Loading...
HomeMy WebLinkAbout516 DEINES COURT, EXTRA OCCUPANCY RENTAL HOUSE - PDP - PDP120005 - CORRESPONDENCE -Fort City of Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134-fax fcgov.com February 13, 2012 Debra Cook 5983 Star View Drive Broomfield, CO 80020 Re: Single Family Extra Occupancy Rental at 516 Deines Court Description of project: This is an extra occupancy request for five tenants in a single-family detached dwelling unit located at 516 Deines Court. The site is zoned Low Density Mixed-Use Residential (LMN) and more that four tenants are permitted subject to an Administrative (Type 1) review and public hearing [LUC 4.5(B)(2)(7)]. Please see the following summary of comments regarding the project request referenced above. The comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you have any questions regarding these comments or the next steps in the review process, you may contact the individual commente^gr direct your questions through the Project Planner, Steve Olt, at 970-221-6341 orsolt@fcqov.com. Comment Summary: Department: Zoning Contact: Gary Lopez, 970-416^2338, qlopez@fcqov.com 1. The width of the lot frontage as measured along the street is actually greater than 65'. It measured to approx. 68'. A portion of the property is located along the cul-de-sac curvature which the 68' includes though as a right angle or straight line the width of the lot is approx. 61'. Thus the provision in LUC 3.2.2(K)(1)(j) allowing for tandem parking for one of the min. 4 vehicle spaces cannot apply. The single car wide garage space cannot be used for one of the parking spaces. The min. width of a 4 veh. space driveway is 34' thus an additional 8.5' width of concrete is required above what is existing and proposed. 2. Section 20-105(d) of the City's Municipal Code limits the parking of vehicles to 40% of the front yard area. It is questionable if a 34.5'j^ide driveway along with a 19' minimum depth will not exceed the 40% limit. It is doubtful that this along with the limited on-street parking in the cul-de-sac will cause staff to support the extra occupancy application for 5 individuals. 3. We would recommend that the applicant instead request through basic development review an extra occupancy home for up to 4 individuals requiring the width of 25.5' for the driveway the applicant is suggesting. '. Department: Water-Wastewater Engineering Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com 1. If there are no changes to the existing water or sewer services, there are no comments at this time. Department: Stormwater Engineering Contact: Glen Schlueter, 970-224-6065, gschlueter@fcgov.com If the driveway is to be added as part of the proposal, a drainage report/letter is required if the increase in impervious is more than 1000 square feet. The letter needs to discuss the impacts to the drainage system. If there are major impacts some mitigation would be required. The application indicates the driveway will follow the "current drainage" so a simple grading plan needs to be included as part of the letter to document the grading. Water quality treatment is required as described in the Urban Storm Drainage Criteria Manual, Volume 3 Best Management Practices (BMPs). (http://www.udfcd.org/downloads/down_critmanual_vollll.htm) In cases like this disconnection of impervious areas and running the roof runoff into landscape areas are ways to meet this requirement. The city wide Stormwater development fee (PIF) is $6,390.00/acre ($0.1467/sq.ft.) for new impervious area over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.ft.) review fee. No fee is charged for existing impervious area. These fees are to be paid at the time each building permit is issued. Information on fees can be found on the City's web site at http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-feesor by contacting Jean Pakech at 221- 6375. There is also an erosion control escrow required before the Development Construction Permit is issued. The amount of the escrow is determined by the design engineer, and is based on the site disturbance area or a minimum amount in accordance with the Fort Collins Stormwater Design Criteria. The design of this site must conform to the drainage basin design of the Spring Creek Basin Master Drainage Plan as well the City's Stormwater- Design Criteria. l! Department: Park Planning / I !flv Contact: Craig Foreman, 970-221-6618, cforeman@fcgov.com ^e&M. 1. 1.2/06/12: No comments ^ Department: Environmental Planning Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com 1. The applicant should make note of Article 3.2.1 (C) that requires developments to submit plans that "...(4) protects significant trees, natural systems, and habitat". Note that a significant tree is defined as a tree having DBH (Diameter at Breast Height) of six inches or more. If any trees on site have a DBH of greater than six inches, a review of the trees shall be conducted with Tim Buchanan, City Forester (221-6361) to determine the status of the existing trees and any mitigation requip^ients as the result of development impacts. Department: Engineering Development Review U Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com 1. Larimer County Road Impact Fees and Street Oversizing Fees are typically due at the time of building permit. Verify applicability of this comment with Matt Bater^at 224-6108. . / /?ci x~\ 'W \$jj( I "W\c o^iV&L-f' V V>T«VJV~&> 2. The City's Transportation Development Review Fee (TDRF) is due anhe time of submittal. For additional information on these fees, please see: http://www.fcgov.com/engineering/dev-review.php 3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 4. Please contact the City's Traffic Engineer, Joe Olson (224-6062) to schedule a scoping meeting and determine if a traffic study is needed for this project. In addition, please contact Transportation Planning for their requirements as well. Department: Electric Engineering Contact: Justin Fields, 970-224-6150, ifields@fcgov.com 1. No comments. Current Planning Contact: Steve Olt, 970-221-6341, solt@fcgov.com 1. The proposed development project is subject to an Administrative (Type 1) review and public hearing, the decision maker for Type 1 hearings is an Administrative Hearing Officer. The applicant for this development request isnot required to hold a neighborhood meeting for a Type 1 hearing, but if you would like to have one to notify your neighbors of the proposal, please let me know and I can help you in setting a date, time and location for a meeting. Neighborhood Meetings are a great way to get public feedback and avoid potential hiccups that may occur later in the review process. 2. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color coded flowchart with comprehensive, easy to read information on each step in the process. This guide includes links to just about every resource you need during development review. \ 3. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code (LUC), including Article 3 General Development Standards. The entire LUC is available for your review on the web at http://www.colocode.com/ftcollins/landuse/begin.htm. 4. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of the LUC for more information on criteria to apply for a Modification of Standard. 5. Please see the Submittal Requirements and Checklist at: http://www.fcgov.com/developmentreview/applications.php. 6. The request will be subject to the Development Review Fee Schedule that is available in the Community Development and Neighborhood Services office. The fees are due at the time of submittal of the required documents for the appropriate development review process by City staff and affected outside reviewing agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal. 7. When you are ready to submit your formal plans, please make an appointment with Community Development and Neighborhood Services at (970)221-6750. '/ QuPuMiLotDrJ , r>sirl, 1 ^ 1 0