Loading...
HomeMy WebLinkAboutAMENDED CSURF CENTRE FOR ADVANCED TECHNOLOGY - ODP - MJA110001 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE (6)Exhibit C Explanation of ODP Note Changes 1. THE FOLLOWING NOTES APPLY TO THOSE ODP PARCELS WITHIN THE FLOODWAY: A. ANY PARKING PROPOSED FOR AREAS IN THE FLOODWAY MUST BE CERTIFIED TO CAUSE NO-RISE IN THE BASE FLOOD ELEVATION AND OBTAIN A FLOOD PLAIN USE PERMIT. B. TEMPORARY OR PERMANENT STORAGE OF MATERIALS IS NOT ALLOWED IN THE FLOODWAY. THIS INCLUDES CONSTRUCTION MATERIALS, FLEET VEHICLES, STORAGE RELATED TO A BUSINESS, ETC. C. ANY ITEMS SUCH AS PICNIC TABLES, BLEACHERS, ETC. MUST BE ANCHORED SO AS NOT TO BE MOVED DURING A FLOOD AND CERTIFIED TO CAUSE NO-RISE ON THE BASE FLOOD ELEVATION. D. ANY CHANGE TO THE FEMA FLOODWAY WILL REQUIRE A CONDITIONAL LETTER OF MAP REVISION (CLOMR) AND A LETTER OF MAP REVISION (LOMR). E. ALL DEVELOPMENT WITHIN THE FEMA DESIGNATED FLOODPLAIN OR FLOODWAY MUST COMPLY WITH ALL FLOODPLAIN REGULATIONS IN CHAPTER 10 OF CITY CODE. 2. WITHIN THE ODP A TOTAL OF 96.5 ACRES IS ZONED E EMPLOYMENT DISTRICT. OF THOSE 96.5 ACRES, 72.4 ACRES (75%) ARE REQUIRED TO DEVELOP AS PRIMARY USES AND 24.1 ACRES (25%) CAN BE DEVELOPED AS SECONDARY USES. PARCELS D AND E REPRESENT 62.3 ACRES. ALL 62.3 ACRES IS CURRENTLY LOCATED WITHIN THE FEMA FLOODWAY AND THEREFORE COULD NOT BE DEVELOPED AS PRIMARY USES IN THE E DISTRICT. THIS ODP ESTABLISHES THAT FUTURE USES IN PARCELS D AND E WILL NOT BE COUNTED AGAINST THE SECONDARY USE ALLOWANCE (25%) IN THE ODP. 3. ALL DEVELOPMENT MUST COMPLY WITH THE APPLICABLE STANDARDS IN ARTICLE 4 OF THE LAND USE CODE. ALLOWED LAND USES IN EACH PARCEL ARE PER THE E ZONE DISTRICT AND THE MMN ZONE DISTRICT AS APPLICABLE. 4. THE CSURF CENTRE FOR ADVANCED TECHNOLOGY OVERALL DEVELOPMENT PLAN IS PLANNED TO BE MIXED USE DEVELOPMENT, THAT MAY INCLUDE STUDENT HOUSING, OFFICES, PARKS, OPEN SPACE AND TRAILS. THE LAND USE Amended CSURF Centre for Advanced Technology ODP Planning Objectives Exhibit C – Explanation of ODP Note Changes March 30, 2011 Page 2 of 3 DESIGNATIONS DEPICTED ON THIS PLAN ARE BASED UPON THE BEST ESTIMATE OF THE DEVELOPMENT AT THIS TIME. AS CHANGES OCCUR IN THE REQUIREMENTS OF THE OVERALL DEVELOPMENT, IT MAY BE NECESSARY TO MODIFY THE OVERALL DEVELOPMENT PLAN. 5. COMMON OPEN SPACE AREAS AND STREETSCAPES WILL BE MAINTAINED BY THE OWNER/DEVELOPER OR A HOMEOWNERS' ASSOCIATION (HOA) UNLESS OTHERWISE ACCEPTED BY THE CITY OF FORT COLLINS FOR MAINTENANCE. HOMEOWNERS' ASSOCIATION IS RESPONSIBLE FOR SNOW REMOVAL ON THE SIDEWALKS AND ALL BICYCLE/PEDESTRIAN TRAILS. CITY WILL NOT TAKE ON MAINTENANCE OF STREETSCAPE OR SIDEWALK PER CITY CODE. THE DEVELOPER/OWNER OR HOA WILL MAINTAIN ALL STREETSCAPES AND SIDEWALKS. 6. ALL PUBLIC STREETS WILL BE DESIGNED TO MEET OR EXCEED CITY STANDARDS IN EFFECT AT THE TIME OF APPLICATION FOR A PROJECT DEVELOPMENT PLAN PER THE CITY LAND USE CODE AND THE LARIMER COUNTY URBAN AREA STREET STANDARDS. 7. THE PURPOSE OF THE OVERALL DEVELOPMENT PLAN IS TO ESTABLISH GENERAL PLANNING AND DEVELOPMENT CONTROL PARAMETERS FOR PROJECTS THAT WILL BE DEVELOPED IN PHASES WITH MULTIPLE SUBMITTALS WHILE ALLOWING SUFFICIENT FLEXIBILITY TO PERMIT DETAILED PLANNING IN SUBSEQUENT SUBMITTALS. APPROVAL OF AN OVERALL DEVELOPMENT PLAN DOES NOT ESTABLISH ANY VESTED RIGHT TO DEVELOP PROPERTY IN ACCORDANCE WITH THE PLAN. 8. FIRE HYDRANTS WILL BE PROVIDED AS REQUIRED BY THE POUDRE FIRE AUTHORITY STANDARDS. 9. RESIDENTIAL DEVELOPMENT IN THE MMN ZONE DISTRICT SHALL HAVE AN OVERALL MINIMUM AVERAGE DENSITY OF TWELVE(12) DWELLING UNITS PER NET ACRE OF RESIDENTIAL LAND OR SEVEN (7) DWELLING UNITS PER NET ACRE IF THE SUBJECT DEVELOPMENT PLAN IS TWENTY (20) ACRES OR LESS IN SIZE.. 10. BOUNDARY CONNECTIONS SHALL BE IN COMPLIANCE WITH APPLICABLE LAND USE CODE AND LARIMER COUNTY URBAN AREA STREET STANDARDS IN PLACE AT THE TIME OF DEVELOPMENT APPLICATION SUBMITTAL UNLESS MODIFICATIONS AND/OR ENGINEERING VARIANCES ARE APPROVED. 11. ALL DEVELOPMENT MUST COMPLY WITH APPLICABLE STANDARDS CONTAINED IN THE LAND USE CODE ARTICLE 3, CITY CODE CHAPTER 10, FEDERAL REGULATIONS 44 CFR, AT THE TIME OF APPLICATION FOR A PROJECT DEVELOPMENT PLAN. 12. DEVELOPMENT WITHIN THE AREA OF THE MMN ZONE DISTRICT SHALL BE CONSISTENT WITH THE BLOCK SIZE REQUIREMENTS OF SECTION 4.6 OF THE LAND USE CODE UNLESS A MODIFICATION OR VARIANCE IS GRANTED. Amended CSURF Centre for Advanced Technology ODP Planning Objectives Exhibit C – Explanation of ODP Note Changes March 30, 2011 Page 3 of 3