Time of Concentration (Equation RO-4) 3 1 1 . 87 1 . 1 * S Ti C Cf L  2/14/2013 4:02 PM * Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins. 3 1 1 . 87 1 . 1 * S Ti C Cf L  2/14/2013 4:02 PM % Imperv. Existing Conditons EX1 0.09 0.00 0.01 0.00 0.01 0.000 Clayey | Flat <2% 0.07 0.35 0.35 0.44 18% EX2 0.13 0.00 0.02 0.00 0.02 0.003 Clayey | Flat <2% 0.09 0.41 0.41 0.51 25% Proposed Condition A1 0.10 0.04 0.01 0.00 0.01 0.01 Clayey | Average 2% to 7% 0.03 0.69 0.69 0.87 62% B1 0.02 0.00 0.00 0.00 0.01 0.00 Clayey | Average 2% to 7% 0.01 0.62 0.62 0.78 48% B2 0.03 0.00 0.01 0.00 0.02 0.00 Clayey | Average 2% to 7% 0.01 0.84 0.84 1.00 76% B2 (Roof Area) 0.02 0.00 0.00 0.00 0.02 0.00 Clayey | Average 2% to 7% 0.00 0.95 0.95 1.00 90% B3 0.04 0.00 0.00 0.00 0.02 0.00 Clayey | Average 2% to 7% 0.02 0.65 0.65 0.82 52% C1 0.01 0.00 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.01 0.28 0.28 0.35 4% C2 0.01 0.00 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.01 0.25 0.25 0.31 0% 1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS February 14, 2013 Composite Runoff Coefficient with Adjustment 2/14/2013 3:47 PM SUMMARY 2/14/2013 3:29 PM